This document is an abstract of bids received in response to a solicitation for construction services. The solicitation, number W912P823B0025, is for work on the West Shore Lake Pontchartrain, Louisiana Hurricane and Storm Damage Risk Reduction Project, WSLP 107 Levee Reach in St. John the Baptist Parish. The work consists of clearing and grubbing, placing sand fill, separator fabric, compacted clay embankment, drainage canals, culverts, access roads, fertilizing, turf establishment and other incidental work. Eight bids were received in response, ranging from $24,555,899.67 to $36,531,075.00. The government estimate was between $25,000,000 and $50,000,000. All bidders provided the required 20% bid bond except one. The award is a single firm fixed price contract. The contracting officer will review the bids for accuracy and compliance with the solicitation.

View the file

Other files

File Type Posted
Updated 23B0025 Bid Abstract SIGNED.pdf PDF
W912P823B0025 Amendment 0004.pdf PDF
W912P823B0025 Amendment 0003.pdf PDF
W912P823B0025 Amendment 0002.pdf PDF
W912P823B0025 Amendment 0001.pdf PDF
W912P823B0025 Solicitation.pdf PDF
Plans.pdf PDF
Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

West Shore Lake Pontchartrain, Hurricane and Storm Damage Risk Reduction Project, WSLP-107 Levee, St. John the Baptist Parish, Louisiana

Solicitation Number: W912P823B0025

2. DATE ISSUED 3. DATE OPENED PAGE

4-Jan-23 1 0F __ PAGES

DATE SIGNED

7A. ITEM 7C. EST. D. UNIT E. UNIT F. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 Mobilization & Demobilization 1 JOB $1,405,584.75 $1,405,584.75 $2,000,000.00 $2,000,000.00 $1,004,635.10 $1,004,635.10 $4,220,000.00 $4,220,000.00 $2,855,598.00 $2,855,598.00 $2,674,000.00 $2,674,000.00 $2,120,000.00 $2,120,000.00 $1,228,078.02 $1,228,078.02

0002 Traffic Control and Coordination 1 JOB $220,000.00 $220,000.00 $80,000.00 $80,000.00 $314,456.65 $314,456.65 $55,000.00 $55,000.00 $65,000.00 $65,000.00 $462,000.00 $462,000.00 $15,000.00 $15,000.00 $636,995.71 $636,995.71

0003 Truck Wash-Down Rack 1 JOB $215,000.00 $215,000.00 $100,000.00 $100,000.00 $77,973.14 $77,973.14 $450,000.00 $450,000.00 $32,930.68 $32,930.68 $140,000.00 $140,000.00 $252,500.00 $252,500.00 $107,574.09 $107,574.09

0004 Separator Fabic 20,300 SY $4.26 $86,478.00 $3.00 $60,900.00 $6.92 $140,476.00 $5.00 $101,500.00 $5.47 $111,041.00 $11.00 $223,300.00 $4.00 $81,200.00 $4.62 $93,786.00

0005 Separator Geotextile 53,200 SY $15.00 $798,000.00 $9.50 $505,400.00 $12.50 $665,000.00 $14.00 $744,800.00 $9.52 $506,464.00 $9.50 $505,400.00 $12.50 $665,000.00 $10.36 $551,152.00

0006 Clearing and Grubbing 1 JOB $3,049,000.00 $3,049,000.00 $2,000,000.00 $2,000,000.00 $4,271,795.06 $4,271,795.06 $5,375,000.00 $5,375,000.00 $3,054,970.00 $3,054,970.00 $3,246,542.80 $3,246,542.80 $2,264,000.00 $2,264,000.00 $2,089,523.73 $2,089,523.73

0007 Drainage Chanel Excavation 1 JOB $1,371,000.00 $1,371,000.00 $1,612,000.00 $1,612,000.00 $1,801,781.02 $1,801,781.02 $2,100,000.00 $2,100,000.00 $3,766,869.50 $3,766,869.50 $1,534,867.80 $1,534,867.80 $1,850,000.00 $1,850,000.00 $2,095,266.17 $2,095,266.17

0008 Embankment, Compacted Fill 290,000 CY $47.85 $13,876,500.00 $45.00 $13,050,000.00 $58.51 $16,967,900.00 $54.00 $15,660,000.00 $36.17 $10,489,300.00 $36.58 $10,608,200.00 $50.50 $14,645,000.00 $43.06 $12,487,400.00

0009 Sand Fill

0009AA First 81,600 TON 81,600 TON $19.42 $1,584,672.00 $22.00 $1,795,200.00 $47.27 $3,857,232.00 $31.25 $2,550,000.00 $19.25 $1,570,800.00 $28.33 $2,311,728.00 $21.50 $1,754,400.00 $31.98 $2,609,568.00

0009AB All Over 81,600 TON 20,400 TON $19.42 $396,168.00 $17.00 $346,800.00 $36.42 $742,968.00 $31.25 $637,500.00 $19.25 $392,700.00 $25.00 $510,000.00 $21.50 $438,600.00 $30.28 $617,712.00

0010 Surfacing

0010AA First 16,100 TON 16,100 TON $93.85 $1,510,985.00 $75.00 $1,207,500.00 $72.00 $1,159,200.00 $80.00 $1,288,000.00 $56.69 $912,709.00 $95.68 $1,540,448.00 $89.50 $1,440,950.00 $82.30 $1,325,030.00

0010AB All Over 16,100 TON 2,930 TON $93.85 $274,980.50 $65.00 $190,450.00 $70.31 $206,008.30 $80.00 $234,400.00 $56.69 $166,101.70 $80.96 $237,212.80 $89.50 $262,235.00 $82.30 $241,139.00

0011 Seeding and Mulching 76 AC $7,520.00 $571,520.00 $7,000.00 $532,000.00 $6,521.83 $495,659.08 $8,000.00 $608,000.00 $2,600.00 $197,600.00 $8,008.00 $608,608.00 $9,200.00 $699,200.00 $3,717.95 $282,564.20

0012 Fertilizer

0012AA First 7,600 LB 7,600 LBS $6.27 $47,652.00 $2.00 $15,200.00 $8.70 $66,120.00 $2.50 $19,000.00 $1.43 $10,868.00 $2.52 $19,152.00 $2.70 $20,520.00 $1.70 $12,920.00

0012AB All Over 7,600 LB 3,420 LBS $6.27 $21,443.40 $1.00 $3,420.00 $2.27 $7,763.40 $2.50 $8,550.00 $1.43 $4,890.60 $2.69 $9,199.80 $2.70 $9,234.00 $1.70 $5,814.00

0013 Lime Soil Amendment 75 TON $630.00 $47,250.00 $100.00 $7,500.00 $444.84 $33,363.00 $300.00 $22,500.00 $1,298.45 $97,383.75 $173.60 $13,020.00 $1,100.00 $82,500.00 $1,045.97 $78,447.75

0014 Sulfur Soil Amendment 38 TON $1,900.00 $72,200.00 $100.00 $3,800.00 $1,828.95 $69,500.10 $375.00 $14,250.00 $2,043.75 $77,662.50 $1,904.00 $72,352.00 $2,600.00 $98,800.00 $2,445.50 $92,929.00

$25,548,433.65 $23,510,170.00 $31,881,830.85 $34,088,500.00 $24,312,888.73 $24,716,031.20 $26,699,139.00 $24,555,899.67

0015 Separator Geotextile - OW 4,910 SY $4.26 $20,916.60 $3.00 $14,730.00 $5.20 $25,532.00 $5.00 $24,550.00 $5.47 $26,857.70 $2.24 $10,998.40 $4.00 $19,640.00 $4.63 $22,733.30

0016 Bypass Canal Excavation - OW 1 JOB $86,200.00 $86,200.00 $200,000.00 $200,000.00 $321,275.36 $321,275.36 $280,000.00 $280,000.00 $336,812.00 $336,812.00 $168,083.80 $168,083.80 $140,000.00 $140,000.00 $265,999.03 $265,999.03

Embankment Compacted Fill - OW 1,300 CY $51.09 $66,417.00 $45.00 $58,500.00 $33.27 $43,251.00 $64.00 $83,200.00 $36.17 $47,021.00 $70.14 $91,182.00 $33.00 $42,900.00 $41.68 $54,184.00

0018 Sand Fill - OW 6,400 TON $19.41 $124,224.00 $22.00 $140,800.00 $36.69 $234,816.00 $31.25 $200,000.00 $19.25 $123,200.00 $32.41 $207,424.00 $19.00 $121,600.00 $27.44 $175,616.00

0019 Surfacing - OW 2,635 TON $93.85 $247,294.75 $65.00 $171,275.00 $65.93 $173,725.55 $80.00 $210,800.00 $56.69 $149,378.15 $97.82 $257,755.70 $72.00 $189,720.00 $82.30 $216,860.50

Corrugated Metal Pipe Culvert 60" Diameter - OW 1,365 LF $448.00 $611,520.00 $600.00 $819,000.00 $474.86 $648,183.90 $685.00 $935,025.00 $664.00 $906,360.00 $585.04 $798,579.60 $485.00 $662,025.00 $503.96 $687,905.40

Corrugated Metal Pipe Culvert 72" Diameter - OW 650 LF $629.00 $408,850.00 $700.00 $455,000.00 $555.86 $361,309.00 $940.00 $611,000.00 $754.00 $490,100.00 $717.31 $466,251.50 $615.00 $399,750.00 $607.28 $394,732.00

0022 Stone_R-90 - OW 700 TON $105.92 $74,144.00 $140.00 $98,000.00 $126.69 $88,683.00 $140.00 $98,000.00 $89.16 $62,412.00 $161.30 $112,910.00 $93.00 $65,100.00 $110.83 $77,581.00

$1,639,566.35 $1,957,305.00 $1,896,775.81 $2,442,575.00 $2,142,140.85 $2,113,185.00 $1,640,735.00 $1,895,611.23

$27,188,000.00 $25,467,475.00 $33,778,606.66 $36,531,075.00 $26,455,029.58 $26,829,216.20 $28,339,874.00 $26,451,510.90

NO. 7

A. OFFEROR

Phylway Construction, LLC

B. BID SECURITY (Type and amount) 20%, $3,000,000.00

C. AMENDMENTS ACKNOWLEDGED Yes

NO. 6

A. OFFEROR

Onshore Materials, LLC

B. BID SECURITY (Type and amount) 20%, $3,000,000.00

C. AMENDMENTS ACKNOWLEDGED Yes

Option Work 1 Total

7B. DESCRIPTION OF OFFERED ITEM

BASE WORK

C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

(Including Profit)

West Shore Lake Pontchartrain, Hurricane and Storm Damage Risk Reduction Project, WSLP-107 Levee, St.

John the Baptist Parish, Louisiana

(Check A, B or C and complete D, E, and F) NO. 1

Total

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1

NO. 5

A. OFFEROR

Genesis 360, LLC

B. BID SECURITY (Type and amount) 20%, $3,000,000.00

C. AMENDMENTS ACKNOWLEDGED No

NO. 3

A. OFFEROR

Cycle Costruction Company, LLC

B. BID SECURITY (Type and amount) 20%, $3,000,000.00

C. AMENDMENTS ACKNOWLEDGED Yes

NO. 4

A. OFFEROR

Dynamic Group, LLC

B. BID SECURITY (Type and amount) 20%, $3,000,000.00

C. AMENDMENTS ACKNOWLEDGED - Yes

6. NUMBER OF AMENDMENTS ISSUED: 4

NO. 2

A. OFFEROR

Civil Works Contracting LLC

A. HIRED LABOR A. OFFEROR

b&k Construction Company, LLC

B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) 20%, $3,000,000.00 B. BID SECURITY (Type and amount) 20%, $3,000,000.00

(Without Profit)

SIGNATURE

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

ABSTRACT OF OFFERS - CONSTRUCTION Solicitation Number: W912P823B0025 2-Mar-23

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US ARMY ENGINEER DISTRICT, MVN (NOD)

7400 Leake Avenue Cori Caimi New Orleans, LA 70118-3651 Contract Specialist

Margaret C. Maine Contracting Officer

NOTE: Civil Works Contracting LLC include math errors in bid.

3/3/2023

2023-03-03T08:52:44-0600
MAINE.MARGARET.COOKSEY.1151563550