This is an Abstract of Offers document for a federal construction solicitation issued by the U.S. Army Engineer District, New Orleans. The solicitation number is W912P826BA003, issued on August 17, 2018, with offers opened on November 6, 2025, and signed on July 23, 2026. The project involves construction of a New Shops Building at Freshwater Bayou Lock in Vermilion Parish, Louisiana.
Five contractors submitted bids for this project. MB Design Consultants of Baton Rouge, LA submitted the lowest offer at $6,847,344.00, followed by Lamar-BCP Group, LLC (LaPlace, LA) at $7,259,043.91, Castor, LLC (Baton Rouge, LA) at $7,809,738.67, Reasor Building Group, LLC (Pensacola, FL) at $9,499,815.28, and Turner & Turner Contracting, LLC (Alexandria, LA) at $10,080,601.72. The government estimate was $6,242,831.00. All bidders acknowledged three amendments to the solicitation and submitted bid bonds equal to 20% of their offers. The contract is categorized as a reasonable contract including profit. Work items include mobilization and demobilization, concrete framing and casting, steel stairs, aluminum railings, metal building systems, ventilation and electrical work, precast prestressed concrete piles (4,235 linear feet), compression pile load testing, and site preparation including seeding, mulching, fertilizer application, soil amendments, and clearing and grubbing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. MB Design Consultants 6,847,344.00$ 4. Turner & Turner Contracting, LLC 10,080,601.72$ Baton Rouge, LA Alexandria, LA
2. Reasor Building Group, LLC 9,499,815.28$ 5. Castor, LLC 7,809,738.67$ Pensacola, FL Baton Rouge, LA
3. Lamar-BCP Group, LLC 7,259,043.91$ LaPlace, LA
IGE Amount: 6,242,831.00$
Freshwater Bayou Waterway, Freshwater Bayou Lock, New Shops Building, Vermilion Parish, Louisiana
Solicitation Number: W912P826BA003
2. DATE ISSUED
17-Aug-2018
3. DATE OPENED
6-Nov-25 23-Jul-26
DATE SIGNED
23-Jul-26
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
Mobilization and Demobilization
1 JOB $ 608,000.00 $ 608,000.00 $ 720,000.00 $ 720,000.00 $ 1,288,555.63 $ 1,288,555.63 $ 792,050.12 $ 792,050.12
Truck Wash-Down
Rack 1 JOB $ 149,229.00 $ 149,229.00 $ 26,100.00 $ 26,100.00 $ 59,686.83 $ 59,686.83 $ 19,084.06 $ 19,084.06
0003 Cast-in-Place Concrete 1 JOB $ 406,718.00 $ 406,718.00 $ 450,000.00 $ 450,000.00 $ 241,865.39 $ 241,865.39 $ 760,640.18 $ 760,640.18
Precast Concrete
Framing 1 JOB $ 2,645,500.00 $ 2,645,500.00 $ 3,339,000.00 $ 3,339,000.00 $ 4,547,741.35 $ 4,547,741.35 $ 2,326,483.89 $ 2,326,483.89
0005 Steel Stairs 1 JOB $ 257,262.00 $ 257,262.00 $ 230,400.00 $ 230,400.00 $ 79,890.16 $ 79,890.16 $ 273,978.55 $ 273,978.55
0006 Aluminum Railings 1 JOB $ 87,985.00 $ 87,985.00 $ 99,000.00 $ 99,000.00 $ 19,972.54 $ 19,972.54 $ 134,670.01 $ 134,670.01
0007 Metal Building System 1 JOB $ 802,200.00 $ 802,200.00 $ 372,600.00 $ 372,600.00 $ 541,471.43 $ 541,471.43 $ 660,174.85 $ 660,174.85
0008 Ventilation System 1 JOB $ 185,048.00 $ 185,048.00 $ 46,800.00 $ 46,800.00 $ 4,127.66 $ 4,127.66 $ 68,728.74 $ 68,728.74
0009 Electrical Work 1 JOB $ 200,628.00 $ 200,628.00 $ 102,600.00 $ 102,600.00 $ 228,105.05 $ 228,105.05 $ 402,543.69 $ 402,543.69
Precast Prestressed
Concrete Piles 4235 LF $ 159.00 $ 673,365.00 $ 264.00 $ 1,118,040.00 $ 386.58 $ 1,637,169.77 $ 268.26 $ 1,136,081.10
Compression Pile Load
Test 1 EA $ 213,400.00 $ 213,400.00 $ 312,000.00 $ 312,000.00 $ 792,536.83 $ 792,536.83 $ 177,150.00 $ 177,150.00
0012 Seeding and Mulching 0.8 AC $ 12,540.00 $ 10,032.00 $ 7,200.00 $ 5,760.00 $ 28,743.81 $ 22,995.05 $ 15,797.53 $ 12,638.02
0013AA Fertilizer - First 80 LBS 80 LBS $ 7.00 $ 560.00 $ 4.05 $ 324.00 $ 69.57 $ 5,565.68 $ 63.15 $ 5,052.00
0013AB
Fertilizer - All Over 80
LBS
40 LBS $ 7.00 $ 280.00 $ 4.00 $ 160.00 $ 69.57 $ 2,782.84 $ 63.34 $ 2,533.60
0014 Lime Soil Amendment 1.6 TON $ 280.00 $ 448.00 $ 325.00 $ 520.00 $ 5,034.74 $ 8,055.59 $ 10,834.14 $ 17,334.62
0015 Sulfur Soil Amendment 0.8 TON $ 1,220.00 $ 976.00 $ 800.00 $ 640.00 $ 7,473.06 $ 5,978.45 $ 10,843.21 $ 8,674.57
0016 Clearing and Grubbing 1 JOB $ 1,200.00 $ 1,200.00 $ 23,400.00 $ 23,400.00 $ 13,315.03 $ 13,315.03 $ 461,225.90 $ 461,225.90
$ 6,242,831.00 $ 6,847,344.00 $ 9,499,815.28 $ 7,259,043.91
W912P826BA003
NOTE: Estimated Amount Fields highlighted in yellow are corrected tabulations based on Quantity and Unit Price proposed.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
A. HIRED LABOR A. OFFEROR: MB Design Consultants, LLC B. OFFEROR: Reasor Building Group, LLC
Taylor Brandon
Contract Specialist
Nakiea Butler
Contracting Officer
1. SOLICITATION
NUMBER
TOTAL:
Freshwater Bayou Waterway, Freshwater Bayou Lock, New Shops Building, Vermilion
Parish, Louisiana
7B. DESCRIPTION OF
OFFERED ITEM
B. BID SECURITY (Type and amount): BID BOND 20%
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES
X
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount): BID BOND 20% B. BID SECURITY (Type and amount): BID BOND 20%
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1
ABSTRACT OF OFFERS
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
SIGNATURE
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
B. OFFEROR: Lamar-BCP Group, LLC
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB $ 608,000.00 $ 608,000.00 $ 2,565,655.00 $ 2,565,655.00 $ 681,126.11 $ 681,126.11
0002 Truck Wash-Down Rack 1 JOB $ 149,229.00 $ 149,229.00 $ 216,250.00 $ 216,250.00 $ 10,937.49 $ 10,937.49
0003 Cast-in-Place Concrete 1 JOB $ 406,718.00 $ 406,718.00 $ 928,125.00 $ 928,125.00 $ 271,149.49 $ 271,149.49
0004 Precast Concrete Framing 1 JOB $ 2,645,500.00 $ 2,645,500.00 $ 3,084,375.00 $ 3,084,375.00 $ 3,345,553.93 $ 3,345,553.93
0005 Steel Stairs 1 JOB $ 257,262.00 $ 257,262.00 $ 112,500.00 $ 112,500.00 $ 148,754.72 $ 148,754.72
0006 Aluminum Railings 1 JOB $ 87,985.00 $ 87,985.00 $ 68,750.00 $ 68,750.00 $ 25,966.21 $ 25,966.21
0007 Metal Building System 1 JOB $ 802,200.00 $ 802,200.00 $ 553,125.00 $ 553,125.00 $ 686,412.56 $ 686,412.56
0008 Ventilation System 1 JOB $ 185,048.00 $ 185,048.00 $ 20,820.00 $ 20,820.00 $ 59,548.56 $ 59,548.56
0009 Electrical Work 1 JOB $ 200,628.00 $ 200,628.00 $ 111,250.00 $ 111,250.00 $ 296,900.59 $ 296,900.59
Precast Prestressed Concrete
Piles
4235 LF $ 159.00 $ 673,365.00 $ 406.25 $ 1,720,468.75 $ 461.81 $ 1,955,765.35
0011 Compression Pile Load Test 1 EA $ 213,400.00 $ 213,400.00 $ 432,562.50 $ 432,562.50 $ 297,144.86 $ 297,144.86
0012 Seeding and Mulching 0.8 AC $ 12,540.00 $ 10,032.00 $ 12,500.00 $ 10,000.00 $ 16,102.41 $ 12,881.93
0013AA Fertilizer - First 80 LBS 80 LBS $ 7.00 $ 560.00 $ 12.50 $ 1,000.00 $ 12.15 $ 972.00
0013AB Fertilizer - All Over 80 LBS 40 LBS $ 7.00 $ 280.00 $ 12.50 $ 500.00 $ 12.15 $ 486.00
0014 Lime Soil Amendment 1.6 TON $ 280.00 $ 448.00 $ 1,953.13 $ 3,125.01 $ 364.58 $ 583.33
0015 Sulfur Soil Amendment 0.8 TON $ 1,220.00 $ 976.00 $ 1,125.00 $ 900.00 $ 1,215.28 $ 972.22
0016 Clearing and Grubbing 1 JOB $ 1,200.00 $ 1,200.00 $ 251,195.46 $ 251,195.46 $ 14,583.32 $ 14,583.32
$ 6,242,831.00 $ 10,080,601.72 $ 7,809,738.67
NOTE: Estimated Amount Fields highlighted in yellow are corrected tabulations based on Quantity and Unit Price proposed.
(Including Profit)
7B. DESCRIPTION OF OFFERED ITEM
TOTAL:
6. NUMBER OF AMENDMENTS ISSUED
C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES
X B. REASONABLE CONTRACT B. BID SECURITY (Type and amount): BID BOND 20% B. BID SECURITY (Type and amount): BID BOND 20%
(Without Profit)
A. HIRED LABOR A. OFFEROR: Turner & Turner Contracting, LLC B. OFFEROR: Castor, LLC
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Freshwater Bayou Waterway, Freshwater Bayou Lock, New Shops Building, Vermilion Parish, Louisiana
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2
| 2026-07-23T13:36:03-0500 | |
| BUTLER.NAKIEA.BUCKNER.1118772608 |