TABULATION OF BENCHMARK (VERTICAL CONTROL)
DATUMNAME LATITUDE LONGITUDE NORTHING EASTING DESCRIPTIONEPOCH
876 6072 C NAD83 NA2011 384030.940 2971784.480
SOUTHERN 6 FT (1.8 m) HIGH. HEIGHT = 3.15 (NAVD88 - 2009.55 EPOCH)
MARK IS A FLANGE ENCASED STAINLESS STEEL ROD LOCATED 6.1 FT (20.1 M) SOUTH OF THE
FACILITY TO A WATER ACCESS AREA. THE MARK IS ON THE RIGHT NEAR THE WATERS EDGE. THE
THE LEFT. GO EAST ON THE DIRT ROAD ALONG THE SOUTH SECURITY FENCE FOR THE LOCK
IN CR 3147, CONTINUE ON AROUND THE CURVE FOR ANOTHER 20 FT (61.0 M) TO A DIRT ROAD TO
FOR THE CORPS OF ENGINEERS FRESHWATER BAYOU LOCK FACILITY AND A CURVE TO THE RIGHT
INTERSECTION. TURN LEFT AND CONTINUE 8.2 MI (13.2 KM) ON CR 3147 TO THE ACCESS GATE
ON THE LEFT, VEER LEFT AND CONTINUE 1.8 MI (2.9 KM) SOUTHERLY ON CR 3147 TO AN
27.1 MI (43.6 KM) SOUTHERLY ON LA 35 TO THE FORK INTERSECTION OF CR 3147 (A GRAVEL ROAD)
TO REACH FROM THE INTERSECTION OF STATE HIGHWAYS LA 35 AND 14 IN KAPLAN, PROCEED
NAD83V 375 NA2011 517907.010 3712188.660
ROD DRIVEN 25.6 M AND STAMPED V 375 1985. HEIGHT = 2.23 (NAVD88 - 2009.55 EPOCH)
GATE, 107 FT SOUTH OF A LIGHT POLE, 10FT SOUTH OF A WITNESS SIGN. STATION IS A STAINLESS
CENTERLINE OF ENTRANCE ROAD TO LOCKS, 18.3 FT SOUTHEAST OF THE EAST GATE POST FOR
TO LOCKS, PASSING THROUGH GATE AND MARK ON LEFT NEAR GATE. THE STATION IS 2.6 FT EAST OF
PATTERSON FOR 0.9 MILES TO BLYTHE ROAD, TURN RIGHT ON BLYTHE AND GO TO GATE ENTRANCE
PATTERSON DRIVE (LEVEE ROAD), TURN RIGHT ON PATTERSON DRIVE AND PROCEED EAST ON
ROAD, NEAR THE BRIDGE OVER INTERCOASTAL WATERWAY, GO NORTH ON SULLEN ROAD TO
TO REACH THE STATION FROM THE INTERSECTION OF GENERAL DE GAULLE AVENUE AND SULLEN
NAD83W 357 NA2011 559937.010 2669514.770
BOX ATTACHMENT. HEIGHT = 2.8 (NAVD88 - 2009.55 EPOCH)
POURED AROUND THE MONUMENT. AN EYE ANCHOR BOLT WAS SET INTO THE SLAB FOR LATER LOCK
POST. THE MARK IS 0.3 M BELOW THE HIGHWAY. A 2 FT (0.6 M) BY 4 FT (1.2 M) CONCRETE SLAB WAS
0.60 M (2.0 FT) SOUTHWEST OF A RIGHT-OF-WAY FENCE. THE MARK IS 0.37 M NW FROM A WITNESS
NORTHEAST OF THE CENTER LINE OF THE CONCRETE PIPE CULVERT UNDER THE HIGHWAY, AND
GRAND LAKE TO THE MARK ON THE LEFT, ABOUT THE CENTER OF A LONG CURVE, 11.89 M (39.0 FT)
0.8 KM (0.5 MILE) SOUTHEAST ALONG STATE HIGHWAY 384 FROM THE BIG LAKE GOSPEL CHURCH IN
H G
-0 .d g n
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S I Z
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
F R
E S
H W
A T
E R
B A
Y O
U W
A T
E R
W A
Y D
A V
ID
J
G
L Y
N N
P
.E
S D
B
J U
L Y
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
F R
E S
H W
A T
E R
B A
Y O
U L
O C
K
N E
W S
H O
P S
B U
IL
D
IN
G
V E
R M
IL
IO
N P
A R
IS
H
L
A
L a u re n
K
D 'A rm o n d
P
.E
W
P
-2
-B -A
T A
R R
IS
G
R E
E R
P
.E
F
IL
E N
A M
E
F R
E S
H W
A T
E R B
A Y
O U L
O C
K
PROJECT LOCATION
FRESHWATER CITY RD
F R
E S
H W
A T E
R C
IT
Y R
D
G-002
L O
C A
T
IO
N A
N D
V
IC
IN
IT
Y M
A P
N
A T
C H
A F A
L A
Y A
R
IV
E R
A R K A N S A S
SHREVEPORT
MONROE
R
IV
E R
R
IV
E R
VICKSBURG
NATCHEZ
ALEXANDRIA
R E
D
R
IV
E R
LAKE CHARLES
BATON ROUGEL O U I S I A N A
M I S S I S S I P P I
T E X A S
LAKE
PONTCHARTRAIN
LAKE BORGNE
G U L F O F M E X I C O
M
IS
S
IS
S
IP
P I
SCALE OF MILES
40 400 80 120 160 200
CITY
MORGAN
LOCATION MAP
VICINITY MAP
LOCATION
PROJECT
ORLEANS
NEW
O U
A C
H
IT
A
N
SCALE: 1'' = 500'
0 500' 1000'
G-003
D R
A W
IN
G
I N
D E
X A
N D
S Y
M B
O L
O G
Y
H
G -0
.d g n
E-102
E-101
LIGHTING PLAN
E-200 EXTERIOR ELEVATIONS
ELECTRICAL PLAN
G-001 COVER SHEET
G-002
DWG. DESCRIPTION
INDEX TO DRAWINGS
DWG. DESCRIPTION
INDEX TO DRAWINGS
G-003 DRAWING INDEX AND SYMBOLOGY
LOCATION & VICINITY MAP
SITE PLAN - EXISTINGC-101
C-102A EXISTING UTILITIES DISPOSITION TABLES
S-101 OVERALL PILE LAYOUT & PLATFORM FRAMING PLANS
S-102 ENLARGED PLATFORM FRAMING PLAN
S-103 FLOOR PLAN
SOUTH STAIR PLAN AND SECTIONS-104
NORTH STAIR PLAN AND SECTIONS-105
S-402 PRECAST FRAMING SECTIONS
S-403 PRECAST FRAMING SECTIONS
E-001 ELECTRICAL LEGEND
S-301 BUILDING AND RAMP CROSS SECTIONS
S-404 STAIR SECTIONS
DETAILSS-501
E-100 ELECTRICAL SITE PLAN
G-004 ABBREVIATIONS
S-201 EAST AND WEST EXTERIOR ELEVATIONS
S-202 NORTH AND SOUTH EXTERIOR ELEVATIONS
NORTHEAST ISOMETRICS-901
S-902 SOUTHEAST ISOMETRIC
SITE PLAN - PROPOSEDC-103
S-001 GENERAL NOTES
S-401 PRECAST FRAMING ENLARGED PLANS AND SECTIONS
E-300 LIGHTING SCHEDULE
E-301 PANEL SCHEDULE
C-104 CONCRETE TRANSITIONAL PAVING PLAN & SECTIONS
M-201
WEST EXTERIOR ELEVATIONS
MECHANICAL EQUIPMENT EAST AND
SOUTH EXTERIOR ELEVATIONS
MECHANICAL EQUIPMENT NORTH AND M-202
BORING LOG 1 OF 4
BORING LOG 2 OF 4
BORING LOG 3 OF 4
BORING LOG 4 OF 4
B-101
B-102
B-103
B-104
REFERENCE SHEET
REFERENCE SHEET
REF-100
REF-101
PARTIAL SITE PLANC-101A
C-102 EXISTING UTILITIES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S I Z
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
F R
E S
H W
A T
E R
B A
Y O
U W
A T
E R
W A
Y D
A V
ID
J
G
L Y
N N
P
.E
S D
B
J U
L Y
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
F R
E S
H W
A T
E R
B A
Y O
U L
O C
K
N E
W S
H O
P S
B U
IL
D
IN
G
V E
R M
IL
IO
N P
A R
IS
H
L
A
L a u re n
K
D 'A rm o n d
P
.E
W
P
-2
-B -A
T A
R R
IS
G
R E
E R
P
.E
F
IL
E N
A M
E
W
GENERAL CROSS-REFERENCING SYMBOLS
SECTION/DETAIL)
(CENTERED UNDER
ON SAME DRAWING
SECTION/DETAIL TITLE
SECTION/DETAIL)
(CENTERED UNDER
ON ANOTHER DRAWING
SECTION/DETAIL TITLE
EACH VIEW)
(CENTERED UNDER
VIEW SUBTITLE
SCALE:
SUPPLEMENTAL INFORMATION
DETAIL/SECTION
A
99/999
DETAIL/SECTION
SCALE:
TOP FRONT SIDE
ELEVATION SECTION
A
SAME DRAWING
VIEW SHOWN ON
SECTION CUT W/
ANOTHER DRAWING
VIEW SHOWN ON
SECTION CUT W/
ANOTHER DRAWING
VIEW SHOWN ON
DETAIL SYMBOL W/
SAME DRAWING
VIEW SHOWN ON
DETAIL SYMBOL W/
99/999
GENERAL LEGEND
A
97-41M
CB
P.I. POINT
FIRE HYDRANT
MANHOLE
CATCHBASIN
WATER VALVE
SHEETPILE
LEVEE
EXISTING GAS
EXISTING FENCE
OVERHEAD P0WER
EXISTING
STORM SEWER
EXISTING
SANITARY SEWER
EXISTING
LINE (TELEPHONE)
EXISTING COMMUN.
(COAXIAL T.V.)
EXISTING CABLE
CONSTRUCTION
LIMIT OF
PIPE
EXISTING CULVERT
POWER POLE
GENERAL SOIL BORING
BORING LOCATION
UNDISTURB
(CPT)
CONE PENETROMETER
PROPERTY LINE (P/L)
SLOPE
EASEMENT
WORK AREA
TEMPORARY
ACCESS ROAD C/L
STORM SEWER TANK
CLEAN OUT VALVE
STORM MANHOLE
WATER METER
ROAD SIGN
ELECTRIC METER POLE
NEW WATERMAIN
EXISTING WATERMAIN
OVERHEAD P0WER
EXISTING SECONDARY
EM
COCO
ST
GENERAL NOTES:
12. SPEED LIMIT WITHIN CONSTRUCTION LIMITS IS 10 MPH.
CONDITIONS WHICH WILL AFFECT THE PERFORMANCE OF THE WORK.
ADDITIONAL SURVEYS AND INVESTIGATIONS AS NECESSARY TO DETERMINE
BORING LOCATIONS. THE CONTRACTOR, AT HIS OWN EXPENSE, MAY MAKE
AND CONDITION OF THE MATERIALS WHICH WILL BE ENCOUNTERED BETWEEN THE
11. THE CONTRACTOR SHALL MAKE HIS OWN INTERPRETATION OF THE CHARACTER
OSHA, ENTERGY REQUIREMENTS, AND USACE SAFETY MANUAL "EM-385-1-1"
10. ALL WORK AROUND HIGH VOLTAGE POWER LINES SHALL BE IN ACCORDANCE WITH
RELATIVE TO THE EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION.
9. CONTRACTOR SHALL VISIT THE SITE OF WORK AND COMPLETELY INFORM HIMSELF
BLOWING.
LEVEE RIGHT-OF-WAY. THE EMBANKMENT SHALL BE KEPT MOIST TO PREVENT
UNNECESSARY DUST WHILE TRANSPORTING EARTHEN MATERIAL WITHIN THE
8. DUST CONTROL - CONTRACTOR SHALL TAKE MEASURES TO PREVENT
REPAIRED AT THE CONTRACTOR'S EXPENSE.
DAMAGE OCCURS AS A RESULT OF HIS NEGLIGENCE. THE DAMAGE SHALL BE
7. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING UTILITIES IF
CONSTRUCTION. SEE SPECIFICATIONS FOR A LIST OF ALL UTILITY CONTACTS.
RESPONSIBILITY TO VERIFY ALL EXISTING UTILITY LOCATIONS PRIOR TO
PROVIDED BY THE RESPECTIVE UTILITY COMPANIES. IT IS THE CONTRACTOR'S
FOR INFORMATIONAL PURPOSES ONLY AND ARE BASED, IN PART, ON INFORMATION
6. LOCATION OF EXISTING UTILITIES INDICATED ON THE PLAN SHEETS ARE SHOWN
UNLESS OTHERWISE STATED.
5. ALL ELEVATIONS ARE EXPRESSED IN FEET AND REFER TO NAVD 88 (2009.55),
SHOWN ONLY WHERE DRAWING IS OBVIOUSLY OUT OF SCALE.
4. DRAWINGS ARE GENERALLY TO SCALE, BUT SHOULD NOT BE SCALED. NTS IS
IN THE FIELD.
APPROXIMATE READING. THE CONTRACTOR SHALL VERIFY ACTUAL DIMENSIONS
3. DIMENSIONS AND/OR ELEVATIONS MARKED PLUS OR MINUS (+/-) ARE
STATE PLANE, LA SOUTH, ZONE 1702, US FEET.
2. XY COORDINATES USED IN DRAWINGS REFER TO HORIZONTAL DATUM: NAD 83,
1. HORIZONTAL DISTANCES ARE MEASURED IN US SURVEY FEET.
OF THE PLANS.
CONTACTOR SHALL VERIFY ALL DIMENSIONS, EVEN WITH GOVERNMENT APPROVAL
16. PRIOR TO FABRICATION AND CONSTRUCTION OF PERMANENT WORK, THE
LIABILITY FOR DAMAGE.
PROJECT LIMIT. A SPECIAL PERMIT DOES NOT DECREASE THE CONTRACTOR'S
LIMIT, WHEN HAULING EQUIPMENT MATERIALS ON PUBLIC ROAD BEYOND THE
SUBCONTRACTOR, OR SUPPLIERS SHALL OBSERVE LEGAL ROAD
CONTRACTOR,
LOCAL LAWS AND ORDINANCES INCLUSIVE OF POSTED WEIGHT LIMITS. THE
15. ALL CONTRACTOR HAULING OPERATIONS SHALL ABIDE BY FEDERAL, STATE, AND
CLEANED DAILY OF MUD, DEBRIS ETC.
SWEEPERS AND SCRAPERS ONSITE. ALL STREETS AND HIGHWAYS SHALL BE
DURING CONSTRUCTION. THE CONTRACTOR SHALL HAVE WASH RACKS,
14. THE CONTRACTOR SHALL KEEP ALL STATE AND FEDERAL HIGHWAYS CLEAN
PRIOR TO END OF CONTRACT.
13. THE CONTRACTOR SHALL CLEAN AND REMOVE ALL TRASH IN THE PROJECT LIMIT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S I Z
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
F R
E S
H W
A T
E R
B A
Y O
U W
A T
E R
W A
Y
S D
B
J U
L Y
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
F R
E S
H W
A T
E R
B A
Y O
U L
O C
K
N E
W S
H O
P S
B U
IL
D
IN
G
V E
R M
IL
IO
N P
A R
IS
H
L
A
L a u re n
K
D 'A rm o n d
P
.E
W
P
-2
-B -A
F
IL
E N
A M
E
MAY NOT APPEAR ON THIS SET OF DRAWINGS.
ALL ABBREVIATIONS SHOWN ON THIS SHEET1.
NOTE:
ABBREVIATIONS
G-004
A B
B R
E V
IA
T
IO
N
S
H
G -0
.d g n
COR CONTRACTING OFFICERS REPRESENTATIVE
WINDOWWD
UNDERGROUND ELECTRICUE
TRANSIENT VOLTAGE SURGE SUPPRESSORTVSS
TEMPORARY BENCH MARKTBM
VARIABLE SPEED CONTROL SWITCHSV
SPECIFICATIONSSPECS
SINGLE POLESP
HORSEPOWER RATED MANUAL TOGGLE SWITCHSM
SUPPLY FANSF
SECONDARYSEC
THREE-WAY TOGGLE LIGHTING SWITCHS3
SINGLE POLE TOGGLE LIGHTING SWITCHS
RIGID METAL CONDUITRMC
RELAY CONTRACTOR AND RELAY COILR
PRIMARYPRI
PANELBOARDPNLB
PULL BOXPB
NON-FUSIBLE SAFETY SWITCHNFSS
NEUTRALN
MAIN LUG ONLYMLO
MANHOLE NO.2 (TYPICAL)MH-2
MOUNTING HEIGHTMH
MAIN DISCONNECT SWITCHMDS
ELECTRIC METERM
MANUALLY OPERATED LOUVERLV
LIQUIDTIGHT FLEXIBLE METAL CONDUITLFMC
JUNCTION BOXJB
GALVANIZED RIGID STEEL CONDUITGRS
GROUNDGRD, G
GROUND FAULT CIRCUIT INTERRUPTERGFCI
FOOT.FEETFT
FUSIBLE SAFETY SWITCHFSS
EXIT/EMERGENCY LIGHTING FIXTUREEX
ELECTRICAL METALLIC TUBINGEMT
EXHAUST FAN EF
ELECTRICAL LINE, OVER HEAD E
DOUBLE POLE DP
DIRECT BURIAL DB
CONTRACTOR FURNISHED CONTRACTOR INSTALLEDCFCI
COMPACT FLUORESCENT LAMP CFL
CENTER-TO-CENTERC/C
CONDUIT C
BREAKER BKR
AUTOMATIC TRANSFER SWITCH ATS
AMPERES INTERRUPTING CAPACITY AIC
AMPERES A
B-101 THRU B-104
SEE SHEETS
CPT FBL-1C
S13
T17S R1E
S18
T17S R2E
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S I Z
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
F R
E S
H W
A T
E R
B A
Y O
U W
A T
E R
W A
Y
S D
B
M A
R C
H
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
F R
E S
H W
A T
E R
B A
Y O
U L
O C
K
N E
W S
H O
P S
B U
IL
D
IN
G
V E
R M
IL
IO
N P
A R
IS
H
L
A
L a u re n K
D
'A rm o n d P
.E
W
P
-2
-B -0
F
IL
E N
A M
E
SITE PLAN - EXISTING
SCALE: 1" = 60'
NORTH
PLAN
C-101
S
IT
E P
L A
N
E X
IS
T
IN
G
H
C -1
.d g n
FRESHWATER CITY RD (ACCESS)
F R
E S
H W
A T
E R B
A Y
O U
F L
O W b2edsdjg Text Box
JULY 2025
b2edsdjg Text Box W912P8-25-B-A026
BLDG. & STAIRS
PROPOSED
D N
1.3
1.8
1.8
1.8
1.9
2.0
2'
2.0
2.1
2.2
2.2
2.2
2.2
2.3
2.3
2.3
2.4
2.4
2.4
2.5
2.6
2.6
2.7
2.7
2.7
2.7
2.7
2.8
2.8
2.9
2.9
2.9
2.9
2.9
2.9
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.1
3.1
3.1
3.1
3.1
3.1
3.2
3.2
3.2 3.2
3.2
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.4
3.4 3.4
3.4
3.4
3.4
3.4
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6 3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7 3.8
3.8
3.8
3.8
3.8
3.8
3.9
3.9
3.9 3.9
3.9
4.0
4.0
4.0
4'
4'
4'
4'
4'
4'
4'
4'
4.0
4.0
4.0
4.1
4.1 4.1
4.1
4.2
4.2
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.5
4.5
4.5
4.5
4.5
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.7
4.7
4.74.7
4.7
4.7 4.7
4.7
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.9
4.9
4.9
5.0
5.0
5.0
5.0
5.0
5.1
5.1
5.2
5.4 6.06.1
6.1
6.1
4.5'
.5
4.5'
PARTIAL SITE PLAN
SCALE: 1" = 20'
NORTH
PLAN
F R
E S
H W
A T
E R B
A Y
O U
C-101A
P A
R T
IA
L
S
IT
E P
L A
N H
C
-1
A
.d g n
F L
O W
P R
O P
O S
E D R
A M
P
CONTROL POINT
HORIZONTAL VERTICAL
TEMPORARY CONTROL MARK
MAJOR CONTOUR LINE
MINOR CONTOUR LINE
TOPO BREAKLINE
DTM BOUNDARY EXTERIOR
EDGE OF ROAD
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S I Z
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
F R
E S
H W
A T
E R
B A
Y O
U W
A T
E R
W A
Y
S D
B
M A
R C
H
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
F R
E S
H W
A T
E R
B A
Y O
U L
O C
K
N E
W S
H O
P S
B U
IL
D
IN
G
GENERAL NOTES
V E
R M
IL
IO
N P
A R
IS
H
L
A
L a u re n
K
D 'A rm o n d
P
.E
W
P
-2
-B -0
F
IL
E N
A M
E b2edsdjg Text Box
JULY 2025
b2edsdjg
MULTIPLE LINES
2-3' DEPTH
MULTIPLE LINES
2-3' DEPTH
MULTIPLE LINES
2-3' DEPTH
MULTIPLE LINES
2-3' DEPTH
MULTIPLE LINES
2-3' DEPTH
WATER LINE
UNABLE TO LOCATE
WATER LINE
UNABLE TO LOCATE
WATER LINE
UNABLE TO LOCATE
BLDG. & STAIRS
PROPOSED
E1
E2
E3
E4
E5
E6
E7
E8
E9
S1S2
S3
S4
S5
W1
W2
WATER LINE
UNCONFIRMED
2-4' DEPTH
BUILDING
SHOP
EXISTING
D N
L
WVLE
PB
PB
L
1-2' DEPTH
1-2' DEPTH
1-2' DEPTH
1.8
1.8
2.0
2.3
2.3 2.5
2.8
2.9
2.9
3.03.0
3.1
3.13.1
3.2
3.2
3.3
3.33.3
3.4
3.4
3.4
3.5
3.6
3.7
3.7
3.7 3.8
4.0
4.2
4.2
4.3
4.3
4.3
4.3
4.4
4.44.4
4.4
4.5
4.5
4.5 4.5
4.6
4.7
4.74.7
4.7
4.74.7
4.7
4.8
4.8
4.8
4.8
4.9
4.9
4.9
1-2' DEPTH
1-2' DEPTH
4.9
4.9
4.94.9 5.0
5.0 5.0
5.0
5.0
5.0
5.0
5.1
5.1
5.1
5.1
5.1
5.2
5.4
5.7 J
5.7
1-2' DEPTH
0-1' DEPTH
CONDUIT
2" PVC
EXISTING
PULL BOX
EXISTING
PULL BOX
EXISTING
DISTURB
DO NOT
PIPE RACK
ALUMINUM
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S I Z
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
F R
E S
H W
A T
E R
B A
Y O
U W
A T
E R
W A
Y
S D
B
M A
R C
H
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
F R
E S
H W
A T
E R
B A
Y O
U L
O C
K
N E
W S
H O
P S
B U
IL
D
IN
G
V E
R M
IL
IO
N P
A R
IS
H
L
A
L a u re n
K
D 'A rm o n d
P
.E
W
P
-2
-B -0
F
IL
E N
A M
E
EXISTING UTILITIES
SCALE: 1" = 20'
NORTH
PLAN
F R
E S
H W
A T
E R B
A Y
O U
C-102
E X
IS
T
IN
G
U T
IL
IT
IE
S
H C
-1 .d g n
F L
O W
P R
O P
O S
E D R
A M
P
WVL
L
E
J
SEE C-102A FOR EXISTING UTILITY DISPOSITION TABLES
BUILDING OUTLINE
FENCE LINE
STRUCTURE OUTLINE
ELECTRICAL HANDHOLE
ELECTRICAL LINE
UNDERGROUND
JUNCTION BOX
COMMUNICATION
COMMUNICATION LINE
UNDERGROUND
WATER VALVE
WATER LINE
LIFT/PUMP STATION
SANITARY SEWER
MAIN LINE
SANITARY SEWER
UTILITY LINE
UNKNOWN UNDERGROUND
GENERAL NOTES
LEGEND
PULL BOXPB
b2edsdjg Text Box
JULY 2025
b2edsdjg
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S I Z
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
F R
E S
H W
A T
E R
B A
Y O
U W
A T
E R
W A
Y
S D
B
M A
R C
H
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
F R
E S
H W
A T
E R
B A
Y O
U L
O C
K
N E
W S
H O
P S
B U
IL
D
IN
G
V E
R M
IL
IO
N P
A R
IS
H
L
A
L a u re n
K
D 'A rm o n d
P
.E
W
P
-2
-B -0
F
IL
E N
A M
E
C-102A
E X
IS
T
IN
G
U T
IL
IT
IE
S
D
IS
P O
S
IT
IO
N
T A
B L
E S
H C
-1 A
.d g n
EXISTING ELECTRIC UTILITIES - UNDERGROUND
ITEM NO. DESCRIPTION SHEET NO. OWNER DISPOSITION
DNDE1
E2
E3
E4
POWER LINE
X Y
DND
DNDE6
E7
E8
DNDE5
DNDE9
USACE
DND
DND
DND
DND
C-102 2971649.29
2971619.12
2971631.90
2971863.07
2971804.65
2971867.47
2971828.52
2971759.98
2971655.18
384767.86
POWER LINE C-102 USACE
POWER LINE C-102 USACE
POWER LINE C-102 USACE
POWER LINE C-102 USACE
POWER LINE C-102 USACE
POWER LINE C-102 USACE
POWER LINE C-102 USACE
POWER LINE C-102 USACE
384772.89
384851.07
384804.85
384817.90
384799.25
384785.36
384799.41
384767.28
ITEM NO. DESCRIPTION SHEET NO. OWNER DISPOSITION
DND
EXISTING STRUCTURES
EXISTING SHOPS BLDG.
STORAGE BLDG.
LOCK
DND
USACE
DND
C-102
C-102
C-102
USACE
USACE
SEWER LINES
ITEM NO. DESCRIPTION SHEET NO. OWNER DISPOSITION
DNDS1 SEWER LINE
X Y
DND
DND
USACE
DND
DND
C-102 2971687.02
2971653.16
2971758.42
2971828.15
2971869.05
384764.88
C-102 USACE
C-102 USACE
C-102 USACE
C-102 USACE
384765.89
384799.29
384784.52
384799.57
S2
S3
S4
S5
SEWER LINE
SEWER LINE
SEWER LINE
SEWER LINE
WATER LINES
ITEM NO. DESCRIPTION SHEET NO. OWNER DISPOSITION
DNDW1 WATER LINE
X Y
USACE
DND
C-102 2971736.27
2971748.20
384950.42
C-102 USACE384974.62WATER LINEW2
WATER VALVE
ITEM NO. DESCRIPTION SHEET NO. OWNER DISPOSITION
DNDWVL WATER VALVE
X Y
USACEC-102 2971906.85 384804.77
b2edsdjg Text Box
JULY 2025
b2edsdjg
S13
T17S R1E
S18
T17S R2E
Z
.0
Y
.5
X
.7
Z
.0
Y
.4
X
.0
F R
E S
H W
A T
E R B
A Y
O U
L
IM
IT
O
F W
O R
K
LIMIT OF W
ORK
LIMIT OF WORK
L
IM
IT
O
F W
O R
K
L
IM
IT
O
F W
O R
K
L
IM
IT
O
F W
O R
K
S T
A G
IN
G A
R E
A
A
B
CD
S T
A G
IN
G A
R E
A
E F
G H
P R
O P
O S
E D S
H O
P S B
L D
G R
A M
P D
N
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S I Z
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
F R
E S
H W
A T
E R
B A
Y O
U W
A T
E R
W A
Y
S D
B
M A
R C
H
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
F R
E S
H W
A T
E R
B A
Y O
U L
O C
K
N E
W S
H O
P S
B U
IL
D
IN
G
V E
R M
IL
IO
N P
A R
IS
H
L
A
L a u re n K
D
'A rm o n d P
.E
W
P
-2
-B -0
F
IL
E N
A M
E
SITE PLAN - PROPOSED
SCALE: 1" = 60'
NORTH
PLAN
C-103
S
IT
E P
L A
N
P R
O P
O S
E D
H
C -1
.d g n
LIMITS OF WORK
PT. X Y
1 2971568.76 384359.79
2971648.13 384844.98
2971694.26 384833.06
2971836.21 385152.24
FRESHWATER CITY RD (ACCESS)
5 2971968.50 385082.68
6 2971838.95 384319.32
STAGING AREA
PT. X Y
A 2971856.75 384851.56
2971921.54 384840.56
2971946.55 384962.79
2971902.95 384966.86
B
C
D
E 2971915.04 384988.18
2971950.00 384983.15
2971968.50 385082.68
2971955.49 385088.69
F
G
H
SEE SHEET C-104
TRANSITION SLAB
F L
O W b2edsdjg Text Box
JULY 2025
b2edsdjg
C
L R
C
L R
3"
C
L R
1'-0"
1 1/2 "
SEE S-101
RAMP
TOC EL. 5.0
TOC EL. 5.0
GRADE
MATCH EXIST
GRADE
MATCH EXIST
OF PAVEMENT
EXIST EDGE
OF PAVEMENT
EXIST EDGE PAVING
TRANSITION
CONCRETE
5.0' CONTOUR
MATERIAL
1/2" EXPANSION JOINT
SEE S-201
RAMP
STONE BASE
COMPACTED
SUBGRADE
COMPACTED
SOIL
IN-SITU
#4 @ 16" OC EACH WAY
CONCRETE SLAB
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S I Z
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
F R
E S
H W
A T
E R
B A
Y O
U W
A T
E R
W A
Y
S D
B
M A
R C
H
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
F R
E S
H W
A T
E R
B A
Y O
U L
O C
K
N E
W S
H O
P S
B U
IL
D
IN
G
GENERAL NOTES
V E
R M
IL
IO
N P
A R
IS
H
L
A
L a u re n
K
D 'A rm o n d
P
.E
W
P
-2
-B -0
F
IL
E N
A M
E
STONE BASE
COMPACTED
SUBGRADE
COMPACTED
SOIL
IN-SITU
#4 @ 16" OC EACH WAY
CONCRETE SLAB
EXISTING PAVEMENT
PAVING
CONCRETE
#4 @ 16" OC EACH WAY
GRADE
EXISTING
(2) #6 TOP & BOT
@ 18" OC
#4 STIRRUPS
CLR
CLR
C-104
P L
A N
A N
D S
E C
T
IO
N S
C O
N C
R E
T E
T R
A N
S
IT
IO
N
A L
P A
V
IN
G
C
-1 .d g n
SCALE: 3/4"=1'
SECTION
A
LSSRB 203.08.
7. PREPARE SUBGRADE TO MEET THE REQUIREMENTS OF
6. CURING MATERIALS SHALL COMPLY WITH LSSRB 1011.01.
REQUIREMENTS OF LSSRB 302.
5. CRUSHED STONE BASE COURSE CLASS II MEETING THE
LSSRB 1005.01.
4. JOINT FILLER SHALL MEET THE REQUIREMENTS OF
WITH LSSRB 1009.01.
3. REINFORCING STEEL SHALL BE ASTM A615 AND SHALL COMPLY
MEETING THE REQUIREMENTS OF LSSRB 901.
2. CONCRETE SHALL BE PORTLAND CEMENT CONCRETE CLASS B
REQUIREMENTS OF LSSRB 601.
1. PORTLAND CEMENT CONCRETE PAVEMENT MEETING THE
4.3
4.5
N
A
CONCRETE TRANSITION PAVING PLAN
SCALE: 1'=3"
B
C
N
SCALE: 3/4"=1'
SECTION
B
C
SECTION
SCALE: 3/4"=1'
b2edsdjg Text Box
JULY 2025
b2edsdjg
CR - CONTRACTOR RESPONSIBILITIES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE REQUIRED DESIGNS,
MANUFACTURING, AND INSTALLATIONS OF BOTH THE PRECAST FRAMING AND THE METAL BUILDING
SYSTEM, AS WELL AS ALL OTHER RELATED COMPONENTS IN ACCORDANCE WITH THE CONTRACT
REQUIREMENTS.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE SPECIFICATION AND STANDARD DETAILS AS SHOWN IN UNIFIED FACILITY CRITERIA (UFC) UFC 1 -200-01 DOD BUILDING CODE DATED 8 OCTOBER 2019 WITH CHANGE 1 DATED 1 OCTOBER 2020 AND THE INTERNATIONAL BUILDING CODE (IBC) 2018.
3. THE CONTRACTOR SHALL MAINTAIN AND ADHERE TO ALL CONSTRUCTION SITE SAFETY IN ACCORDANCE
WITH USACE ENGINEERING MANUAL EM 385-1-1 AND UFC SAFETY CRITERIA (UFC 4-020-01).
4. ANY WORK PERFORMED WITHOUT THE APPROVAL OF THE PROJECT ENGINEER AND/OR ALL MATERIAL NOT IN CONFORMANCE WITH THE SPECIFICATION IS SUBJECT TO REMOVAL AND REPLACEMENT AT THE
CONTRACTOR'S EXPENSE.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND DISPOSAL OF EXCESS MATERIALS AND WASTE. SUCH DISPOSAL AND REMOVAL SHALL NOT CREATE A NUISANCE. EARTHWORK MATERIAL SHALL
BE REMOVED IMMEDIATELY AND DISPOSED OF AT THE DISCRETION OF THE COR.
6. THE CONTRACTOR SHALL RESTORE ANY DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN
EXISTED BEFORE CONSTRUCTION.
7. ALL PROPRIETARY SYSTEMS AND ACCESSORIES SHALL BE INSTALLED WITH STRICT ADHERENCE TO THE
MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS.
DC - DESIGN CRITERIA
1. THE STRUCTURES SHALL BE DESIGNED IN ACCORDANCE WITH THE DOD BUILDING CODE UFC 1-200-01, INTERNATIONAL BUILDING CODE (IBC) 2018 EDITION, UFC 3-301-01 STRUCTURAL ENGINEERING, ASCE 7-16, &
AASHTO 9TH EDITION.
2. DEAD LOADS:
A. ROOF: PER PEMB MANUFACTURER
B. PLATFORM FLOOR: PER PRECAST MANUFACTURER
C. RAMP FLOOR: PER PRECAST MANUFACTURER
3. COLLATERAL LOADS:
A. ROOF: 5 PSF (NOT TO BE COMBINED WITH WIND UPLIFT LOAD CASES)
4. UNIFORM LIVE LOADS: (ASCE 7-16)
A. ROOF: 20 PSF (REDUCIBLE)
B. PLATFORM FLOOR: 250 PSF IN ADDITION TO PALLET RACK POST LOADS = 10,000 LBS. EACH (SEE S-103
FOR POST LAYOUT)
C. STAIRS: 100 PSF
5. VEHICULAR LIVE LOADS: (NOT COMBINED WITH UNIFORM LIVE LOAD OR PALLET RACK POST LOADS) A. RAMP & PLATFORM FLOOR: H15-44, 15 TON TRUCK WITH A 6 KIP FRONT AXLE & 24 KIP REAR AXLE
SPACED 14FT APART.
B. DESIGN LANE LOAD: 0.64 KLF (COMBINED WITH DESIGN TRUCK)
6. SNOW LOADS: (ASCE 7-16)
A. ROOF: OMITTED (GROUND SNOW LOAD = 0 PSF)
7. WIND LOADS: (ASCE 7-16)
A. RISK CATEGORY: IV
B. BASIC WIND SPEED: 164 MPH
C. ALLOWABLE STRESS DESIGN WIND SPEED VASD = 127 MPH
D. EXPOSURE CATEGORY: D
E. INTERNAL PRESSURE COEFFICIENT: ±0.55 (PARTIALLY ENCLOSED)
F. THE EAVE HEIGHT USED IN WIND PRESSURE DETERMINATION SHALL ACOUNT FOR THE ELEVATED
FINISHED FLOOR AND SHALL BE MEASURED FROM THE GROUND SURFACE.
8. SEISMIC LOADS: (ASCE 7-16)
A. RISK CATEGORY: IV
B. SEISMIC IMPORTANCE FACTOR: Ie = 1.50
C. SITE CLASS: D - DEFAULT
D. MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS: SS = 0.076g, S1 = 0.046g E. SITE COEFFICIENTS: Fa = 1.6, Fv = 2.4 F. SITE ADJUSTED SPECTRAL RESPONSE ACCELERATION PARAMETERS: SMS = 0.121g, SM1 = 0.110g G. DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS: SDS = 0.081g, SD1 = 0.073g
H. SEISMIC DESIGN CATEGORY: C
I. SEISMIC LATERAL FORCE RESISTING SYSTEM:
1. BUILDING: PER PRE-ENGINEERED METAL BUILDING MANUFACTURER
2. PLATFORM AND RAMP: NONBUILDING STRUCTURE TYPE ALL OTHER SELF-SUPPORTING
STRUCTURES (ASCE 7-16 TABLE 15.4-2).
a. RESPONSE MODIFICATION FACTOR: R = 1.25
b. OVERSTRENGTH FACTOR: Ωo = 2.0
c. DEFLECTION AMPLIFICATION FACTOR: Cd = 2.5
d. SEISMIC RESPONSE COEFFICIENT: CS = 0.097
9. WAVE LOADS: (ASCE 7-16)
A. FLOOD ZONE: VE
B. DESIGN FLOOD ELEVATION (DFE): 15.47ft (NAVD88)
10. ROOF RAIN LOADS:
A. 15-MINUTE PRECIPITATION INTENSITY: 10.22 IN/HR
B. 60-MINUTE PRECIPITATION INTENSITY: 6.04 IN/HR
CO - CONCRETE
1. ALL CONCRETE DESIGN AND WORK SHALL CONFORM TO ACI 318-14.
2. ALL CONCRETE SHALL HAVE THE FOLLOWING MINIMUM SPECIFIED 28-DAY COMPRESSIVE STRENGTH:
A. PRECAST / PRESTRESSED CONCRETE: 6,000 PSI (MINIMUM), W/C RATIO = 0.40 (MAXIMUM)
B. CAST-IN-PLACE CONCRETE: 5,000 PSI, W/C RATIO = 0.40 (MAXIMUM)
C. SCOUR PROTECTION SLAB: 2,500 PSI
3. SUBMIT SHOP DRAWINGS WHICH ADEQUATELY DEPICT THE REINFORCING BAR SIZES AND PLACEMENT.
WRITTEN DESCRIPTION OF REINFORCEMENT WITHOUT ADEQUATE SECTIONS, ELEVATIONS, AND DETAILS
IS NOT PERMITTED.
4. A CHAMFER OF 3/4" SHALL BE MADE AT ALL EXPOSED CORNERS OF CONCRETE MEMBERS.
5. RAMP SLAB PANELS SHALL RECIEVE A TINE FINISH.
6. SHOPS BUILDING SLAB PANELS SHALL RECIEVE A STEEL TROWELLED FINISH.
7. THE PRECAST MANUFACTURER SHALL BE RESPONSIIBLE FOR THE DESIGN OF ALL PRECAST SLABS, CAP
BEAMS, STRUTS, AND CONNECTIONS U.N.O.
RS - REINFORCING STEEL:
1. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60 .
2. ALL CONTINUOUS REINFORCING STEEL SHALL BE LAPPED USING A CLASS "B" TENSION LAP.
3. ALL REINFORCING STEEL SHALL BE PLACED WITH A MINIMUM OF 2-1/2" OF CLEAR COVER, TYP. U.N.O.
MB - PRE-ENGINEERED METAL BUILDING
1. ALL STRUCTURAL STEEL, FRAMES, PURLINS, GIRTS, SOFFITS, DECK, WALL SIDING, ETC. SHALL BE DESIGNED AND FABRICATED BY THE METAL BUILDING MANUFACTURER IN ACCORDANCE WITH ALL
APPLICABLE CODES.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COORDINATION AND ERECTION OF THE PRE- ENGINEERED METAL BUILDING SUPERSTRUCTURE INCLUDING DIMENSIONAL ACCURACY, COLUMN BASE
PLATES AND ANCHORAGE.
3. THE PRIMARY AND SECONDARY PRE-ENGINEERED METAL BUILDING COMPONENTS SHALL BE DESIGNED TO SUPPORT THE LOADS FROM ALL MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT SHOWN IN
THE CONTRACT DOCUMENTS.
4. ALL FRAMES, GIRTS, PURLINS, BASE PLATES, ETC. SHALL BE HOT-DIPPED GALVANIZED.
5. THE PEMB MANUFACTURER SHALL PROVIDE COLUMN REACTIONS AND ANCHOR BOLT LAYOUT PRIOR TO
FINAL DESIGN AND CASTING OF THE PRECAST CONCRETE SUBSTRUCTURE.
SS - STRUCTURAL STEEL
1. STRUCTURAL STEEL SHALL CONFORM TO FOLLOWING U.N.O.:
A. ROLLED SHAPES: ASTM A992
B. PLATES: ASTM A36 (MINIMUM)
C. ANGLES: ASTM A36 (MINIMUM)
D. PIPE: ASTM A53, GR. B
E. HSS: ASTM A500, GR. C
F. CHANNELS: ASTM A36
2. BOLTS AND ANCHORS:
A. BOLTED CONNECTIONS SHALL BE BEARING TYPE WITH 3/4" DIAMETER ASTM F3125, GRADE A325
BOLTS, GALVANIZED, U.N.O.
B. ANCHOR RODS SHALL BE HEADED TYPE CONFORMING TO ASTM F1554-36, GALVANIZED, U.N.O.
3. STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED ACCORDING TO THE AISC 15TH EDITION STEEL
CONSTRUCTION MANUAL.
4. SUBMIT SHOP DRAWINGS WHICH ADEQUATELY DEPICT THE STRUCTURAL ELEMENTS AND CONNECTIONS
SHOWN IN THE CONTRACT DOCUMENTS.
5. USE PREQUALIFIED WELDED JOINTS PER AISC AND AWS D1.1 OF THE AMERICAN WELDING SOCIETY. "NON
PREQUALIFIED JOINTS" SHALL BE QUALIFIED PRIOR TO FABRICATION.
6. ALL WELDING SHALL BE PERFORMED USING E70XX SERIES LOW HYDROGEN ELECTRODES.
7. HOLES FOR BOLTING SHALL BE SHOP PUNCHED OR FIELD DRILLED. THE MAKING OF HOLES OR ENLARGEMENT OF HOLES BY BURNING WILL NOT BE PERMITTED. ALL HOLES SHALL BE STANDARDIZED, UNLESS NOTED OTHERWISE.
8. ALL STEEL SHALL BE HOT-DIPPED GALVANIZED PER ASTM A123 AND REPAIRED IN THE FIELD AFTER
ERECTION AS NECESSARY.
9. ALL WELDING SHALL BE ACCOMPLISHED IN ACCORDANCE TO AWS D1.1 USING COMPATIBLE MATERIALS
FOR WELDING GALVANIZED MATERIAL.
10. ALL GROOVE WELDS SHALL BE CJP WELDS, U.N.O.
ABBREVIATIONS:
BRG. BEARING
BTM. BOTTOM
C.D. CONTROL DIMENSION
CJP COMPLETE JOINT PENETRATION
C.L. CENTERLINE
CONT. CONTINUOUS
DFE DESIGN FLOOD ELEVATION
DIA. DIAMETER
DIAG. DIAGONAL
EA. EACH
FCM FRACTURE CRITICAL MEMBER
GALV. GALVANIZED
HORIZ. HORIZONTAL
HSA HEADED STUD ANCHOR
MAX. MAXIMUM
MIN. MINIMUM
O.F. OUTSIDE FACE
O.C. ON-CENTER
PEMB PRE-ENGINEERED METAL BUILDING
PL. PLATE
R RADIUS
SIM. SIMILAR
SS STAINLESS STEEL
SQ. SQUARE
STIFF. STIFFENER
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VERT. VERTICAL
V.I.F. VERIFY IN FIELD
W.P. WORK POINT
@ AT
SF - SHALLOW FOUNDATIONS:
1. SPREAD FOOTINGS ARE DESIGNED FOR AN ALLOWABLE BEARING PRESSURE OF 1200 PSF. 5
5 5
2e
3e
3e
2n
2n
2r
3r
3r
2r
3r
3r
2n
2n
2e
3e
3e
ZONE AREA (SF) PRESSURE (PSF)
COMPONENT & CLADDING WIND PRESSURES
1 & 2e
10 +76, -178
50 +65, -119
100 +60, -74
200 +60, -74
2n, 2r, 3e
10 +76, -247
50 +65, -178
100 +60, -148
200 +60, -118
3r
10 +76, -289
50 +65, -202
100 +60, -164
200 +60, -164 a aa a
10 +108, -115
50 +100, -107
100 +96, -103
200 +92, -99
10 +108, -136
50 +100, -119
100 +96, -112
200 +92, -104
NOTES:
1. WIND PRESSURES SHOWN ARE ULTIMATE PRESSURES.
2. PLUS AND MINUS SIGNS SIGNIFY PRESSURES ACTING
TOWARD AND AWAY FROM SURFACES, RESPECTIVELY.
3. DISTANCE a = 4 FT.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LA
U
R
EN
D 'A
R M
O N
D , P
E
S-001
G
EN
ER
AL
N O
TE
S
FR
ES
H W
AT
ER
B
AY
O U
L O
C K
N
EW
O R
LE
AN
S D
IS
TR
IC
T
N
EW
O R
LE
AN
S, L
A
AD
AM
B
EL
EW
, P
E
AD
AM
B
EL
EW
, P
E
TA
R
R
IS
G R
EE
R
, P E
JU
N
E
W
2P 8-
-B
-0
W
XX
XX
X-
XX
-X
-X
XX
X
R
EA
D Y
FO
R
A D
VE
R
TI
SE
M
EN
T
N
EW
S H
O
PS
B U
IL
D
IN
G
VE
R
M
IL
IO
N
P
AR
R
IS
H , L
A
FR
ES
H W
AT
ER
B
AY
O U
W
AT
ER
W
AY
-53.00P1
P10 - P18
P2
P3
P4
P5
P6
P7
P8
P9
-53.00
-53.00
-53.00
-53.00
-53.00
-53.00
-53.00
-53.00
16.42 -53.00
15.30
13.65
11.98
10.30
8.63
6.95
5.27
3.60
2.25
LOCATION HEAD EL. TIP EL.
PILE SCHEDULE
P10 P11 P12 P13 P14 P15 P16 P17 P18
PE
PC
PA
PG
P9P8P7P6P5P4P3P2P1 13' - 6" 16' - 9" 16' - 9" 16' - 9" 16' - 9" 16' - 9" 16' - 9" 16' - 6" 4' - 6" 9' - 3 1/2" 9' - 3 1/2" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 9' - 3 1/2" 9' - 3 1/2"
8'
0" 2'
6"
5'
6" 5'
6"
2'
6" 8'
0"
18" SQ. PRESTRESSED
CONCRETE PILE, TYP.,
SEE S-501
18" SQ. PRESTRESSED
CONCRETE PILE, TYP.,
SEE S-501
A11 S-301
PB
PF
PD
8'
0" 8'
0"
8'
0" 8'
0"
X 2971852.94 Y 385060.52
X 2971883.43 Y 385050.82X 2971860.04
Y 384977.28
X 2971829.54 Y 384986.98
X 2971838.19 Y 384979.51
X 2971848.67 Y 384976.18
X 2971798.62 Y 384855.16
X 2971809.10 Y 384851.82
X 2971797.94 Y 384895.90
TEST
PILE, SEE
NOTE 2
8' - 4 1/2"
1 5
D
C
B
A
P10 P11 P12 P13 P14 P15 P16 P17 P18
PE
PC
PA
PG
1' - 5" 13' - 6" 16' - 9" 16' - 9" 16' - 9" 16' - 9" 16' - 9" 16' - 9" 16' - 6" 3' - 1"
1' - 5" HOLD
9' - 3 1/2" 9' - 3 1/2" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 9' - 3 1/2" 9' - 3 1/2"
1' - 5" HOLD
P9P8P7P6P5P4P3P2P1
10%
FFE = 18.50
RAMP
135' - 0"
PLATFORM
80' - 0"
5.00
PRECAST SLAB
PANEL, TYP.
PRECAST
CONCRETE CAP
BEAM BELOW, TYP.
PRESTRESSED CONCRETE
PILE BELOW, TYP.
GALV.
STEEL
STAIR
PRECAST
CONCRETE CAP
BEAM BELOW, TYP.
PRESTRESSED CONCRETE PILE
BELOW, TYP.
PRECAST SLAB
PANEL, TYP.
GALV. STEEL STAIR
S-102 A1
S-201
H1
S-201
A1
A11 S-301
S-104 J1
S-105 A1
S-202 A1
A1 S-301
R
AM
P
2'
6"
2'
6"
1'
0"
D R
IV
E
LA
N
E
1'
0"
PRECAST CONCRETE
CURB, EA. SIDE OF RAMP
ALUMINUM GUARDRAIL, EA.
SIDE OF RAMP
PB
PF
PD
1" GAPH15
S-402
J10 S-403
J1 S-403
D1 S-403
B10 S-403
3'
0" 8'
0"
2'
6" 5'
6"
5'
6" 2'
6"
8'
0" 3'
0"
STAIR
FOOTING
SE
E
C -1
F
O R
TR
AN
SI
TI
O
N S
LA
B
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LA
U
R
EN
D 'A
R M
O N
D , P
E
S-101
O
VE
R
AL
L
PI
LE
L
AY
O
U T
AN
D
P
LA
TF
O
R M
F R
AM
IN
G P
LA
N
S
FR
ES
H W
AT
ER
B
AY
O U
L O
C K
N
EW
O R
LE
AN
S D
IS
TR
IC
T
N
EW
O R
LE
AN
S, L
A
AD
AM
B
EL
EW
, P
E
AD
AM
B
EL
EW
, P
E
TA
R
R
IS
G R
EE
R
, P E
JU
N
E
W
2P 8-
-B
-0
W
XX
XX
X-
XX
-X
-X
XX
X
R
EA
D Y
FO
R
A D
VE
R
TI
SE
M
EN
T
N
EW
S H
O
PS
B U
IL
D
IN
G
VE
R
M
IL
IO
N
P
AR
R
IS
H , L
A
FR
ES
H W
AT
ER
B
AY
O U
W
AT
ER
W
AY
NORTH
0 4' 8' 16'
1/8" = 1'-0"H1 PILE LAYOUT PLAN
1/8" = 1'-0"A1 PLATFORM FRAMING PLAN
NORTH
0 4' 8' 16'
1. SEE SPECIFICATION SECTION 31 62 13.20 AND DRAWING
S-501 FOR PILES SPECIFCATIONS AND DETAILS.
2. THE DESIGN PILE SERVICE LOAD IS 105 KIPS.
3. IN ADDITION TO HANDLING STRESSES, DESIGN PILES FOR
LRFD FLEXURE AND SHEAR (Mu = 1,635in-k, Vu-20k)
4. THE TEST PILE INDICATED ON PLAN SHALL BE LOAD TESTED
TO 200% OF THE SERVICE LOAD NOTED ABOVE. SEE
SPECIFICATION SECTION 31 62 14.00 FOR PILE LOAD TEST
REQUIREMENTS.
5. THE PILE HEAD ELEVATION SHOWN IN THE PILE SCHEDULE
IS BASED ON THE BOTTOM OF PRECAST CAP BEAM
ELEVATION. THE FINAL PILE HEAD ELEVATION SHALL BE
COORDINATED WITH THE FINAL PRECAST CAP BEAM DEPTH.
GENERAL NOTES
1 5
A
P10 P11 P12 P13 P14 P15 P16 P17 P18
PA
PG
P9
FFE = 18.50
A1 S-301
3' - 1"
HOLD
1' - 5" 9' - 3 1/2" 9' - 3 1/2" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 9' - 3 1/2" 9' - 3 1/2"
HOLD
1' - 5"
PA
N
EL
W
ID
TH
9'
6"
PA
N
EL
W
ID
TH
9'
6"
PA
N
EL
W
ID
TH
9'
6"
PA
N
EL
W
ID
TH
9'
6"
PANEL LENGTH
20' - 0"
PANEL LENGTH
20' - 0"
PANEL LENGTH
20' - 0"
PANEL LENGTH
20' - 0"
PRECAST
CONCRETE
SLAB PANEL
PRESTRESSED
CONCRETE PILE
BELOW, TYP.
PRECAST
CONCRETE CAP
BEAM BELOW, TYP.
S-202 A1 S-202A11
S-201
A1
S-201
H1
A1 S-402
A1 S-402
H8 S-402
H1 S-402
H1 S-402
A8 S-402
A15 S-402
PB
PF
PD
1" GAP
3'
0" 8'
0"
8'
0" 8'
0"
8'
0" 3'
0"
PRECAST
CONCRETE STRUT
BELOW, TYP.
TY
P.
4'
0"
TY
P .
4'
0"
STRUT C.L.
S-401 K1
80' - 0"
BLOCKOUT IN SLAB
PANEL FOR PEMB
COLUMN, TYP.
S-401 K8
S-401 F1
TYP. TYP.
TYP.
H15 S-402
EQUIPMENT
TIEDOWN, SEE
S-501, TYP.
J16 S-403
J1 S-403
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LA
U
R
EN
D 'A
R M
O N
D , P
E
S-102
EN
LA
R G
ED
P
LA
TF
O R
M F
R
AM
IN
G
P
LA
N
FR
ES
H W
AT
ER
B
AY
O U
L O
C K
N
EW
O R
LE
AN
S D
IS
TR
IC
T
N
EW
O R
LE
AN
S, L
A
AD
AM
B
EL
EW
, P
E
AD
AM
B
EL
EW
, P
E
TA
R
R
IS
G R
EE
R
, P E
JU
N
E
W
2P 8-
-B
-0
W
XX
XX
X-
XX
-X
-X
XX
X
R
EA
D Y
FO
R
A D
VE
R
TI
SE
M
EN
T
N
EW
S H
O
PS
B U
IL
D
IN
G
VE
R
M
IL
IO
N
P
AR
R
IS
H , L
A
FR
ES
H W
AT
ER
B
AY
O U
W
AT
ER
W
AY
1/4" = 1'-0"A1 ENLARGED PLATFORM FRAMING PLAN
NORTH
0 2' 4' 8'
1 5
C
B
A
P10 P12 P14 P16 P18
PA
PG
A1 S-301
HOLD
1' - 5"
18' - 7" 20' - 0" 20' - 0" 18' - 7"
HOLD
1' - 5"
FIRE EXTINGUISHER
DOWNSPOUT, TYP.
DOWNSPOUT, TYP.
3'
4" 3'
2"
S-501J1
80' - 0"
C.L. PILE / PEMB COLUMN C.L. PILE / PEMB COLUMN C.L. PILE / PEMB COLUMN O.F. GIRTO.F. GIRT
S-501 J1
SIM.
FIRE
EXTINGUISHER
9'
0"
9'
0"
O.F. GIRTO.F. GIRT
3'
2" 3'
4"
4'
6"
R O
L L
IN
G D
O O
R
PEMB FRAME
COL., TYP.
PEMB TUBE JAMB, CHANNEL JAMBS
NOT PERMITTED
FFE = 18.50
S-202 A1 S-202A11
S-201
A1
S-201
H1
A1 S-402
A1 S-402
H8 S-402
H1 S-402
H1 S-402
A8 S-402
PALLET RACK SHOWN FOR REFERENCE
ONLY, TYP. NOT IN CONTRACT, SEE S0.1
FOR POST LOADS
POST SPA.
8' - 0" TYP.
TYP.
2' - 0"
OVERHEAD
COILING DOOR
HOOD ABOVE
C.L. PILE / PEMB END WALL FRAME,
PEMB MANUF. TO HOLD C.L.
LOCATION OF END WALL FRAME
TYP.
2' - 0"
POST SPA.
8' - 0" TYP.
POST SPA.
8' - 0" TYP.
TYP.
2' - 0"
INDICATES PEMB
SIDEWALL X-BRACING,
PEMB MANUF. SHALL
PROVIDE BRACING IN
EACH BAY AS SHOWN
C.L. PILE / PEMB END WALL FRAME,
PEMB MANUF. TO HOLD C.L.
LOCATION OF END WALL FRAME
A15 S-402
PB
PF
PD
3'
0" 6'
0"
2'
0" 8'
0"
8'
0" 2'
0"
6'
0" 3'
0"
S-401 K1
TYP. BLOCKOUT IN SLAB
PANEL FOR PEMB
COLUMN, TYP.S-401
K8
TYP.
S-401 F1
TYP.
S-401 F8
H15 S-402
EQUIPMENT
TIEDOWN, SEE
S-501, TYP.
J16 S-403
J1 S-403
PO
ST
S
PA
3'
6" T
YP
1'
3"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LA
U
R
EN
D 'A
R M
O N
D , P
E
S-103
FL
O
O R
P
LA
N
FR
ES
H W
AT
ER
B
AY
O U
L O
C K
N
EW
O R
LE
AN
S D
IS
TR
IC
T
N
EW
O R
LE
AN
S, L
A
AD
AM
B
EL
EW
, P
E
AD
AM
B
EL
EW
, P
E
TA
R
R
IS
G R
EE
R
, P E
JU
N
E
W
2P 8-
-B
-0
W
XX
XX
X-
XX
-X
-X
XX
X
R
EA
D Y
FO
R
A D
VE
R
TI
SE
M
EN
T
N
EW
S H
O
PS
B U
IL
D
IN
G
VE
R
M
IL
IO
N
P
AR
R
IS
H , L
A
FR
ES
H W
AT
ER
B
AY
O U
W
AT
ER
W
AY
1/4" = 1'-0"A1 FLOOR PLAN
NORTH
0 2' 4' 8'
1 P10
PG
A1 S-104
W 8X
GALV. 1-1/2" X 3/16" (19-W-4) BAR
GRATING STAIR TREAD W/
CHECKERED PLATE 90 DEG.
ANGLE NOSING, PROVIDE 3/16"
CARRIAGE PLATE AT EA. END
WELDED TO STRINGER
GALV. STEEL COLUMN,
SEE SECTION, TYP.
C 8X
.5
GALV. 1-1/2" X 3/16" (19-W-4)
BAR GRATING W/ CHECKERED
PLATE 90 DEG. ANGLE NOSING,
TYP. AT LANDINGS
C12X20.7 STRINGER
C12X20.7 STRINGER
C12X20.7 STRINGER
C12X20.7 STRINGER
E1 S-404
5'
6"
3'
6"
C
LR
. W
ID
TH
3'
0"
(12) TREADS @ 11" O.C. = 11' - 0"
LANDING
3' - 0" (11) TREADS @ 11" O.C. = 10' - 1"
LANDING
4' - 9" 1' - 5"
E9 S-404
L3X3X3/8
L3X3X3/8L3X3X3/8L3X3X3/8
L3X3X3/8L3X3X3/8
1' - 7 5/8" 1' - 6" 1' - 6" 1' - 4 3/8"
4' - 6" 6' - 9 3/8" 6' - 0" 13' - 5 5/8" 1' - 5"
STAIR
FOOTING
STAIR
FOOTING
6'
0"
1'
9/
1'
7/
GALV. 1 1/2"
X-STRONG PIPE
GALV. 1 1/2" X-STRONG
POST @ 48" O.C. MAX.
GALV. STRINGER, SEE PLAN
W 8X
1/4
TYP.
GALV. BAR GRATING STAIR
TREAD, SEE PLAN
3/16
TYP.
GALV. BAR GRATING, SEE PLAN, TYP.
RETURN TO
END POST
GALV. L3X3X3/8 HOLD SHORT 1"
EA. SIDE OF COLUMN
EL. = 4.00 ± V.I.F.EL. = 4.00 ± V.I.F.
2'
3"
EXIST. GRADE (APPROX.)
CJP, TYP.
S-404 J1 S-404
J9
2'
3"
4' - 6" 6' - 0"
3' - 1 5/8" 2' - 10 3/8"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LA
U
R
EN
D 'A
R M
O N
D , P
E
S-104
SO
U
TH
S
TA
IR
P
LA
N A
N D
S
EC
TI
O
N
FR
ES
H W
AT
ER
B
AY
O U
L O
C K
N
EW
O R
LE
AN
S D
IS
TR
IC
T
N
EW
O R
LE
AN
S, L
A
AD
AM
B
EL
EW
, P
E
AD
AM
B
EL
EW
, P
E
TA
R
R
IS
G R
EE
R
, P E
JU
N
E
W
2P 8-
-B
-0
W
XX
XX
X-
XX
-X
-X
XX
X
R
EA
D Y
FO
R
A D
VE
R
TI
SE
M
EN
T
N
EW
S H
O
PS
B U
IL
D
IN
G
VE
R
M
IL
IO
N
P
AR
R
IS
H , L
A
FR
ES
H W
AT
ER
B
AY
O U
W
AT
ER
W
AY
1/2" = 1'-0"J1 SOUTH EXTERIOR STAIR PLAN
NORTH
0 1' 2' 4'
0 1' 2' 4'
1/2" = 1'-0"A1 SOUTH STAIR SECTION
1. ALL STAIR FRAMING, GRATING, RAILING, AND HARDWARE SHALL BE HOT DIPPED
GALVANIZED.
A7
S-105
W8X31
W8X31
GALV. 1-1/2" X 3/16" (19-W-4) BAR
GRATING STAIR TREAD W/
CHECKERED PLATE 90 DEG.
ANGLE NOSING, PROVIDE 3/16"
CARRIAGE PLATE AT EA. END
WELDED TO STRINGER
GALV. 1-1/2" X 3/16" (19-W-4)
BAR GRATING W/ CHECKERED
PLATE 90 DEG. ANGLE
NOSING, TYP. AT LANDINGS
C
X2 0.
ST
R
IN
G
ER
C
X2 0.
ST
R
IN
G
ER
C12X20.7
GUARDRAIL, SEE SECTION
HANDRAIL, SEE SECTION
GALV. STEEL COLUMN,
SEE SECTION, TYP.
GALV. STEEL COLUMN,
SEE SECTION, TYP.
C
X2 0.
ST
R
IN
G
ER
C
X2 0.
ST
R
IN
G
ER
L3 X3
X3 /8
L3 X3
X3 /8
6" 3' - 6"
CLR.
3' - 0"
L3 X3
X3 /8
L3 X3
X3 /8
L3 X3
X3 /8
L3 X3
X3 /8
EDGE OF SLAB
6"
E1 S-404
3" 4'
6"
4'
6" 7'
8"
4'
6"
TYP.
5' - 6" STAIR FOOTING
STAIR
FOOTING
STAIR
FOOTING
STAIR
FOOTING
A1 S-404
A9 S-404
6"
EX
TE
N D
G R
AT
IN
G
3'
6" C
O
PE
S
TR
IN
G
ER
3'
1"
E1 S-404
FFE
18.50
D
(12) TREADS @ 11" O.C. = 11' - 0"
LANDING
3' - 0" (11) TREADS @ 11" O.C. = 10' - 1"
LANDING
6' - 6" 2' - 1"
W 8X
W 8X
GALV. 1 1/2"
X-STRONG PIPE
GALV. 1 1/2"
X-STRONG POST
@ 48" O.C. MAX.
GALV. STRINGER,
SEE PLAN
1/4
TYP.
BAR GRATING TREAD AND
LANDING, SEE PLAN, TYP.
3/16
TYP.
GALV. STEEL
CHANNEL, SEE
PLAN, TYP. U.N.O.
RETURN TO
END POST
(1 2)
R
IS
ER
S
5/
1/ 2"
(1 3)
R
IS
ER
S
5/
/2
1"
1' - 0"
2' - 3" 2' - 3"
1' - 6" 1' - 6"
3'
6" 3'
0"
3"
3"
S-404 J1
2'
3"
2'
3"
1' - 0"
/1 6"
T
YP
TYP.
11"
1" TYP.
S-404 J9
S-404 J9
EL. = 4.00 ± V.I.F.EL. = 4.00 ± V.I.F.
EL. = 4.00 ± V.I.F.
4' - 6" 7' - 8" 4' - 6" 13' - 2" 4' - 6" 3"
2'
3"
CJP, TYP.
1' - 10" 2' - 8"
5"
2' - 3" 2' - 3"
2' - 6"
30' - 7"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LA
U
R
EN
D 'A
R M
O N
D , P
E
S-105
N O
R
TH
S
TA
IR
P
LA
N
A N
D S
EC
TI
O N
FR
ES
H W
AT
ER
B
AY
O U
L O
C K
N
EW
O R
LE
AN
S D
IS
TR
IC
T
N
EW
O R
LE
AN
S, L
A
AD
AM
B
EL
EW
, P
E
AD
AM
B
EL
EW
, P
E
TA
R
R
IS
G R
EE
R
, P E
JU
N
E
W
2P 8-
-B
-0
W
XX
XX
X-
XX
-X
-X
XX
X
R
EA
D Y
FO
R
A D
VE
R
TI
SE
M
EN
T
N
EW
S H
O
PS
B U
IL
D
IN
G
VE
R
M
IL
IO
N
P
AR
R
IS
H , L
A
FR
ES
H W
AT
ER
B
AY
O U
W
AT
ER
W
AY
1/2" = 1'-0"A1 NORTH EXTERIOR STAIR PLAN
1/2" = 1'-0"A7 NORTH EXTERIOR STAIR SECTION
NORTH
0 1' 2' 4' 0 1' 2' 4'
1. ALL STAIR FRAMING, GRATING, RAILING, AND HARDWARE SHALL BE HOT DIPPED
GALVANIZED.
FFE
18.50
1 5
EAVE
36.50
P10 P11 P12 P13 P14 P15 P16 P17 P18P9P8P7P6P5P4P3P2P1
INSULATED WALL
PANEL
RIDGE VENT
GUTTER
GALV. STEEL
STAIR
EXTERIOR LIGHT,
SEE ELEC.
DRAWINGS
13' - 6" 16' - 9" 16' - 9" 16' - 9" 16' - 9" 16' - 9" 16' - 9" 16' - 6" 3' - 1" 1' - 5"
9' - 3 1/2" 9' - 3 1/2" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 9' - 3 1/2" 9' - 3 1/2" 1' - 5"
10%
O.F. GIRTO.F. GIRT
INSULATED ROOF
PANEL
80' - 0"
PILE GRID,
TYP.
GALV. STEEL
STAIR
PRESTRESSED
PILE, TYP.
PRECAST BEAM, TYP.
PRECAST SLAB, TYP.
ALUMINUM
GUARDRAIL
PRESTRESSED
PILE, TYP.
PRECAST BEAM, TYP.
PRECAST SLAB, TYP.
EXTERIOR LIGHT,
SEE ELEC.
DRAWINGS
DOWNSPOUT, TYP.
DFE
15.47
2500 PSI SCOUR
PROTECTION SLAB (4"
THICK W/WWR), TYP.
BELOW PLATFORM AND
RAMP, MATCH EXTENTS
STAIR FOUNDATION, TYP.
LOUVER, SEE MECH.
130' - 6"
FFE
18.50
EAVE
36.50
P10P11P12P13P14P15P16P17P18 P9 P8 P7 P6 P5 P4 P3 P2 P1
80' - 0"
13' - 6"16' - 9"16' - 9"16' - 9"16' - 9"16' - 9"16' - 9"16' - 6"3' - 1" 1' - 5"
9' - 3 1/2"9' - 3 1/2"10' - 0"10' - 0"10' - 0"10' - 0"9' - 3 1/2"9' - 3 1/2"1' - 5"
INSULATED
WALL PANEL
RIDGE VENT
GALV. STEEL
STAIR
EXTERIOR LIGHT,
SEE ELEC.
DRAWINGS
O.F. GIRT O.F. GIRT
INSULATED ROOF
PANEL
PILE GRID,
TYP.
GALV.
STEEL
STAIRPRESTRESSED PILE, TYP.
PRECAST BEAM, TYP.
PRECAST SLAB, TYP.
ALUMINUM
GUARDRAIL
PRESTRESSED
PILE, TYP.
PRECAST BEAM, TYP.
PRECAST SLAB, TYP.
10%
EXTERIOR LIGHT,
SEE ELEC.
DRAWINGS
DOWNSPOUT, TYP.
DFE
15.47
2500 PSI SCOUR PROTECTION
SLAB (4" THICK W/WWR), TYP.
BELOW PLATFORM AND RAMP,
MATCH EXTENTS
DESIGN FLOOD
ELEVATION
(DFE)
LOUVER, SEE MECH.
130' - 6"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LA
U
R
EN
D 'A
R M
O N
D , P
E
S-201
EA
ST
A N
D W
ES
T
EX
TE
R
IO
R E
LE
VA
TI
O
N S
FR
ES
H W
AT
ER
B
AY
O U
L O
C K
N
EW
O R
LE
AN
S D
IS
TR
IC
T
N
EW
O R
LE
AN
S, L
A
AD
AM
B
EL
EW
, P
E
AD
AM
B
EL
EW
, P
E
TA
R
R
IS
G R
EE
R
, P E
JU
N
E
W
2P 8-
-B
-0
W
XX
XX
X-
XX
-X
-X
XX
X
R
EA
D Y
FO
R
A D
VE
R
TI
SE
M
EN
T
N
EW
S H
O
PS
B U
IL
D
IN
G
VE
R
M
IL
IO
N
P
AR
R
IS
H , L
A
FR
ES
H W
AT
ER
B
AY
O U
W
AT
ER
W
AY
1/8" = 1'-0"H1 EAST EXTERIOR ELEVATION
1/8" = 1'-0"A1 WEST EXTERIOR ELEVATION
0 4' 8' 16'
DCBA
EAVE
36.50
PEPCPA PG
3" / 1'-0"
9' - 0" 20' - 0" 9' - 0"
38' - 0"
3' - 0" 6' - 0" 2' - 0" 2' - 6" 5' - 6" 5' - 6" 2' - 6" 2' - 0" 6' - 0" 3' - 0"
3" / 1'-0"
16' - 0"
7'
0" 3' - 4" 3' - 2"
EXHAUST FAN, SEE
MECH. DRAWINGS
EXTERIOR LIGHT, SEE
ELEC. DRAWINGS
PREFINISHED
RIDGE VENT
PREFINISHED
GUTTER
INSULATED WALL
PANEL
GALV. STEEL
STAIR
INSULATED ROOF
PANEL
EXTERIOR LIGHT,
SEE ELEC.
DRAWINGS
PREFINISHED
GUTTER
STAIR
FOUNDATION
PRESTRESSED
PILE, TYP.
PRECAST
BEAM, TYP.
PRECAST RAMP
ALUMINUM
GUARDRAIL
O.F. GIRTO.F. GIRT
PILE GRID, TYP.
BUILDING GRID, TYP.
PREFINISHED
DOWNSPOUT
PREFINISHED
DOWNSPOUT
DFE
15.47
2500 PSI SCOUR
PROTECTION SLAB, TYP.
BELOW PLATFORM AND
RAMP, MATCH EXTENTS
DESIGN FLOOD
ELEVATION (DFE),
LOWEST HORIZONTAL
MEMBER OF ELEVATED
PLATFORM SHALL BE
ABOVE THIS ELEVATION
PB PFPD
OVERHEAD
COILING DOOR
FFE
18.50
D C B A
EAVE
36.50
PE PC PAPG
9' - 0" 20' - 0" 9' - 0"
38' - 0"
EXHAUST FAN, SEE MECH. DRAWINGS
EXTERIOR LIGHT, SEE ELEC. DRAWINGS
PREFINISHED RIDGE VENT
PREFINISHED GUTTER
INSULATED WALL
PANEL
GALV. STEEL
STAIR
INSULATED ROOF
PANEL
EXTERIOR LIGHT,
SEE ELEC.
DRAWINGS
PREFINISHED
GUTTER
STAIR FOUNDATION,
TYP.
PRESTRESSED
PILE, TYP.
PRECAST
BEAM, TYP.
O.F. GIRT O.F. GIRT
PILE GRID, TYP.
BUILDING GRID, TYP.
GALV. STEEL
COLUMN, TYP.
3' - 2" 3' - 4"
7'
0"
3" / 1'-0" 3" / 1'-0"
DFE
15.47
2500 PSI SCOUR
PROTECTION SLAB, TYP.
BELOW PLATFORM AND
RAMP, MATCH EXTENTS
DESIGN FLOOD
ELEVATION (DFE),
LOWEST HORIZONTAL
MEMBER OF ELEVATED
PLATFORM SHALL BE
ABOVE THIS ELEVATION
PBPF PD
3' - 0" 6' - 0" 2' - 0" 2' - 6" 5' - 6" 5' - 6" 2' - 6" 2' - 0" 6' - 0" 3' - 0"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LA
U
R
EN
D 'A
R M
O N
D , P
E
S-202
N O
R
TH
A N
D S
O U
TH
E
XT
ER
IO
R
E
LE
VA
TI
O N
S
FR
ES
H W
AT
ER
B
AY
O U
L O
C K
N
EW
O R
LE
AN
S D
IS
TR
IC
T
N
EW
O R
LE
AN
S, L
A
AD
AM
B
EL
EW
, P
E
AD
AM
B
EL
EW
, P
E
TA
R
R
IS
G R
EE
R
, P E
JU
N
E
W
2P 8-
-B
-0
W
XX
XX
X-
XX
-X
-X
XX
X
R
EA
D Y
FO
R
A D
VE
R
TI
SE
M
EN
T
N
EW
S H
O
PS
B U
IL
D
IN
G
VE
R
M
IL
IO
N
P
AR
R
IS
H , L
A
FR
ES
H W
AT
ER
B
AY
O U
W
AT
ER
W
AY
1/4" = 1'-0"A1 SOUTH EXTERIOR ELEVATION
0 2' 4' 8'
1/4" = 1'-0"A11 NORTH EXTERIOR ELEVATION
0 2' 4' 8'
1. OVERHEAD COILING DOOR SHALL BE TESTED IN ACCORDANCE WITH
ANSI/DASMA 108, STANDARD METHOD FOR TESTING SECTIONAL GARAGE
DOORS AND ROLLING DOORS. SEE SPECIFICATION SECTION 08 33 23.
DCBA
EAVE
36.50
PA PG
9' - 0" 20' - 0" 9' - 0"
38' - 0"
3" / 1'-0" 3" / 1'-0"
INTERIOR
LIGHT, SEE
ELECTRICAL
PRESTRESSED
CONCRETE
PILE
PRECAST
CONCRETE
CAP BEAM
PRECAST
CONCRETE
SLAB
GALV. PEMB
FRAME
GALV. PEMB
GIRT, TYP.
GALV. PEMB
PURLIN, TYP.
PREFINISHED
GUTTER
PREFINISHED
DOWNSPOUT
GALV. PEMB
EAVE STRUT
GALV. PEMB
BASE CHANNEL
PREFINISHED
RIDGE VENT
PREFINISHED INSULATED
WALL PANEL
PREFINISHED
INSULATED ROOF
PANEL
2500 PSI SCOUR
PROTECTION
SLAB (4" THICK
W/WWR), TYP.
BELOW
PLATFORM AND
RAMP, MATCH
EXTENTS
DFE
15.47
DESIGN FLOOD
ELEVATION (DFE),
LOWEST HORIZONTAL
MEMBER OF ELEVATED
PLATFORM SHALL BE
ABOVE THIS
ELEVATION
"PALLET RACK,
NOT IN
CONTRACT,
SHOWN FOR
REFERENCE
ONLY, SEE S0.1
FOR DESIGN
POST LOADS
PB PFPD
3' - 0" 6' - 0" 2' - 0" 8' - 0" 8' - 0" 2' - 0" 6' - 0" 3' - 0"
PRECAST
CONCRETE
STRUT
BEAM, TYP.
PILE TIP = -53.00
PEPC
PRECAST SLAB PANEL
PRECAST CAP BEAM
PRESTRESSED PILE
3'
6"
8" 1'
5"
1'
5"
2" 10" 1' - 6"
16' - 0"
CHAMFER CORNERS
PRECAST CONCRETE CURB
ALUMINUM RAIL, TYP.
2' - 6" 11' - 0" 2' - 6"
1' - 6" 10" 2"
PILE TIP = -53.00
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LA
U
R
EN
D 'A
R M
O N
D , P
E
S-301
BU
IL
D
IN
G A
N D
R
AM
P C
R O
SS
S
EC
TI
O N
S
FR
ES
H W
AT
ER
B
AY
O U
L O
C K
N
EW
O R
LE
AN
S D
IS
TR
IC
T
N
EW
O R
LE
AN
S, L
A
AD
AM
B
EL
EW
, P
E
AD
AM
B
EL
EW
, P
E
TA
R
R
IS
G R
EE
R
, P E
JU
N
E
W
2P 8-
-B
-0
W
XX
XX
X-
XX
-X
-X
XX
X
R
EA
D Y
FO
R
A D
VE
R
TI
SE
M
EN
T
N
EW
S H
O
PS
B U
IL
D
IN
G
VE
R
M
IL
IO
N
P
AR
R
IS
H , L
A
FR
ES
H W
AT
ER
B
AY
O U
W
AT
ER
W
AY
1/4" = 1'-0"A1 BUILDING CROSS SECTION
3/4" = 1'-0"A11 RAMP CROSS SECTION
0 2' 4' 8' 0 0.5' 1' 2' 3'
FX
(KIPS)
DL
DLC
RLL
FY
(KIPS)
FZ
(KIPS)LOAD
WL
EL
ESTIMATED COLUMN REACTION SUMMARY
FRAME LINES:
P10 & P18
GRIDS:
A & D
2.6 0.1
0.2 0.1
0.4 0.1
± 20.8 ± 14.0
± 2.2± 5.6
DL
DLC
RLL
WL
EL
FRAME LINES:
P12, P14, P16
GRIDS:
A & D
- 6.1 0.9
- 2.0 0.6
- 4.8 1.3
± 20.514.1 -52.5± 3.6
± 2.6 ± 1.7 ± 2.3
DL
DLC
RLL
- 3.7 -
- 1.0 -
- 3.0 -
WL
EL
-18.5 -29.5± 11.5
± 0.1 ± 5.8 -
END WALL COLUMNS:
P10 & P18
GRIDS:
B & C
COLUMN LOCATION
NOTES:
1. REACTIONS SHOWN ARE FOR ESTIMATING PURPOSES ONLY. FINAL
REACTIONS SHALL BE PROVIDED BY THE PEMB MANUFACTURER PRIOR TO
CONSTRUCTION.
2. FX REACTION IS HORIZONTAL AND ACTS PARALLEL TO THE ROOF RIDGE.
3. FY REACTION IS VERTICAL. MINUS SIGN INDICATES UPLIFT.
4. FZ REACTION IS HORIZONTAL AND ACTS NORMAL TO THE ROOF RIDGE.
MINUS SIGN INDICATES DIRECTION TOWARD THE ROOF RIDGE.
5. REACTIONS SHOWN ABOVE ARE UNFACTORED.
6. DL = DEAD LOAD, DL C = COLLATERAL DEAD LOAD, RLL = ROOF LIVE LOAD,
WL = WIND LOAD, E = EARTHQUAKE LOAD. COLLATERAL DEAD LOAD SHALL
NOT BE USED TO RESIST WIND UPLIFT FORCES.
± 7.1
± 2.6
HOLD
1' - 5" 6" ±
BLOCK-OUT IN PRECAST SLAB PANEL FOR PEMB
COLUMN, FILL W/ NON-SHRINK GROUT AFTER
COLUMN PLACEMENT, SEE NOTE 2
PRECAST CONCRETE
CAP BEAM BELOW
PRESTRESSED PILE BELOW
C.L. PILE / PEMB END
WALL FRAME
PEMB COLUMN & BASE PLATE
EDGE OF PLATFORM/
O.F. GIRT
1' - 11" ±
3'
0"
A1 S-401
M
IN
2'
7"
5"
(2) ADD'L. #5 HAIRPIN IN
CAP BEAM, SEE NOTE 4 5"
(4) 1" DIA. CAST-IN-PLACE ANCHORS, SET
BY PRECAST MANUF. (1'-9" EMBEDMENT),
SEE NOTE 6
2" MIN.
M
AX
2'
1/
4" 2"
M
IN
(2) ADD'L. #5X2'-6" T&B OF SLAB, SEE NOTE 445° TYP.
A1 S-401
3'
0"
6" ± 6" ±
BLOCK-OUT IN PRECAST SLAB PANEL FOR PEMB
COLUMN, FILL W/ NON-SHRINK GROUT AFTER
COLUMN PLACEMENT, SEE NOTE 2
PRECAST CONCRETE CAP BEAM BELOW
PRESTRESSED PILE BELOW
C.L. PILE / PEMB FRAME
PEMB COLUMN & BASE PLATE
(2) ADD'L. #5 HAIRPIN, SEE NOTE 4
EDGE OF PLATFORM/
O.F. GIRT
5" 5"
M
AX
2'
1/
4" 2"
M
IN
M
IN
2'
7"
(4) 1" DIA. CAST-IN-PLACE ANCHORS, SET BY
PRECAST MANUF. (1'-9" EMBEDMENT), SEE NOTE 6
2" MIN.
(2) ADD'L. #5X2'-6" T&B OF SLAB, SEE NOTE 4
HOLD
1' - 5"
6 1/4"
6" 5"
± A8 S-401
BLOCK-OUT IN PRECAST SLAB PANEL FOR
PEMB COLUMN, FILL W/ NON-SHRINK
GROUT AFTER COLUMN PLACEMENT, SEE
NOTE 2
PEMB COLUMN & BASE PLATE, END
WALL COLUMN TO BE CENTERED
ON END WALL FRAME AS SHOWN,
PROVIDE EXTENDED GIRT
CONNECTIONS AS REQUIRED
ALIGN BLOCKOUT WITH
PRECAST SLAB PANEL
JOINT
PRECAST CAP
BEAM BELOW
EDGE OF PLATFORM/
O.F. GIRT
C.L. PILE / PEMB END
WALL FRAME
(4) 3/4" DIA. CAST-IN-PLACE
ANCHORS, SET BY PRECAST MANUF.
(1'-4" EMBEDMENT), SEE NOTE 6
(2) ADD'L. #5X2'-6" T&B OF SLAB, SEE NOTE 4
2" MIN.
2" M
IN
3' - 0"
TYP. CAP BEAM REINF.,
DESIGN BY PRECAST MANUF.
(4) 1" DIA. CAST-IN-PLACE
ANCHORS, SET BY
PRECAST MANUF., SEE
NOTE 6
FOR PILE TO CAP BEAM
CONNECTION SEE DETAIL
/A15 S-402
BLOCK-OUT IN PRECAST SLAB PANEL
FOR PEMB COLUMN, FILL SOLID WITH
NON-SHRINK GROUT AFTER COLUMN
PLACEMENT, SEE NOTE 2
PEMB FRAME COLUMN
EDGE OF PLATFORM/
O.F. GIRT
COLUMN REACTIONS, SEE
TABLE
FY
FZ
(2) ADD'L. #5 HAIRPIN, SEE NOTE 4
H O
LD
H O
LD
2'
0"
3" 3"
1'
9" E
M
BE
D M
EN
T
17.67
HOLD
1' - 5"
H O
LD
H O
LD
2'
0"
FY
FX
COLUMN REACTIONS, SEE
TABLE
EM
BE
D M
EN
T
1'
4"
(4) 3/4" DIA. CAST-IN-PLACE
ANCHORS, SET BY PRECAST
MANUF., SEE NOTE 6
BLOCK-OUT IN PRECAST SLAB PANEL
FOR PEMB COLUMN, FILL SOLID WITH
NON-SHRINK GROUT AFTER COLUMN
PLACEMENT, SEE NOTE 2
PRECAST CONCRETE
CAP BEAM
4" CHAMFERED EDGE, TYP.
DRIP EDGE
PRECAST CONCRETE SLAB PANEL
(4) LAYERS, NO.
30 TARRED FELT
(CONT.), TRIM AT
COLUMN BASE
PLATE
HOLD
2' - 10"
PB
PEMB TUBE JAMB, CHANNEL
JAMBS NOT PERMITTED AT
ROLLING DOOR JAMBS, PEMB
DESIGNER SHALL DESIGN
JAMBS FOR WIND LOADS
NORMAL TO THE OPENING AND
LOADS PARALLEL TO THE
OPENING, COORDINATE WITH
THE DOOR MANUF.
JAMB COLUMN BASE PLATE,
BOTTOM OF BASE PLATE
EL. = 18.50 (SLAB MOUNTED)
EDGE OF PLATFORM/
O.F. GIRT
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LA
U
R
EN
D 'A
R M
O N
D , P
E
S-401
PR
EC
AS
T
FR
AM
IN
G
E N
LA
R
G
ED
P
LA
N S
AN
D
S
EC
TI
O
N S
FR
ES
H W
AT
ER
B
AY
O U
L O
C K
N
EW
O R
LE
AN
S D
IS
TR
IC
T
N
EW
O R
LE
AN
S, L
A
AD
AM
B
EL
EW
, P
E
AD
AM
B
EL
EW
, P
E
TA
R
R
IS
G R
EE
R
, P E
JU
N
E
W
2P 8-
-B
-0
W
XX
XX
X-
XX
-X
-X
XX
X
R
EA
D Y
FO
R
A D
VE
R
TI
SE
M
EN
T
N
EW
S H
O
PS
B U
IL
D
IN
G
VE
R
M
IL
IO
N
P
AR
R
IS
H , L
A
FR
ES
H W
AT
ER
B
AY
O U
W
AT
ER
W
AY
3/4" = 1'-0"K1 ENLARGED PLAN AT PLATFORM CORNER COLUMN
3/4" = 1'-0"K8 ENLARGED PLAN AT PLATFORM SIDEWALL COLUMN
0 0.5' 1' 2' 3' 0 0.5' 1' 2' 3'
3/4" = 1'-0"F1 ENLARGED PLAN AT PLATFORM ENDWALL COLUMN
3/4" = 1'-0"A1 SECTION AT PEMB FRAME COLUMN
0 0.5' 1' 2' 3'
0 0.5' 1' 2' 3'
3/4" = 1'-0"A8 SECTION AT ENDWALL COLUMN
0 0.5' 1' 2' 3'
1. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL SUBMIT THE PRE-
ENGINEERING METAL BUILDING (PEMB) SYSTEM SHOP DRAWINGS, INCLUDING
ANCHOR BOLT LAYOUT AND COLUMN BASE REACTIONS, FOR APPROVAL BY THE
COR. THE CONTRACTOR SHALL PROVIDE THE COR APPROVED PEMB SYSTEM
SUBMITTAL TO THE PRECAST MANUFACTURER PRIOR TO THEIR DESIGN /
SUBMITTAL OF THE PRECAST ELEVATED PLATFORM FRAMING. SUBMISSION OF
THE PRECAST ELEVATED PLATFORM FRAMING PRIOR TO COR APPROVAL OF
THE PEMB SYSTEM IS NOT PERMITTED. THE CONTRACTOR IS RESPONSIBLE
FOR COORDINATION BETWEEN THE PEMB MANUFACTURER AND THE PRECAST
MANUFACTURER.
2. BLOCKOUTS ARE REQUIRED IN THE PRECAST SLAB PANELS TO ALLOW FOR THE
PEMB COLUMNS TO BEAR AND ANCHOR TO THE TOP OF THE PRECAST CAP
BEAMS. THE SIZE OF THE BLOCKOUTS SHOWN ARE EXPECTED SIZES AND ARE
DEPENDENT ON THE FINAL PEMB COLUMN BASE PLATE SIZE. THE PRECAST
MANUFACTURER SHALL COORDINATED THE REQUIRED BLOCKOUT SIZE WITH
THE APPROVED PEMB SUBMITTAL PRIOR TO SUBMITTING SHOP DRAWINGS. THE
BLOCKOUT SHALL BE OFFSET FROM THE PEMB COLUMN BASE PLATE 2" MIN AS
SHOWN IN THE DETAILS ON THIS SHEET.
3. THE PRECAST MANUFACTURER SHALL DESIGN THE CAP BEAMS FOR THE
EXPECTED PEMB COLUMN REACTIONS SHOWN IN THE TABLE BELOW IN
ADDITION TO THE LOADS SHOWN ON DRAWING S-001. THE REACTIONS SHOWN
ARE ESTIMATED AND ARE FOR ESTIMATING PURPOSES ONLY. FINAL COLUMN
REACTIONS SHALL BE PROVIDED BY THE PEMB MANUFACTURER. SEE NOTE 10
FOR EXPECTED MAXIMUM CAP BEAM DESIGN MOMENT AND SHEAR.
4. PRECAST ELEMENTS, INCLUDING REINFORCEMENT AND CONNECTIONS, NOT
SPECIFCALLY DESIGNED AND DETAILED ARE TO BE DESIGNED BY THE PRECAST
MANUFACTURER . WHERE ADDITIONAL (ADD'.L) REINFORCEMENT IS NOTED IN
THE PRECAST ELEMENTS, THE PRECAST MANUFACTURER SHALL PROVIDE THE
SPECIFIED REINFORCEMENT IN ADDITION TO THE REINFORCEMENT REQUIRED
BY THEIR DESIGN.
5. THE FINISHED FLOOR ELEVATION OF THE ELEVATED PLATFORM = EL. 18.50. THE
BOTTOM OF THE PEMB COLUMN BASE PLATE IS AT EL. 17.67 U.N.O.
6. COLUMN ANCHORAGE EMBEDMENT SHOWN IS BASED ON THE EXPECTED PEMB
REACTIONS AND IS FOR ESTIMATING PURPOSES ONLY. REVISIONS TO
ANCHORAGE EMBEDMENT WILL BE PROVIDED BY THE COR AS NECESSARY
AFTER APPROVAL OF THE PEMB SUBMITTAL.
7. ALL COLUMN ANCHOR BOLTS SHALL BE CAST-IN-PLACE AND SET BY THE
PRECAST MANUFACTURER, U.N.O. ANCHOR BOLTS SHALL BE ASTM F1554 GR. 36
WITH A HEAVY HEX HEAD ON THE EMBEDDED END. SECURE THE COLUMN BASE
PLATE TO THE ANCHOR BOLTS WITH (1) FLAT WASHER AND (1) HEX NUT.
ANCHOR BOLTS SHALL BE GALVANIZED.
8. ALL REINFORCEMENT SHALL HAVE 2-1/2" OF CLEAR COVER, TYP. U.N.O.
9. DIMENSIONS TAGGED WITH "HOLD" ARE INTENDED TO BE WITHOUT VARIATION
IN BOTH PREACST AND PEMB…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .