W912P823B0022 Amendment 0006.pdf

PDF 544 KB Posted

Attached to
Grand Isle and Vicinity Project, Post-Ida Clay core/Geotube repairs
Solicitation number
W912P823B0022
Issued by

About this file

This document provides an amendment to the solicitation for the Grand Isle and Vicinity Project Post-Ida Clay Core/Geotube Repairs. The amendment responds to prior questions by interested vendors and clarifies that excess excavated material from the existing dune may be used to fill the dune template in areas outside of the clay core construction area. Additionally, the amendment states that there will not be an equitable adjustment to the contractor if pre-construction surveys find existing conditions below required grades, as the contractor will be required to build the dune and beach sand template to specifications. The single award firm fixed price construction contract valued between $25-100 million is for repairing the Grand Isle dune through excavation and fill, clay core and geotube placement, and sand cover atop the entire dune alignment. Incidental work includes dune planting, sand fencing, timber crossings and ACB crossings. Questions are due by June 6, 2023 with the U.S. Army Corps of Engineers Engineering District New Orleans as the issuing agency.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered Solicitation for Grand Isle and Vicinity, LA, Hurricane Ida Repairs, Dune and Beach Construction, Jefferson Parish, Louisiana has been amended to:

a) Provide answ ers to prior submitted questions.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823B0022

X 9B. DATED (SEE ITEM 11)

23-May-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2023

CODE

CONTRACTING DIV-PROJ EAST BR

CORPS OF ENGINEERS 7400 LEAKE AVENUE

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P823B0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

RESPONSES TO PRIOR QUESTIONS

*Questions are numbered sequentially across all amendments

Q77. 31 23 00.00 12 Paragraph 3.2 states, “Material excavated from the existing dune shall be used in backfill”.

Will Contractors be allowed to use excess excavated material to fill the dune template in areas outside of the clay core dune construction area?

R77. Yes.

Q78. From Amendment # 5 - R56 Per note on the sheet, the existing conditions may vary due to the gulf environment. If the existing conditions are below the required grade during the preconstruction surveys, the contractor will be required to build the required dune and beach sand template at these stations. After the Preconstruction Survey, if elevations differ and cause additional quantities than what is shown in cross sections plans will there be an equitable adjustment provided to contractor for the “1 - Job” item Excavation?

R78. No.

(End of Summary of Changes)