This is Amendment 0003 to Solicitation W912P826BA003 for construction of a New Shops Building at Freshwater Bayou Lock in Vermilion Parish, Louisiana, issued by the U.S. Army Corps of Engineers (USACE), New Orleans District on 08 JUL 2026. The amendment does not extend the receipt deadline for offers and requires acknowledgment via three permitted methods: completing items 8 and 15 and returning copies, acknowledging receipt on each offer copy, or sending separate written communication referencing solicitation and amendment numbers.
The amendment modifies three specification sections and updates contractor questions and answers. Section 01 57 23.00 12 (Storm Water Pollution Prevention Plan) is replaced in its entirety, establishing requirements for implementing erosion and sediment controls, including silt fence barriers and truck wash-down racks, with no separate payment—costs distributed among existing schedule items. Section 31 11 00.00 12 (Clearing and Grubbing) is replaced entirely, specifying removal of vegetation and unsuitable matter to 6 inches depth below building, ramp, and stair foundations, with payment as a lump-sum job price item 0016. Section 31 62 14.00 12 (Pile Load Testing) revises measurement and payment to compensate per compression pile test satisfactorily performed, including all calibration, driving, load testing, equipment operations, and reporting as full compensation. The contractor questions and answers document addresses 13 questions regarding concrete delivery timeframes, silt fence locations, SWPPP pricing allocation, topsoil stripping requirements, pile layout quantities, wind design criteria, equipment landing areas, drawing revisions, truck wash rack necessity, NOI filing requirements, PCI certification for precast duct banks, and material specifications for secondary framing—all answered with specific specification references or clarifications supporting consistent bidding.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
W912P826BA003
Freshwater Bayou Waterway, Freshwater Bayou Lock, New Shops Building, Vermilion Parish, Louisiana
Contractor Questions and Answers
1. Will the standard 90 min time limit for concrete to be poured be upheld on this one? By the time concrete is loaded up at the nearest plant, drives to the nearest location to load up a barge, and is pushed to the jobsite 20 miles away the concrete will be at or nearing the time limit. We can ensure the curing process is slowed down with retarder so that concrete is still pourable once it gets on site, but if the time limit is upheld this will not matter.
Time limits for delivery and placement of fresh concrete depend upon approved mix design submittals.
2. Question 17 was answered “See Amendment 0001,” but Amendment 0001 added only Section 31 11 00.00 12 (Clearing and Grubbing) and the revised drawings; we are unable to locate a silt-fence detail, plan location, or required extents. Please confirm whether perimeter silt fencing or other erosion/sediment-control BMPs are required, identify the locations and extents on the drawings, and confirm the pay item under which erosion control is to be priced, since the revised Pricing Schedule contains no separate line item for it.
Silt fence limits are shown on Drawing C-103, Rev. 1. Refer to Amendment 0001 for further clarifications.
3. The Government confirmed a SWPPP is required per Section 01 57 23.00 12.
The revised Pricing Schedule has no separate line item for SWPPP preparation, implementation, inspections, or BMP maintenance. Please confirm under which lump-sum item this work is to be carried (e.g., 0001 Mobilization and Demobilization).
Refer to paragraph1.3.1 of Section 01 57 23.00 12.
4. Question 12 (topsoil stripping depth) was deferred to the new Clearing and Grubbing section. New Section 31 11 00.00 12 covers clearing, grubbing, and vegetation removal to within 6 inches of the ground surface below the building, ramp, and stair foundations, but does not state a topsoil stripping requirement or depth. Please confirm whether topsoil stripping is required, to what depth, and that it is included in the “Clearing and Grubbing” pay item (0016).
Refer to revised 31 11 00.00 12 with Amendment 0003.
5. Sheet S-101 (Overall Pile Layout and Platform Framing) was deleted and replaced by Amendment 0001. Please confirm that the revised pile layout reconciles with the estimated quantity of 4,235 LF for item 0010 (Precast Prestressed Concrete Piles), and clarify whether the test pile and the support piles required for the load test — which Section 31 62 14.00 12, para. 3.3 required to be pulled — are included within the 4,235 LF or are paid separately in item 0011.
The pile layout was not revised. The estimated quantity of 4,235 LF for item 0010 Precast Prestressed Concrete Piles remains unchanged. The pile(s) involved with the load test are to be paid separately in item 0011 (Refer to Amendment 0001).
6. Amendment 0001 confirms the building is “Partially Open” with internal pressure coefficient ±0.18, basic wind speed (Vult) 164 mph, and Vasd 127 mph, and that the roof slope remains 3:12 with hidden-fastener roof panels. Please confirm these values supersede any “partially enclosed” references elsewhere in the plans and specifications and confirm the single set of wind/enclosure criteria the PEMB manufacturer is to design to so that bids are on a common basis.
The criteria listed supersede any “partially enclosed” references elsewhere in the plans and specifications and represent the single set of wind/enclosure criteria the PEMB manufacturer(s) are to use in their design(s).
7. Question 22 (an area where a ramp barge could land so cranes, lifts, and equipment can be driven off) was answered “See Amendment 0001.” We are unable to locate the referenced photographs/exhibit in our copy of Amendment 0001.
Refer to sheet grid N-11 on Drawing C-103, Rev. 1.
8. Amendment 0001 substitutes Sheets C-103, S-001, S-101, S-201, and S-301.
Please confirm whether these revisions change any dimensions, quantities, or details on companion sheets that were NOT reissued (e.g., C-104 transition paving relative to revised C-103, and S-403 precast details relative to revised S- 301), and confirm those companion sheets remain in effect as originally issued.
Updated information is indicated by the revision clouds and delta marks.
All other information remains unchanged from the original issuance.
9. Given the 5-ton bridge limit precludes concrete trucks and large trucks reaching the site, and the rack location is to be coordinated with the Lockmaster, please confirm the Truck Wash-Down Rack (item 0002) is still required and clarify the intended use/sequencing so it is priced consistently across bidders.
Section 01 57 23.01 12 TRUCK WASH-DOWN RACKS still applies. As stated in paragraph 3.1 of this Section, the intended use is to eliminate mud and debris transported onto public roads.
10. With less than one acre of disturbance, please confirm whether a Notice of Intent (NOI) filing with LDEQ under the construction general permit is required in addition to the project SWPPP, or whether the SWPPP alone satisfies the requirement.
In Section 01 57 23.00 12, refer to paragraph G.2 in PART II of the LPDES
GENERAL PERMIT FOR STORM WATER DISCHARGES FROM SMALL
CONSTRUCTION ACTIVITIES.
11. Referencing Amendment 1 - Q&A #: 4 “Could the duct bank be of a precast concrete duct bank if contractor elects? Precast concrete duct bank option is acceptable.” - Since the Duct bank can be a precast duct bank, does the manufacturer of the precast duct bank also have to be a PCI certified in Category C1 work per the specifications for the precast columns, beams, slabs, etc.?
PCI certification is required under Section 03 45 33 PRECAST STRUCTURAL CONCRETE for precast concrete framing. A precast duct bank for electrical conduit does not constitute a load resisting structural element and would not be subject to the provisions of Section 03 45 33.
12. Referencing Amendment 1 - Q&A# 27 “Please provide the bases of designs for the pre-engineered metal building and the insulated panels. Design criteria are identified in the plans and specifications.” - Specification section 13 34 19, paragraph 2.3.3 Secondary Framing states, “Fabricate framing from cold-formed, structural-steel sheet or roll-formed, metallic-coated steel sheet pre-painted with coil coating, unless otherwise indicated, but plan sheet S-001 states ALL
FRAMES, GIRTS, PURLINS, BASE PLATES, ETC. SHALL BE HOT-DIPPED
GALVANIZED. Is plan page S-001 considered to be “unless otherwise indicated”, or can all secondary members be light gauge material cold-formed / pre-galvanized?
As many light gauge members are too thin for the hot-dip galvanizing process, secondary members can be cold-formed from zinc-coated (pre-galvanized) sheet steel and are not required to be hot-dip galvanized after fabrication.
13. Referencing Amendment 1 Q&A # 27 “Please provide the bases of designs for the pre-engineered metal building and the insulated panels. Design criteria are identified in the plans and specifications.” - We do not believe all design criteria has been identified in plans and specifications. Can you please confirm gauge size for roof and wall panels and for secondary framing?
Design criteria have been provided for vendors to determine loads on the building and precast support elements. Material sizes and thicknesses to successfully and competently resist the design loads and deliver such loads to the foundation are to be determined by structural system vendors.
SPECIFICATIONS:
SECTION 01 57 23.00 12
Delete “Section 01 57 23.00 12 STORM WATER POLLUTION PREVENTION PLAN” in its entirety and substitute the attached revised Section 01 57 23.00 12 STORM WATER
POLLUTION PREVENTION PLAN.
SECTION 31 11 00.00 12
Delete “Section 31 11 00.00 12 CLEARING AND GRUBBING” in its entirety and substitute the attached revised Section 31 11 00.00 12 CLEARING AND GRUBBING.
SECTION 31 62 14.00 12
Page 2, paragraph 1.3 MEASUREMENT AND PAYMENT. Delete paragraph “1.3 MEASUREMENT AND PAYMENT” in its entirety and substitute the revised paragraph
1.3 as follows:
“1.3 MEASUREMENT AND PAYMENT
Compression pile tests will be measured by each pile test satisfactorily performed.
Payment will be made at the contract unit price per each for "Compression Pile Load Test". Price and payment shall constitute full compensation for performing the load test, including calibration of the extensometers, load cell, and hydraulic jack; driving all reaction/support piling; driving the test piling; placing and removing the load frame for each test; placing and removing test loads and test equipment; extracting test piling; extracting reaction or support piles; backfilling pulled pile holes; submission of load test results/report; and all operations incidental thereto.”
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 57 23.00 12
STORM WATER POLLUTION PREVENTION PLAN
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 MEASUREMENT AND PAYMENT
1.3.1 SWPPP
1.3.2 Truck Wash Down Racks
1.3.3 Silt Fence
1.4 DEFINITIONS
1.5 GENERAL
1.5.1 Environmental Assessment of Contract Deviations
1.6 RECORD RETENTION REQUIREMENTS
1.6.1 Documents
1.6.2 Plan Accessibility
1.6.3 Activity Records
1.7 EROSION AND SEDIMENT CONTROLS
1.7.1 Stabilization Controls
1.7.1.1 Unsuitable Conditions
1.7.1.2 No Activity for Less Than 21 Days
1.7.2 Structural Controls
1.7.2.1 Truck Wash Down Racks
1.7.2.2 Silt Fence Barrier
PART 2 PRODUCTS
2.1 COMPONENTS FOR SILT FENCE BARRIER
2.1.1 Silt Fence Geotextile
2.1.2 Wooden Posts and Steel T-Posts
2.1.3 Identification Storage and Handling
PART 3 EXECUTION
3.1 INSTALLATION OF TRUCK WASH DOWN RACKS
3.2 INSTALLATION OF SILT FENCE BARRIER
3.3 MAINTENANCE
3.3.1 Silt Fence Barrier Maintenance
3.4 INSPECTIONS
3.4.1 General
3.4.2 Inspections Details
3.4.3 Inspection Reports
3.5 COMPLETION REPORT
-- End of Section Table of Contents --
SECTION 01 57 23.00 12 Page 1 ED 22-050
SECTION 01 57 23.00 12
STORM WATER POLLUTION PREVENTION PLAN
PART 1 GENERAL
1.1 SCOPE
The work specified in this section consists of the Contractor implementing, and diligently pursuing all measures required in the Storm Water Pollution Prevention Plan (SWPPP). The SWPPP consists of this Section, 01 57 23.00 12, and any and all references and attachments including existing and future signed certification statements. The purpose of the SWPPP is to control soil erosion and the resulting sediment to the extent necessary to prevent sediment from leaving the contract rights-of-way and prevent pollution of any water body caused by the runoff from the areas of construction activities under this contract, under the terms of PERMIT NO. LAR200000 (copy attached at the end of this section), and as specified herein. The requirements of these specifications are supplemental to and shall become part of the overall Environmental Protection Plan required by Section 01 57 20.00 12 ENVIRONMENTAL PROTECTION. The Contractor shall review the SWPPP to determine requirements for compliance. In addition, the Contractor shall ascertain that his subcontractors have reviewed the plan, and that they comply with its provisions. The Contractor shall ensure that all subcontractors sign, "Certification Statements #2 and #3" (blank forms attached at the end of this section).
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D4491/D4491M (2020) Standard Test Methods for Water Permeability of Geotextiles by Permittivity
ASTM D4632/D4632M (2015a) Standard Test Method for Grab Breaking Load and Elongation of Geotextiles
ASTM D4833/D4833M (2007; R 2020)Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products
ASTM D4873/D4873M (2002) Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples
LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY (LDEQ)
PERMIT NO. LAR200000 (2018) Storm Water General Permit for Small Construction Activities
SECTION 01 57 23.00 12 Page 2 ED 22-050
1.3 MEASUREMENT AND PAYMENT
1.3.1 SWPPP
No separate measurement or payment will be made for the implementation of the Storm Water Pollution Prevention Plan. Price and payment shall be distributed amongst the existing Pricing Schedule items.
1.3.2 Truck Wash Down Racks
Measurement and payment for truck wash down racks will be as specified in Section 01 57 23.01 12 TRUCK WASH DOWN RACKS.
1.3.3 Silt Fence
No separate measurement or payment will be made for silt fences. Price and payment shall be distributed throughout existing bidding schedule items.
1.4 DEFINITIONS
a. Construction Owner - The construction owner is the party that has operational control over plans and specifications including the ability to make changes to those items. The New Orleans District (Government) is the construction owner.
b. Construction Operators - The construction operators are the party having control over the plans and specifications and the party having day-to-day operational control over those activities at a project site which are necessary to ensure compliance with the SWPPP or other permit conditions. Both the Government and the Contractor are the construction operators.
c. Completion Report - A document that is completed and submitted to the Louisiana Department of Environmental Quality to terminate permission to discharge under PERMIT NO. LAR200000 . The Completion Report must be submitted to the Permits Division of the LDEQ by January 28 of the year following the calendar year in which the project was completed.(Copy provided at the end of this section.)
1.5 GENERAL
The Contractor shall implement the Storm Water Pollution Prevention Plan (SWPPP) specified in a manner which will meet the requirements of Section 01 57 20.00 12 ENVIRONMENTAL PROTECTION, and the requirements of the Louisiana Pollution Discharge Elimination System (LPDES) permit, PERMIT NO. LAR200000 , effective March 20, 2018.
1.5.1 Environmental Assessment of Contract Deviations
The Contractor is advised that deviations from the SWPPP could result in the requirement for the Government to reanalyze the project from an environmental standpoint. Deviations from the SWPPP erosion control requirements as specified herein and as shown on the drawings which may have an environmental impact will require an extended review, processing, and approval time by the Government.
SECTION 01 57 23.00 12 Page 3 ED 22-050
1.6 RECORD RETENTION REQUIREMENTS
1.6.1 Documents
The Contractor shall retain copies of the SWPPP and all reports required by the general permit, and all records of data used to complete the NOI, for a period of at least three years from the date that the construction site is finally stabilized. Records of the NOI as well as any data used to complete it, the SWPPP, and any reports required by PERMIT NO. LAR200000 shall be retained by the permittee for at least three years from the date that the site is finally stabilized.
1.6.2 Plan Accessibility
A copy of the SWPPP and a copies of all permits received, shall be retained at the construction site (or other local location accessible to the State Administration Authority and the public) from the date of construction initiation to the date of final stabilization. The Contractor shall have a copy of the plan available at a central location on-site for the use of all operators and those identified as having responsibilities under the plan whenever they are on the construction site. A notice shall be posted near the main entrance to the construction site with the following information: (1) the LPDES permit number for the project or a copy of the NOI if a permit has not yet been assigned; (2) the name and telephone number of a local contact person; (3) a brief description of the project; and (4) the location of the SWPPP if the site is inactive or does not have an on-site location to store the plan.
1.6.3 Activity Records
The dates of the following activities shall be recorded:
(1) Major grading activities occurred.
(2) Construction activities temporarily or permanently ceased.
(3) Stabilization measures were initiated.
1.7 EROSION AND SEDIMENT CONTROLS
The controls and measures required for controlling sediment during construction are described below.
1.7.1 Stabilization Controls
The stabilization practices to be implemented shall include fertilizing and seeding as specified in Section 32 92 19.04 12 TURF ESTABLISHMENT AND MAINTENANCE or any other temporary measure to restrict erosion from the construction site. On the daily CQC Report, the Contractor shall record the dates when the major grading activities occur, (e.g., clearing and grubbing, excavation, and grading); when construction activities temporarily or permanently cease on a portion of the site; and when stabilization practices are initiated. Except as provided in paragraphs "Unsuitable Conditions" and "No Activity for Less Than 21 Days," stabilization practices shall be initiated as soon as practicable, but no more than 14 days, in any portion of the site where construction activities have temporarily or permanently ceased.
SECTION 01 57 23.00 12 Page 4 ED 22-050
1.7.1.1 Unsuitable Conditions
Where the initiation of stabilization measures by the fourteenth day after construction activity temporarily or permanently ceases is precluded by unsuitable conditions caused by the weather, stabilization practices shall be initiated as soon as practicable after conditions become suitable.
1.7.1.2 No Activity for Less Than 21 Days
Where construction activity will resume on a portion of the site within 21 days from when activities ceased (e.g., the total time period that construction activity is temporarily ceased is less than 21 days), then stabilization practices do not have to be initiated on that portion of the site by the fourteenth day after construction activity temporarily ceased. Stabilization practices shall be initiated on that portion of the site by the fourteenth day in the case where construction activities will not resume within 21 days after construction activities have ceased.
1.7.2 Structural Controls
Structural practices shall be implemented to divert flows from exposed soils, temporarily store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site. Structural practices shall be implemented in a timely manner during the construction process to minimize erosion and sediment runoff. The Contractor' structural practices shall include the following device.
1.7.2.1 Truck Wash Down Racks
See Section 01 57 23.01 12 TRUCK WASH DOWN RACKS.
1.7.2.2 Silt Fence Barrier
The Contractor shall provide silt fences as a temporary structural practice to minimize erosion and sediment runoff. Silt fences shall be properly installed to effectively retain sediment immediately after completing each phase of work where erosion would occur in the form of sheet and rill erosion (e.g. clearing and grubbing, excavation, embankment, and grading). Silt fences shall be installed in the locations indicated on the drawings. (Final removal of silt fence barriers shall be upon approval by the Contracting Officer.
PART 2 PRODUCTS
2.1 COMPONENTS FOR SILT FENCE BARRIER
2.1.1 Silt Fence Geotextile
The geotextile shall consist of polymeric filaments which are formed into a stable network such that filaments retain their relative positions. The filament shall consist of a long-chain synthetic polymer composed of at least 85 percent by weight of ester, propylene, or amide, and shall contain stabilizers and/or inhibitors added to the base plastic to make the filaments resistant to deterioration due to ultraviolet and heat exposure. Geotextile shall contain ultraviolet ray inhibitators and stabilizers to provide a minimum of six months of expected usable construction life at a temperature range of 0 to 120 degrees F. The silt fence geotextile shall meet the following requirements:
SECTION 01 57 23.00 12 Page 5 ED 22-050
GEOTEXTILE FOR SILT FENCE
PROPERTY TEST PROCEDURE VALUE
PROPERTY UNITS TEST METHOD ACCEPTABLE VALUES
Grab Breaking Load Lbs. ASTM D4632/D4632M 200 Maximum
Grab Elongation at Ultimate
Percent ASTM D4632/D4632M 20 Maximum
Puncture Strength Lbs. ASTM D4833/D4833M 130 Minimum
AOP U.S. Standard Sieve No.
ASTM D4751 30-70
Permittivity Per Second ASTM D4491/D4491M 0.25 Minimum
2.1.2 Wooden Posts and Steel T-Posts
The Contractor may use either rounded wooden posts or steel T-posts for silt fence construction. Wooden posts utilized for silt fence construction shall be either oak or pine wood. Steel T-posts utilized for silt fence construction, shall have a minimum weight of 1.33 pounds per linear foot and a minimum length of 7 feet.
2.1.3 Identification Storage and Handling
Geotextile shall be identified, stored, and handled in accordance with
ASTM D4873/D4873M .
PART 3 EXECUTION
3.1 INSTALLATION OF TRUCK WASH DOWN RACKS
Operation of truck wash down racks shall not include use of detergents.
Sediments resulting from operation of truck wash down racks shall not be permitted to pollute any receiving waters. Sediments shall be utilized in the job or disposed of as construction debris. Sediment retention measures shall be utilized as described in Section 01 57 23.01 12 TRUCK
WASH DOWN RACKS.
3.2 INSTALLATION OF SILT FENCE BARRIER
The silt fence shall be located as indicated on the contract drawings.
Geotextile shall be from a continuous roll cut to the length of the barrier to avoid the use of joints. When joints are unavoidable, geotextile shall be spliced together at a support post, with a minimum 6-inch overlap, and securely sealed. A trench shall be excavated approximately 4 inches wide and 6 inches deep on the upslope side of the location of the silt fence. The 4-inch by 6-inch trench shall be backfilled and the soil compacted over the geotextile. The geotextile shall be attached to the land side of the post with wire or other method recommended by the manufacturer and such that a 6-inch length of geotextile is left unattached at the bottom of the post, the unattached geotextile embedded in the trench and the trench backfilled. It is the responsibility of the Contractor to maintain the integrity of the silt fence. The Contractor shall immediately correct any deficiencies. The silt fence shall be promptly repaired or replaced should it become damaged or otherwise ineffective. The silt fence is to remain in place upon
SECTION 01 57 23.00 12 Page 6 ED 22-050 completion of the project, or as directed by the Contracting Officer. Its maintenance shall be continual for that period of time for which excavated materials are placed in the area of the silt fence.
3.3 MAINTENANCE
The Contractor shall maintain the temporary and permanent vegetation, erosion and sediment control measures, and other protective measures in good and effective operating condition by performing routine inspections to determine condition and effectiveness, by restoration of destroyed vegetative cover, and by repair of erosion and sediment control measures and other protective measures. The following procedures shall be followed to maintain the protective measures.
3.3.1 Silt Fence Barrier Maintenance
Silt fences shall be inspected in accordance with paragraph INSPECTIONS.
Any required repairs shall be made promptly. Close attention shall be paid to the repair of damaged silt fence resulting from end runs and undercutting. Should the geotextile on a silt fence decompose or become ineffective, and the barrier is still necessary, the geotextile shall be replaced promptly. Sediment deposits shall be removed when deposits reach one-third of the height of the barrier. Sediments shall be utilized in the job or disposed of as construction debris. When a silt fence is no longer required, it shall be removed. The immediate area occupied by the fence and any sediment deposits shall be shaped to an acceptable grade.
3.4 INSPECTIONS
3.4.1 General
The Contractor shall inspect disturbed areas of the construction site, areas used for storage of materials that are exposed to precipitation that have not been finally stabilized, stabilization practices, structural practices, other controls, and area where vehicles exit the site at least once every fourteen (14) calendar days, before anticipated storm events (or series of storm events such as intermittent showers over one or more days) expected to cause a significant amount of runoff, and within 24 hours of the end of any storm that produces 0.5 inches or more rainfall at the site. Where sites have been finally stabilized, such inspection shall be conducted at least once every two weeks.
3.4.2 Inspections Details
Disturbed areas and areas used for material storage that are exposed to precipitation shall be inspected for evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control measures identified in the SWPPP shall be observed to ensure that they are operating correctly. Discharge locations or points shall be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters. Locations where vehicles exit the site shall be inspected for evidence of offsite sediment tracking.
3.4.3 Inspection Reports
For each inspection conducted, the Contractor shall prepare a report summarizing the scope of the inspection, name(s) and qualifications of personnel making the inspection, the date(s) of the inspection, major observations relating to the implementation of the SWPPP, maintenance
SECTION 01 57 23.00 12 Page 7 ED 22-050 performed, and actions taken. The report shall be furnished to the Contracting Officer within 24 hours of the inspection as a part of the Contractor's daily CQC REPORT. A copy of the inspection report shall be maintained on the job site. Sample inspection reports (Exhibit D-2, Exhibit D-3, Exhibit D-4, and Table D-5) are included at the end of this section.
3.5 COMPLETION REPORT
Upon stabilization and elimination of all storm water discharges authorized by PERMIT NO. LAR200000 , or where the operator of all storm water discharges at a facility changes, a Completion Report shall be certified and submitted by the Contractor to the Permits Division at the LDEQ. A copy of the Completion Report form is provided at the end of this section. Certified mail is recommended for proof of the Completion Report submittal. The Completion Report shall be submitted within 30 days of final stabilization of the construction site or when the Contractor is no longer the construction operator.
SECTION 01 57 23.00 12 Page 8 ED 22-050
CERTIFICATION STATEMENT #1
Any person, including the construction owner/operator, signing documents (the SWPPP, modifications to the SWPPP, or other reports) under Part VI.G.
of PERMIT NO. LAR200000 shall make the following certification.
(Contract Title)
(Permit Number)
(Document being Certified, such as SWPPP)
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage this system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I also certify that a storm water pollution prevention plan, including both construction and post construction controls, has been prepared for the site in accordance with the permit and that such plan complies with approved State, Tribal and/or local sediment and erosion plans or permits and/or storm water management plans or permits. I am aware that signature and submittal of the Notice of Intent is deemed to constitute my determination of eligibility under one or more of the requirements of Permit Part I.A.3.e(1), related to the Endangered Species Act requirements. To the best of my knowledge, I further certify that such discharges and discharge related activities will not have an effect on properties listed or eligible for listing on the National Register of Historic Places under the National Historic Preservation Act, or are otherwise eligible for coverage under Part I.A.3.f of the permit. I am also aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Signature ____________________________________________________
Printed Name ____________________________________________________
Title ____________________________________________________
Company ____________________________________________________
Date ____________________________________________________
Telephone ____________________________________________________
SECTION 01 57 23.00 12 Page 9 ED 22-050
CERTIFICATION STATEMENT #2
Any Contractor or subcontractor implementing any part of this plan must prepare and sign a copy of the following certification.
(Contract Title)
(Permit Number)
I certify, under penalty of law, that I understand the terms and conditions of the Louisiana Pollutant Discharge Elimination System (LPDES) general permit that authorizes storm water discharges associated with construction activity from the construction site identified as part of this certification.
Firm Name: _____________________________________________________
Address: ____________________________________________________________
_________________________________________ Telephone No: ____________
Signature: ______________________ Title: __________________________
Date: _______________________________________________________________
SECTION 01 57 23.00 12 Page 10 ED 22-050
CERTIFICATION STATEMENT #3
Any Contractor or subcontractor that does not meet the definition of "operator" that will conduct activities that may impact the effectiveness of the SWPPP control measures must prepare and sign the following certification.
(Contract Title)
(Permit Number)
I certify, under penalty of law, that I will coordinate, through the Contractor, owner, or directly, with the Contractor (s) identified in the pollution prevention plan having responsibility for implementing storm water control measures to minimize any impact my actions may have on the effectiveness of these storm water control measures.
Firm Name: _____________________________________________________
Address: ____________________________________________________________
_________________________________________ Telephone No: ____________
Signature: ______________________ Title: __________________________
Date: _______________________________________________________________
-- End of Section --
SECTION 01 57 23.00 12 Page 11 ED 22-050
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 11 00.00 12
CLEARING AND GRUBBING
PART 1 GENERAL
1.1 SCOPE
1.2 MEASUREMENT AND PAYMENT
1.3 QUALITY CONTROL
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CLEARING
3.1.1 General
3.1.2 Vegetation
3.1.3 Areas to be Cleared
3.1.3.1 General
3.2 GRUBBING
3.2.1 General
3.2.2 Areas to be Grubbed
3.2.3 Filling of Holes
3.3 DISPOSAL OF DEBRIS
3.3.1 General
-- End of Section Table of Contents --
SECTION 31 11 00.00 12 Page 1 ED 22-050
SECTION 31 11 00.00 12
CLEARING AND GRUBBING
PART 1 GENERAL
1.1 SCOPE
The work covered by this section consists of furnishing all plant, labor, equipment, and materials, and performing all operations necessary for the clearing and grubbing of the areas specified herein or indicated on the drawings, for the removal and disposal of all cleared and grubbed materials, and for the filling of all holes caused by grubbing operations, as specified herein.
1.2 MEASUREMENT AND PAYMENT
No measurement will be made for clearing, grubbing, and vegetation removal.
Payment for clearing, grubbing, and vegetation removal will be made at the contract job price for "Clearing and Grubbing". Price and payment shall constitute full compensation for furnishing all plant, labor, material, and equipment, and performing all operations necessary for clearing, grubbing, and vegetation removal of the area below the building, ramp, and stair foundations, for removing and disposing of all cleared, grubbed, and vegetation removal materials, and for filling holes resulting from grubbing operations.
1.3 QUALITY CONTROL
The Contractor shall establish and maintain quality control for clearing and grubbing operations to assure compliance with contract requirements, and maintain records of his/her quality control for all construction operations including but not limited to the following:
(1) Clearing. Station to station limits transverse clearing limits from applicable centerline; percentages of area complete; type of material.
(2) Grubbing. Station to station limits, transverse grubbing limits from applicable centerline; percentage of area complete; type of material.
(3) Disposition of Cleared and Grubbed Materials. Method and location of disposition
The original and two copies of these records of inspections and tests, as well as the records of corrective action taken, shall be furnished the Government daily. Format of the report shall be as prescribed in Section 01 45 04.00 10 CONTRACTOR QUALITY CONTROL.
PART 2 PRODUCTS
Not used.
SECTION 31 11 00.00 12 Page 2 ED 22-050
PART 3 EXECUTION
3.1 CLEARING
3.1.1 General
Clearing, unless otherwise specified, shall consist of the complete removal to within 6 inches of the ground surface of all trees, stumps, down timber snags, brush, vegetation, and similar debris.
3.1.2 Vegetation
Vegetation to be removed shall consist of crops, grass, bushes, and weeds.
3.1.3 Areas to be Cleared
3.1.3.1 General
The entire area to be occupied by the building, ramp,and stair foundations.
3.2 GRUBBING
3.2.1 General
Grubbing shall consist of the removal of all grass, stumps, roots, pipes, drains, and other unsuitable matter to a depth of 6-inches.
3.2.2 Areas to be Grubbed
The entire area to be occupied by the building, ramp, and stair foundations.
3.2.3 Filling of Holes
All holes caused by grubbing operations and removal of pipes and drains shall be backfilled with suitable material in 2-inch layers to the elevation of the adjacent ground surface, and each layer compacted to a density at least equal to that of the adjoining undisturbed material.
3.3 DISPOSAL OF DEBRIS
3.3.1 General
All debris resulting from clearing and grubbing operations at the construction site shall be stockpiled or distributed on the Freshwater Bayou Lock site with coordination and direction of the Lockmaster or evenly spread on site, if approved by the Contracting Officer. Debris material shall be so placed as not to interfere with roads, drainage, or other improvements and in such a manner as to eliminate the possibility of its entering into channels, ditches, or streams. If the Contractor chooses to remove debris from the site of the work, such disposal shall comply with all applicable Federal, State, and Local laws.
-- End of Section --
SECTION 31 11 00.00 12 Page 3 ED 22-050
| IDCode: J |
| Page: 1 |
| Pages: 20 |
| AmendNo: 0003 |
| EffDate: 08 JUL 2026 |
| ReqNo: |
| ProjNo: ED 22-050 |
| IssCode: W912P8 |
| AdmCode: |
| IssuedBy: W07V ENDIST N ORLEANS |
KO CONTRACTING DIVISION, 7400 LEAKE AVE
NEW ORLEANS, LA 70118-3651
UNITED STATES
TAYLOR BRANDON, EMAIL: TAYLOR.H.BRANDON@USACE.ARMY.MIL TELEPHONE: (504) 862-1009
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912P826BA003 |
| SolDate: 06 NOV 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: This solicitation is hereby amended to: |
1. Respond to questions. No further questions will be accepted.
2. Make changes to the solicitation as detailed in the following pages.
| ContNameTitle: |
| CoNameTitle: CHRISTOPHER NUCCIO |
| ContDate: |
| CODate: 08 JUL 2026 |