W912P823B0025 Amendment 0003.pdf
PDF 11 MB Posted
- Solicitation number
- W912P823B0025
About this file
This document provides details on a federal contract solicitation for hurricane and storm damage risk reduction work. The U.S. Army Corps of Engineers, New Orleans District, is seeking a contractor to perform clearing and grubbing, sand and clay embankment placement, drainage work, road construction and other efforts along the West Shore Lake Pontchartrain hurricane protection levee in St. John the Baptist Parish, Louisiana. The estimated value of the firm fixed price contract is between $25-50 million. Questions are due by January 17, 2023, with award planned thereafter. Interested vendors are instructed to monitor the System for Award Management website for solicitation documents and amendments. Contact information is provided for any questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated 23B0025 Bid Abstract SIGNED.pdf | ||
| W912P823B0025 Bid Abstract SIGNED.pdf | ||
| W912P823B0025 Amendment 0004.pdf | ||
| W912P823B0025 Amendment 0002.pdf | ||
| W912P823B0025 Amendment 0001.pdf | ||
| W912P823B0025 Solicitation.pdf | ||
| Plans.pdf | ||
| Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered Solicitation for West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, WSLP-107, St. John the Baptist Parish, Louisiana has been amendmended to:
1. Update Plans and Specs
2. Responses to Previous Questions
3.All questions are due NLT 11:00am on Feb 23, 2023 4.Instructions for Bid Opening 5.Extend Bid Opening to March 2, 2023
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Feb-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823B0025
X 9B. DATED (SEE ITEM 11)
03-Jan-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Feb-2023
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P823B0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 28-Feb-2023 11:00 AM to 02-Mar-
2023 11:00 AM.
CLIN 0005
The pricing detail quantity has increased by 39,100.00 from 14,100.00 to 53,200.00.
CLIN 0010
The CLIN type priced has been deleted.
The CLIN description has changed from Surfacing Berm Road to Surfacing.
The pricing detail quantity 16,100.00 has been deleted.
The unit of issue Actual Tons has been deleted.
The FOB Destination has been deleted.
The PSC code Y1PZ has been deleted.
The PROG code C20 has been deleted.
The WSC Equipment code 000 has been deleted.
The NAICS code 237990 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
CLIN 0015
The pricing detail quantity has increased by 3,310.00 from 1,600.00 to 4,910.00.
CLIN 0018
The pricing detail quantity has increased by 2,300.00 from 4,100.00 to 6,400.00.
CLIN 0019
The pricing detail quantity has increased by 1,975.00 from 660.00 to 2,635.00.
CLIN 0020
The pricing detail quantity has increased by 865.00 from 500.00 to 1,365.00.
CLIN 0021
The pricing detail quantity has increased by 150.00 from 500.00 to 650.00.
CLIN 0022
The pricing detail quantity has decreased by 5,300.00 from 6,000.00 to 700.00.
SUBCLIN 0010AA is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0010AA 16,100 Actual
Tons
First 16,100 Ton
FFP
FOB: Destination
PSC CD: Y1PZ
NET AMT
SUBCLIN 0010AB is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0010AB 2,930 Actual
Tons
All Over 16,100 Ton
FFP
FOB: Destination
PSC CD: Y1PZ
NET AMT
INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0010 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
To:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A N/A
The following Acceptance/Inspection Schedule was added for SUBCLIN 0010AA:
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for SUBCLIN 0010AB:
N/A N/A N/A Government
(End of Summary of Changes)
SECTION 00010
Delete pages 3, 4, 5, and 6 in their entirety and substitute the attached revised pages 3, 4, 5, and 6, therefore.
SECTION 01100
Add the attached PERMITTED OR OVERWEIGHT LOAD SUBMITTAL to the end of this section.
Section 31 11 00.00 12
Page 3, paragraph 3.2.3. Delete this paragraph in its entirety and substitute the following therefore:
“3.2.3 Contractor Surveys
The Contractor shall clear the baseline traverse, centerline traverse, and ranges at all P.C. 's, P.I. 's, P.T. 's, 100-foot centerline stations and tie-in stations to facilitate the taking of original cross-sections by the Contractor. This clearing shall consist of the removal to within 6-inches of the ground surface of all trees, brush and vegetation. This clearing shall be completed in 5,000-foot increments and in advance of embankment construction by a minimum of 1,000 feet.”
SECTION 32 15 00.00 12
Pages 2 and 3, paragraphs 1.3.1 and 1.3.2. Delete these paragraphs in their entirety and substitute the following therefore:
“1.3.1 Temporary Roads
No separate measurement or payment will be made for the surfacing material required for temporary roads, including their maintenance, shaping, nor repair of any damages to the finished surfacing occasioned by the Contractor's construction operations required by the Contractor.
1.3.2 Berm Road and Optional Access Road Surfacing
Surfacing material required for the berm road, existing access roads, and optional access road shall be measured by the ton satisfactorily placed. Measurement will be made by the ton at the site of the work. Certified weight tickets shall be provided for each truck delivery. Trucks shall be weighed on scales that have been calibrated within 6-months of hauling. Certification of weigh scale calibration shall be provided to the Contracting Officer's Representative prior to placing surfacing. Payment will be made at the applicable contract unit price per ton for
"Surfacing" or "Surfacing - OW", if Optional Work is exercised. Price and payment shall constitute full compensation for subgrade preparation; furnishing all plant, labor, equipment, and materials; placing, spreading, compacting, and maintenance; as specified herein and as shown on the drawings.”
DRAWINGS
SHEET ID Nos. C-01, C-05, C-06, C-07, C-08, B-01, B-02, B-03, and B-04. Delete these drawings in their entirety and substitute the attached revised drawings SHEET ID Nos. C-01, C-05, C-06, C-07, C-08, B-01, B-02, B-03, and B-04, therefore.
00010-3 Ed 19-026
SECTION 00010 – BIDDING SCHEDULE
West Shore Lake Pontchartrain, LA Hurricane and Storm Damage Risk Reduction Project, WSLP-107. St. John the Baptist Parish Item DESCRIPTION Estimated
Quantity Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
0002 Traffic Control and Coordination 1 JOB
0003 Truck Wash-Down Rack 1 JOB
0004 Separator Geotextile 20,300 SY
0005* Reinforcement Geotextile 53,200 SY
0006 Clearing and Grubbing 1 JOB
0007 Drainage Canal Excavation 1 JOB
0008 Embankment, Compacted Fill 290,000 CY
0009 Sand Fill
0009AA First 81,600 TON 81,600 TON
0009AB All Over 81,600 TON 20,400 TON
0010* Surfacing
0010AA* First 16,100 TON 16,100 TON
0010AB* All Over 16,100 TON 2,930 TON
0011 Seeding and Mulching 76 AC
0012 Fertilizer
0012AA First 7,600 LBS 7,600 LBS
0012AB All Over 7,600 LBS 3,420 LBS
0013++ Lime Soil Amendment 75 TON
0014++ Sulfur Soil Amendment 38 TON
TOTAL BASE WORK: $
00010-4 Ed 19-026
OPTIONAL WORK
0015* Separator Geotextile - OW 4,910 SY
0016 Bypass Canal Excavation - OW 1 JOB
0017 Embankment Compacted Fill -
OW 1,300 CY
0018* Sand Fill - OW 6,400 TON
0019* Surfacing - OW 2,635 TON
0020* Corrugated Metal Pipe Culvert 60” Diameter – OW 1,365 LF
0021* Corrugated Metal Pipe Culvert 72" Diameter - OW 650 LF
0022* Stone_R-90 - OW 700 TON
TOTAL OPTIONAL WORK $
TOTAL BASE WORK + OPTIONAL WORK $
*Denotes a change from the previous Bidding Schedule.
++Items not subject to the requirements of FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY.
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR
AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, 00010-5 Ed 19-026 have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. If implemented the Government will exercise the OPTIONAL WORK, no later than 60 days after Notice to Proceed (NTP). Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
** If an option is to be exercised at the time of contract award FAR17.208 shall be used in place of FAR 52.217-5.
NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF
OPTIONAL WORK. In the event that OPTIONAL WORK items are exercised under the terms of the contract, the time required for completion of the contract shall be 60 calendar days in addition to the original contract duration of 1,370 calendar days established for the BASE WORK items specified in the Contract Clause entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (FAR 52-211-10 – APR 1984)”.
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
00010-6 Ed 19-026
EVALUATION OF SUBLINE ITEMS (Dec 2019 - AFARS 5152.211-9000).
Item Nos. 0009, 0010, and 0012 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBLINE ITEMS (Dec 2019) - AFARS 5152.211-9001).
This variation in estimated quantities clause is applicable only to item Nos. 0009, 0010, and 0012 .
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent subline item or elimination of all work under such a second or subsequent subline item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for item Nos. 0009, 0010, and 0012 is less than 85% of the quantity of the first subline item listed under such item, the contractor will be paid at the contract unit price for that subline item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause at Federal Acquisition Regulation
(FAR) 52.211-18, VARIATION IN ESTIMATED QUANTITY.
(c) If the actual quantity of work performed under item Nos. 0009, 0010, and 0012 exceeds 115% or is less than 85% of the total estimated quantity of the subline item under that item and/or if the quantity of the work performed under the second subline item or any subsequent subline item under item Nos. NONE exceeds 115% or is less than 85% of the estimated quantity of any such subline item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, VARIATION IN ESTIMATED
QUANTITY.
(End of Clause)
The following have been added by full text:
Electronic Submission of Bids:
MVN will utilize email for receipt of electronic bids under IFB Solicitations. In order to submit an electronic bid please follow these steps:
Send an email containing your name, email address and proposal to the following Contracting Officer and Contract Specialist associated with the IFB:
Contracting Officer – Mrs. Margaret C. Maine email: margaret.c.maine@usace.army.mil
Contract Specialist – Ms. Cori Caimi, email: Cori.A.Caimi@usace.army.mil
Once the Contracting Officer or Contract Specialist receives your Proposal, you will then receive a confirmation email stating your Proposal was received.
The Bid Opening is currently scheduled for Thursday, March 2, 2023 at 11:30am CST. The Contracting Officer and Contract Specialist will begin downloading bids at 11:00 AM CST, which is the bid receipt cutoff time. All bids received after 11:00 AM CST on Thursday, March 2, 2023 will be considered late.
Audio Teleconference Bid Opening Information:
Bid Opening will be held on Thursday, March 2, 2023 at 11:30 AM CST. Please use the following information to attend the meeting:
Join from the meeting link https://usace1.webex.com/usace1/j.php?MTID=mcdb71830a94736eb41fc4b2b12961af5
Join by meeting number Meeting number (access code): 2763 347 2889 Meeting password: ppWxPzj6$67
Tap to join from a mobile device (attendees only) ++1-844-800-2712,,27633472889## US Toll Free ++1-669-234-1177,,27633472889## US Toll
Join by phone +1-669-234-1177 US Toll +1-844-800-2712 US Toll Free Global call-in numbers | Toll-free calling restrictions
PERMITTED OR OVERWEIGHT LOAD SUBMITTAL
Contract Number: W12P822C01234 Submittal Number: 000700-24-001
Planned Transport Date April 23, 2024
Access Road to be utilized Access Road F
Description of Load: Crane Body
Type of transport vehicle Lowboy Trailer
Weight of Truck: 16,500
Weight of Trailer: 12,000
Weight of Load: 96,000
TOTAL WEIGHT: 124,500
Axle Load (pounds) # Tires per Axle Estimated Loading/ Spacing between per tire (Axle Load/ # Tires) Axles (from Front)
FIRST AXLE (Front of Truck) 16,000 2 8,000 0
Second Axle load 20,000 4 5,000 10
Third Axle load 20,000 4 5,000 4
Fourth Axle load 18,000 4 4,500 30
Fifth Axle load 18,000 4 4,500 4
Sixth Axle Load 18,000 4 4,500 4
Seventh Axle Load 14,500 4 3,625 4
Total Axle Loading 124,500
Note: Only one way traffic is allowed on access road with loads and configurations that require a State Permit.
I certify that the planned load does not exceed the load limits specified in the contract specifications:
QC Manager Date
SAMPLE
100' 200'0
LANDSIDE
FLOODSIDE
ST JOHN THE BAPTIST PARISH
EXISTING RIGHT OF WAY
CONSTRUCTION GRADE
SAND LAYER GRADE
NORTH
PLAN
4. TREES STOCKPILED ALONG THE "TREE CLEARED ZONE" SHALL BE REMOVED BY THE CONTRACTOR
3. DETAILS FOR THE ACCESS ROAD ALONG THE BERM CAN BE FOUND ON SHEET C-09
2. LEVEE TRANSITION DETAILS CAN BE FOUND IN SHEET C-09
1. DETAILS FOR OPTION WORK CAN BE FOUND IN SHEETS C-07, C-08
NOTES:
EL. 9.6
EL. 3.0
2 3
EXISTING RIGHT OF WAY
L
IM
IT
O
F C
O N
S T
R U
C T
IO
N B /L S
T A . 3
M A
T C
H B /L S
T A . 3
L
IM
IT
O
F W
O R
K S
T A . 3
C-01
B /L
S T
A
T
O B
/L S
T A
P L
A N
A N
D P
R O
F
IL
E
C -0
P L
A N
V
IE
W
.D G
N
,5
,0
,5
,0
,0
,0
,0
,0
,0
°3
'3
°3
'1
°3
'3
°3
'1
73' 1V :3
H
DRAINAGE CHANNEL EL. -5
ACCESS ROAD
TEMPORARY
DRAINAGE CHANNEL
TREE CLEARED ZONE
ACCESS ROAD
EXISTING
V :3
H
OPTION AREA
OPTION AREA
2 3
BYPASS
BYPASS SPOIL AREA
A M
E N
D
R E
V
IS
E D
T R
A N
S
S L
O P
E F
R O
M
V :1
H
T O
V
:3 H
A M
E N
D
R E
V
IS
E D
B Y
P A
S S
T O
T
IE
I N
T O
M
IS
S
B A
Y O
U
UNDER TEMPORARY ACCESS ROAD ONLY
ELEVATION WITH BYPASS EXCAVATED MATERIAL
FILL MISSISSIPPI BAYOU TO NATURAL GROUND
/2
/2
/0
/2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
N E
W O
R L
E A
N S
L A
L
E A
K E
A V
E N
E W
O R
L E
A N
S D
IS
T
R
IC
T U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A D
V E
R T
IS
E
S E
T
W E
S T
S H
O R
E L
A K
E P
O N
T C
H A
R T
R A
IN
L
A
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
G E
R
IS
K R
E D
U C
T
IO
N P
R O
J E
C T
W S
L P
L E
V E
E
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Z X
X X
X X
X X
X X
X X
W
P
-2
-B -0
N O
V E
M B
E R
A N
S I
D S
T
J O
H N
T H
E B
A P
T
IS
T P
A R
IS
H
B R
E N
N A
N
B R
O O
K S
A B
R E
N N
A N
L H
A T
T E
N
D B
E C
K H
-8 -4
C-07
D-1
EL. -5
BYPASS
322+00 323+00 324+00 325+00 326+00 327+00 328+00 329+00 330+00 331+00 332+00 333+00 334+00 335+00 336+00 337+00 338+00 339+00 340+00 341+00 342+00 343+00 344+00
-30 -30
-20 -20
-10 -10
0 0
10 10
20 20
R /W
R /W
R /W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
N E
W O
R L
E A
N S
L A
L
E A
K E
A V
E N
E W
O R
L E
A N
S D
IS
T
R
IC
T U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A D
V E
R T
IS
E
S E
T
W E
S T
S H
O R
E L
A K
E P
O N
T C
H A
R T
R A
IN
L
A
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
G E
R
IS
K R
E D
U C
T
IO
N P
R O
J E
C T
W S
L P
L E
V E
E
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Z X
X X
X X
X X
X X
X X
W
P
-2
-B -0
N O
V E
M B
E R
A N
S I
D S
T
J O
H N
T H
E B
A P
T
IS
T P
A R
IS
H
B R
E N
N A
N
B R
O O
K S
A B
R E
N N
A N
L H
A T
T E
N
D B
E C
K H
-8 -4
FLOODSIDE LANDSIDE
C-05
S T
A
T O
S T
A
T Y
P
IC
A L
S E
C T
IO
N
C -0
T
Y P
IC
A
L S
E C
T
IO
N .D
G N
7. GEOTEXTILE FABRIC SHALL BE 1,000 LB/IN AT 5% STRAIN
OF THE LEVEE.
6. THE REINFORCEMENT GEOTEXTILE SHALL BE PLACED IN A CONTINUOUS PANEL PERPENDICULAR TO THE CENTERLINE
INSTRUMENTATION PLACEMENT TO BE PERFORMED BY ANOTHER CONTRACTOR.
AFTER CLEARING AND GRUBBING BUT PRIOR TO SAND PLACEMENT, CONTRACTOR SHALL COORDINATE THE 5.
THIS STAGE DOES NOT NEED TO BE COMPLETED IN ITS ENTIRETY PRIOR TO BEGINNING STAGE 2 CONSTRUCTION.4.
CANAL EXCAVATION SHALL BE AHEAD OF SAND PLACEMENT.3.
NO HOLD TIME WILL BE REQUIRED FOR THIS STAGE2.
BENEATH THE SAND LAYER. SEE STAGE 3 FOR DETAILS.
ALL STUMPS SHALL BE REMOVED ON AREAS WHERE COMPACTED FILL IS TO BE PLACED, EXCEPT FOR THE AREA2.
CANAL AS SHOWN. SEE DETAIL ON STAGE 2.
MATERIAL EXCAVATED FROM INTERIOR CANAL SHALL BE SPREAD BETWEEN THE EDGE OF BERM AND INTERIOR 1.
NOTES:
FROM THE FOOTPRINT OF THE LEVEE BERM.
ADDITIONAL CANAL EXCAVATED MATERIAL CAN BE PLACED ON THE FLOODSIDE AWAY8.
WATER FROM NOTCH AREA TOWARD INTERIOR CANAL.
COMPLETED. CONTRACTOR SHALL LEAVE SWALES AT 500-FOOT SPACING TO DRAIN
NOTCH AREA LEFT OPEN UNTIL FINAL STAGE OF COMPACTED FILL CONSTRUCTION7.
ADDITIONAL HEIGHT OF MATERIALS TO BE USED TO BACKFILL NOTCH AREA6.
AREAS TO RECEIVE COMPACTED FILL PRIOR TO PLACEMENT OF NEW FILL.
CONTRACTOR SHALL CLEAR ALL VEGETATIVE GROWTH FROM 5.
SEE SHEET C-10 FOR SETTLEMENT PLATE DETAILS.4.
NEXT STAGE SHALL BEGIN AT THE DIRECTION OF COR3.
STAGE 2 AND STAGE 3.
A HOLD TIME OF 90 WEEKS WILL BE REQUIRED BETWEEN 2.
CONCURRENT WITH STAGE 1.
FABRIC AND EMBANKMENT MAY BE CONSTRUCTED 1.
NOTES:
SHALL BE DISTRIBUTED THROUGHOUT THE EXISTING BID ITEMS.
MEASUREMENT WILL BE MADE FOR THE BERM MARKERS, PAYMENT FOR THE BERM MARKERS
OBJECT MARKER SIGNS ATTACHED, POSTS SHALL BE BURIED 4-FEET INTO THE GROUND. NO
SIGN POSTS 12 FEET IN LENGTH, WITH 6X12 INCH VERTICAL OM2-2V ALL-YELLOW REFLECTIVE
EVERY 500 FEET AS SHOWN. THE BERM MARKERS SHALL BE GALVANIZED STEEL U-CHANNEL
UPON COMPLETION OF EMBANKMENT WORK, BERM MARKERS SHALL BE PLACED 5.
TO ADDING FINAL LIFT.
CONTRACTOR TO BRING ENTIRE LEVEE BACK TO STAGE 2 DIMENSIONS PRIOR 4.
AREAS TO RECEIVE COMPACTED FILL PRIOR TO PLACEMENT OF NEW FILL.
CONTRACTOR SHALL CLEAR ALL VEGETATIVE GROWTH FROM 3.
SEE SHEET C-09 FOR BERM ACCESS ROAD DETAILS2.
NO HOLD TIME WILL BE REQUIRED FOR THIS STAGE1.
NOTES:
SMOOTH TRANSITION IS REQUIRED BETWEEN STA. 384+50 AND 385+00
NOTE:
A-1
STA. 326+00 TO STA. 384+50
TYPICAL SETION 1 -
SCALE: NOT TO SCALE
K-1
STAGE1 - DESIGN SECTION
SCALE: NOT TO SCALE
F-1
STAGE 2 - DESIGN SECTION
SCALE: NOT TO SCALE
B-1
STAGE 3 - DESIGN SECTION
SCALE: NOT TO SCALE
70'
1V:3H1V:
3H
60'
REINFORCEMENT GEOTEXTILE 46'
1V:4H 1V:4 H
78'66'
22'
10' 1V:3H
1V:
3H
1V:3H
SAND BASE
SETTLEMENT GAGES
BERM ACCESS ROAD
1V:
3H
1V:3H
EL. 3.0
EL. 7.6
EL. 9.6
EL. 7.1EL. 7.1
1V:3H 1V:3H
EL. 7.1
EL. 7.1
EL. 4.0EL. 3.5
EL. 3.5 EL. 3.0
50'
EL. -5
25'
65'
MAX. EL. 3
BYPASS SPOIL MATERIAL
EL. 3.0
EL. 4.5
15'
TURF ESTABLISHMENT
15'
15'15'
MAX EL. 3
1V:2H1V:2H
EL. 4.5 EL. 4.0
AREA TO BE CLEARED & GRUBBED AREA TO BE CLEARED & GRUBBED
INTERIOR CANAL
SLOPE TO DRAIN
AREA TO BE CLEAREDAREA TO BE CLEARED
ADDITIONAL HEIGHT
NOTCH AREA
SPOIL MATERIAL
INTERIOR CANAL
MAX EL. 2
BERM MARKER
AREA TO BE CLEARED & GRUBBEDAREA TO BE CLEAREDAREA TO BE CLEARED & GRUBBED
15'
THE BERM TOE. SEE DETAIL ON STAGE 3
FLOODSIDE GRUBBING LIMIT IS 15 FT PAST
AND GRUBBING LIMITS
SEE STAGE 3 FOR CLEARING
A M
E N
D C
L A
R
IF
IE
D
C L
E A
R
IN
G A
N D
G R
U B
B
IN
G L
IM
IT
S
/W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
N E
W O
R L
E A
N S
L A
L
E A
K E
A V
E N
E W
O R
L E
A N
S D
IS
T
R
IC
T U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A D
V E
R T
IS
E
S E
T
W E
S T
S H
O R
E L
A K
E P
O N
T C
H A
R T
R A
IN
L
A
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
G E
R
IS
K R
E D
U C
T
IO
N P
R O
J E
C T
W S
L P
L E
V E
E
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Z X
X X
X X
X X
X X
X X
W
P
-2
-B -0
N O
V E
M B
E R
A N
S I
D S
T
J O
H N
T H
E B
A P
T
IS
T P
A R
IS
H
B R
E N
N A
N
B R
O O
K S
A B
R E
N N
A N
L H
A T
T E
N
D B
E C
K H
-8 -4
FLOODSIDE LANDSIDE
7. GEOTEXTILE FABRIC SHALL BE 1,000 LB/IN AT 5% STRAIN
OF THE LEVEE.
6. THE REINFORCEMENT GEOTEXTILE SHALL BE PLACED IN A CONTINUOUS PANEL PERPENDICULAR TO THE CENTERLINE
INSTRUMENTATION PLACEMENT TO BE PERFORMED BY ANOTHER CONTRACTOR.
AFTER CLEARING AND GRUBBING BUT PRIOR TO SAND PLACEMENT, CONTRACTOR SHALL COORDINATE THE 5.
THIS STAGE DOES NOT NEED TO BE COMPLETED IN ITS ENTIRETY PRIOR TO BEGINNING STAGE 2 CONSTRUCTION.4.
CANAL EXCAVATION SHALL BE AHEAD OF SAND PLACEMENT.3.
NO HOLD TIME WILL BE REQUIRED FOR THIS STAGE2.
BENEATH THE SAND LAYER. SEE STAGE 3 FOR DETAILS.
ALL STUMPS SHALL BE REMOVED ON AREAS WHERE COMPACTED FILL IS TO BE PLACED, EXCEPT FOR THE AREA2.
CANAL AS SHOWN. SEE DETAIL ON STAGE 2.
MATERIAL EXCAVATED FROM INTERIOR CANAL SHALL BE SPREAD BETWEEN THE EDGE OF BERM AND INTERIOR 1.
NOTES:
LEVEE BERM.
ADDITIONAL CANAL EXCAVATED MATERIAL CAN BE PLACED ON THE FLOODSIDE OF 8.
WATER FROM NOTCH AREA TOWARD INTERIOR CANAL.
COMPLETED. CONTRACTOR SHALL LEAVE SWALES AT 500-FOOT SPACING TO DRAIN
NOTCH AREA LEFT OPEN UNTIL FINAL STAGE OF COMPACTED FILL CONSTRUCTION7.
ADDITIONAL HEIGHT OF MATERIALS TO BE USED TO BACKFILL NOTCH AREA6.
AREAS TO RECEIVE COMPACTED FILL PRIOR TO PLACEMENT OF NEW FILL.
CONTRACTOR SHALL CLEAR ALL VEGETATIVE GROWTH FROM 5.
SEE SHEET C-10 FOR SETTLEMENT PLATE DETAILS.4.
NEXT STAGE SHALL BEGIN AT THE DIRECTION OF COR3.
STAGE 2 AND STAGE 3.
A HOLD TIME OF 90 WEEKS WILL BE REQUIRED BETWEEN 2.
CONCURRENT WITH STAGE 1.
FABRIC AND EMBANKMENT MAY BE CONSTRUCTED 1.
NOTES:
C-06
S T
A
T O
S T
A
T Y
P
IC
A L
S E
C T
IO
N
C -0
T
Y P
IC
A
L S
E C
T
IO
N .D
G N
1. SMOOTH TRANSITION IS REQUIRED BETWEEN STA. 384+50 AND 385+00
NOTES:
K-1
STAGE 1 - DESIGN SECTION
SCALE: NOT TO SCALE
60'
50'
1V:3H1V:
3H
REINFORCEMENT GEOTEXTILE
F-1
STAGE 2 - DESIGN SECTION
SCALE: NOT TO SCALE
B-1
STAGE 3 - DESIGN SECTION
SCALE: NOT TO SCALE
22'
78'66'
10'
1V:
3H
46'
1V:4 H1V:4H
A-1 410+00
TYPICAL SECTION 2 - STA. 385+00 TO STA.
SCALE: NOT TO SCALE
SAND BASE
SETTLEMENT PLATES
STAGE 2
1V:
3H 1V:3H
1V:3H
1V:3H BERM ACCESS ROAD
SHALL BE DISTRIBUTED THROUGHOUT THE EXISTING BID ITEMS.
MEASUREMENT WILL BE MADE FOR THE BERM MARKERS, PAYMENT FOR THE BERM MARKERS
OBJECT MARKER SIGNS ATTACHED, POSTS SHALL BE BURIED 4-FEET INTO THE GROUND. NO
SIGN POSTS 12 FEET IN LENGTH, WITH 6X12 INCH VERTICAL OM2-2V ALL-YELLOW REFLECTIVE
EVERY 500 FEET AS SHOWN. THE BERM MARKERS SHALL BE GALVANIZED STEEL U-CHANNEL
UPON COMPLETION OF EMBANKMENT WORK, BERM MARKERS SHALL BE PLACED 5.
TO ADDING FINAL LIFT.
CONTRACTOR TO BRING ENTIRE LEVEE BACK TO STAGE 2 DIMENSIONS PRIOR 4.
AREAS TO RECEIVE COMPACTED FILL PRIOR TO PLACEMENT OF NEW FILL.
CONTRACTOR SHALL CLEAR ALL VEGETATIVE GROWTH FROM 3.
SEE SHEET C-09 FOR BERM ACCESS ROAD DETAILS2.
NO HOLD TIME WILL BE REQUIRED FOR THIS STAGE1.
NOTES:
EL. 3.0
EL. 7.6
EL. 9.6
EL. 7.1EL. 7.1
EL. 7.1 EL. 7.1
1V:3H1V:3H
EL. 3.0EL. 3.5
EL. 3.5 EL. 3.0
MAX EL. 3
EL. 4.0EL. 4.5
15'15'
EL. 4.0EL. 4.5
1V:3H
50'15'15'
TURF ESTABLISHMENT
INTERIOR CANAL
AREA TO BE CLEARED & GRUBBED
SLOPE TO DRAIN
AREA TO BE CLEARED AREA TO BE CLEARED & GRUBBED AREA TO BE CLEARED
NOTCH AREA
SPOIL MATERIAL
INTERIOR CANAL
ADDITIONAL HEIGHT
EL. -5
MAX EL. 2
BERM MARKER
AREA TO BE CLEARED & GRUBBEDAREA TO BE CLEAREDAREA TO BE CLEARED & GRUBBED
THE BERM TOE. SEE DETAIL ON STAGE 3
FLOODSIDE GRUBBING LIMIT IS 15 FT PAST
15'
AND GRUBBING LIMITS
SEE STAGE 3 FOR CLEARING
A M
E N
D C
L A
R
IF
IE
D
C L
E A
R
IN
G A
N D
G R
U B
B
IN
G L
IM
IT
S
L-11
CULVERTS
TYPICAL SECTION 1 - ACCESS ROAD WITH
SCALE: NOT TO SCALE
H-11
CULVERTS
TYPICAL SECTION 2 - ACCESS ROAD WITHOUT
SCALE: NOT TO SCALE
D-11
BYPASS - TYPICAL SECTION
SCALE: NOT TO SCALE
WSLP-107 WSLP-108
30'
CULVERTS NOT SHOWN FOR CLARITY. FOR CULVERT DETAILS SEE SHEET C-082.
CULVERT AREAS.
SECTION PROPERTIES APPLY TO ALL LOCATIONS WHERE ROAD CROSSES 1.
NOTES:
1V:6H1V:6H
COMPACTED FILL
EMBANKMENT
BOTTOM OF EXCAVATION
EL. -8.0
GRAVEL 9" THICK
ANGLE OF REPOSE
EL. 5.0
EL. 5.0
1V:2H1V:2 H
EL. -5.0
1V:4H
1V:4 H
EXISTING GROUND
C-07
P L
A N
A N
D T
Y P
IC
A
L S
E C
T
IO
N S
O P
T
IO
N W
O R
K
C -0
O p ti o n W o rk
.d g n
TEMPORARY ACCESS ROAD
CONTRACTOR TO CONTINUE
BYPASS CHANNEL
ACCESS ROAD
ACCESS ROAD D
TIE-IN TO EXISTING
NOTE:
AT THE END OF CONSTRUCTION.
CONTRACTOR SHALL REMOVE ALL TEMPORARY ROADWAYS AND CULVERTS3.
FOR PERMANENT CULVERT DETAILS SEE SHEET C-08.2.
FOR INTERIOR DRAINAGE DITCH DETAILS SEE SHEETS C-05 AND C-06.1.
ANGLE OF REPOSE
COMPACTED FILL
SAND
EXISTING GROUND
PERMANENT CULVERTS
TEMPORARY CULVERTS
D-1
OPTION WORK - PLAN VIEW
SCALE: NOT TO SCALE
ACCESS ROAD
SAND FILL
COMPACTED FILL 1' THICK
GRAVEL 9" THICK A
M
E N
D
R E
V
IS
E D
T E
M P
B
Y P
A S
S C
A N
A L
W
ID
T H
T O
F T
NOTE: THE SECTION IS THE SAME AS THE ACCESS ROAD SECTION TO BE MAINTAINED
A M
E N
D
R E
V
IS
E D
B Y
P A
S S
A
D D
E D
A R
-D M
A
IN
T
N O
T E
68'
-243.73' R324+64.17582909.15 3520686.80BCL-5
54.86' L324+64.14583201.243520624.85BCL-4
TBCL-1
153.89' L323+76.57583279.963520518.65BCL-3
-172.09' L322+31.33583267.643520372.79BCL-2
-227.06' L321+70.75583308.853520302.13BCL-1
YX
CURVEB/L OFFSETB/L STA.
STATE PLANE COORDINATES
P.I.
TEMPORARY BYPASS CANAL CENTERLINE TABULATINOS
70.66'161.97°82.86°144.43'100'TBCL-1
TANGENT
CURVATURE
DEGREE OF
DELTA
LENGTH
CURVE
RADIUSCURVE
CENTERLINE
TABULATIONS OF CURVE FOR TEMPORARY BYPASS
/2
/2
/0
/2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
N E
W O
R L
E A
N S
L A
L
E A
K E
A V
E N
E W
O R
L E
A N
S D
IS
T
R
IC
T U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A D
V E
R T
IS
E
S E
T
W E
S T
S H
O R
E L
A K
E P
O N
T C
H A
R T
R A
IN
L
A
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
G E
R
IS
K R
E D
U C
T
IO
N P
R O
J E
C T
W S
L P
L E
V E
E
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Z X
X X
X X
X X
X X
X X
W
P
-2
-B -0
N O
V E
M B
E R
A N
S I
D S
T
J O
H N
T H
E B
A P
T
IS
T P
A R
IS
H
B R
E N
N A
N
B R
O O
K S
A B
R E
N N
A N
L H
A T
T E
N
D B
E C
K H
-8 -4
L-11
C-07
D-11
C-07
H-11
C-07
1 2
C-08
C U
L V
E R
T D
E T
A
IL
S O
P T
IO
N
W O
K
C -0
C U
L V
E R
T D
E T
A
IL
S .D
G N
K-1
CROSSING
PLAN VIEW - TEMPORARY BYPASS CANAL
1"=1" FULL SIZESCALE:
E-1
CROSSING
CROSS SECTION - TEMPORARY BYPASS CANAL
1"=1" FULL SIZESCALE:
A-1
CROSSING
PROFILE - TEMPORARY BYPASS CANAL
1"=1" FULL SIZESCALE:
K-11
CROSSING
PLAN VIEW - INTERIOR DRAINAGE CANAL
1"=1" FULL SIZESCALE:
E-11
CROSSING
CROSS SECTION - INTERIOR DRAINAGE CANAL
1"=1" FULL SIZESCALE:
A-11
CROSSING
PROFILE - INTERIOR DRAINAGE CANAL
1"=1" FULL SIZESCALE:
68'
BYPASS CANAL
C/L TEMPORARY
INVERT ELEVATION -5
ACCESS ROAD
C/L TEMPORARY
ELEVATION 5
EL. 5
1V:6 H 1V:6H
M
IN
CPM CULVERTS
(9) 5.0' DIAMETER
INVERT EL. -5
C
L A
Y C
A P
M
IN
IM
U
M
30'
ACCESS ROAD
CRUSHED STONE
#610 LIMESTONE BEDDING
SEPARATOR GEOTEXTILE
SEPARATOR GEOTEXTILE
SEPARATOR GEOTEXTILE
68'
M
IN
IM
U M
C
L A
Y C
A P
M
IN
IM
U
M
ELEVATION 5
CMP CULVERTS
(10) 5' DIAMETER
18" MINIMUM
C/L TEMPORARY BYPASS CANAL
INVERT ELEVATION -5
30'
CANAL EL. -5
INTERIOR DRAINAGE
CANAL EL. -4
INTERIOR DRAINAGE
18" R-90 STONE
ELEVATION -4
CULVERT INVERT
C/L INTERIOR CANAL
C/L 30' WIDE PERMANENT ACCESS ROAD
TIE-IN TO EXISTING ROAD
30'
ANGLE OR REPOSE
10' 10'
1V:6 H 1V:6H
EL. -4
EL. -5EL. -5
EL. -4
ACCESS ROAD
CRUSHED STONE
18" R-90 RIPRAP
ANGLE OF REPOSE
12" COMPACTED FILL
SEPARATOR GEOTEXTILE#610 LIMESTONE BEDDING
M
IN
IM
U
M
46'
M
IN
IM
U M
M
IN
IM
U
M
M
IN
IM
U M
ELEVATION +5.0
3' MINIMUM
TIE-IN TO ACCESS ROAD D
(5) 6' DIAMETER CMP CULVERT
#610 LIMESTONE BEDDING
SAND BACKFILL
COMPACTED FILL
CRUSHED STONE ACCESS ROAD
INVERT ELEVATION -4
GEOTEXTILE SEPARATOR
GEOTEXTILE SEPARATOR
A M
E N
D
R E
V
IS
E D
T E
M P
B
Y P
A S
S C
A N
A L
W
ID
T H
T O
F T
A M
E N
D C
L A
R
IF
IE
D
O W
C U
L V
E R
T
R O
A D
D E
T A
IL
S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
N E
W O
R L
E A
N S
L A
L
E A
K E
A V
E N
E W
O R
L E
A N
S D
IS
T
R
IC
T U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A D
V E
R T
IS
E
S E
T
W E
S T
S H
O R
E L
A K
E P
O N
T C
H A
R T
R A
IN
L
A
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
G E
R
IS
K R
E D
U C
T
IO
N P
R O
J E
C T
W S
L P
L E
V E
E
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Z X
X X
X X
X X
X X
X X
W
P
-2
-B -0
N O
V E
M B
E R
A N
S I
D S
T
J O
H N
T H
E B
A P
T
IS
T P
A R
IS
H
B R
E N
N A
N
B R
O O
K S
A B
R E
N N
A N
L H
A T
T E
N
D B
E C
K H
-8 -4
C-08
E-1
C-08
A-1
C-08
E-11
C-08
A-11
ST JOHN THE BAPTIST PARISH
NORTH
PLAN
19-070U
19-102C-V
19-063C
19-069U
2 3
B-01
B O
R
IN
G A
N D
I N
S T
R U
M E
N T
A T
IO
N
P L
A N
S T
A
T O
S T
A
C -0
P L
A N
V
IE
W
.D G
N
L
IM
IT
O
F C
O N
S T
R U
C T
IO
N
M A
T C
H S
T A . 3
,5
,0
,0
,0
,0
,0
,0
,0
°3
'3
°3
'1
°3
'3
°3
'1
ALREADY INSTALLED
SAND BASE
INSTRUMENTATION CONTRACTOR
SETTLEMENT GAGE INSTALLED BY
PIEZOMETER 1
PIEZOMETER 2
OF FINISHED SAND BASE
BERM FILL PLACED TO ELEVATION
HORIZONTAL SAA INSTRUMENT
DATA CABLES AND
OF CANAL EXCAVATED MATERIALS.
WITHIN 25 FEET ON EITHER SIDE OF THE DATA LOG BOX DURING FINAL GRADING
7. EXTRA STOCKPILED CANAL EXCAVATED MATERIAL SHALL NOT BE PLACED
INSTRUMENTATION CONCTRACTORS' USE
6. CONTRACTOR SHALL PLACE COMPACTED FILL OUT TO DATA LOG BOX FOR
LEVEE FILL PLACEMENT.
5. INCLINOMETER IS TO BE INSTALLED AT LEVEE TOE AFTER COMPLETION OF
OFFSET OF THE BREAK IN SLOPE BETWEEN LEVEE AND BERM.
4. PIEZOMETER 2 IS TO BE INSTALLED BY INSTRUMETATION CONTRACTOR AT THE
WILL BE APPROXIMATELY 2 FT W X I FT D.
WHICH IS TO BE EXCAVATED BY THE INSTRUMENTATION CONTRACTOR.TRENCH
DATA CABLES AND HORIZONTAL SAA INSTRUMENT SHALL BE LAID IN TRENCH 3.
AFTER BERM FILL IS PLACED TO ELEVATION OF FINISHED SAND BASE.
2. PIEZOMETER 1 IS TO BE BE INSTALLED BY INSTRUMENTATION CONTRACTOR
1. SETTLEMENT GAGE IS TO BE INSTALLED BY INSTRUMENTATION CONTRACTOR.
NOTES:
INCLINOMETER
COMPACTED FILL
DATA LOGGER
EXCAVATED MATERIAL
EXTRA CANAL
FILL PLACEMENT AT EACH LOCATION WHERE INSTRUMENTATION IS PRESENT
INSTRUMENTATION TO BE INSTALLED BY OTHERS AFTER COMPLETION OF SAND AND BERM
A M
E N
D
R E
V
IS
E D
R A
T E
O F
F
IL
L P
L A
C E
M E
N T
T O
-F
T
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
N E
W O
R L
E A
N S
L A
L
E A
K E
A V
E N
E W
O R
L E
A N
S D
IS
T
R
IC
T U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A D
V E
R T
IS
E
S E
T
W E
S T
S H
O R
E L
A K
E P
O N
T C
H A
R T
R A
IN
L
A
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
G E
R
IS
K R
E D
U C
T
IO
N P
R O
J E
C T
W S
L P
L E
V E
E
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Z X
X X
X X
X X
X X
X X
W
P
-2
-B -0
N O
V E
M B
E R
A N
S I
D S
T
J O
H N
T H
E B
A P
T
IS
T P
A R
IS
H
B R
E N
N A
N
B R
O O
K S
A B
R E
N N
A N
L H
A T
T E
N
D B
E C
K H
-8 -4
MD
T
MD
T
T
T
MD
T T
WSLP-107-D2
WSLP-107-Z2B
WSLP-107-Z2A
338+00
WSLP-107-D1
WSLP-107-I1
WSLP-107-Z1B
WSLP-107-Z1A
332+00
LABELSTATION
INSTRUMENTATION
DATA LOGGER
STABILITY PLATE
INCLINOMETER
PIEZOMETER
SYMBOLINSTRUMENTATION
WSLP-107-D4
WSLP-107-I4
WSLP-107-Z4B
WSLP-107-Z4A
365+00
WSLP-107-D3
WSLP-107-I3
WSLP-107-G3B
WSLP-107-G3A
WSLP-107-Z3B
WSLP-107-Z3A
344+00
LABELSTATION
INSTRUMENTATION
T
MD
DEVICES SHALL BE DISTRIBUTED THROUGHOUT EXISTING BID ITEMS.
INSTALLATION OF THE GEOTECHNICAL INSTRUMENTATION AND PROTECTION OF THE INSTALLED
12.THE COST FOR ALL REQUIRED WORK BY THE CONTRACTOR FOR ASSISTING WITH THE
FOR SETTLMENT ARE FOUND IN SPECIFICATION SECTION 31 24 00.00 12.
ADDITIONAL PAYMENT DUE TO SETTLEMENT. MEASUREMENT AND PAYMENT CONSIDERATIONS
AND MAY NOT BE USED BY THE CONTRACTOR FOR ANY USE, INCLUDING THE CALCULATION OF
11.DATA OBTAINED FROM THIS INSTRUMENTATION IS FOR THE SOLE USE OF THE GOVERNMENT
TASKS WILL BE REQUIRED.
DURING CONSTRUCTION. ACCESS FOR OPERATORS AND EQUIPMENT TO COMPLETE THESE
10.THE GOVERNMENT WILL BE PERFORMING SOIL BORINGS AND CONE PENETRATION TESTS
INSTRUMENTS AND OBTAIN NEW BASELINE READINGS.
SUPPLIES, AND LABOR REQUIRED BY THE THIRD PARTY CONTRACTOR TO RE-ESTABLISH THE
INSTRUMENTATION DAMAGED BY THE CONTRACTOR. THIS INCLUDES THE COST OF EQUIPMENT,
9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPLACEMENT COST OF
INSTRUMENTATION FROM DAMAGE.
GOVERNMENT. TAKE ALL MEASURES NECESSARY TO PROTECT THE GEOTECHNICAL
8.PROVIDE ACCESS AT ALL TIMES TO THE INSTRUMENTATION LOCATIONS SELECTED BY THE
DAMAGE TO THE CABLES WHEN BACKFILLING.
BE APPROXIMATELY 2-FT WIDE BY 1-FT DEEP. CARE SHALL BE TAKEN TO BE TAKEN TO AVOID
WILL CONNECT TO DATA LOGGERS SET UP ON THE L/S OF THE WORK SITE. TRENCHES WILL
THE WORK SITE FROM THE C/L OF THE LEVEE SECTION TO THE L/S SO THAT ALL INSTRUMENTS
CABLING THAT WILL CONNECT INSTRUMENTS TO DATA LOGGERS. CABLING WILL TRAVERSE
7.TRENCHES WILL BE EXCAVATED BY THE THIRD PARTY CONTRACTOR FOR INSTALLING DATA
TIME FRAME FOLLOWING RESUMPTION OF CONSTRUCTION IN THE AFFECTED AREA.
6.RATE OF FILL PLACEMENT SHALL NOT EXCEED 2 VERTICAL FEET IN ELEVATION OVER A 7-DAY
CONSTRUCTION IN THE AFFECTED AREA.
READING SATISFACTORILY, THE CONTRACTING OFFICER WILL AUTHORIZE RESUMPTION OF
ONCE THE INSTRUMENTS ARE DETERMINED BY THE THIRD PARTY CONTRACTORTO BE
ACROSS THE CORRIDOR BETWEEN THE INSTRUMENTS AND THE ADJACENT DATA LOGGER.
5.COORDINATE WITH THE THIRD PARTY CONTRACTOR FOR ANY WORK PERFORMED OR
INSTRUMENTS SHALL BE OBSERVED.
DURING THIS 17-DAY PERIOD, A NO WORK ZONE OF A 25-FT RADIUS AROUND THE
INSTRUMENT SITE IS GRANTED, PLUS AN ADDITIONAL 7 DAYS TO INITIALIZE THE EQUIPMENT.
4. INSTRUMENTATION INSTALLATION IS EXPECTED TO TAKE 10 DAYS ONCE ACCESS TO
EXTENDING THE BERM FILL TO PROVIDE ACCESS TO THE DATA LOGGER.
INDICATE WHEN THE SAND BASE AND BERM FILL PLACEMENT IS COMPLETE INCLUDING
3.PROVIDE TEN DAYS ADVANCE NOTICE TO THE CONTRACTING OFFICER REPRESENTATIVE TO
2.THIS IS SCHEMATIC ONLY. REFER TO TYPICAL SECTIONS FOR SECTION DIMENSIONS.
1.GEOTECHNICAL INSTRUMENTATION WILL BE INSTALLED BY A THIRD PARTY CONTRACTOR.
NOTES:
DEVICES SHALL BE DISTRIBUTED THROUGHOUT EXISTING BID ITEMS.
INSTALLATION OF THE GEOTECHNICAL INSTRUMENTATION AND PROTECTION OF THE INSTALLED
12.THE COST FOR ALL REQUIRED WORK BY THE CONTRACTOR FOR ASSISTING WITH THE
FOR SETTLMENT ARE FOUND IN SPECIFICATION SECTION 31 24 00.00 12.
ADDITIONAL PAYMENT DUE TO SETTLEMENT. MEASUREMENT AND PAYMENT CONSIDERATIONS
AND MAY NOT BE USED BY THE CONTRACTOR FOR ANY USE, INCLUDING THE CALCULATION OF
11.DATA OBTAINED FROM THIS INSTRUMENTATION IS FOR THE SOLE USE OF THE GOVERNMENT
TASKS WILL BE REQUIRED.
DURING CONSTRUCTION. ACCESS FOR OPERATORS AND EQUIPMENT TO COMPLETE THESE
10.THE GOVERNMENT WILL BE PERFORMING SOIL BORINGS AND CONE PENETRATION TESTS
INSTRUMENTS AND OBTAIN NEW BASELINE READINGS.
SUPPLIES, AND LABOR REQUIRED BY THE THIRD PARTY CONTRACTOR TO RE-ESTABLISH THE
INSTRUMENTATION DAMAGED BY THE CONTRACTOR. THIS INCLUDES THE COST OF EQUIPMENT,
9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPLACEMENT COST OF
INSTRUMENTATION FROM DAMAGE.
GOVERNMENT. TAKE ALL MEASURES NECESSARY TO PROTECT THE GEOTECHNICAL
8.PROVIDE ACCESS AT ALL TIMES TO THE INSTRUMENTATION LOCATIONS SELECTED BY THE
DAMAGE TO THE CABLES WHEN BACKFILLING.
BE APPROXIMATELY 2-FT WIDE BY 1-FT DEEP. CARE SHALL BE TAKEN TO BE TAKEN TO AVOID
WILL CONNECT TO DATA LOGGERS SET UP ON THE L/S OF THE WORK SITE. TRENCHES WILL
THE WORK SITE FROM THE C/L OF THE LEVEE SECTION TO THE L/S SO THAT ALL INSTRUMENTS
CABLING THAT WILL CONNECT INSTRUMENTS TO DATA LOGGERS. CABLING WILL TRAVERSE
7.TRENCHES WILL BE EXCAVATED BY THE THIRD PARTY CONTRACTOR FOR INSTALLING DATA
TIME FRAME FOLLOWING RESUMPTION OF CONSTRUCTION IN THE AFFECTED AREA.
6.RATE OF FILL PLACEMENT SHALL NOT EXCEED 2 VERTICAL FEET IN ELEVATION OVER A 7-DAY
CONSTRUCTION IN THE AFFECTED AREA.
READING SATISFACTORILY, THE CONTRACTING OFFICER WILL AUTHORIZE RESUMPTION OF
ONCE THE INSTRUMENTS ARE DETERMINED BY THE THIRD PARTY CONTRACTORTO BE
ACROSS THE CORRIDOR BETWEEN THE INSTRUMENTS AND THE ADJACENT DATA LOGGER.
5.COORDINATE WITH THE THIRD PARTY CONTRACTOR FOR ANY WORK PERFORMED OR
INSTRUMENTS SHALL BE OBSERVED.
DURING THIS 17-DAY PERIOD, A NO WORK ZONE OF A 25-FT RADIUS AROUND THE
INSTRUMENT SITE IS GRANTED, PLUS AN ADDITIONAL 7 DAYS TO INITIALIZE THE EQUIPMENT.
4. INSTRUMENTATION INSTALLATION IS EXPECTED TO TAKE 10 DAYS ONCE ACCESS TO
EXTENDING THE BERM FILL TO PROVIDE ACCESS TO THE DATA LOGGER.
INDICATE WHEN THE SAND BASE AND BERM FILL PLACEMENT IS COMPLETE INCLUDING
3.PROVIDE TEN DAYS ADVANCE NOTICE TO THE CONTRACTING OFFICER REPRESENTATIVE TO
2.THIS IS SCHEMATIC ONLY. REFER TO TYPICAL SECTIONS FOR SECTION DIMENSIONS.
1.GEOTECHNICAL INSTRUMENTATION WILL BE INSTALLED BY A THIRD PARTY CONTRACTOR.
ST. JOHN THE BAPTIST PARISH
FLOODSIDE
NORTH
PLAN
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
19-062C 19-068U
19-061C 19-067U
EXISTING RIGHT OF WAY EXISTING RIGHT OF WAY7
B-02
B O
R
IN
G A
N D
I N
S T
R U
M E
N T
A T
IO
N
P L
A N
S T
A
T O
S T
A
C -0
P L
A N
V
IE
W
.D G
N
M A
T C
H S
T A . 3
M A
T C
H S
T A . 3
,5
,0
,0
,0
,0
,0
,0
°3
' 0
°3
'4
°3
' 0
°3
'4
30°06'15"
30°06'15"
LAND SIDE BERM
EL. 3
EL. 2.5
DATA LOGGER
LAND BRIDGE
DATA LOGGER
10'
E-6
DATA LOGER AND LAND BRIDGE SECTION
SCALE: NOT TO SCALE
A-8
DATA LOGGER AND LAND BRIDGE - DETAIL
1"=1" FULL SIZESCALE:
EL. 3
EDGE OF BERM
LOGGER
DATA
EL. 3
SPOIL BANK MATERIAL
SLOPE TO DRAIN
15'
CANAL EXCAVATED MATERIAL
EXCAVATED MATERIALS
DATA LOG BOX DURING FINAL GRADING OF CANAL
OF DATA LOG INSTALLATION TO AVOID DISTURBING
SHALL NOT BE PLACED WITHIN 25 FEET EITHER SIDE
EXTRA STOCKPILED CANAL EXCAVATED MATERIAL
15'
BERM TOE
MAINTENANCE
5'
OF LEVEE FILL PLACEMENT
LEVEE TOE AFTER COMPLETION
INCLINOMETER INSTALLED AT
5'
A M
E N
D
R E
V
IS
E D
R A
T E
O F
F
IL
L P
L A
C E
M E
N T
T O
-F
T
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
N E
W O
R L
E A
N S
L A
L
E A
K E
A V
E N
E W
O R
L E
A N
S D
IS
T
R
IC
T U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A D
V E
R T
IS
E
S E
T
W E
S T
S H
O R
E L
A K
E P
O N
T C
H A
R T
R A
IN
L
A
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
G E
R
IS
K R
E D
U C
T
IO
N P
R O
J E
C T
W S
L P
L E
V E
E
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Z X
X X
X X
X X
X X
X X
W
P
-2
-B -0
N O
V E
M B
E R
A N
S I
D S
T
J O
H N
T H
E B
A P
T
IS
T P
A R
IS
H
B R
E N
N A
N
B R
O O
K S
A B
R E
N N
A N
L H
A T
T E
N
D B
E C
K H
-8 -4
T
MD
T
T
T
T
MD
WSLP-107-D2
WSLP-107-Z2B
WSLP-107-Z2A
338+00
WSLP-107-D1
WSLP-107-I1
WSLP-107-Z1B
WSLP-107-Z1A
332+00
LABELSTATION
INSTRUMENTATION
DATA LOGGER
STABILITY PLATE
INCLINOMETER
PIEZOMETER
SYMBOLINSTRUMENTATION
T
MD
WSLP-107-D4
WSLP-107-I4
WSLP-107-Z4B
WSLP-107-Z4A
365+00
WSLP-107-D3
WSLP-107-I3
WSLP-107-G3B
WSLP-107-G3A
WSLP-107-Z3B
WSLP-107-Z3A
344+00
LABELSTATION
INSTRUMENTATION
DEVICES SHALL BE DISTRIBUTED THROUGHOUT EXISTING BID ITEMS.
INSTALLATION OF THE GEOTECHNICAL INSTRUMENTATION AND PROTECTION OF THE INSTALLED
12.THE COST FOR ALL REQUIRED WORK BY THE CONTRACTOR FOR ASSISTING WITH THE
FOR SETTLMENT ARE FOUND IN SPECIFICATION SECTION 31 24 00.00 12.
ADDITIONAL PAYMENT DUE TO SETTLEMENT. MEASUREMENT AND PAYMENT CONSIDERATIONS
AND MAY NOT BE USED BY THE CONTRACTOR FOR ANY USE, INCLUDING THE CALCULATION OF
11.DATA OBTAINED FROM THIS INSTRUMENTATION IS FOR THE SOLE USE OF THE GOVERNMENT
TASKS WILL BE REQUIRED.
DURING CONSTRUCTION. ACCESS FOR OPERATORS AND EQUIPMENT TO COMPLETE THESE
10.THE GOVERNMENT WILL BE PERFORMING SOIL BORINGS AND CONE PENETRATION TESTS
INSTRUMENTS AND OBTAIN NEW BASELINE READINGS.
SUPPLIES, AND LABOR REQUIRED BY THE THIRD PARTY CONTRACTOR TO RE-ESTABLISH THE
INSTRUMENTATION DAMAGED BY THE CONTRACTOR. THIS INCLUDES THE COST OF EQUIPMENT,
9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPLACEMENT COST OF
INSTRUMENTATION FROM DAMAGE.
GOVERNMENT. TAKE ALL MEASURES NECESSARY TO PROTECT THE GEOTECHNICAL
8.PROVIDE ACCESS AT ALL TIMES TO THE INSTRUMENTATION LOCATIONS SELECTED BY THE
DAMAGE TO THE CABLES WHEN BACKFILLING.
BE APPROXIMATELY 2-FT WIDE BY 1-FT DEEP. CARE SHALL BE TAKEN TO BE TAKEN TO AVOID
WILL CONNECT TO DATA LOGGERS SET UP ON THE L/S OF THE WORK SITE. TRENCHES WILL
THE WORK SITE FROM THE C/L OF THE LEVEE SECTION TO THE L/S SO THAT ALL INSTRUMENTS
CABLING THAT WILL CONNECT INSTRUMENTS TO DATA LOGGERS. CABLING WILL TRAVERSE
7.TRENCHES WILL BE EXCAVATED BY THE THIRD PARTY CONTRACTOR FOR INSTALLING DATA
TIME FRAME FOLLOWING RESUMPTION OF CONSTRUCTION IN THE AFFECTED AREA.
6.RATE OF FILL PLACEMENT SHALL NOT EXCEED 2 VERTICAL FEET IN ELEVATION OVER A 7-DAY
CONSTRUCTION IN THE AFFECTED AREA.
READING SATISFACTORILY, THE CONTRACTING OFFICER WILL AUTHORIZE RESUMPTION OF
ONCE THE INSTRUMENTS ARE DETERMINED BY THE THIRD PARTY CONTRACTORTO BE
ACROSS THE CORRIDOR BETWEEN THE INSTRUMENTS AND THE ADJACENT DATA LOGGER.
5.COORDINATE WITH THE THIRD PARTY CONTRACTOR FOR ANY WORK PERFORMED OR
INSTRUMENTS SHALL BE OBSERVED.
DURING THIS 17-DAY PERIOD, A NO WORK ZONE OF A 25-FT RADIUS AROUND THE
INSTRUMENT SITE IS GRANTED, PLUS AN ADDITIONAL 7 DAYS TO INITIALIZE THE EQUIPMENT.
4. INSTRUMENTATION INSTALLATION IS EXPECTED TO TAKE 10 DAYS ONCE ACCESS TO
EXTENDING THE BERM FILL TO PROVIDE ACCESS TO THE DATA LOGGER.
INDICATE WHEN THE SAND BASE AND BERM FILL PLACEMENT IS COMPLETE INCLUDING
3.PROVIDE TEN DAYS ADVANCE NOTICE TO THE CONTRACTING OFFICER REPRESENTATIVE TO
2.THIS IS SCHEMATIC ONLY. REFER TO TYPICAL SECTIONS FOR SECTION DIMENSIONS.
1.GEOTECHNICAL INSTRUMENTATION WILL BE INSTALLED BY A THIRD PARTY CONTRACTOR.
NOTES:
CONTRACTOR. TRENCH WILL BE APPROX 2 FT W X 1 FT D.
TRENCH WHICH TO BE EXCAVATED BY THE INSTRUMENTATION
DATA CABLES AND HORIZONTAL SAA INSTRUMENT LAID IN
AT EACH LOCATION OF INSTRUMENTATION
COMPLETION OF SAND AND BERM FILL PLACEMENT
INSTRUMENTATION TO BE INSTALLED BY OTHERS AFTER
DEVICES SHALL BE DISTRIBUTED THROUGHOUT EXISTING BID ITEMS.
INSTALLATION OF THE GEOTECHNICAL INSTRUMENTATION AND PROTECTION OF THE INSTALLED
12.THE COST FOR ALL REQUIRED WORK BY THE CONTRACTOR FOR ASSISTING WITH THE
FOR SETTLMENT ARE FOUND IN SPECIFICATION SECTION 31 24 00.00 12.
ADDITIONAL PAYMENT DUE TO SETTLEMENT. MEASUREMENT AND PAYMENT CONSIDERATIONS
AND MAY NOT BE USED BY THE CONTRACTOR FOR ANY USE, INCLUDING THE CALCULATION OF
11.DATA OBTAINED FROM THIS INSTRUMENTATION IS FOR THE SOLE USE OF THE GOVERNMENT
TASKS WILL BE REQUIRED.
DURING CONSTRUCTION. ACCESS FOR OPERATORS AND EQUIPMENT TO COMPLETE THESE
10.THE GOVERNMENT WILL BE PERFORMING SOIL BORINGS AND CONE PENETRATION TESTS
INSTRUMENTS AND OBTAIN NEW BASELINE READINGS.
SUPPLIES, AND LABOR REQUIRED BY THE THIRD PARTY CONTRACTOR TO RE-ESTABLISH THE
INSTRUMENTATION DAMAGED BY THE CONTRACTOR. THIS INCLUDES THE COST OF EQUIPMENT,
9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPLACEMENT COST OF
INSTRUMENTATION FROM DAMAGE.
GOVERNMENT. TAKE ALL MEASURES NECESSARY TO PROTECT THE GEOTECHNICAL
8.PROVIDE ACCESS AT ALL TIMES TO THE INSTRUMENTATION LOCATIONS SELECTED BY THE
DAMAGE TO THE CABLES WHEN BACKFILLING.
BE APPROXIMATELY 2-FT WIDE BY 1-FT DEEP. CARE SHALL BE TAKEN TO BE TAKEN TO AVOID
WILL CONNECT TO DATA LOGGERS SET UP ON THE L/S OF THE WORK SITE. TRENCHES WILL
THE WORK SITE FROM THE C/L OF THE LEVEE SECTION TO THE L/S SO THAT ALL INSTRUMENTS
CABLING THAT WILL CONNECT INSTRUMENTS TO DATA LOGGERS. CABLING WILL TRAVERSE
7.TRENCHES WILL BE EXCAVATED BY THE THIRD PARTY CONTRACTOR FOR INSTALLING DATA
TIME FRAME FOLLOWING RESUMPTION OF CONSTRUCTION IN THE AFFECTED AREA.
6.RATE OF FILL PLACEMENT SHALL NOT EXCEED 2 VERTICAL FEET IN ELEVATION OVER A 7-DAY
CONSTRUCTION IN THE AFFECTED AREA.
READING SATISFACTORILY, THE CONTRACTING OFFICER WILL AUTHORIZE RESUMPTION OF
ONCE THE INSTRUMENTS ARE DETERMINED BY THE THIRD PARTY CONTRACTORTO BE
ACROSS THE CORRIDOR BETWEEN THE INSTRUMENTS AND THE ADJACENT DATA LOGGER.
5.COORDINATE WITH THE THIRD PARTY CONTRACTOR FOR ANY WORK PERFORMED OR
INSTRUMENTS SHALL BE OBSERVED.
DURING THIS 17-DAY PERIOD, A NO WORK ZONE OF A 25-FT RADIUS AROUND THE
INSTRUMENT SITE IS GRANTED, PLUS AN ADDITIONAL 7 DAYS TO INITIALIZE THE EQUIPMENT.
4. INSTRUMENTATION INSTALLATION IS EXPECTED TO TAKE 10 DAYS ONCE ACCESS TO
EXTENDING THE BERM FILL TO PROVIDE ACCESS TO THE DATA LOGGER.
INDICATE WHEN THE SAND BASE AND BERM FILL PLACEMENT IS COMPLETE INCLUDING
3.PROVIDE TEN DAYS ADVANCE NOTICE TO THE CONTRACTING OFFICER REPRESENTATIVE TO
2.THIS IS SCHEMATIC ONLY. REFER TO TYPICAL SECTIONS FOR SECTION DIMENSIONS.
1.GEOTECHNICAL INSTRUMENTATION WILL BE INSTALLED BY A THIRD PARTY CONTRACTOR.
B-03
S T
A
T O
S T
A
B O
R
IN
G A
N D
I N
S T
R U
M E
N T
A T
IO
N
P L
A N
C -0
P L
A N
V
IE
W
.D G
N
LANDSIDE
ST. JOHN THE BAPTIST PARISH
FLOODSIDE
EXISTING RIGHT OF WAY
EXISTING RIGHT OF WAY
NORTH
PLAN
19-066U
19-059C
19-065U
19-101C-V
M A
T C
H S
T A . 3
M A
T C
H S
T A . 3
,5
,0
,0
,0
,0
,0
,0
°3
'4
°3
'3
°3
'1
°3
'4
°3
'3
°3
'1
30°06'15"
30°06'15"
19-060C
19-058C
A M
E N
D
R E
V
IS
E D
R A
T E
O F
F
IL
L P
L A
C E
M E
N T
T O
-F
T
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
N E
W O
R L
E A
N S
L A
L
E A
K E
A V
E N
E W
O R
L E
A N
S D
IS
T
R
IC
T U
.S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
A D
V E
R T
IS
E
S E
T
W E
S T
S H
O R
E L
A K
E P
O N
T C
H A
R T
R A
IN
L
A
H U
R R
IC
A
N E
A N
D S
T O
R M
D A
M A
G E
R
IS
K R
E D
U C
T
IO
N P
R O
J E
C T
W S
L P
L E
V E
E
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Z X
X X
X X
X X
X X
X X
W
P
-2
-B -0
N O
V E
M B
E R
A N
S I
D S
T
J O
H N
T H
E B
A P
T
IS
T P
A R
IS
H
B R
E N
N A
N
B R
O O
K S
A B
R E
N N
A N
L H
A T
T E
N
D B
E C
K H
-8 -4
MD
TT
T
MD
T
WSLP-107-D2
WSLP-107-Z2B
WSLP-107-Z2A
338+00
WSLP-107-D1
WSLP-107-I1
WSLP-107-Z1B
WSLP-107-Z1A
332+00
LABELSTATION
INSTRUMENTATION
DATA LOGGER
STABILITY PLATE
INCLINOMETER
PIEZOMETER
SYMBOLINSTRUMENTATION
T
MD
WSLP-107-D6
WSLP-107-I6
WSLP-107-G6B
WSLP-107-G6A
WSLP-107-Z6B
WSLP-107-Z6A
395+00
WSLP-107-D5
WSLP-107-Z5B
WSLP-107-Z5A
380+00
LABELSTATION
INSTRUMENTATION
NOTES:
1.GEOTECHNICAL INSTRUMENTATION WILL BE INSTALLED BY A THIRD PARTY CONTRACTOR.
2.THIS IS SCHEMATIC ONLY. REFER TO TYPICAL SECTIONS FOR SECTION DIMENSIONS.
3.PROVIDE TEN DAYS ADVANCE NOTICE TO THE CONTRACTING OFFICER REPRESENTATIVE TO
INDICATE WHEN THE SAND BASE AND BERM FILL PLACEMENT IS COMPLETE INCLUDING
EXTENDING THE BERM FILL TO PROVIDE ACCESS TO THE DATA LOGGER.
4. INSTRUMENTATION INSTALLATION IS EXPECTED TO TAKE 10 DAYS ONCE ACCESS TO
INSTRUMENT SITE IS GRANTED, PLUS AN ADDITIONAL 7 DAYS TO INITIALIZE THE EQUIPMENT.
DURING THIS 17-DAY PERIOD, A NO WORK ZONE OF A 25-FT RADIUS AROUND THE
INSTRUMENTS SHALL BE OBSERVED.
5.COORDINATE WITH THE THIRD PARTY CONTRACTOR FOR ANY WORK PERFORMED OR
ACROSS THE CORRIDOR BETWEEN THE INSTRUMENTS AND THE ADJACENT DATA LOGGER.
ONCE THE INSTRUMENTS ARE DETERMINED BY THE THIRD PARTY CONTRACTORTO BE
READING SATISFACTORILY, THE CONTRACTING OFFICER WILL AUTHORIZE RESUMPTION OF
CONSTRUCTION IN THE AFFECTED AREA.
6.RATE OF FILL PLACEMENT SHALL NOT EXCEED 2 VERTICAL FEET IN ELEVATION OVER A 7-DAY
TIME FRAME FOLLOWING RESUMPTION OF CONSTRUCTION IN THE AFFECTED AREA.
7.TRENCHES WILL BE EXCAVATED BY THE THIRD PARTY CONTRACTOR FOR INSTALLING DATA
CABLING THAT WILL CONNECT INSTRUMENTS TO DATA LOGGERS. CABLING WILL TRAVERSE
THE WORK SITE FROM THE C/L OF THE LEVEE SECTION TO THE L/S SO THAT ALL INSTRUMENTS
WILL CONNECT TO DATA LOGGERS SET UP ON THE L/S OF THE WORK SITE. TRENCHES WILL
BE APPROXIMATELY 2-FT WIDE BY 1-FT DEEP. CARE SHALL BE TAKEN TO BE TAKEN TO AVOID
DAMAGE TO THE CABLES WHEN BACKFILLING.
8.PROVIDE ACCESS AT ALL TIMES TO THE INSTRUMENTATION LOCATIONS SELECTED BY THE
GOVERNMENT. TAKE ALL MEASURES NECESSARY TO PROTECT THE GEOTECHNICAL
INSTRUMENTAT…
This is the start of the file's text. The full file is on GovTribe.