R-CH # O2D-17104-17 - REPAIR ROOF # 20019
PRICE SCHEDULE
Ref. Items QTY U U.P. T.P.
TP-1-03 Dismounting 1 LS
TP-2-01 Old Roof Removal and Cleaning 90 M2
TP-2-03 Evacuation in container 10m3 2 EA
TP-3-01 Substrate 1 LS
TP-3-02 Concrete cemented roof walls - cornice 1 LS
TP-3-02 Concrete cemented roof walls - other surfaces 1 LS
TP-3-02 Concrete cemented roof walls - anti-carbonation paint (full treatment of cornices, other surfaces)
10 M2
TP-4-01 Sloped insulation system 90 M2
TP-5-01 First layer 90 M2
TP-5-01 Finishing layer 90 M2
TP-6-01
TP-6-02
Upstands and special profiles 50 LM
TP-7-01 Connection membrane – PVC and inlet filter 5 EA
TP-7-03 Water downspouts - reinstallation 5 EA
TP-7-03 Repairs and cleaning of manholes 1 LS
TP-7-04 Rainwater shoe (reinstallation) 5 EA
G-05 As-built drawings 1 LS
TOTAL:
Legend: LS – Lump Sum; M2 - Squared Meters; LM – Linear Meters; EA - Each