Scope of Work Rend Lake Park Rehab Facility Maintenance
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment W912P919R0039-0002.pdf | ||
| 19R0039_Revised_Appendices_01NOV2019.pdf | ||
| W912P919R0039_Amendment_1.pdf | ||
| Sign-In_Sheet_19R0039.pdf | ||
| Bid_Schedule_2019_SectionB_Park_Rehab.pdf | ||
| Bid_Notes_SECTION_B.pdf | ||
| Revised_Scope_of_Work_Rend_Lake__Park_Rehabilatation_&_Facilities_Maintenance.pdf | ||
| A22_Sol_No_W912P919R0039.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C
DESCRIPTION/ SPECIFICATIONS/WORK STATEMENT
SPECIFICATIONS FOR PARK AND RECREATION AREA MAINTENANCE AT REND LAKE,
BENTON, ILLINOIS.
1. GENERAL.
1.1 SCOPE OF WORK. This is an indefinite delivery indefinite quantity contract for furnishing all plant, labor, equipment, transportation, supplies and material to perform rehabilitation of recreation areas and facility maintenance as specified in delivery orders issued against this contract. The quantities of the services specified in the bid schedule are estimates only and are not purchased by this contract.
Delivery or performance shall be made only as authorized by orders issued by the Contracting Officer or Representative. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
1.2 DEFINITIONS. As used throughout this description/specification, the following terms shall have the meaning set forth below:
a. CONTRACTOR - the term Contractor refers to the prime Contractor and all contractor employees and personnel. The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract.
b. CONTRACTOR REPRESENTATIVE - a foreman or superintendent, assigned to represent the interests of the Contractor with regards to all matters involving the contract.
c. CONTRACTING OFFICER (KO) - the term "Contracting Officer" means the person executing this contract on behalf of the Government, and any other officer or civilian employee who is properly designated by the Contracting Officer; and the term includes, except as otherwise provided in this contract, the authorized representative of a Contracting Officer acting within the limits of their authority.
d. QUALITY CONTROL - the term "Quality Control" refers to action taken by the
Contractor and/or their personnel to document, inspect, and control performance of services to ensure they meet the specifications and requirements of this contract.
e. QUALITY ASSURANCE - the term "Quality Assurance" refers to action taken by the government to ensure the Contractor's quality control system is functioning and effective, and the Contractor is providing services which are in accordance with this contract.
f. Q.A.S.P. - Quality Assurance Surveillance Plan. This is a detailed plan defining
Government inspection methods and can be found in appendix F.
g. C.D.R. - the Control Deficiency Report is a written record of unsatisfactory performance by the Contractor as observed by the Quality Assurance Inspection.
h. CONTRACTING OFFICERS REPRESENTATIVE (COR) - the term "Contracting Officers Representative" means the individual authorized in writing by the Contracting Officer to perform specific technical or administrative contract functions.
i. FULLY CLOTHED - The term "fully clothed" shall be construed as, at a minimum, contractor and employees must wear short sleeved shirts without abusive language and/or pictures, safety shoes, hard hats and long pants without holes as stated in EM 385-1-1, "Safety and Health Requirements Manual”. No shorts will be allowed.
1.3 CONTRACT AREAS. The work areas for this indefinite quantity contract are primarily, heavily used recreation areas and administrative areas at Rend Lake, Jefferson and Franklin counties, Illinois, including, but not limited to campgrounds, beaches, visitor center, and picnic areas.
However orders may be issued on this contract for other wildlife areas as well. General location maps are available at the Rend Lake Management Office, 11981 Rend City Road, Benton, IL 62812, where they can be inspected from 0800 to 1500 Monday through Friday, (except Holidays).
(Appendix A and B)
1.3.1 WORK PERIOD. The services listed herein shall be in accordance with Section 00700, paragraph 52.211-10 “COMEMMENCEMENT, EXECUTION AND COMPLETION
OF WORK”.
1.4 UTILITIES. Water and electricity required in the performance of this contract shall be provided by the Contractor. Water and electricity may be obtained and utilized by the Contractor from government sources within the recreation areas at no cost to the Contractor or from other sources approved by the Contracting Officer. If water or electricity is obtained from sources other than the Government, all arrangements and payments, if any, shall be the responsibility of the Contractor.
The absence of a government water or electric source will not relieve the Contractor of obligation to provide services as scheduled for any facility or area. Raw lake water shall not be used.
1.4.1 The contractor shall be responsible for locating all public underground utilities prior to commencing work. The Government will locate all Government owned underground utilities at the request of the Contractor. The absence of Government located or mismarked utilities, will not relieve the Contractor of obligation to provide services as scheduled for any facility or area.
1.5 SAFETY. All equipment used and work performed shall be in accordance with safety requirements set forth in Corps of Engineers Manual, EM 385-1-1 entitled, "Safety and Health Requirements Manual" 30 November 2014, and all other current revisions. Copies of the Safety Manual are available on the St. Louis District website. The link for Em385-1-1 is;
https://intranet.usace.army.mil/mvd/mvs/soh/Pages/EM385-1- 1.aspx. Any unsafe work and/or actions will be stopped immediately. All equipment or materials found not to be in conformity with the requirements of EM 385-1-1 shall be removed from Government property immediately.
1.5.1 In order to provide safety controls for protection to life and health of employees and other persons, for prevention of damage to property, materials, supplies, and equipment, and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with all pertinent provisions of EM 385-1-1, and shall also take or cause to be taken such additional measures necessary for that purpose. Compliance with the provisions of this clause by employees and subcontractors will be the responsibility of the
Contractor.
1.5.2 The Contracting Officer shall notify the Contractor of any noncompliance with the provisions of this clause and any corrective action required. The Contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the Contractor or his representative at the site of the work, shall be deemed sufficient to take immediate action. If Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of claim for extension of time or for excess costs or damages by the Contractor.
1.5.3 SAFETY PLAN. Contractor shall develop and submit a written detailed safety plan. This plan must indicate in detail the general policies and procedures for safe operation in the accomplishment of this contract. The plan shall show how the Contractor intends to perform all services in full compliance with the safety requirements set forth in EM 385-1- 1, entitled "Safety and Health Requirements Manual", 30 November 2014. The Contractor shall submit his safety plan to the Contracting Officer for approval a minimum of ten working days prior to the commencement of services under this contract.
1.5.4 ACCIDENT REPORTING. An accident constitutes an incident or act involving the
Contractor which may or may not have caused obvious damage to persons or property.
All accidents shall be reported to the Contracting Officer within 24 hours of the occurrence. All serious accidents (those resulting in death or injury requiring medical attention) shall be reported immediately.
1.5.5 SAFETY EXPOSURE REPORTING. The Contractor shall maintain an accurate record of, and shall submit a monthly "SAFETY EXPOSURE REPORT" to the Contracting Officer in the manner and on the forms as prescribed. The report will cover hours worked during the previous month, accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies, and equipment necessary to work performed under this contract. The report will be submitted the first week of the month.
1.5.6 HIGH VISIBILITY REFLECTIVE SAFETY WEAR. All personnel working within twenty-five feet of highways or roadways are required to wear a high visibility reflective vest/shirt or coat.
1.5.7 HEAD PROTECTION. All personnel working within a construction area shall wear head protection.
1.5.8 BARRICADE PROTECTION. Barricades, as defined in EM 385-1-1, shall be sufficiently placed around the work site to prevent encroachment into areas where work is being performed in order to protect the public and the work in progress. The method of barricading shall be approved by the COR.
1.5.9 TRAFFIC CONTROL. Where applicable the Contractor shall provide all necessary Traffic
Control devices and personnel necessary at no additional cost to the Government. The Contractor shall submit the Traffic Control plan for each delivery order where applicable to the Contracting Officer for approval prior to commencing work.
1.5.10 PERMITS & LICENSES. The Contractor shall, at his/her own expense, obtain any licenses or permits required for transportation of equipment and materials from the point of supply to delivery location. Permits may be required by the State of Illinois, Franklin and Jefferson Counties, and/or local township road commissioners for exceeding weight limits as designated on local roadways. See Appendix B. The Government will keep an updated list for issue to the contractor of all names and contact information of count highway dept. and township road commissioners. Also, the Contractor shall comply with all current Federal, State, and local laws and regulations and shall comply with any subsequent changes.
1.6 VEHICLES. All vehicles utilized under this contract shall be presentable, serviceable, must meet all safety requirements set forth in EM 385-1-1 and shall comply with all applicable state and federal motor vehicle regulations. Any vehicle utilized under this contract that is found deficient shall be removed in accordance with Section 4.2.2, INSPECTION OF EQUIPMENT, MATERIALS, AND
SUPPLIES.
1.6.1 IDENTIFICATION OF CONTRACTOR VEHICLES. All Contractor vehicles shall be identified with the company name or logo, type of business, address, and phone number conspicuously displayed on both sides. Professionally done hand lettering, magnetic signs, or pressure sensitive decals with 1
½" or larger lettering may be used to comply with this specification. The signs shall be subject to the approval of the Contracting Officer.
1.6.2 The Contractor shall not drive off the paved or gravel access roads onto the grass at any time without prior approval of the Contracting Officer.
1.6.3 No vehicles shall be left unattended for any extended periods of time at any recreation area or elsewhere without prior approval of the Contracting Officer.
1.6.4 Vehicles shall be operated in accordance with posted regulations and traffic control signs.
The Quality Assurance Inspector shall closely monitor speed of traffic in the contract area.
1.7 OMISSIONS. This contract may duplicate or not cover all specified activities, steps, and/or procedures required to accomplish contract work. In case of omission, the normal industry standards, practices, specifications and/or guides shall prevail. In no instance shall an omission be a reason to perform inferior work, produce a less than acceptable product or service, or refuse to perform an intended activity.
1.8 OTHER CONTRACTS. The Contractor's attention is called to the fact that other Contractors and
Corps of Engineers employees may be in the area for the purpose of performing duties. The Contractor will cooperate fully with all Contractors and Corps of Engineer employees in the area and shall not impede the work of other Contractors and Corps of Engineer employees in any way.
1.9 DAMAGES. The Contractor is responsible for taking any action necessary to protect all supplies, and property, including material and supplies issued by the Government to accomplish a job, against damage, theft, or loss. Government assumes no responsibility for loss or damage to any material, supplies, or property after it is received by, or in the possession of the Contractor. Any Government property lost or stolen due to negligence of the Contractor shall be replaced by the Contractor at no cost to the Government.
1.9.1 The Contractor shall use reasonable care to avoid damaging buildings, equipment, and vegetation on Government property. The Contractor shall replace or repair the damage at no expense to the Government within a time frame approved by the Contracting Officer. If the Contractor fails or refuses to make such repairs or replacement, within the time frame, the Contractor shall be liable for the cost to make the repair or replacement, which will be deducted from the contract payment.
1.10 CAUTION. Some of the work areas are located in heavily used recreational areas. All bidders are encouraged to attend a pre-bid conference and inspection.
WARNING: IN NO EVENT SHALL A FAILURE TO INSPECT THE SITE CONSTITUTE
GROUNDS FOR WITHDRAWAL OF BID AFTER OPENING.
2. PERSONNEL REQUIREMENTS
2.1 MINIMUM MANPOWER REQUIREMENTS. The Contractor shall provide an adequate number of fully qualified personnel to perform the specified work, properly and efficiently within the time limits specified. The Prime Contractor will be no more than 100 miles from the Rend Lake project office. If the Contractor is unable to accomplish work in accordance with the requirements of this contract within the times specified, he shall immediately obtain additional personnel as necessary to fulfill the requirements of this contract.
2.2 EMPLOYEE CONDUCT. The majority of work will be performed in the presence of the general public; thus the conduct of all employees is critical and will be closely monitored.
The Contractor shall be responsible for insuring that his employees strictly comply with all Federal and State laws. Any illegal or criminal activity may result in the removal of Contractor employee(s) from the project.
2.2.1 No alcoholic beverages and/or drugs shall be consumed by the Contractor or employees while working on this contract.
2.2.2 All workers are to be fully clothed, in accordance with Section C,1.2.h & E.M. 385-1-1, "Safety and Health Requirements Manual, and maintain a neat and clean appearance.
2.3 REMOVAL OF CONTRACTOR EMPLOYEE. The Contracting Officer may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Contracting Officer, is incompetent, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to safely or satisfactorily perform his work. Notification to the Contractor shall be verbal or telephonic, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
2.4 SUPERVISION. The Contractor shall establish a defined chain of command including Contractor Representatives, Quality Control Inspectors, and crew leaders. In most cases this can be the same individual. This individual must be knowledgeable of all aspects of the contract and the task order specifications. For the purpose of this contract, it is intended that the Contractor Representative and Quality Control inspectors shall have responsibility to ensure compliance and coordination with contract specifications and have full capacity to act on the Contractors behalf in matters of the contract. The Contractor Representatives and/or Quality Control personnel shall be required to have a copy of the contract and task orders in their possession at all times for referral concerning questions of Contractor responsibility.
3. INSPECTIONS
3.1 CONTRACTOR QUALITY CONTROL. The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization is in full compliance with this contract.
3.2 CONTRACTOR QUALITY CONTROL PLAN. The Contractor is responsible for establishing and maintaining a complete Quality Control System to insure satisfactory performance of all sections of the contract. This will be assured by the development of a comprehensive Quality Control Plan by the Contractor and supplied to the Contracting Officer at the post award conference for acceptance prior to initiating work. If the plan is judged not to be adequate and is disapproved by the Government, the Contractor must revise the plan and submit it to the Contracting Officer for acceptance within five working days.
3.3 GOVERNMENT QUALITY ASSURANCE. The Government will monitor and inspect the
Contractor's operation to ensure the Quality Control Plan is in place and is working, and that the Contractor's performance meets all contract specifications. The Government will monitor the Contractor’s performance through a Quality Assurance Surveillance Plan (QASP). Appendix F.
3.4 RE-PERFORMANCE AND RE-INSPECTION. The Government shall require the Contractor to re-perform any work found to be deficient by the Quality Assurance inspector. Should it become necessary for the Government Quality Assurance inspector to perform re-inspections of defective work that was required to be redone, there will be a re-inspection charge. These charges will be deducted, in accordance with the QASP, from the Contractor's invoice.
3.5 PERFORMANCE EVALUATION MEETINGS. The Contractor, his Contractor Representative, and/or Quality Control inspectors shall meet with the Contracting Officer or his representatives as often as determined necessary by the Contracting Officer in order to discuss performance. Mutual effort will be made to resolve any and all problems identified.
4. CONTRACTOR FURNISHED EQUIPMENT, MATERIALS, AND SUPPLIES
4.1 GENERAL - Unless otherwise stated, the Contractor shall furnish and maintain all sufficient equipment, materials and supplies suitable to satisfactorily perform the requirements of this contract.
4.1.1 All equipment shall be maintained in safe operating condition complying with all requirements of EM 385-1-1 and in accordance with Section 1.5, SAFETY. A regular schedule of preventive maintenance shall be followed on all equipment.
4.1.2 If the Contractor is unable to accomplish work in accordance with the requirements of this contract within the times specified, he shall immediately obtain additional equipment, materials, and supplies necessary to fulfill the requirements of this contract.
4.1.3 All Contractor's equipment, materials, and supplies shall be removed from Government property at the end of each working day unless otherwise approved by the Contracting Officer.
4.2 APPROVAL OF EQUIPMENT, MATERIALS AND SUPPLIES. Prior to commencing work, the
Contractor shall attend a post award conference at the Rend Lake Project Office and submit to the Contracting Officer, a written statement identifying the grade, type, quantity, mixture, and manner of application of all materials to be used during the contract period; and provide a list of all equipment, materials and supplies available to perform the services listed in this contract. All equipment, materials, supplies, and operating procedures must be approved by the Contracting Officer prior to the commencement of work, or prior to implementing any changes.
4.2.1 SDS. The Contractor shall be responsible for obtaining "Hazardous Materials Safety Data
Sheets" from the manufacturers for all supplies of a chemical nature used in the operation of this contract. All MSDS sheets must be submitted to the Contracting Officer for approval prior to beginning any services required by this contract.
4.2.2 INSPECTION OF EQUIPMENT, MATERIALS AND SUPPLIES. The Contracting
Officer may inspect all equipment, materials, and supplies at any time when on Government property. Any equipment or supplies found deficient shall be removed from service immediately until such time as deficiencies have been corrected and approved for use by the Contracting Officer. No such removal will reduce the Contractor's obligation to perform all work required within this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
4.3 CREW SUPPLIES. The Contractor shall be responsible for maintaining each crew with sufficient supplies for performing required services.
4.4 MANUFACTURER'S DIRECTIONS. The Contractor shall be responsible for ensuring that employees follow all manufacturers’ instructions for use of all materials and supplies.
4.5 STORAGE. All supplies and equipment stored on Government property shall be kept in a neat and orderly fashion. The Government, including any of its agents or officers, is not responsible for any Contractor equipment, materials or supplies while stored, placed or used on Government property.
4.6 ELECTRONIC COMMUNICATION. The Contractor shall provide mobile cellular telephone number for each work crew, any time work is in progress. This will allow for communications between the Contractor Representative and/or Quality Control inspector and Government personnel during times when services under this contract are being performed.
5. GOVERNMENT FURNISHED EQUIPMENT, MATERIALS, AND SUPPLIES
5.1 GENERAL. GOVERNMENT FURNISHED PROPERTY - The Government will supply equipment, supplies, and material only if specified in the delivery order written against this contract. All supplies, equipment and materials shall be stored at the Administration Building, Maintenance Compound or Stockpile Storage Area. The Contractor will be responsible for the protection against loss, theft, or damage of any government supplied property. The Contractor shall sign a property receipt upon taking possession of any government furnished property.
5.1.1 KEYS. The Government will provide keys. Keys will not be reproduced by the
Contractor. The Contractor will supply, and update as needed, a list of employees who have keys and which keys they have been issued. If any key(s) are lost and/or not returned, a deduction fee for the actual replacement costs will be made from the Contractors invoice. This includes a deduction for the cost of re-keying all affected doors and/or replacing all affected padlocks.
6. WORKDAY. Services scheduled to be performed may not commence before 0700. All services must be completed by 1630 on all workdays. No work shall be allowed on weekends or holidays. The Contracting Officer must approve any variation from this schedule in advance.
6.1 BILLING PROCEDURES. The Contractor shall submit invoices for equipment, materials, and supplies per the contract line items in the task order. No additional payments will be made for incidental supplies, materials, and equipment furnished by the Contractor. The invoice shall include the line item number, item description, unit of measurement, unit price and total amount. The invoice shall also include the contract number, contract name and the task order number. The Contractor shall provide with the invoice, daily reports, payroll documentation, certified weight and load certificates, and if requested, documentation showing the catalog sheets for materials or products furnished.
6.2 APPLICABLE PUBLICATIONS. The Contractor shall perform all work in accordance with applicable publications. They include but are not limited to:
MANUFACTURER'S RECOMMENDATIONS:
- For equipment and materials used by the Contractor
- Operating/Maintenance Manuals
INDUSTRIAL STANDARDS AND CODES (LATEST EDITIONS):
- American National Standards Institute
- EM 385-1-1, Safety and Health Requirements Manual of the US Army Corps of Engineers
- OSHA Safety Standards
- State of Illinois, Illinois Department of Transportation, “Standard specifications for Road and Bridge Construction and Amendments”.
- American Society for Testing and Materials (ASTM)
6.3 ORDER AND COORDINATION OF WORK. During the course of the contract, the Contractor will ensure that no visitor is allowed to be in the actual work area. The Contractor should be aware that the access roads to the recreation areas will remain open to the public while work is being performed. If in the performance of work at a particular site, it is necessary to block or partially block an access road, it is the responsibility of the Contractor to provide the necessary manpower and traffic control equipment. It is the responsibility of the Contractor to barricade any work site where a hazard to the visitor may exist.
7. WORK ITEMS / DESCRIPTION / SPECIFICATIONS SITE IMPROVEMENTS AND
APPURTENANCES
7.1. SCOPE. The work covered by this section consists of furnishing all plant, labor, materials and equipment, and performing all operations in connection with the rehabilitation of facilities, properties and resources specified herein. No additional payment will be made for backfilling, seeding and mulching any areas disturbed during these operations.
7.2 LOCATION. Work under this contract may be at any location within the Rend Lake Project
Boundary shown on Appendix B. The majority of work performed will be within recreation areas at Rend Lake as shown on Appendix A and B at the end of these specifications. The following is a list of recreation areas where work may be performed:
A. North Sandusky B. South Sandusky C. Dam West D. Administration Bldg. /Maintenance Area E. Spillway F. South Marcum G. North Marcum H. Gun Creek I. Ina Boat Ramp Area
J. Turnip Patch Boat Ramp Area K. Jackie Branch Boat Ramp Area L. Hunter Fisherman Lots (25) M. All Government owned lands on the Rend Lake project
8. EQUIPMENT OPERATION
8.1 Scope. The equipment described within this section shall be used for performing operations in accordance with the specifications contained herein and associated task orders. Equipment within this section shall be utilized independently of the requirements within Section 7, WORK ITEMS / DESCRIPTION / SPECIFICATIONS
SITE IMPROVEMENTS AND APPURTENANCES.
8.1.1 Equipment Prices. The prices for equipment shall include equipment & equipment operator; the Contractor shall provide all services and other personnel or equipment as necessary for operation of the equipment at the worksite, fuel, lubricants, and repairs. The equipment furnished shall be of standard make and the capacities indicated herein. Personnel furnished as operators for this equipment shall be thoroughly qualified in the use of equipment in order that maximum capacity may be obtained. All equipment and labor furnished by the Contractor shall be subject to the approval of the Contracting Officer.
8.2.1 Mobilization & De-mobilization. The Contractor shall deliver the necessary equipment, in operating condition, with operator to the worksite of each delivery order and begin work as required by each delivery order. All mobilization & de-mobilization shall be inclusive to the unit price for each piece of equipment and shall not constitute additional compensation by the Government.
8.3. Operating Working Time.
8.3.1 Operating Time. The equipment shall be available for operation Monday through
Friday, and only on weekends with the consent of the Contracting Officer, weather and other conditions permitting. No work will be performed when soil and/or weather conditions, in the opinion of the Contracting Officer, or representative at the site, will not permit efficient and economical operations.
8.3.2 Suspension of Operations. Should soil and/or weather conditions develop during the life of the delivery order, which will, in the opinion of the field representative of the Contracting Officer, make further work impracticable or undesirable, the Contractor will be ordered to suspend operations until such time as the working conditions improve and become suitable for further work to proceed. The Contractor shall be required to recommence work within 48 hours of written notification by the Contracting Officers Representative. No adjustment in contract price will be made to the Contractor, resulting from any suspension of work up to and including thirty (30) consecutive days, however the delivery order work period will be extended for each working day that operations are suspended.
8.4 Maintenance and Replacement of Equipment
8.4.1 Maintenance. The Contractor shall make repairs and perform maintenance to insure the condition of the working equipment shall be kept in safe working condition when in use. The Contractor shall keep small repair parts and replacements shall be made with a minimum of lost time and in a manner satisfactory to the Contracting Officer. The Contractor shall furnish all fuel, grease, and other operating supplies as required for the proper operation of the equipment. Costs for the foregoing shall be included in the contract unit prices and no separate payment therefore will be made.
8.4.2 Replacements. The Contractor to the satisfaction of the Contracting Officer shall, promptly replace any equipment which, in the opinion of the Contracting Officer, proves to be deficient in quality as the work progresses. If the Contractor does not promptly replace such deficient equipment, the Contracting Officer reserves the right to terminate the use of such equipment.
8.5 Alternative Equipment. The Contractor may propose for use an alternative type of equipment not included in the specifications. The suitability of the alternative equipment must be demonstrated to the Contracting Officer by a field test conducted by and at the expense of the Contractor.
Procedures for testing will be provided by the Contracting Officer. Each proposed alternative type of equipment must be capable of performing equal to or greater in all capacities to that equipment specified herein.
8.6 Measurement and Payment. Measurement for equipment operation will be computed by the Contracting Officer in hours of productive operation. In computing the number of hours of productive operation, only the time of actual operation will be considered. Standby or idle time, including lunch periods when equipment is not operating or repair of equipment will not be paid for. Time spent, up to15 minutes per 8-hour day, for performing routine maintenance and servicing such as refueling and greasing will be considered productive operation. Hours of productive operation shall include mobilizations and demobilizations within each contract area and to and from the contract area. Payment for all equipment operation will be made at the respective contract unit price for the applicable equipment, which price and payment shall constitute full compensation for the cost of equipment, operator (UNLESS SPECIFIED), fuel, materials, supplies, repairs and support necessary to mobilize and demobilize and number of productive hours of operation for each piece of equipment.
8.7 BOLD TYPE: BID ITEMS CORRESPOND TO BID SHEET (SECTION B)
1. CLEARING AND GRUBBING, SCOPE. The work covered by this section consists of furnishing all plant, labor, equipment, and materials, and performing all operations necessary for the clearing and grubbing of the work sites, for the removal and disposal of all cleared and grubbed materials, and for the filling of all holes caused by grubbing operations, as specified herein. All holes or depressions made by grubbing shall be filled in 12-inch layers to the elevation of the adjacent ground surface with contractor-furnished borrow material, and each layer compacted to a density at least equal to that of the adjacent undisturbed material. If the grubbed area is in an area that is to be cut or filled, the finished grubbed surface shall conform to the appropriate level as determined by the Contracting Officer. The Contractor shall remove all debris from the work site, except trees suitable for firewood and shall be disposed of, off Government property at no additional cost to the government. Such disposal shall comply with all applicable Federal, State, and local laws. Such materials shall be removed from the site of the work before the date of completion of the work. All parts of trees over 3 inches in diameter and less than 12 inches in diameter that are removed as a result of clearing and grubbing operations shall be cut into 18-inch lengths and stacked at a location in the campground designated by the Contracting Officer. Clearing and grubbing will be broken down into two categories; determination of the sizes will be made by the Contracting Officer.
1a. Light -Woody vegetation, brush and trees less than twelve inches in diameter, (Diameter at Breast Height, D.B.H).
1b. Heavy- Trees greater than twelve inches in diameter at the diameter at breast height, (D.B.H.).
1.1. Clearing. Clearing, unless otherwise specified, shall consist of the complete removal above ground surface of all trees, stumps, down timber, snags, brush, vegetation, stone, and similar debris. The Contracting Officer will mark all trees and identify all vegetation to be removed. All woody vegetation to be removed will be marked by the Contracting Officer.
Nothing shall be removed unless approved by the Contracting Officer.
1.2. Grubbing. Grubbing shall consist of the removal and disposal of stumps, roots larger than 2 inches in diameter, and matted roots from the areas to be cleared. This material shall be removed to a minimum depth of 12 inches below the finished grade.
1.3 Measurement and Payment. Measurement for clearing and grubbing will be made by the square yard measured on a horizontal plane at ground level prior to excavation. Payment will be made at the contract unit price per square yard for "Clearing and Grubbing: Light, or Heavy", which price and payment shall constitute full compensation for furnishing all labor, materials, equipment and supplies necessary to perform Clearing and Grubbing.
2. SITE GRADING. The Contractor shall grade worksites by placing, removing or relocating material in order to meet the requirements of the delivery order. Any areas that have Site Grading work performed shall be seeded, in accordance with ESTABLISHMENT OF TURF, at no additional cost to the Government. NOTE: Some bid items within this Contract have Site Grading that is inclusive to that particular bid item. Site Grading will be broken down into two categories depending on the amount of cubic yards of material to be site graded.
2 a. Light Site Grading – Site grading that requires 100 cubic yards or less of material.
2 b. Heavy Site Grading – Site grading that requires more than 100 cubic yards of material.
2.1 Site Grade Work. The work site or areas that require grading shall be designated by stakes, wire flags or paint placed at the work site corners by the Contracting Officer.
2.2 Fill Material. The Contractor shall furnish, deliver, place and compact suitable fill material as required. The fill shall be earth, obtained by the Contractor from Non- Government property. If borrow is obtained from a third party, written proof of permission shall be obtained and provided as requested by the Contracting Officer. No borrow areas shall be on Government property unless otherwise directed by the Contracting Officer.
2.2.1 Suitable Materials. Suitable materials shall consist of materials classified in
Accordance with ASTM D 2487 as lean clay (CL), fat clay (CH), silty clay (CL – ML); silt (ML) clayey sand (SC) shall be used for the fill material. Fill material shall be furnished by the Contractor from outside the Government boundaries.
2.2.2 Unsuitable Materials. Unsuitable material includes all materials that are not defined above as suitable material. In addition, unsuitable materials are materials that classify according to ASTM D 2487 as poorly graded gravel (GP), well graded gravel (GW), silty gravel (GM), clayey gravel (GC), high plasticity silt (MH), peat (PT), high plasticity organics (OH), and low plasticity organics (OL). Unsuitable materials also include all material that contains debris, refuse, roots, organic matter, frozen material, asphalt, and contamination from hazardous, toxic or radiological substances, stones greater than 1 inch in any dimension and as determined by the Contracting Officer. The Contracting Officer may require the wasting of unsuitable materials, in order that the work may proceed, at no additional cost to the Government.
2.2.3 Placement. Fill material shall be placed in locations as directed by the Contracting Officer. Fill material for areas shall be placed in layers not more than 9 inches in loose depth for areas to be compacted by heavy compaction equipment and not more than 6 inches in loose depth for areas compacted by hand-operated tampers
2.2.4 Compaction. Compact fill material to not less than the following percentages of maximum dry density as per ASTM D 698, Standard Proctor Test.
1. 95% - Paved Areas
2. 90% - Unpaved Areas
2.3 Removal of Material. The Contractor shall remove all sand, river gravel, soil, crushed stone or a combination of materials, to a suitable depth in order to meet the requirements of the Task Order. Unless specified, the Contractor shall remove waste materials from Government property and properly disposed of at no additional cost to the Government. If the material is to be relocated on Project lands, the Contractor shall deliver and stockpile the material at no additional cost to the Government.
2.4 Measurement and Payment. Measurement for Site Grading will be made by the cubic yard.
Payment will be made at the contract unit price per cubic yard for "Site Grading; Light or Heavy", which price and payment shall constitute full compensation for furnishing all labor, materials, equipment and supplies necessary to perform Site Grading, which includes soil cut, removed, hauled and placed as fill, grading of the living area or work site, slopes outside living area or work site, filling depressions and the establishment of turf.
3. FILL MATERIAL. Fill Material shall be furnished by the Contractor from an approved borrow source outside the Government boundaries, at the Contractors expense, and shall meet the requirements stated herein. Sources shall be submitted for the approval of the Contracting Officer.
Approval of a borrow source shall not relieve the Contractor from the obligation to furnish suitable materials.
3.1 Suitable Materials. Materials classified by the Unified Soil Classification Systems as silts
(ML, MH, OL) and clays (CL, CH, OH) shall be used for the fill material.
3.2 Unsuitable Materials. Material classified by the Unified Soil Classification System as gravel (GW, GP, GM, GC) and sands (SW, SP, SM, SC) shall not be used for the fill material unless suitably blended with less pervious material to the extent that it no longer classifies as these materials. Additional materials classified as unsuitable for fill material are defined as masses of organic matter, peat, sticks, branches, roots, other debris and any frozen material.
3.3 Delivery. Fill materials shall be delivered to locations as directed by the Contracting Officer in accordance with the schedule supplied with each delivery order. The Government will assume the responsibility for placement.
3.4 Measurement and Payment. Measurement for payment for fill material will be made by the cubic yard delivered. This measurement will be determined by measuring the cubic yards supplied. Payment will be made at the contract unit price per cubic yard for “Fill Material”, which price and payment shall constitute full compensation for furnishing, loading, hauling and handling of material.
4. TOPSOIL. Topsoil shall be furnished by the contractor from outside the government boundaries. The material shall be a friable mixture capable of supporting growth of turf, and shall be free of brush, stones and other waste materials.
4.1 Delivery. Topsoil shall be delivered to locations as directed by the Contracting Officer in accordance with the schedule supplied with each delivery order. The Government will assume the responsibility for placement.
4.2 Measurement and Payment. Measurement for payment for topsoil will be made by the cubic yard supplied. Payment will be made at the contract unit price per cubic yard for “Topsoil”, which price and payment shall constitute full compensation for furnishing, loading, hauling, and handling of material.
5. ESTABLISHMENT OF TURF. The work covered by this section consists of furnishing all plant, labor, equipment and materials, and performing all operations necessary for tillage, seeding, fertilizing and mulching in accordance with the requirements of this section. NOTE: EXCEPTION TO PAYMENT. The contractor shall establish turf, at no additional cost to the Government, when completing areas that were disturbed as a result of construction ordered under this contract. All areas disturbed due to haul roads, ruts or negligence by the Contractor shall be repaired, seeded, fertilized and mulched according to the guidelines of this contract at no cost to the Government.
5.1 MATERIALS.
5.1.1 Fertilizer. Fertilizer shall be applied after the ground surface is prepared. The fertilizer shall be a 12-12-12 mixture and applied at the rate of 200 pounds per acre. Fertilizer shall be distributed uniformly over areas to be seeded and shall be incorporated into the soil by raking or other methods approved by the Contracting Officer.
5.1.2 Seeding. Seed shall be fresh new crop furnished in sealed standard containers and applied at the rate of 100 pounds per acre. Wet, moldy, or seed that has been otherwise damaged in transit or storage will not be acceptable. Seed shall not be sown when conditions for planting are unfavorable as determined by the Contracting Officer. Such unfavorable conditions may consist of drought, high winds, excessive moisture or other factors that satisfactory results are not likely to be obtained. After seeding and fertilizing, the prepared area shall be raked to cover the seed with approximately ½- inch of soil. Seed mixture shall further conform to the following:
5.1.3Mulching. Mulch shall be fresh threshed straw, from a cereal grain such as oats, wheat or barley, free of mold, mildew and objectionable weed seeds, and shall be applied at the rate of 7,000 pounds per acre or 1.5 pounds per square yard. Mulch shall be applied immediately after completion of seeding operations. Mulch shall be spread uniformly in a continuous blanket
Kind of Seed
Pounds per Acre
Min.
Purity Percent
Min.
Germination Percent
Max. Weed Content Percent
Annual Rye Grass 25 98 85 0.8
Turf Type Tall Fescue
75 97 85 0.8 and shall be spread by hand or a method approved by the Contracting Officer.
5.2 Preparation of Ground Surface. Soil shall be prepared for seeding by tilling, breaking or removing clods over three inches in diameter, and smoothing the area. The surface shall be cleared of stones, roots, cable, wire, and other materials that might hinder the growth of seed.
5.3 Damage to Seeding. The Contractor shall be fully responsible for any damage to the seeded areas caused by his operation. Areas that become damaged as a result of poor workmanship, failure or partial failure of the seed to germinate, or failure to meet the requirements of the specifications may be ordered to be reseeded to the specification requirements, at no additional cost to the Government.
5.4 Measurement and Payment. Measurement for establishment of turf will be made by the acre. Payment will be made at the contract unit price per acre for "Establishment of Turf" which price and payment shall constitute full compensation for furnishing all labor, materials, equipment and supplies and performing all operations necessary for preparation of ground surface, seeding, fertilizing and mulching of all areas to be turfed.
6. TREE MAINTENANCE. The work covered by this section consists of furnishing all labor, equipment and materials and performing all operations necessary for the trimming and removal of trees and the removal of stumps.
6a. Tree Trimming – Low; Tree Limbs 0 – 15 feet above grade.
6b. Tree Trimming – High; Tree Limbs 15 – 60 feet above grade.
6c. Tree Removal – Light; Trees less than 24 inch D.B.H.
6d. Tree Removal – Heavy; Trees greater than 24 inch D.B.H.
6e. Stump Removal – Light; Stumps less than 24 inch diameter top surface.
6f. Stump Removal – Heavy; Stumps greater than 24 inch diameter top surface.
6.1 Tree Trimming. The Contractor shall remove tree limbs to a maximum height of 15 or 60 feet above grade and as directed by the Contracting Officer. Limbs shall be cut flush to the collar of the limb or trunk.
6.2 Tree Removal. The Contractor shall remove trees, including the tree stump to a minimum depth of 6 inches below grade. The Contractor shall remove chips, furnish and place topsoil, seed, fertilizer and straw, ensuring that no depressions form due to settling. Trees must be dropped within (3) three working days from notification, all remaining work: removal from government property, stump grinding, etc. shall be completed within (10) fifteen working days from the assigned starting date.
Non-scheduled trees damaged by the Contractor while performing this task shall be trimmed or removed, as directed by the Contracting Officer, at the Contractors expense.
6.3 Stump Removal. The Contractor shall be responsible for removing tree stumps as directed by the Contracting Officer. Stumps shall be removed to a minimum level of six inches below the existing grade. The Contractor shall remove chips, furnish and place topsoil, seed, fertilizer and straw, ensuring that no depressions form due to settling. Stump heights vary from at grade to 48 inches above grade.
6.4 Removal of Debris. The Contractor shall remove debris created by tree maintenance and dispose of off Government Property. A wood chipper may be used to assist the Contractor in the removal process. The disposal of chipped refuse shall be off Government property unless otherwise directed by the Contracting Officer. If approved by the Contracting Officer, parts of trees over 3 inches in diameter and less than 12 inches in diameter that are removed as a result of tree trimming operations, shall be cut into 18-inch lengths and stacked at locations within the campground.
6.5 Measurement and Payment.
6.5.1 Measurement for Tree Trimming, will be made by the hour per Low and High definitions. Payment will be made at the contract unit price per hour for "Tree Trimming", which price and payment shall constitute full compensation for furnishing all labor, materials, equipment and supplies necessary to perform Tree Trimming, which includes, trees trimmed, trees removed and refuse removed by means contained herein.
6.5.2 Measurement for Tree Removal, will be made for each per the Light and Heavy definitions. Payment will be made at the contract unit price per each for "Tree Removal", which price and payment shall constitute full compensation for furnishing all labor, materials, equipment and supplies necessary to perform Tree Removal, which includes removal of the tree stump.
6.5.3 Measurement for Stump Removal, will be made each per the Light and Heavy definitions. Payment will be made at the contract unit price per each for "Stump Removal", which price and payment shall constitute full compensation for furnishing all labor, materials, equipment and supplies necessary.
7. CRUSHED STONE. The work covered by this section consists of furnishing all plant, labor, equipment and materials and performing all operations necessary for the supply and placement of crushed stone in living/picnic areas, lake access/hiking trails, playground equipment, access roads and other identified locations specified by the Contracting Officer in accordance with each delivery order. Delivery orders for crushed stone will be separated in two categories:
(1) Crushed stone supply for placement by the Government.
(2) Crushed stone supply, placement and compaction by the Contractor.
7.1 Crushed Stone. Crushed stone shall conform to the gradation specified in the State of Illinois, Illinois Department of Transportation, "Standard Specifications for Road and Bridge Construction".
The Contractor shall supply and deliver crushed stone to locations directed by the Contracting
Officer. The Contractor shall supply and place crushed stone in locations designated by the Contracting Officer. The Contractor shall provide the stone from an approved source. Crushed stone shall be free of debris, soil, fabric or other undesirable material. The following stone shall be provided by the Contractor:
7a. FA-4; Supply 7b. FA-4; Supply & Placement 7c. CA-6; Supply 7d. CA-6; Supply & Placement 7e. CA-7; Supply 7f. CA-7; Supply & Placement 7g. CA-12; Supply 7h. CA-12; Supply & Placement
7.2 Supply. Materials shall be delivered to locations as directed by the Contracting Officer in accordance with the schedule supplied with each delivery order. The Government will assume the responsibility of placement of this item.
7.3 Supply & Placement. The Contractor shall supply and place crushed stone by using mechanical or manual means. The Contractor shall deliver crushed stone in trucks capable of tailgating the material and may be placed using a “slinger” truck if approved by the Contracting Officer.
7.3.1 Compaction. Crushed Stone placed in living/picnic areas, walkways lake access and hiking trails shall be compacted with a minimum of two passes of a hand-operated plate-type vibratory compactor that has been approved by the Contracting Officer.
Compaction of access roads will be specified by the Contracting Officer in which case a self propelled roller may be used.
7.3.2 Existing Roads. The Contractor shall conduct operations in such a manner that the existing Corps of Engineers…