This document is an Abstract of Bids for a flood control project in East Baton Rouge Parish, Louisiana. The solicitation (W912P825B0036) is issued by the US Army Corps of Engineers, New Orleans District, for the Comite River Diversion Project, specifically the Bayou Baton Rouge Rock Chute component. The abstract details bid submissions from six contractors: Rigid Constructors, LLC; James Construction Group, LLC; Phylway Construction, LLC; Five S Group, LLC; Omega Foundation Services, Inc.; and Dynamic Group, LLC.

The bid abstract includes line-item pricing for 75 different project components, ranging from mobilization and demobilization ($1,076,000 to $5,000,000) to detailed excavation, concrete work, geotextile installation, and optional work. The base work total varies significantly among bidders, with the lowest bid at $27,233,459 (James Construction Group) and the highest at $44,695,761 (Phylway Construction). When including optional work, the total bid prices range from $27,602,359 to $44,904,761. The project involves extensive earthwork, concrete structures, bridge and road relocation, and flood control infrastructure across multiple project areas including the Comite River Diversion Channel and Bayou Baton Rouge Rock Chute.

View the file

Other files

File Type Posted
Amendment 0005..pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana (ED 20-001)

Solicitation Number: W912P825B0036

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

2. DATE ISSUED 3. DATE OPENED

14-Mar-25

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

Mobilization and Demobilization

1 JOB $ 1,076,000.00 $ 1,076,000.00 $ 2,485,000.00 $ 2,485,000.00 1,600,000.00$ $ 1,600,000.00 2,000,000.00$ $ 2,000,000.00

0002 Safety Fence 1 JOB $ 250,000.00 $ 250,000.00 $ 58,000.00 $ 58,000.00 11,000.00$ $ 11,000.00 225,000.00$ $ 225,000.00

Video and Photographic Documentation

1 JOB $ 77,000.00 $ 77,000.00 $ 14,000.00 $ 14,000.00 59,000.00$ $ 59,000.00 50,000.00$ $ 50,000.00

Traffic Control

1 JOB $ 194,000.00 $ 194,000.00 $ 121,000.00 $ 121,000.00 249,295.00$ $ 249,295.00 200,000.00$ $ 200,000.00

Temporary Retaining Structures 1

JOB $ 557,000.00 $ 557,000.00 $ 27,400.00 $ 27,400.00 1.00$ $ 1.00 600,000.00$ $ 600,000.00

Silt Fences

33,000 LF $ 8.80 $ 290,400.00 $ 3.00 $ 99,000.00 15.00$ $ 495,000.00 3.85$ $ 127,050.00

0007 Straw Bales 5,000 LF $ 26.00 $ 130,000.00 $ 8.50 $ 42,500.00 9.00$ $ 45,000.00 5.00$ $ 25,000.00

0008 Truck Wash-Down Racks

1 JOB $ 270,000.00 $ 270,000.00 $ 89,500.00 $ 89,500.00 310,000.00$ $ 310,000.00 142,000.00$ $ 142,000.00

Demolition

1 JOB $ 147,000.00 $ 147,000.00 $ 282,000.00 $ 282,000.00 515,000.00$ $ 515,000.00 1,500,000.00$ $ 1,500,000.00

Removal of Abandoned Oil Well GW-1

1 JOB $ 57,400.00 $ 57,400.00 $ 73,000.00 $ 73,000.00 550,000.00$ $ 550,000.00 100,000.00$ $ 100,000.00

Approach Slabs

1 JOB $ 78,900.00 $ 78,900.00 $ 290,200.00 $ 290,200.00 685,000.00$ $ 685,000.00 247,500.00$ $ 247,500.00

Bridge Concrete

1 JOB $ 220,000.00 $ 220,000.00 $ 1,000,400.00 $ 1,000,400.00 1,500,000.00$ $ 1,500,000.00 1,430,000.00$ $ 1,430,000.00

Pump Station Concrete

1 JOB $ 66,600.00 $ 66,600.00 $ 108,500.00 $ 108,500.00 48,000.00$ $ 48,000.00 203,500.00$ $ 203,500.00

UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin 7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

A. HIRED LABOR Rigid Constructors, LLC James Construction Group, LLC Phylway Construction, LLC

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

7B. DESCRIPTION OF

OFFERED ITEM

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

02-MAY-2025

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin 7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

A. HIRED LABOR Rigid Constructors, LLC James Construction Group, LLC Phylway Construction, LLC

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

7B. DESCRIPTION OF

OFFERED ITEM

Pump Station Items

1 JOB $ 426,000.00 $ 426,000.00 $ 307,300.00 $ 307,300.00 1,200,000.00$ $ 1,200,000.00 115,000.00$ $ 115,000.00

Precast Prestressed Concrete Girders

1,380 LF $ 713.00 $ 983,940.00 $ 460.00 $ 634,800.00 700.00$ $ 966,000.00 740.00$ $ 1,021,200.00

0016 Carney Road Bridge

1 JOB $ 1,302,000.00 $ 1,302,000.00 $ 521,300.00 $ 521,300.00 500,000.00$ $ 500,000.00 110,000.00$ $ 110,000.00

Carney Road Bridge End Bents and Wingwalls

1 JOB $ 607,000.00 $ 607,000.00 $ 214,800.00 $ 214,800.00 550,000.00$ $ 550,000.00 165,000.00$ $ 165,000.00

0018 24" RCP 32 LF $ 166.00 $ 5,312.00 $ 290.00 $ 9,280.00 133.50$ $ 4,272.00 315.00$ $ 10,080.00

0019 18" RCP 83 LF $ 121.00 $ 10,043.00 $ 270.00 $ 22,410.00 240.00$ $ 19,920.00 315.00$ $ 26,145.00

0020 54" RCP Extension 8 LF $ 826.00 $ 6,608.00 $ 590.00 $ 4,720.00 813.00$ $ 6,504.00 830.00$ $ 6,640.00

0021 24" CMP 150 LF $ 139.00 $ 20,850.00 $ 195.00 $ 29,250.00 170.00$ $ 25,500.00 190.00$ $ 28,500.00

0022 42" CMP 78 LF $ 206.00 $ 16,068.00 $ 373.00 $ 29,094.00 340.00$ $ 26,520.00 350.00$ $ 27,300.00

0023 Electrical Work 1 JOB $ 90,300.00 $ 90,300.00 $ 631,100.00 $ 631,100.00 450,000.00$ $ 450,000.00 510,000.00$ $ 510,000.00

Separator Geotextile - Roadway

25,600 SY $ 8.60 $ 220,160.00 $ 3.25 $ 83,200.00 3.50$ $ 89,600.00 3.30$ $ 84,480.00

**0025 Separator Geotextile - Diversion

57,500 SY $ 8.60 $ 494,500.00 $ 3.25 $ 186,875.00 7.00$ $ 402,500.00 8.60$ $ 494,500.00

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin 7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

A. HIRED LABOR Rigid Constructors, LLC James Construction Group, LLC Phylway Construction, LLC

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

7B. DESCRIPTION OF

OFFERED ITEM

**0026 Separator Geotextile - Bayou Baton Rouge

48,300 SY $ 8.60 $ 415,380.00 $ 3.25 $ 156,975.00 7.00$ $ 338,100.00 8.60$ $ 415,380.00

0027 Clearing and Grubbing

1 JOB $ 7,900.00 $ 7,900.00 $ 210,000.00 $ 210,000.00 1,450,000.00$ $ 1,450,000.00 3,400,000.00$ $ 3,400,000.00

Excavation for Bayou Baton Rouge Temporary Alignment

18,000 CY $ 10.10 $ 181,800.00 $ 3.00 $ 54,000.00 8.00$ $ 144,000.00 11.50$ $ 207,000.00

Excavation for Bayou Baton Rouge Rock Chute

167,000 CY $ 8.80 $ 1,469,600.00 $ 3.00 $ 501,000.00 8.00$ $ 1,336,000.00 5.00$ $ 835,000.00

Excavation for Comite River Diversion Channel

712,000 CY $ 8.50 $ 6,052,000.00 $ 3.00 $ 2,136,000.00 4.50$ $ 3,204,000.00 4.20$ $ 2,990,400.00

Excavation for Relocation of Carney Road and Pump Station Access

18,500 CY $ 7.40 $ 136,900.00 $ 3.00 $ 55,500.00 13.25$ $ 245,125.00 7.00$ $ 129,500.00

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin 7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

A. HIRED LABOR Rigid Constructors, LLC James Construction Group, LLC Phylway Construction, LLC

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

7B. DESCRIPTION OF

OFFERED ITEM

Carney Road Bridge Abutments/Wingw alls Structural

1 JOB $ 23,900.00 $ 23,900.00 $ 12,000.00 $ 12,000.00 100,000.00$ $ 100,000.00 38,500.00$ $ 38,500.00

Pump Station Excavation and Backfill

1 JOB $ 177,000.00 $ 177,000.00 $ 220,000.00 $ 220,000.00 1,050,000.00$ $ 1,050,000.00 126,000.00$ $ 126,000.00

**0034

Excavation for Interceptor Ditches and Swales 1 JOB $ 179,000.00 $ 179,000.00 $ 14,900.00 $ 14,900.00 600,000.00$ $ 600,000.00 75,000.00$ $ 75,000.00

0035 Channel Unwatering

1 JOB $ 594,000.00 $ 594,000.00 $ 430,000.00 $ 430,000.00 2,000,000.00$ $ 2,000,000.00 500,000.00$ $ 500,000.00

0036 Pump Station Unwatering

1 JOB $ 66,600.00 $ 66,600.00 $ 191,000.00 $ 191,000.00 10,000.00$ $ 10,000.00 50,000.00$ $ 50,000.00

Embankment - Relocation of Carney Road

27,000 CY $ 2.90 $ 78,300.00 $ 4.00 $ 108,000.00 42.00$ $ 1,134,000.00 10.50$ $ 283,500.00

Embankment - Pump Station Access and Berm Road

1,000 CY $ 3.80 $ 3,800.00 $ 4.30 $ 4,300.00 41.00$ $ 41,000.00 8.50$ $ 8,500.00

**0039 Embankment - Guide Levees

13,000 CY $ 3.80 $ 49,400.00 $ 1.75 $ 22,750.00 42.00$ $ 546,000.00 8.50$ $ 110,500.00

Embankment - Proposed Banks and Abandoned Channels

250,000 CY $ 3.80 $ 950,000.00 $ 0.50 $ 125,000.00 0.75$ $ 187,500.00 2.50$ $ 625,000.00

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin 7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

A. HIRED LABOR Rigid Constructors, LLC James Construction Group, LLC Phylway Construction, LLC

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

7B. DESCRIPTION OF

OFFERED ITEM

Embankment - Carney Road Preload

26,000 CY $ 3.80 $ 98,800.00 $ 1.25 $ 32,500.00 17.00$ $ 442,000.00 8.50$ $ 221,000.00

0042 Grouted Riprap 620 CY $ 209.00 $ 129,580.00 $ 115.00 $ 71,300.00 370.00$ $ 229,400.00 260.00$ $ 161,200.00

Precast, Prestressed Concrete Pile, 14-inch x 14-inch

120 LF $ 363.00 $ 43,560.00 $ 597.00 $ 71,640.00 927.00$ $ 111,240.00 165.00$ $ 19,800.00

Precast, Prestressed Concrete Pile, 18-inch x 18-inch

1,680 LF $ 409.00 $ 687,120.00 $ 146.00 $ 245,280.00 216.00$ $ 362,880.00 193.00$ $ 324,240.00

Precast, Prestressed Concrete Pile, 30-inch x 30-inch

1,040 LF $ 482.00 $ 501,280.00 $ 670.00 $ 696,800.00 405.00$ $ 421,200.00 935.00$ $ 972,400.00

0046 Pile Load Test (18-inch x 18-inch)

1 EA $ 156,000.00 $ 156,000.00 $ 183,000.00 $ 183,000.00 309,100.00$ $ 309,100.00 250,000.00$ $ 250,000.00

0047 Pile Load Test (30-inch x 30-inch)

1 EA $ 263,000.00 $ 263,000.00 $ 321,300.00 $ 321,300.00 444,200.00$ $ 444,200.00 400,000.00$ $ 400,000.00

0048 Asphalt Leveling Course

460 TON $ 175.00 $ 80,500.00 $ 151.00 $ 69,460.00 140.00$ $ 64,400.00 147.00$ $ 67,620.00

0049 Asphalt Binder Course

3,300 TON $ 175.00 $ 577,500.00 $ 133.00 $ 438,900.00 123.00$ $ 405,900.00 130.00$ $ 429,000.00

0050 Asphalt Wearing Course

2,500 TON $ 165.00 $ 412,500.00 $ 133.00 $ 332,500.00 123.00$ $ 307,500.00 130.00$ $ 325,000.00

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin 7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

A. HIRED LABOR Rigid Constructors, LLC James Construction Group, LLC Phylway Construction, LLC

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

7B. DESCRIPTION OF

OFFERED ITEM

0051 Cold Planing 2,750 TON $ 6.70 $ 18,425.00 $ 6.50 $ 17,875.00 6.00$ $ 16,500.00 6.30$ $ 17,325.00

0052 Class II Base Course

21,600 SY $ 60.00 $ 1,296,000.00 $ 39.00 $ 842,400.00 40.00$ $ 864,000.00 52.00$ $ 1,123,200.00

0053 Surfacing 580 CY $ 164.00 $ 95,120.00 $ 101.00 $ 58,580.00 264.00$ $ 153,120.00 93.00$ $ 53,940.00

0054 Access Road and Laydown Area

1 JOB $ 100,000.00 $ 100,000.00 $ 403,000.00 $ 403,000.00 250,000.00$ $ 250,000.00 750,000.00$ $ 750,000.00

0055 High Security Fence

488 LF $ 78.00 $ 38,064.00 $ 28.00 $ 13,664.00 26.25$ $ 12,810.00 63.00$ $ 30,744.00

0056 Swing Gates 2 EA $ 9,500.00 $ 19,000.00 $ 1,800.00 $ 3,600.00 1,667.00$ $ 3,334.00 2,600.00$ $ 5,200.00

0057 Barbed Wired Fencing

4,250 LF $ 26.00 $ 110,500.00 $ 6.00 $ 25,500.00 6.00$ $ 25,500.00 7.75$ $ 32,937.50

0058 Farm Gates 2 EA $ 3,400.00 $ 6,800.00 $ 1,200.00 $ 2,400.00 1,150.00$ $ 2,300.00 1,850.00$ $ 3,700.00

High Performance Turf Reinforcement Mats

3,200 SY $ 35.00 $ 112,000.00 $ 35.00 $ 112,000.00 28.00$ $ 89,600.00 36.50$ $ 116,800.00

0060 Turf Establishment and Maintenance

91 AC $ 1,400.00 $ 127,400.00 $ 6,375.00 $ 580,125.00 4,000.00$ $ 364,000.00 5,000.00$ $ 455,000.00

0061 Utility Horizontal Directional Drilling

197 LF $ 281.00 $ 55,357.00 $ 548.00 $ 107,956.00 350.00$ $ 68,950.00 525.00$ $ 103,425.00

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin 7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

A. HIRED LABOR Rigid Constructors, LLC James Construction Group, LLC Phylway Construction, LLC

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

7B. DESCRIPTION OF

OFFERED ITEM

0062 Guard Rails 1 JOB $ 112,000.00 $ 112,000.00 $ 56,000.00 $ 56,000.00 51,740.00$ $ 51,740.00 60,000.00$ $ 60,000.00

0063 Vertical Lift Sluice Gate

1 EA $ 48,100.00 $ 48,100.00 $ 164,300.00 $ 164,300.00 180,000.00$ $ 180,000.00 36,750.00$ $ 36,750.00

0064 Bedding Stone No.

45,750 TON $ 78.00 $ 3,568,500.00 $ 61.00 $ 2,790,750.00 95.00$ $ 4,346,250.00 61.00$ $ 2,790,750.00

0065 Bedding Stone No.

3,000 TON $ 78.00 $ 234,000.00 $ 61.50 $ 184,500.00 95.00$ $ 285,000.00 65.00$ $ 195,000.00

0066 Riprap, R-25 7,200 TON $ 80.00 $ 576,000.00 $ 65.50 $ 471,600.00 105.00$ $ 756,000.00 72.00$ $ 518,400.00

0067 Riprap, R-90 61,500 TON $ 81.00 $ 4,981,500.00 $ 66.75 $ 4,105,125.00 105.00$ $ 6,457,500.00 69.00$ $ 4,243,500.00

0068 Riprap, R-3500 4,100 TON $ 102.00 $ 418,200.00 $ 72.00 $ 295,200.00 150.00$ $ 615,000.00 90.00$ $ 369,000.00

0069 Riprap, R-1500 23,000 TON $ 92.00 $ 2,116,000.00 $ 71.00 $ 1,633,000.00 110.00$ $ 2,530,000.00 77.00$ $ 1,771,000.00

0070 Riprap, R-650 12,500 TON $ 89.00 $ 1,112,500.00 $ 69.50 $ 868,750.00 115.00$ $ 1,437,500.00 77.00$ $ 962,500.00

*0071 Removal and Stockpile, Riprap, R-25

1 JOB $ 90,600.00 $ 90,600.00 $ 45,600.00 $ 45,600.00 50,000.00$ $ 50,000.00 25,000.00$ $ 25,000.00

Non-Clog Submersible Pumps

2 EA $ 91,100.00 $ 182,200.00 $ 95,900.00 $ 191,800.00 60,000.00$ $ 120,000.00 79,000.00$ $ 158,000.00

0073 Pipelines, Liquid Process Piping

1 JOB $ 105,000.00 $ 105,000.00 $ 191,000.00 $ 191,000.00 225,000.00$ $ 225,000.00 157,500.00$ $ 157,500.00

#VALUE!OPTIONAL WORK

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin 7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

A. HIRED LABOR Rigid Constructors, LLC James Construction Group, LLC Phylway Construction, LLC

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

7B. DESCRIPTION OF

OFFERED ITEM

*0074 Construction Dewatering - OW

1 JOB $ 1,325,000.00 $ 1,325,000.00 $ 206,900.00 $ 206,900.00 115,000.00$ $ 115,000.00 188,000.00$ $ 188,000.00

Hauling and Disposal, Excess Material - OW

20,000 CY $ 35.00 $ 700,000.00 $ 8.10 $ 162,000.00 4.70$ $ 94,000.00 7.00$ $ 140,000.00

$36,455,767.00 $27,233,459.00 $44,695,761.00 $36,393,106.50

$38,480,767.00 $27,602,359.00 $44,904,761.00 $36,721,106.50

Base Total

Base Work + Options Total

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

Mobilization and Demobilization

1 JOB $ 1,076,000.00 $ 1,076,000.00 $ 1,065,488.37 $ 1,065,488.37 5,000,000.00$ $ 5,000,000.00 3,407,158.00$ $ 3,407,158.00

0002 Safety Fence 1 JOB $ 250,000.00 $ 250,000.00 $ 12,929.81 $ 12,929.81 100,000.00$ $ 100,000.00 9,139.20$ $ 9,139.20

Video and Photographic Documentation

1 JOB $ 77,000.00 $ 77,000.00 $ 5,433.70 $ 5,433.70 100,000.00$ $ 100,000.00 11,200.00$ $ 11,200.00

Traffic Control

1 JOB $ 194,000.00 $ 194,000.00 $ 15,682.63 $ 15,682.63 70,000.00$ $ 70,000.00 65,023.26$ $ 65,023.26

Temporary Retaining Structures 1

JOB $ 557,000.00 $ 557,000.00 $ 31,554.59 $ 31,554.59 475,000.00$ $ 475,000.00 784,000.00$ $ 784,000.00

Silt Fences

33,000 LF $ 8.80 $ 290,400.00 $ 3.16 $ 104,280.00 4.00$ $ 132,000.00 6.02$ $ 198,660.00

0007 Straw Bales 5,000 LF $ 26.00 $ 130,000.00 $ 1.03 $ 5,150.00 12.00$ $ 60,000.00 17.58$ $ 87,900.00

0008 Truck Wash-Down Racks

1 JOB $ 270,000.00 $ 270,000.00 $ 266,909.90 $ 266,909.90 225,000.00$ $ 225,000.00 98,145.90$ $ 98,145.90

Demolition

1 JOB $ 147,000.00 $ 147,000.00 $ 342,672.98 $ 342,672.98 1,300,000.00$ $ 1,300,000.00 315,050.98$ $ 315,050.98

Removal of Abandoned Oil Well GW-1

1 JOB $ 57,400.00 $ 57,400.00 $ 126,218.37 $ 126,218.37 185,000.00$ $ 185,000.00 56,000.00$ $ 56,000.00

Approach Slabs

1 JOB $ 78,900.00 $ 78,900.00 $ 434,191.20 $ 434,191.20 375,000.00$ $ 375,000.00 252,000.00$ $ 252,000.00

Bridge Concrete

1 JOB $ 220,000.00 $ 220,000.00 $ 1,498,830.55 $ 1,498,830.55 1,500,000.00$ $ 1,500,000.00 1,456,000.00$ $ 1,456,000.00

Pump Station Concrete

1 JOB $ 66,600.00 $ 66,600.00 $ 63,109.19 $ 63,109.19 60,000.00$ $ 60,000.00 207,200.00$ $ 207,200.00

7B. DESCRIPTION OF

OFFERED ITEM

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6

A. HIRED LABOR Five S Group, LLC Omega Foundation Services, INC Dynamic Group, LLC

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

7B. DESCRIPTION OF

OFFERED ITEM

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6

A. HIRED LABOR Five S Group, LLC Omega Foundation Services, INC Dynamic Group, LLC

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin

Pump Station Items

1 JOB $ 426,000.00 $ 426,000.00 $ 252,436.75 $ 252,436.75 1,400,000.00$ $ 1,400,000.00 123,200.00$ $ 123,200.00

Precast Prestressed Concrete Girders

1,380 LF $ 713.00 $ 983,940.00 $ 694.20 $ 957,996.00 675.00$ $ 931,500.00 790.72$ $ 1,091,193.60

0016 Carney Road Bridge

1 JOB $ 1,302,000.00 $ 1,302,000.00 $ 111,741.12 $ 111,741.12 110,000.00$ $ 110,000.00 112,000.00$ $ 112,000.00

Carney Road Bridge End Bents and Wingwalls

1 JOB $ 607,000.00 $ 607,000.00 $ 315,545.94 $ 315,545.94 315,000.00$ $ 315,000.00 168,000.00$ $ 168,000.00

0018 24" RCP 32 LF $ 166.00 $ 5,312.00 $ 137.48 $ 4,399.36 165.00$ $ 5,280.00 172.12$ $ 5,507.84

0019 18" RCP 83 LF $ 121.00 $ 10,043.00 $ 118.03 $ 9,796.49 134.00$ $ 11,122.00 430.29$ $ 35,714.07

0020 54" RCP Extension 8 LF $ 826.00 $ 6,608.00 $ 409.43 $ 3,275.44 1,000.00$ $ 8,000.00 402.70$ $ 3,221.60

0021 24" CMP 150 LF $ 139.00 $ 20,850.00 $ 171.69 $ 25,753.50 210.00$ $ 31,500.00 170.70$ $ 25,605.00

0022 42" CMP 78 LF $ 206.00 $ 16,068.00 $ 248.73 $ 19,400.94 425.00$ $ 33,150.00 282.80$ $ 22,058.40

0023 Electrical Work 1 JOB $ 90,300.00 $ 90,300.00 $ 220,882.14 $ 220,882.14 550,000.00$ $ 550,000.00 543,200.00$ $ 543,200.00

Separator Geotextile - Roadway

25,600 SY $ 8.60 $ 220,160.00 $ 3.40 $ 87,040.00 4.00$ $ 102,400.00 6.17$ $ 157,952.00

**0025 Separator Geotextile - Diversion

57,500 SY $ 8.60 $ 494,500.00 $ 5.29 $ 304,175.00 5.00$ $ 287,500.00 7.47$ $ 429,525.00

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

7B. DESCRIPTION OF

OFFERED ITEM

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6

A. HIRED LABOR Five S Group, LLC Omega Foundation Services, INC Dynamic Group, LLC

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin

**0026 Separator Geotextile - Bayou Baton Rouge

48,300 SY $ 8.60 $ 415,380.00 $ 5.27 $ 254,541.00 5.00$ $ 241,500.00 7.47$ $ 360,801.00

0027 Clearing and Grubbing

1 JOB $ 7,900.00 $ 7,900.00 $ 496,721.35 $ 496,721.35 3,325,000.00$ $ 3,325,000.00 845,769.50$ $ 845,769.50

Excavation for Bayou Baton Rouge Temporary Alignment

18,000 CY $ 10.10 $ 181,800.00 $ 3.34 $ 60,120.00 8.50$ $ 153,000.00 9.22$ $ 165,960.00

Excavation for Bayou Baton Rouge Rock Chute

167,000 CY $ 8.80 $ 1,469,600.00 $ 2.85 $ 475,950.00 8.00$ $ 1,336,000.00 8.66$ $ 1,446,220.00

Excavation for Comite River Diversion Channel

712,000 CY $ 8.50 $ 6,052,000.00 $ 2.80 $ 1,993,600.00 7.00$ $ 4,984,000.00 7.54$ $ 5,368,480.00

Excavation for Relocation of Carney Road and Pump Station Access

18,500 CY $ 7.40 $ 136,900.00 $ 2.44 $ 45,140.00 6.50$ $ 120,250.00 9.22$ $ 170,570.00

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

7B. DESCRIPTION OF

OFFERED ITEM

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6

A. HIRED LABOR Five S Group, LLC Omega Foundation Services, INC Dynamic Group, LLC

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin

Carney Road Bridge Abutments/Wingw alls Structural

1 JOB $ 23,900.00 $ 23,900.00 $ 32,478.69 $ 32,478.69 45,000.00$ $ 45,000.00 39,200.00$ $ 39,200.00

Pump Station Excavation and Backfill

1 JOB $ 177,000.00 $ 177,000.00 $ 252,436.75 $ 252,436.75 875,000.00$ $ 875,000.00 280,000.00$ $ 280,000.00

**0034

Excavation for Interceptor Ditches and Swales 1 JOB $ 179,000.00 $ 179,000.00 $ 40,987.15 $ 40,987.15 28,000.00$ $ 28,000.00 112,000.00$ $ 112,000.00

0035 Channel Unwatering

1 JOB $ 594,000.00 $ 594,000.00 $ 63,360.24 $ 63,360.24 1,700,000.00$ $ 1,700,000.00 488,890.21$ $ 488,890.21

0036 Pump Station Unwatering

1 JOB $ 66,600.00 $ 66,600.00 $ 220,882.14 $ 220,882.14 12,000.00$ $ 12,000.00 56,000.00$ $ 56,000.00

Embankment - Relocation of Carney Road

27,000 CY $ 2.90 $ 78,300.00 $ 1.00 $ 27,000.00 2.50$ $ 67,500.00 15.05$ $ 406,350.00

Embankment - Pump Station Access and Berm Road

1,000 CY $ 3.80 $ 3,800.00 $ 4.15 $ 4,150.00 2.50$ $ 2,500.00 11.77$ $ 11,770.00

**0039 Embankment - Guide Levees

13,000 CY $ 3.80 $ 49,400.00 $ 4.15 $ 53,950.00 2.50$ $ 32,500.00 11.77$ $ 153,010.00

Embankment - Proposed Banks and Abandoned Channels

250,000 CY $ 3.80 $ 950,000.00 $ 1.00 $ 250,000.00 2.75$ $ 687,500.00 8.28$ $ 2,070,000.00

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

7B. DESCRIPTION OF

OFFERED ITEM

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6

A. HIRED LABOR Five S Group, LLC Omega Foundation Services, INC Dynamic Group, LLC

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin

Embankment - Carney Road Preload

26,000 CY $ 3.80 $ 98,800.00 $ 2.29 $ 59,540.00 2.75$ $ 71,500.00 17.46$ $ 453,960.00

0042 Grouted Riprap 620 CY $ 209.00 $ 129,580.00 $ 188.21 $ 116,690.20 400.00$ $ 248,000.00 431.82$ $ 267,728.40

Precast, Prestressed Concrete Pile, 14-inch x 14-inch

120 LF $ 363.00 $ 43,560.00 $ 504.87 $ 60,584.40 500.00$ $ 60,000.00 168.00$ $ 20,160.00

Precast, Prestressed Concrete Pile, 18-inch x 18-inch

1,680 LF $ 409.00 $ 687,120.00 $ 214.57 $ 360,477.60 195.00$ $ 327,600.00 196.00$ $ 329,280.00

Precast, Prestressed Concrete Pile, 30-inch x 30-inch

1,040 LF $ 482.00 $ 501,280.00 $ 757.31 $ 787,602.40 750.00$ $ 780,000.00 1,037.11$ $ 1,078,594.40

0046 Pile Load Test (18-inch x 18-inch)

1 EA $ 156,000.00 $ 156,000.00 $ 441,764.31 $ 441,764.31 435,000.00$ $ 435,000.00 168,000.00$ $ 168,000.00

0047 Pile Load Test (30-inch x 30-inch)

1 EA $ 263,000.00 $ 263,000.00 $ 757,310.23 $ 757,310.23 750,000.00$ $ 750,000.00 280,000.00$ $ 280,000.00

0048 Asphalt Leveling Course

460 TON $ 175.00 $ 80,500.00 $ 176.71 $ 81,286.60 250.00$ $ 115,000.00 156.80$ $ 72,128.00

0049 Asphalt Binder Course

3,300 TON $ 175.00 $ 577,500.00 $ 155.25 $ 512,325.00 175.00$ $ 577,500.00 137.76$ $ 454,608.00

0050 Asphalt Wearing Course

2,500 TON $ 165.00 $ 412,500.00 $ 155.25 $ 388,125.00 195.00$ $ 487,500.00 137.76$ $ 344,400.00

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

7B. DESCRIPTION OF

OFFERED ITEM

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6

A. HIRED LABOR Five S Group, LLC Omega Foundation Services, INC Dynamic Group, LLC

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin

0051 Cold Planing 2,750 TON $ 6.70 $ 18,425.00 $ 7.57 $ 20,817.50 9.00$ $ 24,750.00 6.72$ $ 18,480.00

0052 Class II Base Course

21,600 SY $ 60.00 $ 1,296,000.00 $ 35.64 $ 769,824.00 40.00$ $ 864,000.00 72.60$ $ 1,568,160.00

0053 Surfacing 580 CY $ 164.00 $ 95,120.00 $ 133.47 $ 77,412.60 225.00$ $ 130,500.00 151.20$ $ 87,696.00

0054 Access Road and Laydown Area

1 JOB $ 100,000.00 $ 100,000.00 $ 81,575.23 $ 81,575.23 350,000.00$ $ 350,000.00 65,626.12$ $ 65,626.12

0055 High Security Fence

488 LF $ 78.00 $ 38,064.00 $ 33.13 $ 16,167.44 40.00$ $ 19,520.00 39.20$ $ 19,129.60

0056 Swing Gates 2 EA $ 9,500.00 $ 19,000.00 $ 2,104.06 $ 4,208.12 1,250.00$ $ 2,500.00 2,315.04$ $ 4,630.08

0057 Barbed Wired Fencing

4,250 LF $ 26.00 $ 110,500.00 $ 7.03 $ 29,877.50 9.50$ $ 40,375.00 9.97$ $ 42,372.50

0058 Farm Gates 2 EA $ 3,400.00 $ 6,800.00 $ 1,451.52 $ 2,903.04 2,200.00$ $ 4,400.00 1,657.60$ $ 3,315.20

High Performance Turf Reinforcement Mats

3,200 SY $ 35.00 $ 112,000.00 $ 35.34 $ 113,088.00 60.00$ $ 192,000.00 38.99$ $ 124,768.00

0060 Turf Establishment and Maintenance

91 AC $ 1,400.00 $ 127,400.00 $ 5,679.83 $ 516,864.53 13,500.00$ $ 1,228,500.00 11,133.81$ $ 1,013,176.71

0061 Utility Horizontal Directional Drilling

197 LF $ 281.00 $ 55,357.00 $ 631.09 $ 124,324.73 625.00$ $ 123,125.00 560.00$ $ 110,320.00

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

7B. DESCRIPTION OF

OFFERED ITEM

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6

A. HIRED LABOR Five S Group, LLC Omega Foundation Services, INC Dynamic Group, LLC

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin

0062 Guard Rails 1 JOB $ 112,000.00 $ 112,000.00 $ 61,064.45 $ 61,064.45 75,000.00$ $ 75,000.00 64,033.42$ $ 64,033.42

0063 Vertical Lift Sluice Gate

1 EA $ 48,100.00 $ 48,100.00 $ 189,327.56 $ 189,327.56 225,000.00$ $ 225,000.00 39,200.00$ $ 39,200.00

0064 Bedding Stone No.

45,750 TON $ 78.00 $ 3,568,500.00 $ 65.34 $ 2,989,305.00 90.00$ $ 4,117,500.00 67.09$ $ 3,069,367.50

0065 Bedding Stone No.

3,000 TON $ 78.00 $ 234,000.00 $ 69.52 $ 208,560.00 93.00$ $ 279,000.00 66.93$ $ 200,790.00

0066 Riprap, R-25 7,200 TON $ 80.00 $ 576,000.00 $ 72.70 $ 523,440.00 103.00$ $ 741,600.00 73.57$ $ 529,704.00

0067 Riprap, R-90 61,500 TON $ 81.00 $ 4,981,500.00 $ 69.71 $ 4,287,165.00 125.00$ $ 7,687,500.00 77.56$ $ 4,769,940.00

0068 Riprap, R-3500 4,100 TON $ 102.00 $ 418,200.00 $ 87.94 $ 360,554.00 120.00$ $ 492,000.00 87.06$ $ 356,946.00

0069 Riprap, R-1500 23,000 TON $ 92.00 $ 2,116,000.00 $ 85.85 $ 1,974,550.00 115.00$ $ 2,645,000.00 80.26$ $ 1,845,980.00

0070 Riprap, R-650 12,500 TON $ 89.00 $ 1,112,500.00 $ 73.20 $ 915,000.00 113.50$ $ 1,418,750.00 79.64$ $ 995,500.00

*0071 Removal and Stockpile, Riprap, R-25

1 JOB $ 90,600.00 $ 90,600.00 $ 29,350.82 $ 29,350.82 30,000.00$ $ 30,000.00 44,800.00$ $ 44,800.00

Non-Clog Submersible Pumps

2 EA $ 91,100.00 $ 182,200.00 $ 110,441.07 $ 220,882.14 75,000.00$ $ 150,000.00 84,000.00$ $ 168,000.00

0073 Pipelines, Liquid Process Piping

1 JOB $ 105,000.00 $ 105,000.00 $ 157,772.96 $ 157,772.96 270,000.00$ $ 270,000.00 168,000.00$ $ 168,000.00

OPTIONAL WORK

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

7B. DESCRIPTION OF

OFFERED ITEM

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES

(Including Profit)

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Without Profit)

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin

Comite River Diversion Project Bayou Baton Rouge Rock Chute

East Baton Rouge Parish, Louisiana (ED 20-001)

(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6

A. HIRED LABOR Five S Group, LLC Omega Foundation Services, INC Dynamic Group, LLC

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

7400 Leake Avenue Contract Specialist New Orleans, LA 70118

Karen Hargrave UNRESTRICTED. Contracting Officer

ABSTRACT OF BIDS 1. SOLICITATION NUMBER W912P825B0036

30-Apr-25

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY CORPS OF ENGINEERS, NOD DISTRICT Anedra Baldwin

*0074 Construction Dewatering - OW

1 JOB $ 1,325,000.00 $ 1,325,000.00 $ 336,454.00 $ 336,454.00 175,000.00$ $ 175,000.00 783,641.38$ $ 783,641.38

Hauling and Disposal, Excess Material - OW

20,000 CY $ 35.00 $ 700,000.00 $ 6.31 $ 126,200.00 9.00$ $ 180,000.00 12.39$ $ 247,800.00

$36,455,767.00 $27,795,951.65 $51,940,322.00 $40,418,469.49

$38,480,767.00 $28,258,605.65 $52,295,322.00 $41,449,910.87

Base Total

Base Work + Options Total

Note #1: Items marked in yellow indicate a calculation discrepancy within the bidder's price schedule. Accordingly, the bidder's unit price submitted has been used to calcalulate proper extended amount and is shown on the abstract.

2025-05-02T07:35:43-0500
HARGRAVE.KAREN.DENISE.1019731959

File details come from the government source that posted it. Updated .