This document is an Amendment (Amendment 0005) to a federal solicitation for a flood control project in East Baton Rouge Parish, Louisiana. The project involves the Comite River Diversion Project and Bayou Baton Rouge Rock Chute, with a total estimated excavation volume of approximately 712,000 cubic yards for the Comite River Diversion Channel and 167,000 cubic yards for the Bayou Baton Rouge Rock Chute. The amendment postpones the virtual bid opening date to Wednesday, April 30, 2025, at 11:00 am local time, with the bid submission deadline set for 10:00 am on the same day.
The amendment includes multiple technical revisions across various project sections, such as modifications to excavation measurement procedures, payment terms for specific project components, and updates to geotextile installation requirements. It also introduces changes to several project drawings and cross-sections, including sheets G-003, C-002, and multiple channel and road cross-section drawings. The project involves complex channel construction, embankment work, and infrastructure development, with a contract duration of 1,087 calendar days for the base work items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract_W912P825B0036_SIGNED.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The subject solicitation for Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana (ED 20-001) is hereby amended as follow s:
1) Provides revisions shown on the attached continuation pages.
2) The virtual bid opening date has been postponed to Wednesday, April 30, 2025, 11:00am (local time). The bid submission deadline is Wednesday, April 30, 2025, 10:00am (local time). It is anticipated that this w ill be the last amendment for this requirement. No further questions w ill be addressed at this time.
****PLEASE ACKNOWLEDGE ALL AMENDMENTS IN YOUR BID PACKAGE SUBMISSION***
1. CONTRACT ID CODE PAGE OF PAGES
J 1 51
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P825B0036
X 9B. DATED (SEE ITEM 11)
14-Mar-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Apr-2025
CODE
CONTRACTING DIV- CHIEF
7400 LEAKE AVENUE, ROOM 172
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION 00010
Pages 00010-3, 4, 5, 6, and 7. Delete these pages in their entirety and replace with the attached revised pages 00010-3, 4, 5, 6, and 7, therefore.
SECTION 01100
Page 97/1037. Delete this page in its entirety and replace with the attached revised Drawings Index G-003, therefore.
SECTION 31 05 19.04 12
Page 5. After paragraph 3.4, add the following new paragraph, therefore:
“3.5 KEY TRENCHES
The ends of geotextile shall be anchored at the channel top of bank using key trenches. The trench shall be a minimum of two (2) feet x two (2) feet. The key trench shall be excavated in stable material. Upon completion of the placement of the geotextile, trench shall be backfilled with clay (CH or CL) material excavated from the channel. The material shall be compacted and tested similar to the compacted fill embankment. The compaction lift thicknesses for the key trench shall be 6 inches, followed by 12 inches, and 6 inches. Upon completion of the compaction, the geotextile shall be extended and wrapped around the top of the trench prior to placement of bedding material and riprap.”
SECTION 31 23 00.00 12
1. Page 2, paragraph 1.2.1. Delete this paragraph in its entirety and replace with following revised paragraph, therefore:
“1.2.1 Excavation
Measurement for excavation, as specified herein, will be made by the cubic yard, computed by the average end area method from cross sections taken "before and after" the theoretical design sections shown in the drawings. The Contractor shall perform cross sections every 100 feet for partial payment and final compliance cross sections. The measurements shall include authorized excavation of unsatisfactory subgrade soil. The measurement will not include the volume of subgrade material or other material that is scarified or plowed and reused in-place, and shall not include the volume excavated without authorization or the volume of any material used for purposes other than directed by the Contracting Office's representative. The measurement will not include the volume of any excavation performed prior to the taking of elevations and measurements of the undisturbed grade.”
2. Page 3. After paragraph 1.2.9, add the following new paragraph in its entirety, therefore:
“1.2.10 Excavation for Interceptor Ditches and Swales
No separate measurement will be made for excavation required for the interceptor ditches and swales.”
3. Page 3 paragraph 1.3.1. Delete this paragraph in its entirety and replace with the following revised paragraph, therefore:
“1.3.1 Excavation for Bayou Baton Rouge Temporary Alignment
Payment for excavation and for Bayou Baton Rouge temporary alignment will be made at the contract unit price per cubic yard for "Excavation for Bayou Baton Rouge Temporary Alignment". Price and payment shall constitute full compensation for furnishing all plant, labor, materials and equipment, to complete the excavation for the Bayou Baton Rouge temporary alignment; including removal and disposal of excess spoil material; as specified herein and as shown on the drawings. Payment will be limited to the lines and grades shown on the drawings.”
4. Page 4 paragraph 1.3.2. Delete this paragraph in its entirety and replace with the following revised paragraph, therefore:
“1.3.2 Excavation for Bayou Baton Rouge Rock Chute
Payment for excavation for Bayou Baton Rouge Rock Chute will be made at the contract unit price per cubic yard for "Excavation for Bayou Baton Rouge Rock Chute". Price and payment shall constitute full compensation for furnishing all plant, labor, materials and equipment, to complete the excavation for Bayou Baton Rouge Rock Chute; including removal and disposal of excess spoil material; as specified herein and as shown on the drawings. Payment will be limited to the lines and grades shown on the drawings.”
5. Page 5. After paragraph 1.3.9, add the following new paragraph in its entirety, therefore:
“1.3.10 Excavation for Interceptor Ditches and Swales
Payment will be made at the contract job price for "Excavation for Interceptor Ditches and Swales".
Price and payment shall constitute full compensation for furnishing all plant, labor, materials, tools, equipment, appliances, and doing all work involved to complete the excavation as specified herein and as shown on the drawings.”
SECTION 31 24 00.00 12
1. Page 4, paragraph 1.3.2. Delete this paragraph in its entirety and replace with following revised paragraph, therefore:
“1.3.2 Disposal Stockpile Embankment (Semi-Compacted Fill)
No separate measurement will be made for depositing materials in the disposal stockpile areas.”
2. Page 5, paragraph 1.4.2. Delete this paragraph in its entirety and substitute the following revised paragraph, therefore:
“1.4.2 Disposal Stockpile Embankment (Semi-Compacted Fill)
No separate measurement or payment will be made for depositing materials in the disposal stockpile areas. Payment shall be included in the contract prices for which the work is incidental thereto or distributed amongst the existing bid items.”
3. Page 13. After subparagraph 2.1.3.2, add the following new subparagraphs in their entirety, “2.1.4 Semi-Compacted Fill
2.1.4.1 Moisture Control
It is intended that the material will be placed in the stockpile embankment at its natural moisture content. No moisture control will be required by the Contractor unless, in the opinion of the Contracting Officer, the desired compaction is not being obtained with the prescribed compactive effort due to the material being too wet or too dry. In such cases, the Contractor shall perform moisture control as described below. If the material is too wet, it shall either be stockpiled and allowed to drain before it is placed in the stockpile embankment cross-sections and/or the wet material shall be processed by disking and harrowing, if necessary, until the moisture content is reduced sufficiently. If the material is too dry, it shall either be pre-wet or sufficient moisture shall be uniformly distributed in each layer before compaction.
2.1.4.2 Compaction
The materials for semi-compacted fill shall be placed or spread in layers. When the moisture content and conditions of the spread layer are satisfactory, each layer shall be compacted by any of the following methods at the option of the contractor.
(1) Tamper-Type Roller. Four complete passes over each layer will be required. If tamping rollers are used in tandem, not more than two rows will be permitted, and in such case, one trip of the tandem rollers over any surface will be considered as two passes. When tamping rollers are used in tandem, the tamper foot spacing shall be offset so that the circumferential rows on the rear drums are in line with the midpoint of the circumferential rows of the forward drums. Each pass of the tamping roller shall overlap the preceding or adjacent pass by not less than 1 foot.
(2) Rubber-Tired Rollers. Two complete passes over each layer will be required.
(3) Crawler-Type Tractor. Three complete passes over each layer will be required. The tractor will not be considered to be compacting while spreading materials. A pass shall consist of one complete coverage of the surface of a layer by the treads of a roller, tractor, or other compacting equipment.
Portions of the embankments which the compacting equipment cannot reach for any reason shall be compacted by an approved method to the density at least equal to that of the surrounding embankments.
2.1.5 Dressing
The entire embankment shall be brought to not less than the prescribed design cross section, within allowable tolerance, at all points. Unreasonable roughness of the surface shall be dressed out to permit fertilizing and seeding operations.”
4. Page 15, paragraph 3.3. Delete this paragraph in its entirety and replace with following revised paragraph, “3.3 Disposal Area Embankment
The disposal material from the required excavation shall be placed within the disposal area as shown on drawings. The Contractor shall plan the work so that upon completion of work, the disposal area is filled uniformly within the limits shown on the drawings. The disposal area embankment shall not extend beyond the limits shown. Disposal embankment shall be continuous over the entire disposal area shown with no openings or breaks therein, unless otherwise directed. Placement of excavated material shall be such that water will not impound within the disposal area embankment. Stumps, logs, and other debris removed in the excavation process shall be disposed of as prescribed in Section 31 11 00.00 12 CLEARING AND GRUBBING. Disposal material shall be placed in approximately horizontal layers not exceeding 3 feet in thickness. The layers shall be uniformly spread, distributed, and otherwise manipulated during placement to such an extent that individual loads of material deposited will not remain intact, and large, open voids will be eliminated. Layers shall have sufficient crown and slope to provide satisfactory drainage during construction. Lifts shall be placed in a manner which prevents shrinkage cracks and open voids from developing in previously placed lifts. Drainage ditches shall be excavated prior to placement of disposal area embankment.
The disposal area embankment shall be constructed at the location(s) and to the lines and grades and sections indicated on the drawings. The finish surface shall be smooth graded and shaped to drain in accordance with the requirements shown on the drawings.
The maximum height for the existing Lilly Bayou stockpile is 16-ft. The Contractor shall match the existing slopes of the stockpile and provide silt fencing as required. The Contractor shall verify the existing condition and limits of the stockpile via field surveys prior to placement of excavated waste material from the Bayou Baton Rouge Rock Chute project.”
DRAWINGS
1. SHEET IDENTIFICATION Nos. G-003, G-004, C-002, C-005, C-006, C-007, C-008, C-009, C-014, C- 015, C-017, C-018, C-023A, C-025, C-026A, C-026B, C-026C, C-026D, C-026E, C-027, C-028, C-029, C- 030, C-031, C-032, C-033, C-034, C-070, C-071, C-072, C-074, C-075, C-076, C-077, C-078, C-079, C- 080, C-301 and C-302 . Delete these drawings in their entirety and substitute the attached revised SHEET IDENTIFICATION Nos. G-003, G-004, C-002, C-005, C-006, C-007, C-008, C-009, C-014, C-015, C-017, C-018, C-023A, C-025, C-026A, C-026B, C-026C, C-026D, C-026E, C-027, C-028, C-029, C-030, C-031, C-032, C-033, C-034, C-070, C-071, C-072, C-074, C-075, C-076, C-077, C-078, C-079, C-080, C-301 and C-302 therefore.
2. Add the attached new drawing SHEET IDENTIFICATION No. C-035.
00010-3 Ed 20-001
SECTION 00010 – BIDDING SCHEDULE
Flood Control, Amite River Tributaries, Louisiana, Comite River Basin Comite River Diversion Project
Bayou Baton Rouge Rock Chute East Baton Rouge Parish, Louisiana
Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount
0001 Mobilization and Demobilization 1 JOB
0002 Safety Fence 1 JOB
0003 Video and Photographic Documentation 1 JOB
0004 Traffic Control 1 JOB
0005 Temporary Retaining Structures 1 JOB
0006 Silt Fences 33,000 LF
0007 Straw Bales 5,000 LF
0008 Truck Wash-Down Racks 1 JOB
0009 Demolition 1 JOB
0010 Removal of Abandoned Oil Well
GW-1 1 JOB
0011 Approach Slabs 1 JOB
0012 Bridge Concrete 1 JOB
0013 Pump Station Concrete 1 JOB
0014 Pump Station Items 1 JOB
0015 Precast Prestressed Concrete Girders 1,380 LF
0016 Carney Road Bridge 1 JOB
0017 Carney Road Bridge End Bents and Wingwalls 1 JOB
0018 24" RCP 32 LF
0019 18" RCP 83 LF
0020 54" RCP Extension 8 LF
0021 24" CMP 150 LF
0022 42" CMP 78 LF
0023 Electrical Work 1 JOB
00010-4 Ed 20-001
0024 Separator Geotextile - Roadway 25,600 SY
*0025 Separator Geotextile - Diversion 57,500 SY
*0026 Separator Geotextile - Bayou Baton Rouge 48,300 SY
0027 Clearing and Grubbing 1 JOB
0028 Excavation for Bayou Baton Rouge Temporary Alignment 18,000 CY
0029 Excavation for Bayou Baton Rouge Rock Chute 167,000 CY
0030 Excavation for Comite River Diversion Channel 712,000 CY
Excavation for Relocation of Carney Road and Pump Station Access
18,500 CY
Carney Road Bridge Abutments/Wingwalls Structural Excavation and Backfill
1 JOB
0033 Pump Station Excavation and Backfill 1 JOB
*0034 Excavation for Interceptor Ditches and Swales 1 JOB
0035 Channel Unwatering 1 JOB
0036 Pump Station Unwatering 1 JOB
0037 Embankment - Relocation of Carney Road 27,000 CY
0038 Embankment - Pump Station Access and Berm Road 1,000 CY
*0039 Embankment - Guide Levees 13,000 CY
0040 Embankment-Proposed Banks and Abandoned Channels 250,000 CY
0041 Embankment - Carney Road Preload 26,000 CY
0042 Grouted Riprap 620 CY
0043 Precast, Prestressed Concrete Pile, 14-inch x 14-inch 120 LF
0044 Precast, Prestressed Concrete Pile, 18-inch x 18-inch 1,680 LF
0045 Precast, Prestressed Concrete Pile, 30-inch x 30-inch 1,040 LF
0046 Pile Load Test (18-inch x 18-inch) 1 EA
0047 Pile Load Test (30-inch x 30-inch) 1 EA
0048 Asphalt Leveling Course 460 TON
0049 Asphalt Binder Course 3,300 TON
00010-5 Ed 20-001
0050 Asphalt Wearing Course 2,500 TON
0051 Cold Planing 2,750 SY
0052 Class II Base Course 21,600 SY
0053 Surfacing 580 CY
0054 Access Road and Laydown Area 1 JOB
0055 High Security Fence 488 LF
0056 Swing Gates 2 EA
0057 Barbed Wired Fencing 4,250 LF
0058 Farm Gates 2 EA
0059 High Performance Turf Reinforcement Mats 3,200 SY
0060 Turf Establishment and Maintenance 91 AC
0061 Utility Horizontal Directional Drilling 197 LF
0062 Guard Rails 1 JOB
0063 Vertical Lift Sluice Gate 1 EA
0064 Bedding Stone No. 1 45,750 TON
0065 Bedding Stone No. 2 3,000 TON
0066 Riprap, R-25 7,200 TON
0067 Riprap, R-90 61,500 TON
0068 Riprap, R-3500 4,100 TON
0069 Riprap, R-1500 23,000 TON
0070 Riprap, R-650 12,500 TON
0071 Removal and Stockpile, Riprap, R-
25 1 JOB
0072 Non-Clog Submersible Pumps 2 EA
0073 Pipelines, Liquid Process Piping 1 JOB
TOTAL BASE WORK: $
OPTIONAL WORK (OW)
0074 Construction Dewatering - OW 1 JOB
0075 Hauling and Disposal, Excess Material - OW 20,000 CY
00010-6 Ed 20-001
TOTAL OPTIONAL WORK: $
TOTAL BASE + OPTIONAL WORK: $
*Denotes change to previous bid schedule.
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR
AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: OPTION WORK ITEMS: The Government may require the delivery of, in whole or part, the Optional Work Item. The Government may exercise the Optional Item by written notice to the Contractor. If the Government activates the Optional Item, the activation will occur while the Contractor’s plant is within the limits of work. No additional mobilization/ demobilization will be paid to the Contractor for the Optional Work.
NOTE 5: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
NOTE 6: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF
OPTIONAL WORK. In the event that the OPTIONAL WORK is exercised under the terms of the contract, the work will be performed concurrent with the original
00010-7 Ed 20-001 contract duration of 1087 calendar days established for the BASE WORK items specified in Section 00700 CONTRACT CLAUSES paragraph entitled
COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.
NOTE 7: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
NEW ORLEANS DISTRICT
G-003
G -0
.d g n
J E
S
AT&T UTILITY RELOCATION 6 OF 6REF-020
AT&T UTILITY RELOCATION 5 OF 6REF-019
AT&T UTILITY RELOCATION 4 OF 6REF-018
AT&T UTILITY RELOCATION 3 OF 6REF-017
AT&T UTILITY RELOCATION 2 OF 6REF-016
AT&T UTILITY RELOCATION 1 OF 6REF-015
PLAN AND PROFILE - DIVERSION CHANNELREF-014
PLAN AND PROFILE - DIVERSION ROADREF-013
PLAN AND PROFILE - DIVERSION ROADREF-012
PLAN AND PROFILE - DIVERSION ROADREF-011
PLAN AND PROFILE - DIVERSION ROADREF-010
PLAN AND PROFILE - DIVERSION ROADREF-009
PLAN AND PROFILE - DIVERSION ROADREF-008
PLAN AND PROFILE - LA 964REF-007
PLAN AND PROFILE - LA 964REF-006
PLAN AND PROFILE - LA 964REF-005
PLAN AND PROFILE - LA 964REF-004
PLAN AND PROFILE - LA 964REF-003
PLAN AND PROFILE - LA 964REF-002
TITLE SHEET AND LAYOUT MAPREF-001
REFERENCES
XD-002 EXISTING CARNEY RD BRIDGE TO BE REMOVED
SITE DEMOLTION PLANXD-001
DEMOLITION
RIGHT OF WAY TABULATION TABLER-019
DISPOSITION TABLES 2 OF 2R-018
DISPOSITION TABLES 1 OF 2R-017
FACILITIES AND UTILITIES 11 OF 11R-016
FACILITIES AND UTILITIES 10 OF 11R-015
FACILITIES AND UTILITIES 9 OF 11R-014
FACILITIES AND UTILITIES 8 OF 11 R-013
FACILITIES AND UTILITIES 7 OF 11 R-012
FACILITIES AND UTILITIES 6 OF 11R-011
FACILITIES AND UTILITIES 5 OF 11 R-010
FACILITIES AND UTILITIES 4 OF 11R-009
FACILITIES AND UTILITIES 3 OF 11 R-008
FACILITIES AND UTILITIES 2 OF 11R-007
FACILITIES AND UTILITIES 1 OF 11R-006
OVERALL FACILITIES AND UTILITIESR-005
ROW/CONSTRUCTION LIMITS NEAR CEMETERYR-004A
OVERALL RIGHT OF WAY MAPR-004
INDEX, LEGEND AND ABBREVIATIONSR-003
LOCATION AND VICINITY MAPR-002
COVER SHEETR-001
RIGHT-OF-WAY
BORING LOGS (SHEET 11 OF 11)B-113
BORING LOGS (SHEET 10 OF 11)B-112
BORING LOGS (SHEET 9 OF 11)B-111
BORING LOGS (SHEET 8 OF 11)B-110
BORING LOGS (SHEET 7 OF 11)B-109
BORING LOGS (SHEET 6 OF 11)B-108
BORING LOGS (SHEET 5 OF 11)B-107
BORING LOGS (SHEET 4 OF 11)B-106
BORING LOGS (SHEET 3 OF 11)B-105
BORING LOGS (SHEET 2 OF 11)B-104
BORING LOGS (SHEET 1 OF 11)B-103
BORING LOCATION MAPB-102
BORING LEGENDB-101
SOIL BORING LOG
CARNEY ROAD CROSS SECTIONSC-061
PEDESTRIAN / BIKE STRIPING LAYOUTC-060C
PAVEMENT MARKING DETAILS PLAN AND SECTION VIEWSC-060B
RUMBLE STRIPS PLAN AND SECTION VIEWSC-060A
PAVEMENT MARKING PLANC-060
NEW ENTERGY POWER POLES - NEW CARNEY ROADC-059A
PLAN AND PROFILE CARNEY ROAD SHEET 6 OF 6C-059
PLAN AND PROFILE CARNEY ROAD SHEET 5 OF 6C-058
PLAN AND PROFILE CARNEY ROAD SHEET 4 OF 6C-057
PLAN AND PROFILE CARNEY ROAD SHEET 3 OF 6C-056
PLAN AND PROFILE CARNEY ROAD SHEET 2 OF 6C-055
PLAN AND PROFILE CARNEY ROAD SHEET 1 OF 6C-054
(NOT USED)C-053
CARNEY ROAD TYPICAL SECTIONS (2 OF 2)C-052
CARNEY ROAD TYPICAL SECTIONS (1 OF 2)C-051
CARNEY ROAD
CHANNEL GEOTEXTILE KEY-IN TRENCH DETAILSC-035
BAYOU BATON ROUGE TEMPORARY BYPASS CROSS SECTIONS (2 OF 2)C-034
BAYOU BATON ROUGE TEMPORARY BYPASS CROSS SECTIONS (1 OF 2)C-033
COMITE RIVER DIVERSION CHANNEL CROSS SECTIONS (4 OF 4)C-032
COMITE RIVER DIVERSION CHANNEL CROSS SECTIONS (3 OF 4)C-031
COMITE RIVER DIVERSION CHANNEL CROSS SECTIONS (2 OF 4)C-030
COMITE RIVER DIVERSION CHANNEL CROSS SECTIONS (1 OF 4)C-029
BAYOU BATON ROUGE ROCK CHUTE CROSS SECTIONS (2 OF 2)C-028
BAYOU BATON ROUGE ROCK CHUTE CROSS SECTIONS (1 OF 2)C-027
SUGGESTED SEQUENCE OF CONSTRUCTION PHASE 5C-026E
SUGGESTED SEQUENCE OF CONSTRUCTION PHASE 4C-026D
SUGGESTED SEQUENCE OF CONSTRUCTION PHASE 3C-026C
SUGGESTED SEQUENCE OF CONSTRUCTION PHASE 2C-026B
SUGGESTED SEQUENCE OF CONSTRUCTION PHASE 1C-026A
BAYOU BATON ROUGE TEMPORARY ACCESS ROAD PLANC-025
FINAL SITE GRADING AND DRAINAGE PLAN SHEET 2 OF 2 C-024E
FINAL SITE GRADING AND DRAINAGE PLAN SHEET 1 OF 2C-024D
INTERIM SITE GRADING & DRAINAGE - COORDINATES & GENERAL NOTESC-024C
INTERIM SITE GRADING & DRAINAGE PLAN SHEET 2 OF 2C-024B
INTERIM SITE GRADING & DRAINAGE PLAN SHEET 1 OF 2C-024A
ACCESS TO LILLY BAYOU STOCKPILE AREA C-023B
DISPOSAL AREA COORDINATES, SECTIONS, DETAILS AND GENERAL NOTESC-023A
DISPOSAL AREA LAYOUTC-023
RIPRAP TRANSITION AND EDGE DETAILSC-022
COMITE RIVER DIVERSION CHANNEL SECTIONS (3 OF 3)C-021
COMITE RIVER DIVERSION CHANNEL SECTIONS (2 OF 3)C-020
COMITE RIVER DIVERSION CHANNEL SECTIONS (1 OF 3)C-019
COMITE RIVER DIVERSION CHANNEL PLAN VIEW (2 OF 2)C-018
COMITE RIVER DIVERSION CHANNEL PLAN VIEW (1 OF 2)C-017
COMITE RIVER DIVERSION PHASE 1 & PHASE 4 PROFILEC-016
COMITE RIVER DIVERSION PHASE 4 PLANC-015
COMITE RIVER DIVERSION PHASE 1 PLANC-014
BAYOU BATON ROUGE ROCK CHUTE SECTIONS (4 OF 4)C-013
BAYOU BATON ROUGE ROCK CHUTE SECTIONS (3 OF 4)C-012
BAYOU BATON ROUGE ROCK CHUTE SECTIONS (2 OF 4)C-011
BAYOU BATON ROUGE ROCK CHUTE SECTIONS (1 OF 4)C-010
BAYOU BATON ROUGE ROCK CHUTE PLAN VIEW (2 OF 2)C-009
BAYOU BATON ROUGE ROCK CHUTE PLAN VIEW (1 OF 2)C-008
BAYOU BATON ROUGE ROCK CHUTE PHASE 1 & PHASE 4 PROFILEC-007
BAYOU BATON ROUGE ROCK CHUTE PHASE 1 & PHASE 4 PLANC-006
BAYOU BATON ROUGE TEMPORARY BYPASS SECTIONC-005
BAYOU BATON ROUGE TEMPORARY BYPASS PLAN & PROFILEC-004
EXCAVATION PLAN C-003
PROPOSED SITE PLANC-002
EXISTING SITE PLAN C-001
BAYOU BATON ROUGE & COMITE RIVER DIVERSION CHANNEL
GENERAL NOTES AND LEGENDG-004
INDEX OF DRAWINGSG-003
PROJECT LOCATION MAP AND VICINITY MAPG-002
COVER SHEETG-001
GENERAL
CONCRETE SURFACE FINISH QUANTITIESS-118
CONCRETE SURFACE FINISHS-117
APPROACH SLAB DETAILSS-116
SPAN DETAILS (3 OF 3)S-115
SPAN DETAILS (2 OF 3)S-114
SPAN DETAILS (1 OF 3)S-113
BEARING PAD DETAILS AND JOINT DATAS-112
GIRDER SCHEDULES-111
GIRDER DETAILSS-110
FRAMING PLANS-109
INTERMEDIATE BENT DETAILSS-108
END BENT DETAILS (2 OF 2)S-107
END BENT DETAILS (1 OF 2)S-106
PILE DATAS-105
FOUNDATION PLANS-104
GENERAL PLAN & ELEVATIONS-103
SUMMARY OF BRIDGE QUANTITIESS-102
GENERAL NOTES AND INDEX S-101
CARNEY ROAD BRIDGE
TRUCK WASH DOWN RACK DETAILSC-503
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) (2 OF 2)C-502
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) (1 OF 2)C-501
STORMWATER POLLUTION PREVENTION PLAN
CLOSURE OF BAYOU BATON ROUGEC-302
PRELOAD AND SETTLEMENT MONITORINGC-301
PRELOAD DETAILS AND BAYOU BATON ROUGE CLOSURE
PUMP STATION MANHOLE DETAILS (SHEET 2 OF 2)C-127
PUMP STATION MANHOLE DETAILS (SHEET 1 OF 2)C-126
PUMP STATION TRASH RACK AND SLUICE GATE DETAILSC-125
PUMP STATION MISCELLANEOUS PUMP STATION DETAILS (SHEET 2 OF 2)C-124
PUMP STATION MISCELLANEOUS PUMP STATION DETAILS (SHEET 1 OF 2)C-123
PUMP STATION SECURITY FENCE DETAILSC-122
PUMP STATION HEADWALL DETAILSC-121
PUMP STATION WET WELL DETAILSC-120
PUMP STATION TYPICAL SECTIONSC-110
PUMP STATION PROPOSED PAD LAYOUTC-109
PUMP STATION PROPOSED MAINTENANCE ROAD CROSS SECTIONS (SHEET 3 OF 3)C-108
PUMP STATION PROPOSED MAINTENANCE ROAD CROSS SECTIONS (SHEET 2 OF 3)C-107
PUMP STATION PROPOSED MAINTENANCE ROAD CROSS SECTIONS (SHEET 1 OF 3)C-106
PUMP STATION PROPOSED MAINTENANCE ROAD PROFILEC-105
PUMP STATION PROPOSED PIPE PROFILEC-104
PUMP STATION PROPOSED SITE PLANC-103
PUMP STATION REMOVAL PLANC-102
PUMP STATION EXISTING SITE PLANC-101
PUMP STATION ALIGNMENT DATAC-100
PUMP STATION CIVIL
LA 964 AT CARNEY ROAD TEMP. TRAFFIC CONTROL PLANC-083
DETOUR SIGNING AND MAPC-082
LA ROUTE 964 CROSS SECTIONS AT CARNEY ROADC-081
CARNEY ROAD CROSS SECTIONS C-080
CARNEY ROAD CROSS SECTIONSC-079
CARNEY ROAD CROSS SECTIONS C-078
CARNEY ROAD CROSS SECTIONS C-077
CARNEY ROAD CROSS SECTIONS C-076
CARNEY ROAD CROSS SECTIONSC-075
CARNEY ROAD CROSS SECTIONS C-074
CARNEY ROAD CROSS SECTIONS C-073
CARNEY ROAD CROSS SECTIONS C-072
CARNEY ROAD CROSS SECTIONS C-071
CARNEY ROAD CROSS SECTIONS C-070
CARNEY ROAD CROSS SECTIONS C-069
CARNEY ROAD CROSS SECTIONS C-068
CARNEY ROAD CROSS SECTIONS C-067
CARNEY ROAD CROSS SECTIONS C-066
CARNEY ROAD CROSS SECTIONS C-065
CARNEY ROAD CROSS SECTIONS C-064
CARNEY ROAD CROSS SECTIONSC-063
CARNEY ROAD CROSS SECTIONSC-062
PUMP STATION DEMCO POWER SERVICE DETAILE-017
PUMP STATION PROGRAM EXAMPLE OF DATA EXCHANGE TABLE FOR SCADAE-016
PUMP STATION PROGRAM (PDP) PLC I/O WIRING DIAGRAM, 3 OF 3E-015
PUMP STATION PROGRAM (PDP) PLC I/O WIRING DIAGRAM, 2 OF 3E-014
PUMP STATION PROGRAM (PDP) PLC I/O WIRING DIAGRAM, 1 OF 3E-013
PUMP STATION POWER DISTRIBUTION & PUMP CONTROL DIAGRAME-012
ELECTRICAL LIGHTING SCHEMATICS AND DETAILSE-011
PUMP STATION ELECTRICAL TYPICAL DETAILSE-010
PUMP STATION TERMINAL JUNCTION BOX & CABLE TRENCH LAYOUTE-009
PUMP STATION ELECTR. POWER DISTRIBUTION & PUMP CONTROL DIAGRAME-008
PUMP STATION CONTROL PANELE-007
PUMP STATION ELECTRICAL EQUIPMENT RACK ELEVATION DETAILE-006
PUMP STATION ELECTRICAL SCHEDULESE-005
PUMP STATION ELECTRICAL 3-LINE DIAGRAME-004
PUMP STATION ELECTRICAL SITE PLANE-003
PUMP STATION ELECTRICAL NOTESE-002
PUMP STATION ELECTRICAL LEGENDE-001
PUMP STATION ELECTRICAL
PILING DETAILS COMPRESSION PILE TESTS-161
OBJECT MARKERS AND DEAD END ROAD INSTALLATIONS-160
HIGHWAY GUARD RAIL (MASH) OFF-SYSTEM BRIDGE APPLICATIONS-159
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (11 OF 11)S-158
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (10 OF 11)S-157
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (9 OF 11)S-156
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (8 OF 11)S-155
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (7 OF 11)S-154
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (6 OF 11)S-153
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (5 OF 11)S-152
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (4 OF 11)S-151
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (3 OF 11)S-150
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (2 OF 11)S-149
HIGHWAY SAFETY GUARD RAIL (MASH) (01-03-2019) (1 OF 11)S-148
STEEL WIRE BAR SUPPORTS-147
LADOTD STANDARD PLANS
APPROACH SLAB DRAINAGE DETAILS (4 OF 4)S-146
APPROACH SLAB DRAINAGE DETAILS (3 OF 4) S-145
APPROACH SLAB DRAINAGE DETAILS (2 OF 4)S-144
APPROACH SLAB DRAINAGE DETAILS (1 OF 4)S-143
APPROACH SLAB COMMON DETAILS (6 OF 6)S-142
APPROACH SLAB COMMON DETAILS (5 OF 6)S-141
APPROACH SLAB COMMON DETAILS (4 OF 6)S-140
APPROACH SLAB COMMON DETAILS (3 OF 6)S-139
APPROACH SLAB COMMON DETAILS (2 OF 6)S-138
APPROACH SLAB COMMON DETAILS (1 OF 6)S-137
YEAR PLATES-136
CAST-IN-PLACE BARRIER RAILING AND TRANSITIONS-135
SEALED EXPANSION JOINT PREFORMED NEOPRENE (2 OF 2)S-134
SEALED EXPANSION JOINT PREFORMED NEOPRENE (1 OF 2)S-133
LG-45 COMMON DETAILS (11 OF 11)S-132
LG-45 COMMON DETAILS (10 OF 11)S-131
LG-45 COMMON DETAILS (9 OF 11)S-130
LG-45 COMMON DETAILS (8 OF 11)S-129
LG-45 COMMON DETAILS (7 OF 11)S-128
LG-45 COMMON DETAILS (6 OF 11)S-127
LG-45 COMMON DETAILS (5 OF 11)S-126
LG-45 COMMON DETAILS (4 OF 11)S-125
LG-45 COMMON DETAILS (3 OF 11)S-124
LG-45 COMMON DETAILS (2 OF 11)S-123
LG-45 COMMON DETAILS (1 OF 11))S-122
LG-45 REINFORCEMENT WELDED WIRE REINFORCEMENTS-121
LG-45 REINFORCEMENT CONVENTIONAL REINFORCEMENTS-120
PRECAST PRESTRESSED CONCRETE PILESS-119
LADOTD SPECIAL DETAILS
IN
D
E X
O F
D R
A W
IN
G
S
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
A D
D E
D N
E W
P L
A N
S H
E E
T R
-0 A
A
P R
IL
J D
L
J D
L A
P R
IL
A D
D E
D N
E W
P L
A N
S H
E E
T C
-0
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D
A T
E
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E P
L O
T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
®of Engineers
US Army Corps
A N
S I
D of Engineers
US Army Corps
F
IL
E N
U M
B E
R
J E
S
J E
S
N -Y
A S
S O
C
IA
T E
S
IDENTIFICATION
SHEET
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
N E
W O
R L
E A
N S
D
IS
T R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W P
-2
-B
-0
SS
O
C
IA
T E
S, I
N C
EN
GI
NE
ER
S
A
RC
HI
TE
CT
S
P
LA
NN
ER
S
PR
OG
RA
M
P
RO
JE
CT
M
AN
AG
ER
S
H -4
-4 -8
E a s t
B a to n R o u g e P a ri s h
L o u is ia n a
F lo o d
C o n tr o l, A m it e R iv e r
T ri b u ta ri e s
L o u is ia n a
B a y o u
B a to n R o u g e R o c k
C h u te
C o m it e R iv e r
B a s in
C o m it e R iv e r
D iv e rs io n
P ro je c t
C A
L
F E
B R
U A
R Y
W X
X X
X X
-X X
-X -X
X X
NEW ORLEANS DISTRICT
RIGHT OF ENTRY
R/W
SB
MW
W
W
ELECTRIC LINE (OVERHEAD)
ELECTRIC LINE (UNDERGROUND)
POWER POLE
GUY WIRE
LIGHT POLE
ELECTRIC PULL BOX
ELECTRIC MANHOLE
ELECTRIC TRANSFORMER
WATER LINE
WATER VALVE VAULT
WATER METER
HYDRANT
SANITARY SEWER LINE
SANITARY SEWER MANHOLE
SANITARY SEWER CLEANOUT
GAS LINE
GAS METER
FUEL VALVE
TELEPHONE PEDESTAL
FIBER OPTIC LINE
CULVERT
CATCH BASIN OR DROP INLET
DRAINAGE MANHOLE
COMMUNICATION JUNCTION BOX
COMMUNICATION LINE
FENCE
RAILROAD TRACKS
RAILROAD SIGN
TREE
SIGN
PIPE BOLLARDS
MONITORING WELL
FLAGPOLE
BORING LOCATION
E
P
CO
S
G
F
TJ
FO
CJ
D
CP
CB
Gx
SSx
Ex
Ex
Wx
Cx
RAILROAD SWITCHBOX
RAILROAD SWITCH
VALVE
MONUMENT
FILL
DITCH/ CHANNEL CENTER
CUT/FILL
RIPRAPAGGREGATE SURFACE
PROJECT CONTROL POINT (PCP)
PRIMARY PROJECT CONTROL POINT (PPCP)
R R
G-004
G E
N E
R A
L N
O T
E S
A N
D L
E G
E N
D
GENERAL NOTES:
LEGEND:
ABBREVIATIONS:
S-201
DETAIL/SECTION
DETAIL/SECTION
TOP SIDE
ELEVATION SECTION
S-201
S-201
FRONT
GENERAL CROSS-REFERENCING SYMBOLS:
GAS UTILITY DISTRICT 1 RANDY CROFT 225.624.4020 1g286@BELLSOUTH.NET
800.399.4001 NBUTLER@ENTERGY.COM
225.654.0201
ENTERGY
CITY OF ZACHARY LIONELL LAWSON
@CITYOFZACHARY.ORG
LINONELL.LAWSON
CB-??
ANOTHER DRAWING
VIEW SHOWN ON
DETAIL SYMBOL W/
SAME DRAWING
VIEW SHOWN ON
DETAIL SYMBOL W/
ANOTHER DRAWING
VIEW SHOWN ON
SECTION CUT W/
SAME DRAWING
VIEW SHOWN ON
SECTION CUT W/
EACH VIEW)
(CENTERED UNDER
VIEW SUBTITLE
SECTION/DETAIL)
(CENTERED UNDER
DRAWING
TITLE ON ANOTHER
SECTION/DETAIL
SECTION/DETAIL)
(CENTERED UNDER
DRAWING
TITLE ON SAME
SECTION/DETAIL
SUPPLEMENTAL INFORMATION
SCALE:
SCALE:
SUPPLEMENTAL INFORMATION
AT&T TRACY LAUVRAY TL697R@ATT.COM
BENCHMARKS:
COX
EAST BATON ROUGE PARISH TOM STEPHENS TSTEPHENS@BRGOV.COM
EXT. 566
225.389.3186
BATON ROUGE, LA 70802
1100 LAUREL ST.
OWNER CONTACT PHONE ADDRESS EMAIL
DESIGNATION:
CONTROL:
VERTICAL
DESCRIPTION OF BENCHMARK:
POINTS OF CONTACT FOR FACILITIES:
BUTLER-LEON
NERISSA
225.367.0613
BATON ROUGE, LA 70816
5550 S. SHERWOOD FOREST BLVD.
DENHAM SPRINGS, LA. 70726
300 JULIA ST.
THOMAS FLOYD
225.806.4745 (C)
225.237.5423
BATON ROUGE, LA 70806
7401 FLORIDA BLVD.
thomas.floyd@cox.com
LARRY BONNER
601-433-9458 (C)
601-776-6721
QUITMAN, MS 39355
103 EAST FRANKLIN ST.
@BLACKBEARLLC.COM
LBONNER
ZACHARY, LA. 70791
4650 MAIN ST.
ZACHARY, LA. 70791
10633 ZACHARY DEERFORD RD.
MIDLA, LLC
BLACK BEAR TRANSMISSION
NAVD88 (2006.81)
ELEV. = 80.31
(PPCP)
NGS PID. BBDY83
11087C PBM1
(PCP)
NGS PID. BBDY83
11087C PBM2
EASTING = 3322911.077
NORTHING = 772712.993
EASTING = 3323775.185
NORTHING = 773494.392
NAVD88 (2006.81)
ELEV. = 81.67
CONSTRUCTION. ALL OTHER PROJECT CONTROL POINTS (PCPs) ARE FOR VERIFICATION PURPOSES)
(THE PRIMARY PROJECT CONTROL POINT (PPCP) IS THE CONSTRAINING BENCHMARK FOR ALL
(PCP)
19-036C-1
EASTING = 3319852.58
NORTHING = 771884.64
LONG = 91°12'33.4368" W
LAT = 30°37'20.7698"N
SURFACE AND STAMPED 19-036C-1 2019.
DRIVEWAY, AND 2.3 FEET WEST OF A 6" TREATED POST ON THE FENCE LINE. SET FLUSH WITH THE GROUND
FEET NORTH/NORTHWEST OF A FENCE CORNER, 17.0 FEET EAST OF THE EAST EDGE OF A LIMESTONE
ACCESS COVER SET IN CONCRETE. LOCATED 52 FEET NORTH OF THE CENTERLINE OF CARNEY ROAD, 8.0
ROD DRIVEN TO REFUSAL (A DEPTH OF 24 FT.) AND SET IN AN ALUMINUM FLANGE ON A 6" PVC PIPE WITH AN
1057 CARNEY ROAD. THE STATION IS A CORPS OF ENGINEERS, NEW ORLEANS DISTRICT STAINLESS STEEL
FOR 0.95 MILES, THEN TURN LEFT ONTO A DRIVEWAY, AND THE STATION WILL BE NEAR A FENCE CORNER AT
NORTHEASTERLY DIRECTION FOR 0.75 MILES, THEN TURN RIGHT ONTO CARNEY ROAD AND PROCEED EAST
61 FOR 2.4 MILES TO BARNETT ROAD, THEN TURN LEFT ONTO BARNETT ROAD AND PROCEED IN A
INTERSECTION OF HIGHWAY 64 AND HIGHWAY 61 JUST WEST OF ZACHARY, LA. PROCEED SOUTH ON HIGHWAY
WEST/SOUTHWEST OF ZACHARY, LA., AND 8.73 MILES EAST OF GLYNN, LA. TO REACH THE STATION FROM THE
THE STATION IS LOCATED IN EAST BATON ROUGE PARISH, 3.42 MILES NORTHWEST OF BAKER, LA., 3.64 MILES
CONTROL:
HORIZONTAL
NAVD88 (2006.81)
ELEV. = 89.59
INSIDE FACEIF
HIGH PERFORMANCE TURF REINFORCED MATHPTRM
HORIZONTALHORZ
HEIGHTHT
GALVANIZEDGALV
FLARED END SECTIONFES
FAR FACEFF
EXISTINGEXIST
EACH WAYEW
EQUAL SPACESES
ELEVATIONEL
EXPANSION JOINTEJ
EACH FACEEF
DOWELDWL
DRAWINGDWG
DIAMETERDIA
CORROSION RESISTANT STEELCRS
CONCRETECONC
CORRUGATED METAL PIPECMP
CONSTRUCTION JOINTCJ
CLEARCLR
CURB & GUTTERC&G
CENTERLINEC/L
BOTTOMBOT
BITUMINOUSBITUM
BAYOU BATON ROUGEBBR
ALUMINUMALUM
ALTERNATE WITHALT W/
APPROXIMATEAPPROX
WATER MAINWM
WIDTHW
VERTICALVERT
UNDERGROUNDUGND
UNLESS OTHERWISE NOTEDUNO
TYPICALTYP
TOP AND BOTTOMT&B
STAINLESS STEELSST
SPECIFICATIONSSPEC
SANITARYSAN
RIGHT-OF-WAYR/W
REQ'D REQUIRED
RIGHT OF ENTRYROE
POINT OF ENDINGPOE
POINT OF BEGINNINGPOB
PRIMARY PROJECT CONTROL POINTPPCP
PROJECT CONTROL POINTPCP
ON CENTEROC
OUTSIDE FACEOF
NUMBERNO
NEAR FACENF
MISCELLANEOUSMISC
MIRROREDMIRR
MINIMUMMIN
MAXIMUMMAX
LANDWARDL/W
LOCAL PROJECT CONTROL POINTLPCP
LONGLG
BUT WILL BE INSTALLED AFTER RE-ALIGNED CARNEY ROAD IS COMPLETED.
RELOCATED TO THE RE-ALIGNED CARNEY ROAD WILL NOT HAVE TEMPORARY UTILITIES THROUGH THE CONSTRUCTION WORK LIMITS, TO THE DISPOSITION TABLES ON SHEETS R-017 AND R-018. UTILITIES REMOVED FROM EXISTING CARNEY ROAD RIGHT-OF-WAY AND
CONTRACTOR IS REQUIRED TO COORDINATE AND PERFORM WORK AS DEFINED WITHIN THE RIGHT-OF-WAY PLANS, SPECIFICALLY10.
CONTRACTOR SHALL OBTAIN ALL PERMITS PRIOR TO BEGINNING OF WORK. 9.
ELEVATIONS ARE IN FEET AND REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988, 2006.81 EPOCH (NAVD88(2006.81).8.
THE NORTH AMERICAN DATUM OF 1983 (NAD83-NA2011). COORDINATES ARE IN U.S. SURVEY FEET.
STATE PLANE COORDINATES (SPC) SHOWN ARE REFERENCED TO LOUISIANA SOUTH STATE PLANE COORDINATE SYSTEM USING7.
TO DUSTING SHALL BE KEPT MOIST WITH WATER.
DUST CONTROL - CONTRACTOR SHALL TAKE RESPONSIBLE MEASURES TO AVOID UNNECESSARY DUST. EACH SURFACE SUBJECT6.
DIFFERENTIAL LEVELING PER SECTION 01100.
THE CONTRACTOR SHALL VERIFY ALL CONTROL POINTS (PPCP, PCPs, AND LPCPs) AT A MINIMUM EVERY 6 MONTHS VIA5.
SUBMIT THE CONTROL VERIFICATION SURVEY TO THE CORE WITHIN 14 DAYS OF NOTICE TO PROCEED.
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY BASELINES AND PROJECT CONTROL POINTS PRIOR TO CONSTRUCTION AND
CONTROL POINTS ARE INDICATED ON THE PLANS AND ARE ALSO THE VERTICAL BENCHMARKS FOR THE PROJECT. IT IS THE
THE CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AND GRADES PRIOR TO THE BEGINNING OF CONSTRUCTION. PROJECT
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LAYOUT AND CONTROL AS DETAILED IN THESE CONSTRUCTION DRAWINGS.4.
PROPER CONSTRUCTION METHODS SHALL BE EMPLOYED.
IT IS THE CONTRACTOR'S RESPONSIBILITY FOR THE INTEGRITY OF THE SLOPES AND ADJOINING AREAS OF THE WORK AREA.3.
OPERATIONS. THE DAMAGE SHALL BE REPAIRED IN KIND AT THE CONTRACTOR'S EXPENSE.
THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING UTILITIES CAUSED BY CONSTRUCTION NEGLIGENT2.
UNDERGROUND UTILITY LINES RELOCATED IN CONJUNCTION WITH CONSTRUCTION.
COMPLETE OR ACCURATE. THE CONTRACTOR MUST COORDINATE DIRECTLY WITH THE INVOLVED UTILITY OWNERS TO HAVE
INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER CAN NOT AND DOES NOT WARRANT THAT THIS INFORMATION IS
EXISTING UNDERGROUND UTILITY LINES (PHONE, FIBER OPTIC, ETC.) ARE SHOWN ON THE DRAWINGS BASED UPON THE BEST1.
AND 2.1 FEET EAST OF A BARBED WIRE FENCE.
IS LOCATED 98 FEET WEST OF THE CENTERLINE OF LA HWY 964, 31.8 FEET NORTH OF A POWER POLE
CARNEY ROAD, TRAVEL NORTH ON LA HWY 964 FOR 0.3 MILES TO THE MARK ON THE LEFT. THE STATION
HUDSON, LA. TO REACH THE STATION FROM THE INTERSECTION OF LA HWY 964 (OLD SCENIC HWY) AND
SOUTHWEST OF ZACHARY LA. 3.7 MILES NORTHWEST OF BAKER, LA. AND 5.6 MILES SOUTHEAST OF PORT
MOUNTED FLUSH WITH THE GROUND. THIS STATION IS LOCATED IN EAST BATON ROUGE PARISH, 3.7 MILES
A DEPTH OF 40 FEET, SET IN A SAND FILLED PVC PIPE IN CONCRETE WITH AN ALUMINUM ACCESS COVER, THE STATION IS STAMPED "11087C PBM 1 2011" AND IS A 9/16 IN STAINLESS STEEL ROD DRIVEN TO REFUSAL AT
POWER POLE AND 2.7 FEET WEST OF A BARBED WIRE FENCE.
STATION IS LOCATED 78 FEET EAST OF THE CENTERLINE OF LA HWY 964 46 FEET SOUTHWEST OF A
AND CARNEY ROAD, TRAVEL NORTH ON LA HWY 964 FOR 0.5 MILES TO THE MARK ON THE RIGHT. THE
NORTH OF ALSEN, LA. TO REACH THE STATION FROM THE INTERSECTION OF LA HWY 964 (OLD SCENIC HWY)
PARISH, 3.5 MILES SOUTHWEST OF ZACHARY LA, 3.7 MILES NORTHEAST OF BAKER, LA AND 3.8 MILES
ACCESS COVER AND MOUNTED FLUSH WITH THE GROUND. THE STATION IS LOCATED IN EAST BATON ROUGE
REFUSAL AT A DEPTH OF 44 FEET, SET IN A SAND FILLED PVC PIPE SET IN CONCRETE WITH AN ALUMINUM
THE STATION IS STAMPED "11087C PBM 2 2011".AND IS A 9/16 IN STAINLESS STEEL ROD DRIVEN TO c le m a y
H G
-0 G
E N
N O
T E
S A
N D
L E
G E
N D
.d g n
/2
/2
:4
:5
A
M
INCLUDED WITHIN CLIN ENTITLED "EMBANKMENT-PROPOSED BANKS AND ABANDONED CHANNELS".
12. FILL AREAS SHOWN ON THE DRAWINGS ARE DESIGNATED AS COMPACTED FILL. THE QUANTITES AND COSTS FOR THIS WORK SHALL BE
ENTERGY.
PROVIDE METER AND CT/CABINET THAT WILL BE APPROVED BY ENTERGY. CONTRACTOR SHALL COORDINATE FINAL CONNECTION SCHEDULE WITH
INCLUDING METER AND DISCONNECTS AS SHOWN. CONTRACTOR SHALL COORDINATE WITH ENTERGY PRIOR TO PREPARING SUBMITTALS AND
PROVIDING AND INSTALLING CONDUIT AND CONDUCTORS FROM POLE-MOUNTED UTILITY TRANSFORMER TO PUMP STATION CONTROL PANEL,
11. ENTERGY IS RESPONSIBLE FOR REMOVAL OF EXISTING OVERHEAD POWER LINES AND POLES AS SHOWN. CONTRACTOR IS RESPONSIBLE FOR
A D
D E
D N
E W
N O
T E
T O
T H
E P
L A
N S
H E
E T
/2
/2
J D
L
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D
A T
E
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E P
L O
T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
®of Engineers
US Army Corps
A N
S I
D of Engineers
US Army Corps
F
IL
E N
U M
B E
R
J E
S
J E
S
N -Y
A S
S O
C
IA
T E
S
IDENTIFICATION
SHEET
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
N E
W O
R L
E A
N S
D
IS
T R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W P
-2
-B
-0
SS
O
C
IA
T E
S, I
N C
EN
GI
NE
ER
S
A
RC
HI
TE
CT
S
P
LA
NN
ER
S
PR
OG
RA
M
P
RO
JE
CT
M
AN
AG
ER
S
H -4
-4 -8
E a s t
B a to n R o u g e P a ri s h
L o u is ia n a
F lo o d
C o n tr o l, A m it e R iv e r
T ri b u ta ri e s
L o u is ia n a
B a y o u
B a to n R o u g e R o c k
C h u te
C o m it e R iv e r
B a s in
C o m it e R iv e r
D iv e rs io n
P ro je c t
F E
B R
U A
R Y
W X
X X
X X
-X X
-X -X
X
LA
N
P R
O P
O S
E D S
IT
E P
L A
N
ACCESS ROAD
TEMPORARY
STA. 11+00.00
STA. 10+00.00
SEE NOTE 4BRIDGE
CARNEY RD.
DITCH
REQ'D R/W
REQ'D R/W
REQ'D R/W
REQ'D R/W
REQ'D R/W
REQ'D R/W
REQ'D R/W
R E
Q 'D R /W
R E Q 'D R /W
REQ'D R/W
R E
Q 'D R /W
R E Q 'D R /W
REQ'D R/W
PROPOSED SITE PLAN
C-002
R E
Q 'D R /W
(BY OTHERS
LA964 BRIDGE
REQ'D R/W
REQ'D R/WREQ'D R/W
(BY OTHERS)
LA964 BYPASS
REQ'D R/W
COLD MILL AND OVERLAY
BEGIN CARNEY ROAD
P I S
T A
.5
E
.5
N
.7
E 3322352.43
N 772014.71
E 3318914.54
N 771374.25
P I S
T A . 3
.9
E
.0
N
.8
STATION
PUMP
CARNEY ROAD
EXIST.
11. SEE SHEETS C-026A TO C-026E FOR SUGGESTED SEQUENCE OF CONSTRUCTION.
10. REFER TO SHEET G-004 FOR LEGEND AND ABBREVIATIONS.
9. SEE SHEET C-025 FOR TEMPORARY ACCESS ROAD.
8. SEE SHEET C-024A AND C-024B FOR GRADING AND DRAINAGE.
7. SEE SHEET C-023 FOR DISPOSAL AREA DETAILS.
6. SEE SHEETS C-010 THRU C-013 AND C-020 THRU C-021 FOR TYPICAL CHANNEL SECTIONS.
5. FILL EXISTING, LOW-LYING AREAS TO APPROXIMATE EL. 78.0'±. WITH COMPACTED EMBANKMENT
IF NECESSARY, A CORRIDOR OVER THE PIPELINES MAY BE LEFT OPEN AT THE DIRECTION OF THE OWNER.
MATERIAL IN PERMANENT DISPOSAL AREA 3 WILL AFFECT THE RELOCATED PIPELINES.
SHALL VERIFY WITH THE OWNER WHETHER OVERBURDEN PRESSURES OF THE FILL
PIPELINE OWNER PRIOR TO THE USE OF THE DISPOSAL AREAS. THE CONTRACTOR
4. PIPELINE RELOCATION (DRILLING LIMITS) TO BE COORDINATED WITH
REPAIR OF DAMAGED ITEMS.
CONTRACT. NO PAYMENT WILL BE MADE FOR REPLACEMENT OR
REPRESENTATIVE, ANY STRUCTURE DAMAGED DURING THE DURATION OF THE
REPLACE OR REPAIR, AS DIRECTED BY THE CONTRACTING OFFICER'S
WHICH MAY OCCUR DURING CONSTRUCTION. THE CONTRACTOR SHALL
STRUCTURES SUCH AS PIPES, INLETS, BRIDGES, ETC. FROM DAMAGE
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT EXISTING
TO BEGINNING WORK.
CONTACT LOCAL UTILITY COMPANIES AND LOUISIANA ONE CALL AT 811 PRIOR
BASED ON THE INFORMATION AVAILABLE. THE CONTRACTOR SHALL
2. EXISTING UNDERGROUND UTILITY LINES ARE SHOWN ON THE DRAWINGS
THROUGHOUT THE DURATION OF THE PROJECT.
1. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SITE DRAINAGE
NOTES:
DRAINAGE DITCHES
C/L CARNEY RD
SHEET R-018)
DISPOSITION TABLE,
OWNER - SEE
(TO BE REMOVED BY
NATURAL GAS PIPELINES
BLACK BEAR TRANSMISSION MIDLA
WEST INTERCEPTOR DITCH EAST INTERCEPTOR DITCH
NO. 1
LEVEE
GUIDE
GUIDE LEVEE NO. 2
NO. 3
LEVEE
GUIDE
NO. 5
GUIDE LEVEE
DISPOSAL AREA NO. 1
DISPOSAL AREA NO. 5
PHASE 5 EXPANDED
AREA NO. 2
DISPOSAL
AREA NO. 3
DISPOSAL
DISPOSAL AREA NO. 4
GUIDE LEVEE NO. 4
ADOPTED (P&A) CARNEY ROAD
BEGIN PROJECTED AND
CARNEY ROAD
ADOPTED (P&A)
PROJECTED AND
CARNEY ROAD
ADOPTED (P&A)
PROJECTED AND
CARNEY ROAD
ADOPTED (P&A)
END PROJECTED AND
CHUTE (BBR RC)
BEGIN BBR ROCK
CHUTE (BBR RC)
C/L BBR ROCK
E 3321492.63 N 771906.67
STA. 319+67.46
COMITE RIVER DIVERSION CHANNEL (CRDC)
STA. 0+00.00 =
BBR ROCK CHUTE (BBR RC)
(BY OTHERS)
DIVERSION CHANNEL (CRDC)
C/L COMITE RIVER
C/L BBR RC (NORTH DITCH)
C/L BBR RC (SOUTH DITCH)
GW-1
C/L (CRDC)
STA 311+00
POB
PI STA 346+00
POE
(BY OTHERS)
DIVERSION CHANNEL (CRDC)
COMITE RIVER
CARNEY RD.
C/L EXISTING
DISTURB
DO NOT
CEMETERY
DISTURB
DO NOT
CEMETERY
SCALE: 1" = 200'
SCALE: 1" = 200'
EXIST R/W
EXIST R/W
0200' 200' 400'
R /W
R E
V
IS
E D
C E
M E
T E
R Y
L
IM
IT
M
R
C H
J E
S
R
E V
IS
E
D N
O T
E A
P R
IL
J E
S S
O L
IC
IT
A T
IO
N
N O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D
A T
E
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E P
L O
T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
®of Engineers
US Army Corps
NEW ORLEANS DISTRICT
A N
S I
D of Engineers
US Army Corps
F
IL
E N
U M
B E
R
IDENTIFICATION
SHEET
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
N E
W O
R L
E A
N S
D
IS
T R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W X
X X
X X
-X X
-X -X
X X
X
SS
O
C
IA
T E
S, I
N C
EN
GI
NE
ER
S
A
RC
HI
TE
CT
S
P
LA
NN
ER
S
PR
OG
RA
M
P
RO
JE
CT
M
AN
AG
ER
H -4
-4 -8
E a s t
B a to n R o u g e P a ri s h
L o u is ia n a
B a y o u
B a to n R o u g e R o c k
C h u te
C o m it e R iv e r
B a s in
C o m it e R iv e r
D iv e rs io n P ro je c t
F E
B R
U A
R Y
W
P
-2
-B
J
S
IM
M O
N S
F lo o d C o n tr o l, A m it e R iv e r
A n d T ri b u ta ri e s L o u is ia n a
J
S
IM
M O
N S
J
S
IM
M O
N S
R E
A D
Y F
O R
A D
V E
R T
IS
E
M E
N T
C
L E
M A
Y
PR 79
C-024B
EXIST. 3-48" RCP
C T
IO
N
T E
M P
O R
A R
Y B
Y P
A S
S
B A
Y O
U B
A T
O N R
O U
G
C-005
2' (TYP.)
1 2 3 4 5
New Orleans District of Engineers
US Army Corps
A P
P R
D
D A
T E
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
C
D E
S C
R
IP
T
IO
N M
A R
K
S O
L
IC
IT
A T
IO
N N
O
D A
T E
F
IL
E N
U M
B E
R
C O
N T
R A
C T N
O
H -4 -4 -8
W P -2
-B -0
W X
X X
X X -X
X -X -X
X X
X
F E
B R
U A
R Y
C K
D B
Y
M P
A R
A
P L
O T D
A T
E
F
IL
E N
A M
E
H
C -0
R o c k C h u te .d g n
N .T .S
D W
N B
Y
D E
S
IG
N E
D B
Y
B S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
A N
S I
D
C L
O V
IN
G
A N
S I
D
M
H R
Z
IC
H N
T B C
O R
P
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
M
IS
S
IS
S
IP
P I
R
IV
E R D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
A
A
E a s t
B a to n R o u g e P a ri s h L o u is ia n a
C o m it e R iv e r
D iv e rs io n P ro je c t
B a y o u B a to n R o u g e R o c k C h u te
C o m it e R iv e r
B a s in
F lo o d C o n tr o l, A m it e R iv e r a n d T ri b u ta ri e s L o u is ia n a
IDENTIFICATION
SHEET
R E
A D
Y F
O R A
D V
E R
T
IS
E M
E N
T
(APPROX. LOCATION)
EXISTING TIMBER PILES (TYP.)
EXISTING GROUND
PLAN VIEW
2' (TYP.)
(TYP.)
RIPRAP THICKNESS 1.5'
AREA TO BE COMPACTED FILL
AREA TO BE COMPACTED FILL
AREA TO BE COMPACTED FILL
AREA TO BE COMPACTED FILL
AREA TO BE COMPACTED FILL
AREA TO BE COMPACTED FILL
SECTION A-A
BAYOU BATON ROUGE TEMPORARY BYPASS SECTION
N.T.S.
NOTES:
AT EXISTING CARNEY ROAD BRIDGE CROSSING.
NOTE: RIPRAP TO BE PLACED AT PILE SCOUR HOLES
CHANNEL, SHALL REMAIN IN PLACE.
THE RIPRAP R-25 OUTSIDE THE LIMITS OF THE PERMANENT DIVERSION
2. FOR COMPACTED FILL OF THE BAYOU BATON ROUGE TEMPORARY BYPASS,
1. SEE SHEET C-004 FOR INVERT ELEVATIONS.
TEMPORARY R-90 RIPRAP BLANKET
N.T.S.
BAYOU BATON ROUGE TEMPORARY BYPASS SECTION
BAYOU BATON ROUGE TEMPORARY BYPASS SECTION
N.T.S.
N.T.S.
A A
R-25 RIPRAP
R-25 RIPRAP
R-25 RIPRAP
REQUIRED)
DRAINAGE (WHEN
TO FACILITATE
AREA TO BE CUT
90 90
30' 30'
1V:3H
EL. 78.00
1V:3H
EL. 78.00
80 80
C L
70 70
60 60 10.0'
50 50
30' 30'
EL. 78.00
30'
EL. 78.00
1V:3H
30'
1V:3H
EL. 78.00
EL. 78.00
C L
C L
1V:3H 8080
10.0'
10.0'
T
A .0
S T
A .0
S
T A .0
S T
A .0
S T
A .0
S T
A .0
S
T A .0
12 XX
C-006
H
C -0
-R o c k C h u te .d g n
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
E a s t
B a to n R o u g e P a ri s h L o u is ia n a
New Orleans District of Engineers
US Army Corps
C o m it e R iv e r
D iv e rs io n P ro je c t
H -4 -4 -8
M
IS
S
IS
S
IP
P I
R
IV
E R D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
A M P
A R
A C L
O V
IN
G
A N
S I
D
B a y o u B a to n R o u g e R o c k C h u te
P L
O T D
A T
E
M
H R
Z
IC
C o m it e R iv e r
B a s in
F lo o d C o n tr o l, A m it e R iv e r a n d T ri b u ta ri e s L o u is ia n a
W P -2
-B -0
W X
X X
X X -X
X -X -X
X X
X H
N T
B C
O R
P
R E
A D
Y F
O R A
D V
E R
T
IS
E M
E N
T
F E
B R
U A
R Y
COMITE RIVER DIVERSION CHANNEL.
PHASE 3. PHASE 4 SEGMENT TO BE CONSTRUCTED UPON COMPLETION OF
3. EXCAVATION STARTED IN PHASE 1 WILL BE CONTINUED INTO PHASE 2 AND
2,3
C-022
1,2
C-022
C-022
2,3
S 78°19'08.1" W
2. REFER TO SHEET G-004 FOR LEGEND AND ABBREVIATIONS.
S T
A .9
N 11°05'08" W
S 5° '5 7" E
C-022
C-022
S T
A .0
324+00
324+00
323+00
323+00
322+00
322+00
321+00
321+00
V :3
H
V :3
H
V :3
H
V :3
H
STA. 12+00.00
ROCK CHUTE
BBR
STA. 13+39.95
PHASE 1 POE
BBR ROCK CHUTE
STA. 17+20.00
PHASE 2 POE
BBR ROCK CHUTE
STA. 0+00.00 =
CHUTE POB
C/L BBR ROCK
STA. 0+00.00 =
CHUTE POB
C/L BBR ROCK
V :3
H
V :3
H
V :3
H
V :3
H
TIE INTO EXISTING GROUND
BEGIN 1:7 SLOPE INTO EXISTING GROUND
E 3320987.00 N 773339.30
E 3321492.63 N 771906.67
STA. 319+67.46
DIVERSION CHANNEL
C/L COMITE RIVER
E 3321492.63 N 771906.67
STA. 319+67.46
DIVERSION CHANNEL
C/L COMITE RIVER
PI STA. 318+19.51
E 3321622.28 N 771933.47
PI STA. 318+19.51
E 3321622.28 N 771933.47
320+00
320+00
FOR PLAN & PROFILE)
(SEE SHEET C-014 THRU C-016
C/L COMITE RIVER DIVERSION CHANNEL
PLAN & PROFILE)
(SEE SHEET C-014 to C-019 FOR
C/L COMITE RIVER DIVERSION CHANNEL
C/L BBR ROCK CHUTE
C/L BBR ROCK CHUTE
P C S
T A .9
E
.8
N
.2
P C S
T A .9
E
.8
N
.2
319+00
319+00
318+00
318+00
317+00
317+00
316+00
316+00
S
'0
.1
W S
'0
.1
W S
°3
'1
.8
W S
°3
'1
.8
W
NOTES:
1. SEE SHEETS C-010 THRU…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .