W912P823R0053 AM0003.pdf
PDF 874 KB Posted
- Attached to
- Catfish Point Control Structure Federal contract opportunity
- Solicitation number
- W912P823R0053
About this file
This document is an amendment to a solicitation for marine rental services and elevated platforms to support dewatering efforts for the Catfish Point Control Structure project. The key project details are as follows:
The amendment extends the response deadline from September 21st to September 22nd at 11:30 AM Central Time. It provides responses to seven questions asking for clarification on requirements such as the ability for one individual to serve as superintendent, quality control manager, and safety officer for each project phase. The amendment also confirms the government will install all supplied materials and equipment and will provide lifting support using hired labor and cranes, but no bid bond is required. The solicitation number is W912P823R0053 and is issued by the US Army Corps of Engineers Engineering District New Orleans for the Catfish Point Control Structure project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P823R00530003 FINAL SF30 Catfish Point.pdf | ||
| W912P823R00530002 FINAL SF30 8-28.pdf | ||
| W912P823R00530001 FINAL SPS Catfish Point CS.pdf | ||
| W912P823R0053 FINAL SPS Solicitation CPCS 7-31.pdf | ||
| Enclosure 2 - CPCS Technical Specifications.pdf | ||
| Enclosure 1 - CPCS SS Ref Docs for GF Sector Gates.pdf | ||
| Enclosure 5 - CPCS Machinery Pit and Anchorage Details.pdf | ||
| Enclosure 1 - CPCS SS Ref Docs for GFE (Hagglunds-Instructions).pdf | ||
| Enclosure 1 - CPCS SS Ref Docs for GFE (Hagglunds-Manual).pdf | ||
| Enclosure 4 - CPCS Gantt Chart (Rev 2023-05-24).pdf | ||
| Enclosure 3 - CPCS Plans.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THE PURPOSE FOR THIS AMENDMENT IS AS FOLLOWS:
a) Post RFI responses,
b) Extend the due date to 11:30 AM Central Time, Friday, 22 SEP 2023.
Nothing Follow s.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Sep-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823R0053
X 9B. DATED (SEE ITEM 11)
31-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Sep-2023
CODE
CONTRACTING DIV- CHIEF
7400 LEAKE AVENUE, ROOM 172
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P823R0053
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
Q1. Please confirm if a single, duly qualified individual can "triple hat" as the Superintendent, QCM, and SSHO for each individual project.
A1. A single, completely qualified individual can “triple hat” as the Superintendent, QCM, and SSHO for each phase of the project.
Q2. Is a bid bond required for this bid?
A2. A bid bond is NOT required.
Q3. Is there are any instructions available as to what is required for the proposal.
A3. The Instructions to Offerors is on page 5 of the original solicitation. This is a price only RFP. See Note 1:
NOTE 1: The offeror is required to bid on all line items. Failure to submit an offer on all such line items shall result in a non-responsive offer, requiring rejection thereof. The Government’s intent is to award without discussions.
Q4. a) Can you please clarify the discrepancy between the request for 2.5 months of Rental Marine Services in Clin 002, and the Service Items 001-002 on page 9 of 13 stating approximately 1 month of work.
A4. There are submittal on the front end leading to additional time (2.5 months). No submittals are needed for subsequent bays since effort is the same. See Enclosure 4.
Q5. It is our interpretation that all equipment and material that the Government will supply, will also be installed by the Government. Is that correct?
A5. Yes, Government furnished items are gates, machinery, and conduit. Government will install all government supplied material.
Q6. a) Will there be lifting equipment in place for this project, or b) do we need to furnish this?
A6. a) Yes. USACE Hired Labor will have a crane and will support lifts that contractor would need onsite during dewatering. b) N/A.
Q7. a) Will the contractor have to supply the crane for the elevated platforms supplied by the contractor? b) If so, could a plan for the coffer dam be provided to size the crane and barge accordingly.
A7. a) No. USACE Hired Labor will have a crane and will support lifts that a contractor would need onsite during dewatering. b) N/A
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 21-Sep-2023 11:30 AM to 22-Sep-2023 11:30 AM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .