This solicitation is for a firm fixed price construction contract to repair damage from Hurricane Ida to the Grand Isle dune in Louisiana. The work consists of excavation and fill to construct a new clay core in the dune, placement of geotextile and clay materials, installation of sand cover, and ancillary work including dune planting, sand fencing, timber crossings and armored critical access barriers. The estimated value of the contract is between $25 million and $100 million. Questions regarding this solicitation from the U.S. Army Corps of Engineers New Orleans District are due by June 6, 2023. Bids for the unrestricted procurement must be submitted considering the North American Industry Classification System code 237990. Interested vendors are encouraged to register on the System for Award Management and Beta SAM websites. The contract specialists for this opportunity are Calvin Fogle and Margaret C. Maine and may be contacted via the information provided.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P823B0022
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered Solicitation for Grand Isle and Vicinity, LA, Hurricane Ida Repairs, Dune and Beach Construction, Jef ferson Parish, Louisiana has been amended to:
a) Provide updated plans and specif ications.
b) Provide answ ers to prior submitted questions.
c) All questions are due NLT 11:00AM CST on Aug 01, 2023
e) Bid submission date changed to August 10, 2023, at 10:30AM CST.
f) Provide Virtual Bid opening instructions.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823B0022
X 9B. DATED (SEE ITEM 11)
23-May-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jul-2023
CODE
CONTRACTING DIV-PROJ EAST BR
CORPS OF ENGINEERS 7400 LEAKE AVENUE
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P823B0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
BID SUBMISSION INSTRUCTIONS
VIRTUAL BID OPENING:
ALL BID OPENINGS WILL BE VIRTUAL ONLY. NO PHYSICAL ATTENDANCE IS AUTHORIZED FOR THIS IFB.
The Bid Opening is currently scheduled for Thursday, August 10, 2023, at 11:30PM CST. The Contracting Officer and Contract Specialist will begin downloading bids at 10:30 AM CST, which is the bid receipt cutoff time. All bids received after 10:30 AM CST on Thursday, August 10, 2023, will be considered late.
Audio Teleconference Bid Opening Information:
Bid Opening will be held on Thursday, August 10, 2023, at 11:30PM CST. Please use the following information to attend the meeting:
Join from the meeting link https://usace1.webex.com/usace1/j.php?MTID=m059af41ef218c4cca390edd4bfff5948
Join by meeting number
Meeting number (access code): 2762 631 3241
Meeting password: wbFutTm6*25
Join by phone
+1-844-800-2712 US Toll Free
+1-669-234-1177 US Toll
Following the conclusion of the bid opening, in accordance with FAR 14.403(b), abstracts of offers for unclassified acquisitions shall be available for public inspection via SAM.GOV.
RESPONSES TO QUESTIONS
Responses to Questions Amendment 0005:
*QUESTIONS ARE NUMBERED CONTINUOUSLY AMONG ALL AMENDMENTS
Q5. Do either borrow areas have a disturbance limitation?
R5. The requirements are shown in Section 35 20 23.00 12, paragraphs 3.1.4.
Q6. Does the contractor need to completely exhaust the Barataria Borrow Pit to ‐16’ before moving to the Caminada Borrow Pit?
R6. Yes. Note 5 on sheet C‐01 has been revised to state “THE CONTRACTOR IS REQUIRED TO
COMPLETELY EXHAUST THE BARATATRIA BORROW SITE PRIOR TO MOVING TO THE CAMINADA
BORROW SITE, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.”
Q7. What date were the surveys taken of the borrow areas?
R7. Borrow area surveys were taken in November 2021.
Q8. Due to the complexity of the project, please consider postponing the bid date.
R8. See SF 30 Amendment 0005 for Bid Date.
Q9. Can the government provide the lump sum qtys?
R9. No.
Q10. Can the Government provide the end areas/cy of the anticipated excavation?
R10. No..
Q11. Sheet C‐22‐ Clay Core Phase 1 states stockpile material is allowed to be left in place if the material is free of debris. Can the contractor assume for bidding purposed the material is free of debris? If not, how much debris should the contractor anticipate (no way to quantify this)?
R11. No assumption should be made that the material is free of debris. Along the entire clay core alignment, there will be existing geotextiles and supersacks that will be required to be removed. The supersacks are 3’x3’ and are stacked 3 bottom, 2 top pyramid along the length of supersack. See notes in Sheet C‐01 for limits of existing conditions. This information has been added to sheet C‐01, note 2.
Q12. Please provide additional details (size/type) of the ‘Earth Anchors’ referenced in the Geotextile
Overlap Details on sheet C‐22.
R12. See revised edits to the specifications.
Q13. If geotextiles (geotubes or super‐sacks) are present below elevation +5 in the new berm alignment, does this material need to be removed prior to construction of the new clay core? And if so, to what depth?
R13. Per Specifications Section 31 05 19.04 12, The Contractor shall prepare the surface to receive the geotextile to insure that the surface is relatively smooth and free of obstructions, depressions, debris, soft or low density pockets of material, or stone which could damage the geotextile during placement.”
Any supersack or geotube would be considered debris.
Q14. Please confirm that no stitching/sewing is required along the geotextile ‘Operlap’ areas
(perpendicular to the berm centerline).
R.14 No stitching is required at the overlaps. Anchoring is required at the overlaps.
Q15. Are ‘Earth Anchors’ required at the base of the new clay core (at the geotextile overlap areas)?
The Geotextile Overlap Details on sheet C‐22 appears to show the earth‐anchor layout for the TOP of the new clay core. But nothing is shown for the bottom section (prior to placement of clay material).
R15. Earth anchors are not required at the base of the new core.
Q16. Part 3.1 (Geotextile Installation) of section 31 05 19.04 12 (Separator Geotextile) indicates that ALL geotextile is to be covered by the end of each workday. For fills that are not complete at the end of each workday, is it acceptable to leave the 10‐foot land‐size strip, and the 50‐foot gulf‐side roll uncovered overnight (see ‘Clay Core Phase II – Line Foundation with Geotextile’ detail on sheet C‐22)?
R16. No. Section 31 05 19.04 12, Paragraph 3.1 states “The work shall be scheduled so that all of the geotextile that is placed is covered with a layer of the specified material by the end of each workday.”
Q17. Please confirm that the work restrictions listed in Part 3.3.6 (Embankment Work Advance) of section 31 24 00.00 12 (Embankment – Clay – Amendment 0001) only apply to the Clay embankment work and does not include the sand placement/embankment activities.
R17. The work restrictions apply to the clay embankment work only.
Q18. Please confirm that the work restrictions listed in Part 3.7 (Phased Work Limit) of section 01 57
20.01 12 (Environmental Protection) only apply to the Clay embankment work and does not include the
Sand placement/embankment activities.
R18. As stated in paragraph 3.7, the restrictions apply to clearing and grubbing, excavating, and filling, and geotextile and clay placement.
Q19. Amendment 1 included additional cross‐sections for added Dune length (STA 362+00 to 378+33).
However, Amendment 2 adjusted the slope of the beach section, but only provided revised cross‐ sections up to STA 362+00. Additionally, each amendment has a cross‐section provided for STA 360+00, and they are not similar. Please advise which cross‐section should be used for STA 360+00, and whether revised cross‐sections for STA 362+00 to 378+33 are forthcoming (showing the change in slope of the beach section).
R19. New sheet C‐37 is attached.
Q20. Plan sheet S‐102 shows the boardwalk being built over the existing stone core of the dune. The span between the piles at that location is 16’‐0”. Please confirm that the stone core will be narrower than 16’‐0” so that timber piles can be installed. If the stone core is in conflict with the pile locations, please specify what measures the contractor must take in order to drive the piles.
R20. If stone is present at the pile driving location, the contractor may remove the stone to drive the pile. The removed stone shall be placed adjacent to the pile.
Q21. Will jetting or augering of the timber piles into the sand dune be allowed? The sand that the dune is constructed of will restrict driving with an impact hammer and may damage the timber piles.
R21. Jetting of the timber piles will be allowed.
Q22. There are still parts of the existing boardwalk standing on the beach. Will this be removed prior to this contract’s mobilization, or do bidding contractors need to figure demolition of the remaining boardwalk? If so, which bid item should that be included on?
R22. It is expected there will be existing timber on site due to the existing boardwalk standing on the beach. The remains of the existing boardwalk are considered part of abandoned structures. Section 31
11 00.00 12 Clearing and Grubbing, Paragraph 3.2.1 states “Clearing, unless otherwise specified, shall consist of the complete removal above the ground surface of all trees, stumps, down timber snags, brush, vegetation, loose stone, abandoned structures, fencing, and similar debris.”
Q23. Please provide "Dune Centerline Coordinate Tabulation"
R23. Dune Centerline Coordinate Tabulation is provided on sheet G‐03.
Q24. Will the contractor be restricted to specific access locations for clay embankment import?
R24. See additions to the specifications.
Q25. Does the Corps have available areas within the Right of Way in which clay embankment materials may be stockpiled?
R25. Clay embankment may be stockpiled within the right of way no higher than 13.5’ NAVD88. No areas outside of the right of way are provided by the government.
Q26. Will silt fencing be required in any areas along the project construction alignment?
R26. The Contractor shall determine if silt fencing is needed to be in compliance with Section 01 57
20.01 12 Environmental Protection.
Q27. Will the contractor be responsible to "re‐route" tourists visiting the beach during reconstruction of the timber walkway?
R27. The Contractor is responsible for preparing a safety plan which should include consideration for restricting public access into the right‐of‐way. The Contractor should consider the popularity of the beach area and plan accordingly. The Contractor will be responsible for denying public access to areas of construction until acceptance of the project feature. Specifications for a safety fence have been added.
Q28. There are approximately 20 existing recreational vehicle crossings spaced throughout the project alignment. The Town of Grand Isle issues a recreational tag at a purchase price that is valid for the period of 1 year. Has any consideration been made for patrons wishing to access the beach with a recreational vehicle during the course of this project? Will the contractor be responsible for restricting recreational vehicle access outside of the designated and proposed emergency vehicle crossings? Will the contractor be responsible for repair of the dune should patrons choose to access the beach with recreational vehicles and alter the completed section of dune?
R28. See response to R27. The Contractor will be responsible for denying public access to areas of construction until acceptance of the project feature. Specifications for a safety fence have been added.
Q29. The specifications do not present a clear answer on the whether the contractor can stockpile clay material onsite for the reloading and placing within needed limits. Typical USACE projects prohibit stockpiling of any material unless clearly specified as acceptable practice. Can you please confirm?
R29. Clay embankment may be stockpiled within the right of way no higher than 13.5’ NAVD88. No areas outside of the right of way are provided by the government.
Q30. Working time limitations. Will there be any limits on the hours we work?
R30. Section 01100, Paragraph 12 states the permissible hours of work.
Q31. In regards to insurance, will sub‐contractors be required to have marine insurance due to the work area in which we will be working in?
R31. The contractor is required to maintain vessel collision liability and protection, and indemnity liability insurance under this contract.
Q32. Sheet S‐102 has a callout "New 30' Piles at C/L of Walkway; See Note 3". Note 3 is not provided on
Sheet S‐102.
R32. See revised sheet S‐102. There is no note 3.
Q33. The pay quantity for CLIN 0013 Emergency Vehicle Crossings is 4 EA, however, Plan Sheet C‐48 does not have any dimensions shown and it is not drawn to scale. Please provide the square yards of articulated concrete blocks that the government included in their estimate.
R33. Concur. See revised sheet C‐48 with dimensions.
Q34. The specifications state existing construction will be occurring on the western end of the dune alignment. When is the anticipated completion date of this construction?
R34. The existing contract has a current completion date of 11 December 2023. This date may be further extended by contract time growth.
Q35. Sea Oats have been historically hard to get. If this is the case, will Bitter Panicum be substituted?
R35. The specifications provide a list of commercial producers. No change to the specifications.
Q36. Will Lidar Drone data for the before surveys be accepted?
R36. No.
Q37. If possible, please provide x,y,z data of the borrow areas.
R37. Borrow Area xyz data is provided for reference only. Sheets C‐38 to C‐47 provide borrow area information.
Q38. Please provide all original core logs for the borings provided in the plans.
R38. Boring Logs are provided. Sheets B‐01 through B‐12 provide boring information.
Q39. Please provide all available sieve curves. The sieve curves provided in the specifications are below the dredging template depths.
R39. All available data is provided.
Q40. Please consider allowing a tolerance of 1’ above and below the dredging template.
R40. A tolerance below the dredging template is not allowed.
Q41. Is excavation allowed below ‐16’ in the Barataria Borrow Pit and below ‐20’ in the Caminada
Borrow Pit?
Q41. See R5. The requirements are shown in Section 35 20 23.00 12, paragraphs 3.1.4.
Q42. According to the average rainfall in the Grand Isle area per month, the average per week in the optimal planting time range (October‐April) is roughly 0.9607 inches of rain per week. Is this a sufficient amount of rainfall per week to assume watering of the plants will not be necessary during this optimal planting timeframe?
R42. Specifications Section 32 92 19.04 12, Paragraph 3.7 state the water application requirements. The
Contractor shall bid according to the specifications.
Q43. Per specification SECTION 32 92 19.04 12 – 3.5 FERTILIZER APPLICATION it states that the contractor will be required to perform 3 fertilizer applications, one of which takes place within 30 days after planting and the remaining two at 6‐week intervals with a pelleted or granular form of fertilizer.
There are fertilizer planting tablets that have shown great success with Bitter Panicum & Sea Oats that would be less invasive and more concentrated to each plant rather than broadcasting pellets/granules across the site and potentially damaging to the plants with broadcasting operation requirements. Would the substitution of granules/pellets to tablets be approved for fertilizing of the project site?
R43. There will be no change in the fertilizer application specification.
Q44. Specification SECTION 32 92 19.04 12 ‐‐ 1.11.2 Sequence of Work states that at no time shall such fertilizing, and planting operations be more than 14 days behind completed portions of dune unless approved by the Contracting Office. What percentage of dune completion will the contractor be held to plant within the 14 days upon approval of the CO/COR? If the allotted portion of the dune that is complete and approved for planting but outside of the optimal planting window, will it be approved for to wait for an optimal planting window to install the plants?
R44. When suitable reaches of dune and beach receive approval of the final compliance surveys, planting operations shall not be more than 14 days behind each of these completed portions of dune and beach.
Q45. Section 31 23 00 00 Paragraph 3.2 “Degrading Existing Dune” starts at Station 22+00 and ends at
Station 233+00. This is approximately 21,000 LF where the clay core will be placed. If tandem trucks are bringing this offsite material onsite, where can they enter and exit the jobsite? Specification 31 24 00 00
Paragraph 3.3.9 “Local Roads” states local roads can be used but maintained throughout and restored to its pre‐construction condition. The drawings show 4 emergency vehicles crossing. There is also multiple atv/utv crossing with orange signs. Is the contractor allowed to use just local roads for entering and exiting the jobsite, or can both the emergency crossings as well as the atv/utv crossings allowed for entering and exiting the jobsite?
R45. See additions to the specifications.
Q46. SECTION 31 11 00.00 12 Clearing and Grubbing Paragraph 3.2.3 “Vegetation” says vegetation shall be removed from any area receiving excavation (Station 22+00 to 233+00). Paragraph 3.2.4 “Areas to be
Cleared” states entire area to be occupied by embankment within the right of way are to be cleared.
Station 0+00 to 22+00 and 233+00 to 378+00 have no excavation, just sand fill. Do these areas need to have vegetation removed or sand just placed on top of existing ground?
R46. Vegetation does not need to be removed in areas where excavation is not occurring.
Q47. SECTION 31 23 00.00 12 Excavation Paragraph 3.2 “Degrading Existing Dune” states that any material excavated from the dune shall be used in the backfill (Station 22+00 to233+00). If there is no excavation of the sand dune (Station 0+00 to 22+00 and 233+00 to378+00), is it the Government’s intention for the sand fill in these areas to come from the dredge borrow area.
R47. Yes.
Q48. We request the "Offers Due Date" be extended to July 6, 2023 with respect to solicitation
W912P823B0039 with the New Orleans District also currently having an "Offers Due Date" of June 29, 2023.
R48. See SF 30 Amendment 0005 for Bid Date.
Q49. Please provide a copy of the detailed Government estimated quantities for CLINs that are bidding on a JOB basis.
R49. See R9.
Q50. Does drawing C‐37 issued in Amendment 1 supersede drawing C‐37 in Amendment 2? Please confirm which is the correct one to utilize?
R50. See R19.
Q51. ON sheet C‐26 Rev 1 ‐ Station 35+00 the beach side Proposed profile intersects the existing beach at approximately 295 but continues downward to nearly 410. Are we to terminate at the 295 mark or should we excavate down until we get to the 410 mark?
R51. If existing ground is higher than design template, no excavation is required.
Q52. On Sheet C‐28 Rev 1 ‐ Station 105+00 is missing complete proposed Dune and Beach Sand elevation lines working towards the Land side from the top of the dune. Please provide complete proposed elevation lines.
R52. Concur. See Revised sheet C‐28.
Q53. On Sheet C‐29 Rev 1 ‐ Station 135+00 is missing complete proposed Dune and Beach Sand elevation lines working towards the Land side from the top of the dune. Please provide complete proposed elevation lines.
R53. Concur. See Revised sheet C‐29.
Q54. On Sheet C‐30 Rev 1 ‐ Stations 160+00, 170+00 & 175+00 are missing complete proposed Dune and
Beach Sand elevation lines working towards the Beach side from the top of the dune. Please provide complete proposed elevation lines.
R54. Concur. See revised sheet C‐30.
Q55. On Sheet C‐31 Rev 1 ‐ All Stations on this page except 200+00 are missing complete proposed Dune and Beach Sand elevation lines working towards the Beach side from the top of the dune. Please provide complete proposed elevation lines.
R55. The dune and beach sand template at these stations are shown in areas where sand will need to be placed according to surveys taken in December 2021. If no template is shown, the existing dune and beach at the time of the survey met the required grade. Per note on the sheet, the existing conditions may vary due to the gulf environment. If the existing conditions are below the required grade during the preconstruction surveys, the contractor will be required to build the required dune and beach sand template at these stations.
Q56. On Sheet C‐32 Rev 1 ‐ All Stations on this page except 215+00 are missing complete proposed Dune and Beach Sand elevation lines working towards the Land & Beach side from the top of the dune. Please provide complete proposed elevation lines.
R56. The dune and beach sand template at these stations are shown in areas where sand will need to be placed according to surveys taken in December 2021. If no template is shown, the existing dune and beach at the time of the survey met the required grade. Per note on the sheet, the existing conditions may vary due to the gulf environment. If the existing conditions are below the required grade during the preconstruction surveys, the contractor will be required to build the required dune and beach sand template at these stations.
Q57. On Sheet C‐33 Rev 1 ‐ All Stations on this page are missing complete proposed Dune and Beach
Sand elevation lines working towards the Land & Beach side from the top of the dune. Please provide complete proposed elevation lines.
R57. The dune and beach sand template at these stations are shown in areas where sand will need to be placed according to surveys taken in December 2021. If no template is shown, the existing dune and beach at the time of the survey met the required grade. Per note on the sheet, the existing conditions may vary due to the gulf environment. If the existing conditions are below the required grade during the preconstruction surveys, the contractor will be required to build the required dune and beach sand template at these stations.
Q58. On Sheet C‐34 Rev 1 ‐ All Stations on this page are missing complete proposed Dune and Beach
Sand elevation lines working towards the Land & Beach side from the top of the dune. Please provide complete proposed elevation lines.
R58. The dune and beach sand template at these stations are shown in areas where sand will need to be placed according to surveys taken in December 2021. If no template is shown, the existing dune and beach at the time of the survey met the required grade. Per note on the sheet, the existing conditions may vary due to the gulf environment. If the existing conditions are below the required grade during the preconstruction surveys, the contractor will be required to build the required dune and beach sand template at these stations.
Q59. On Sheet C‐36 Rev 1 ‐ Station 340+00 is missing complete proposed Dune and Beach Sand elevation lines working towards the Land side from the top of the dune. Please provide complete proposed elevation lines.
R59. The dune and beach sand template at these stations are shown in areas where sand will need to be placed according to surveys taken in December 2021. If no template is shown, the existing dune and beach at the time of the survey met the required grade. Per note on the sheet, the existing conditions may vary due to the gulf environment. If the existing conditions are below the required grade during the preconstruction surveys, the contractor will be required to build the required dune and beach sand template at these stations.
Q60. On Sheet C‐37 Rev 4 Station 370+00 is missing complete proposed Dune and Beach Sand elevation lines working towards the Land side & Beach Side from the top of the dune. Please provide complete proposed elevation lines.
R60. The dune and beach sand template at these stations are shown in areas where sand will need to be placed according to surveys taken in December 2021. If no template is shown, the existing dune and beach at the time of the survey met the required grade. Per note on the sheet, the existing conditions may vary due to the gulf environment. If the existing conditions are below the required grade during the preconstruction surveys, the contractor will be required to build the required dune and beach sand template at these stations.
Q61. On Sheet C‐48 Emergency Crossing details, the supplier states that there is not enough information given to determine the quantity of block needed to price the project accurately. Can you please provide more information to calculate the total area of block needed at each crossing?
R61. See R33. Concur. See revised sheet C‐48 with dimensions.
Q62. SECTION 31 23 00.00 12 Excavation Paragraph 3.2 “Degrading Existing Dune” states that any material excavated from the dune shall be used in the backfill (Station 22+00 to 233+00). If there is no excavation of the sand dune (Station 0+00 to 22+00 and 233+00 to 378+00), is it the Government’s intention for the sand fill in these areas to come from the dredge borrow area? Or is it the
Government’s intention to excavate sand from the berm that is already above template to build the levee and any additional sand volume needed will then come from the dredge borrow area? If so, the amount of vegetation that will need to be removed in this area will be a huge volume of cubic yards that will need to hauled off, which will be a very expensive cost.
R62. It is not the Government’s intention for contractors to excavate sand that’s already above design template. Sand backfill will come from either material excavated from the dune or from the dredge borrow area. The contractor is responsible for removing the resulting vegetation quantity.
Q63. A note on sheet B‐01 of the plans along with notes on the log sheets and a “(U)” next to the coordinates at the top of the log suggest that borings were taken with 5" piston sampler. However, a different note on sheet B‐01 and the items in parentheses along and to the right of the boring logs suggest that the borings were taken with SPT sampling. The relevant notes are as follows:
i. From notes on sheet B‐01: "Undisturbed borings, indicated by the letter "U", are taken with a 5" I.D.
Piston Type Sampler"
ii. From notes on sheet B‐01: "FIGURES TO RIGHT OF BORING... Figures in parenthesis are driving resistances in blows per foot determined with a standard split spoon sampler (1‐3/8" I.D., 2" O.D.) and a
140 lb. driving hammer with a 30" drop."
The two types of boring methodology are contradictory. Which method was used to perform these borings? If borings were taken with a 5" piston sampler, what is the meaning of the figures in parentheses to the right of the boring? If borings were taken with SPT sampling, what is the meaning of the explicit statement on the logsheets that borings were taken with a piston sampler? If the borings were taken with both SPT and piston sampling, please explain how this was done as the original logs are not provided.
R63. Borings were taken with SPT. Note on sheet B‐01 is revised.
Q64. Section 31 24 00.00 13 – Paragraph 3.1 – Dune Foundation Preparation states, “The base of the dune shall be constructed such that the entire footprint to be repaired is filled with sand to an elevation at least one (1) foot above water surface. The Contractor shall exercise caution when placing sand over the existing stone core, clay core, and existing apron and anchor tubes to avoid additional damage. The entire reach shall be compacted with five passes of the dozer before placing subsequent lifts of the dune.” What are the limits of the base of the dune that shall be compacted prior to placing subsequent lifts of the dune?
R64. In areas with existing water.
Q65. Will compaction be required for sand that is hydraulically placed with the dredge pipeline?
R65. Yes. Specifications Section 31 24 00.00 13, Paragraphs 3.1 and 3.2 specify compaction requirements.
Q66. Section 35 20 23.00 12 – Paragraph 3.1.4 – Borrow Dimensions states, “The borrow pit shall be dredged to the required dimensions shown on the contract drawings. An allowable tolerance of one (1) foot above the dredge bottom cut elevation of ‐20.0' NAVD88 shall be allowed.” Please confirm the required dimensions for the borrow pits, is the maximum depth in the example stated ‐20.0’ NAVD88 plus 1.0’ of tolerance (‐21.0’ NAVD88) or is it ‐19.0’ NAVD88 plus 1.0’ of tolerance(‐20.0’ NAVD88)?
R66. The allowable tolerance of one foot is above the dredge bottom cut elevation, as stated in the spec section quoted. Therefore, Maximum depth is ‐20’ for Caminada Borrow Pit where the tolerance allows to ‐19’, and maximum depth is ‐16’ for Barataria Borrow Pit where tolerance allows to ‐15’.
Q67. Section 31 21 00.00 13 – Embankment – Sand Will Contractor’s be allowed to stockpile sand for the borrow pits along the existing beach prior to mechanically placing the material within the required dune
& beach templates?
R67. Yes. Sand may be stockpiled on the beach prior to shaping. Disposal operations shall comply with
Specification Section 35 20 23.00 12, Paragraph 3.3.
Q68. SF1442 – Note 13 Considering the complexity of this project along with the extensive coordination required between Prime & Subcontractors, we would like to respectfully request a four week extension to the bid date.
R68. See R48. Per Amendment 0004, the bid submission date was extended to August 3, 2023.
Q69. Plan Sheets C‐45 to 47 & C‐39 to C‐43 Please provide the survey dates for the cross sections provided for the Barataria Borrow Pit and Caminada Borrow Pit.
R69. See R7. Borrow area surveys were taken in November 2021.
Q70. Plan Sheet C‐01, Note #5 states, “The Contractor is required to use the Barataria Borrow Site as the primary borrow, unless directed by the Contracting Officer. Will Contractors be allowed to dredge the
Caminada Borrow Pit prior to moving to the Barataria Borrow Site?
R70. No. See R6. Per sheet C‐01, Note 5: THE CONTRACTOR IS REQUIRED TO USE THE BARATARIA
BORROW SITE AS PRIMARY BORROW, UNLESS DIRECTED BY THE CONTRACTING OFFICER.
Q71. Section 00010 – Bidding Schedule, Notes state, “The variation in estimated quantities clause is applicable only to item No. 0007.” Considering the dynamic nature of beach construction, the quantities required for CLIN 0008 – Dune and Beach Sand Fill have the potential to vary from the current advertised quantity of 700,000 CY. Due to the variability of this CLIN, we would like to request that CLIN
0008 also be included in the variation in estimated quantities clause.
R71. The clause in question is in reference to the subline item only. All unit priced items are subject to the Variations in Estimated Quantity Clause.
Q72. Section 35 20 23.00 Paragraph 3.3.5 Work in the Vicinity of other Government Contractors Can the
Government provide any schedule updates for the Contractor that is currently working in the vicinity placing stone?
R72. See R34.
Q73. Does the Government anticipate that there will be other Contractors working in the project vicinity that may impede access to the project site during the execution of this contract?
R73. Yes, there will be another contractor within the ROW during the execution of this contract.
Q74. Section 35 20 23.00 Paragraph 3.2.4 states, “No dredged material shall be discharged directly within 100 feet of any structure or utility.” Does this specification apply to the breakwaters or any underground utilities within the project scope?
R74. This applies to any above ground structure or utility. See revision to specifications.
Barataria Borrow XYZ
217358,276975.34,3722941.09,‐7.84,SND
217359,276990.56,3722960.92,‐7.87,SND
217360,277005.78,3722980.75,‐7.91,SND
217361,277021.01,3723000.58,‐7.79,SND
217362,277036.23,3723020.41,‐7.86,SND
217363,277051.46,3723040.24,‐7.87,SND
217364,277066.68,3723060.07,‐7.85,SND
217365,277081.91,3723079.90,‐7.82,SND
217366,277097.13,3723099.73,‐7.87,SND
217367,277112.35,3723119.56,‐7.88,SND
217368,277127.58,3723139.39,‐7.88,SND
217369,277142.80,3723159.22,‐7.84,SND
217370,277158.03,3723179.05,‐7.89,SND
217371,277173.25,3723198.87,‐7.92,SND
217372,277188.48,3723218.70,‐7.88,SND
217373,277203.70,3723238.53,‐7.88,SND
217374,277218.93,3723258.36,‐7.84,SND
217375,277234.15,3723278.19,‐7.87,SND
217376,277249.37,3723298.02,‐7.92,SND
217377,277264.60,3723317.85,‐7.88,SND
217378,277279.82,3723337.68,‐7.97,SND
217379,277295.05,3723357.51,‐7.94,SND
217380,277310.27,3723377.34,‐7.98,SND
217381,277325.50,3723397.17,‐8.00,SND
217382,277340.72,3723417.00,‐8.06,SND
217383,277355.94,3723436.83,‐8.10,SND
217384,277371.17,3723456.66,‐8.08,SND
217385,277386.39,3723476.49,‐8.11,SND
217386,277401.62,3723496.32,‐8.21,SND
217387,277416.84,3723516.15,‐8.26,SND
217388,277432.07,3723535.98,‐8.30,SND
217389,277447.29,3723555.81,‐8.40,SND
217390,277462.51,3723575.64,‐8.41,SND
217391,277477.74,3723595.47,‐8.41,SND
217392,277492.96,3723615.30,‐8.53,SND
217393,277508.19,3723635.13,‐8.57,SND
217394,277523.41,3723654.96,‐8.54,SND
217395,277538.64,3723674.79,‐8.62,SND
217396,277553.86,3723694.62,‐8.72,SND
217397,277569.08,3723714.45,‐8.84,SND
217398,277584.31,3723734.28,‐8.91,SND
217399,277599.53,3723754.11,‐9.01,SND
217400,277614.76,3723773.94,‐9.08,SND
217401,277629.98,3723793.77,‐9.14,SND
217402,277645.21,3723813.60,‐9.22,SND
217403,277660.43,3723833.43,‐9.22,SND
217404,277675.66,3723853.26,‐9.36,SND
217405,277690.88,3723873.09,‐9.47,SND
217406,277706.10,3723892.92,‐9.56,SND
217407,277721.33,3723912.75,‐9.66,SND
217408,277736.55,3723932.58,‐9.75,SND
217409,277751.78,3723952.41,‐9.89,SND
217410,277767.00,3723972.24,‐10.00,SND
217411,277782.23,3723992.07,‐10.10,SND
217412,277797.45,3724011.90,‐10.20,SND
217413,277812.67,3724031.72,‐10.33,SND
217414,277827.90,3724051.55,‐10.39,SND
217415,277843.12,3724071.38,‐10.52,SND
217416,277858.35,3724091.21,‐10.54,SND
217417,277873.57,3724111.04,‐10.75,SND
217418,277888.80,3724130.87,‐10.85,SND
217419,277904.02,3724150.70,‐10.88,SND
217420,277919.24,3724170.53,‐11.11,SND
217421,277934.47,3724190.36,‐11.23,SND
217422,277949.69,3724210.19,‐11.37,SND
217423,277964.92,3724230.02,‐11.49,SND
217424,277980.14,3724249.85,‐11.62,SND
217425,277995.37,3724269.68,‐11.76,SND
217426,278010.59,3724289.51,‐11.90,SND
217427,278025.82,3724309.34,‐12.02,SND
217428,278041.04,3724329.17,‐12.15,SND
217429,278056.26,3724349.00,‐12.34,SND
217430,278071.49,3724368.83,‐12.47,SND
217431,278086.71,3724388.66,‐12.64,SND
217432,278101.94,3724408.49,‐12.76,SND
217433,278117.16,3724428.32,‐12.94,SND
217434,278132.39,3724448.15,‐13.12,SND
217435,278147.61,3724467.98,‐13.32,SND
217436,278162.83,3724487.81,‐13.54,SND
217437,278178.06,3724507.64,‐13.71,SND
217438,278193.28,3724527.47,‐13.91,SND
217439,278208.51,3724547.30,‐14.12,SND
217440,278223.73,3724567.13,‐14.37,SND
217441,278238.96,3724586.96,‐14.59,SND
Barataria Borrow XYZ 1
217442,278254.18,3724606.79,‐14.82,SND
217443,278269.40,3724626.62,‐14.96,SND
217444,278284.63,3724646.45,‐15.14,SND
217445,278299.85,3724666.28,‐15.35,SND
217446,278315.08,3724686.11,‐15.57,SND
217447,278330.30,3724705.94,‐15.83,SND
217448,278345.53,3724725.77,‐15.98,SND
217449,278360.75,3724745.60,‐16.27,SND
217450,278375.97,3724765.43,‐16.42,SND
217451,278391.20,3724785.26,‐16.59,SND
217452,278406.42,3724805.09,‐16.75,SND
217453,278421.65,3724824.92,‐17.01,SND
217454,278436.87,3724844.75,‐17.11,SND
217455,278452.10,3724864.57,‐17.38,SND
217456,278467.32,3724884.40,‐17.47,SND
217457,278482.55,3724904.23,‐17.52,SND
217458,278497.77,3724924.06,‐17.72,SND
217459,278512.99,3724943.89,‐17.73,SND
217460,278528.22,3724963.72,‐17.80,SND
217461,278543.44,3724983.55,‐17.90,SND
217462,278558.67,3725003.38,‐18.09,SND
217463,278573.89,3725023.21,‐18.12,SND
217464,278589.12,3725043.04,‐18.21,SND
217465,278604.34,3725062.87,‐18.37,SND
217466,278619.56,3725082.70,‐18.39,SND
217467,278634.79,3725102.53,‐18.57,SND
217468,278650.01,3725122.36,‐18.61,SND
217469,278665.24,3725142.19,‐18.76,SND
217470,278680.46,3725162.02,‐18.75,SND
217471,278695.69,3725181.85,‐18.77,SND
217472,278710.91,3725201.68,‐18.83,SND
217473,278726.13,3725221.51,‐18.79,SND
217474,278741.36,3725241.34,‐18.90,SND
217475,278756.58,3725261.17,‐18.93,SND
217476,278771.81,3725281.00,‐19.02,SND
217477,278787.03,3725300.83,‐18.99,SND
217478,278802.26,3725320.66,‐19.20,SND
217479,278817.48,3725340.49,‐19.58,SND
217480,278832.71,3725360.32,‐19.61,SND
217481,278847.93,3725380.15,‐19.78,SND
217482,278863.15,3725399.98,‐19.92,SND
217483,278878.38,3725419.81,‐20.06,SND
217484,278893.60,3725439.64,‐20.08,SND
217485,278908.83,3725459.47,‐20.05,SND
217486,278924.05,3725479.30,‐20.04,SND
217487,278939.28,3725499.13,‐19.97,SND
217488,278954.50,3725518.96,‐19.98,SND
217489,278969.72,3725538.79,‐20.09,SND
217490,278984.95,3725558.62,‐20.10,SND
217491,279000.17,3725578.45,‐20.15,SND
217492,279015.40,3725598.28,‐20.19,SND
217493,279030.62,3725618.11,‐20.30,SND
217494,279045.85,3725637.94,‐20.24,SND
217495,279061.07,3725657.77,‐20.28,SND
217496,279076.29,3725677.60,‐20.38,SND
217497,279091.52,3725697.42,‐20.50,SND
217498,279106.74,3725717.25,‐20.56,SND
217499,279121.97,3725737.08,‐20.59,SND
217500,279137.19,3725756.91,‐20.56,SND
217501,279152.42,3725776.74,‐20.56,SND
217502,279167.64,3725796.57,‐20.65,SND
217503,279182.86,3725816.40,‐20.74,SND
217504,279198.09,3725836.23,‐20.70,SND
217505,279213.31,3725856.06,‐20.79,SND
217506,279228.54,3725875.89,‐20.81,SND
217507,279243.76,3725895.72,‐20.90,SND
217508,279258.99,3725915.55,‐20.86,SND
217509,279274.21,3725935.38,‐20.90,SND
217510,279289.44,3725955.21,‐20.96,SND
217511,279304.66,3725975.04,‐20.93,SND
217512,279319.88,3725994.87,‐20.98,SND
217513,279335.11,3726014.70,‐20.97,SND
217514,279350.33,3726034.53,‐20.96,SND
217515,279365.56,3726054.36,‐21.06,SND
217516,279380.78,3726074.19,‐21.11,SND
217517,279396.01,3726094.02,‐21.08,SND
217518,279411.23,3726113.85,‐21.05,SND
217519,276182.14,3723550.07,‐8.29,SND
217520,276197.37,3723569.90,‐8.35,SND
217521,276212.59,3723589.73,‐8.29,SND
217522,276227.82,3723609.56,‐8.21,SND
217523,276243.04,3723629.39,‐8.28,SND
217524,276258.27,3723649.22,‐8.42,SND
217525,276273.49,3723669.04,‐8.46,SND
Barataria Borrow XYZ 2
217526,276288.72,3723688.87,‐8.57,SND
217527,276303.94,3723708.70,‐8.52,SND
217528,276319.16,3723728.53,‐8.59,SND
217529,276334.39,3723748.36,‐8.52,SND
217530,276349.61,3723768.19,‐8.57,SND
217531,276364.84,3723788.02,‐8.54,SND
217532,276380.06,3723807.85,‐8.58,SND
217533,276395.29,3723827.68,‐8.62,SND
217534,276410.51,3723847.51,‐8.63,SND
217535,276425.74,3723867.34,‐8.69,SND
217536,276440.96,3723887.17,‐8.66,SND
217537,276456.18,3723907.00,‐8.77,SND
217538,276471.41,3723926.83,‐8.83,SND
217539,276486.63,3723946.66,‐8.83,SND
217540,276501.86,3723966.49,‐8.86,SND
217541,276517.08,3723986.32,‐8.90,SND
217542,276532.31,3724006.15,‐8.98,SND
217543,276547.53,3724025.98,‐9.00,SND
217544,276562.75,3724045.81,‐8.99,SND
217545,276577.98,3724065.64,‐9.14,SND
217546,276593.20,3724085.47,‐9.17,SND
217547,276608.43,3724105.30,‐9.23,SND
217548,276623.65,3724125.13,‐9.28,SND
217549,276638.88,3724144.96,‐9.29,SND
217550,276654.10,3724164.79,‐9.33,SND
217551,276669.33,3724184.62,‐9.45,SND
217552,276684.55,3724204.45,‐9.51,SND
217553,276699.77,3724224.28,‐9.62,SND
217554,276715.00,3724244.11,‐9.69,SND
217555,276730.22,3724263.94,‐9.76,SND
217556,276745.45,3724283.77,‐9.82,SND
217557,276760.67,3724303.60,‐9.91,SND
217558,276775.90,3724323.43,‐10.00,SND
217559,276791.12,3724343.25,‐10.08,SND
217560,276806.35,3724363.08,‐10.53,SND
217561,276821.57,3724382.91,‐10.19,SND
217562,276836.79,3724402.74,‐10.21,SND
217563,276852.02,3724422.57,‐10.27,SND
217564,276867.24,3724442.40,‐10.34,SND
217565,276882.47,3724462.23,‐10.42,SND
217566,276897.69,3724482.06,‐10.47,SND
217567,276912.92,3724501.89,‐10.60,SND
217568,276928.14,3724521.72,‐10.66,SND
217569,276943.37,3724541.55,‐10.78,SND
217570,276958.59,3724561.38,‐10.91,SND
217571,276973.81,3724581.21,‐10.93,SND
217572,276989.04,3724601.04,‐11.04,SND
217573,277004.26,3724620.87,‐11.09,SND
217574,277019.49,3724640.70,‐11.21,SND
217575,277034.71,3724660.53,‐11.28,SND
217576,277049.94,3724680.36,‐11.41,SND
217577,277065.16,3724700.19,‐11.45,SND
217578,277080.38,3724720.02,‐11.55,SND
217579,277095.61,3724739.85,‐11.66,SND
217580,277110.83,3724759.68,‐11.77,SND
217581,277126.06,3724779.51,‐11.84,SND
217582,277141.28,3724799.34,‐11.92,SND
217583,277156.51,3724819.17,‐12.02,SND
217584,277171.73,3724839.00,‐12.14,SND
217585,277186.96,3724858.83,‐12.27,SND
217586,277202.18,3724878.66,‐12.39,SND
217587,277217.40,3724898.49,‐12.43,SND
217588,277232.63,3724918.32,‐12.56,SND
217589,277247.85,3724938.15,‐12.72,SND
217590,277263.08,3724957.98,‐12.74,SND
217591,277278.30,3724977.81,‐12.90,SND
217592,277293.53,3724997.64,‐13.02,SND
217593,277308.75,3725017.46,‐13.14,SND
217594,277323.98,3725037.29,‐13.26,SND
217595,277339.20,3725057.12,‐13.38,SND
217596,277354.42,3725076.95,‐13.52,SND
217597,277369.65,3725096.78,‐13.63,SND
217598,277384.87,3725116.61,‐14.20,SND
217599,277400.10,3725136.44,‐13.91,SND
217600,277415.32,3725156.27,‐14.04,SND
217601,277430.55,3725176.10,‐14.14,SND
217602,277445.77,3725195.93,‐14.24,SND
217603,277460.99,3725215.76,‐14.30,SND
217604,277476.22,3725235.59,‐14.40,SND
217605,277491.44,3725255.42,‐14.52,SND
217606,277506.67,3725275.25,‐14.55,SND
217607,277521.89,3725295.08,‐14.66,SND
217608,277537.12,3725314.91,‐14.84,SND
217609,277552.34,3725334.74,‐14.98,SND
Barataria Borrow XYZ 3
217610,277567.57,3725354.57,‐15.11,SND
217611,277582.79,3725374.40,‐15.13,SND
217612,277598.01,3725394.23,‐15.29,SND
217613,277613.24,3725414.06,‐15.42,SND
217614,277628.46,3725433.89,‐15.54,SND
217615,277643.69,3725453.72,‐15.67,SND
217616,277658.91,3725473.55,‐15.79,SND
217617,277674.14,3725493.38,‐15.87,SND
217618,277689.36,3725513.21,‐16.03,SND
217619,277704.59,3725533.04,‐16.04,SND
217620,277719.81,3725552.87,‐16.14,SND
217621,277735.03,3725572.70,‐16.30,SND
217622,277750.26,3725592.53,‐16.29,SND
217623,277765.48,3725612.36,‐16.50,SND
217624,277780.71,3725632.19,‐16.55,SND
217625,277795.93,3725652.02,‐16.67,SND
217626,277811.16,3725671.85,‐16.63,SND
217627,277826.38,3725691.68,‐16.64,SND
217628,277841.61,3725711.50,‐16.76,SND
217629,277856.83,3725731.33,‐16.75,SND
217630,277872.05,3725751.16,‐16.80,SND
217631,277887.28,3725770.99,‐16.99,SND
217632,277902.50,3725790.82,‐17.03,SND
217633,277917.73,3725810.65,‐17.16,SND
217634,277932.95,3725830.48,‐17.29,SND
217635,277948.18,3725850.31,‐17.36,SND
217636,277963.40,3725870.14,‐17.32,SND
217637,277978.62,3725889.97,‐17.43,SND
217638,277993.85,3725909.80,‐17.43,SND
217639,278009.07,3725929.63,‐17.47,SND
217640,278024.30,3725949.46,‐17.61,SND
217641,278039.52,3725969.29,‐17.74,SND
217642,278054.75,3725989.12,‐17.72,SND
217643,278069.97,3726008.95,‐17.82,SND
217644,278085.20,3726028.78,‐17.85,SND
217645,278100.42,3726048.61,‐17.84,SND
217646,278115.64,3726068.44,‐17.94,SND
217647,278130.87,3726088.27,‐18.01,SND
217648,278146.09,3726108.10,‐17.96,SND
217649,278161.32,3726127.93,‐18.16,SND
217650,278176.54,3726147.76,‐18.19,SND
217651,278191.77,3726167.59,‐18.29,SND
217652,278206.99,3726187.42,‐18.38,SND
217653,278222.22,3726207.25,‐18.26,SND
217654,278237.44,3726227.08,‐18.40,SND
217655,278252.66,3726246.91,‐18.44,SND
217656,278267.89,3726266.74,‐18.44,SND
217657,278283.11,3726286.57,‐18.44,SND
217658,278298.34,3726306.40,‐18.44,SND
217659,278313.56,3726326.23,‐18.45,SND
217660,278328.79,3726346.06,‐18.46,SND
217661,278344.01,3726365.89,‐18.41,SND
217662,278359.24,3726385.71,‐18.56,SND
217663,278374.46,3726405.54,‐18.43,SND
217664,278389.68,3726425.37,‐18.61,SND
217665,278404.91,3726445.20,‐18.65,SND
217666,278420.13,3726465.03,‐18.54,SND
217667,278435.36,3726484.86,‐18.60,SND
217668,278450.58,3726504.69,‐18.60,SND
217669,278465.81,3726524.52,‐18.62,SND
217670,278481.03,3726544.35,‐18.83,SND
217671,278496.25,3726564.18,‐18.70,SND
217672,278511.48,3726584.01,‐18.73,SND
217673,278526.70,3726603.84,‐18.87,SND
217674,278541.93,3726623.67,‐18.76,SND
217675,278557.15,3726643.50,‐18.89,SND
217676,278572.38,3726663.33,‐18.87,SND
217677,278587.60,3726683.16,‐18.98,SND
217678,278602.83,3726702.99,‐18.99,SND
217679,278618.05,3726722.82,‐18.86,SND
217680,275388.95,3724159.05,‐9.20,SND
217681,275404.18,3724178.88,‐9.28,SND
217682,275419.40,3724198.71,‐9.28,SND
217683,275434.63,3724218.54,‐9.30,SND
217684,275449.85,3724238.37,‐9.24,SND
217685,275465.08,3724258.20,‐9.26,SND
217686,275480.30,3724278.02,‐9.32,SND
217687,275495.53,3724297.85,‐9.42,SND
217688,275510.75,3724317.68,‐9.43,SND
217689,275525.97,3724337.51,‐9.47,SND
217690,275541.20,3724357.34,‐9.54,SND
217691,275556.42,3724377.17,‐9.53,SND
217692,275571.65,3724397.00,‐9.58,SND
217693,275586.87,3724416.83,‐9.74,SND
Barataria Borrow XYZ 4
217694,275602.10,3724436.66,‐9.67,SND
217695,275617.32,3724456.49,‐9.67,SND
217696,275632.55,3724476.32,‐9.68,SND
217697,275647.77,3724496.15,‐9.74,SND
217698,275662.99,3724515.98,‐9.81,SND
217699,275678.22,3724535.81,‐9.85,SND
217700,275693.44,3724555.64,‐9.84,SND
217701,275708.67,3724575.47,‐9.88,SND
217702,275723.89,3724595.30,‐9.97,SND
217703,275739.12,3724615.13,‐10.10,SND
217704,275754.34,3724634.96,‐10.20,SND
217705,275769.56,3724654.79,‐10.19,SND
217706,275784.79,3724674.62,‐10.22,SND
217707,275800.01,3724694.45,‐10.27,SND
217708,275815.24,3724714.28,‐10.34,SND
217709,275830.46,3724734.11,‐10.31,SND
217710,275845.69,3724753.94,‐10.37,SND
217711,275860.91,3724773.77,‐10.47,SND
217712,275876.14,3724793.60,‐10.47,SND
217713,275891.36,3724813.43,‐10.51,SND
217714,275906.58,3724833.26,‐10.56,SND
217715,275921.81,3724853.09,‐10.60,SND
217716,275937.03,3724872.92,‐10.70,SND
217717,275952.26,3724892.75,‐10.73,SND
217718,275967.48,3724912.58,‐10.79,SND
217719,275982.71,3724932.41,‐10.94,SND
217720,275997.93,3724952.23,‐10.92,SND
217721,276013.16,3724972.06,‐11.41,SND
217722,276028.38,3724991.89,‐10.94,SND
217723,276043.60,3725011.72,‐11.04,SND
217724,276058.83,3725031.55,‐11.12,SND
217725,276074.05,3725051.38,‐11.12,SND
217726,276089.28,3725071.21,‐11.17,SND
217727,276104.50,3725091.04,‐11.32,SND
217728,276119.73,3725110.87,‐11.38,SND
217729,276134.95,3725130.70,‐11.39,SND
217730,276150.18,3725150.53,‐11.48,SND
217731,276165.40,3725170.36,‐11.50,SND
217732,276180.62,3725190.19,‐11.58,SND
217733,276195.85,3725210.02,‐11.67,SND
217734,276211.07,3725229.85,‐11.71,SND
217735,276226.30,3725249.68,‐11.80,SND
217736,276241.52,3725269.51,‐11.90,SND
217737,276256.75,3725289.34,‐11.92,SND
217738,276271.97,3725309.17,‐11.98,SND
217739,276287.19,3725329.00,‐12.06,SND
217740,276302.42,3725348.83,‐12.18,SND
217741,276317.64,3725368.66,‐12.22,SND
217742,276332.87,3725388.49,‐12.24,SND
217743,276348.09,3725408.32,‐12.38,SND
217744,276363.32,3725428.15,‐12.47,SND
217745,276378.54,3725447.98,‐12.58,SND
217746,276393.77,3725467.81,‐12.63,SND
217747,276408.99,3725487.64,‐12.69,SND
217748,276424.21,3725507.47,‐12.72,SND
217749,276439.44,3725527.30,‐12.84,SND
217750,276454.66,3725547.13,‐12.88,SND
217751,276469.89,3725566.96,‐13.00,SND
217752,276485.11,3725586.79,‐13.01,SND
217753,276500.34,3725606.62,‐13.18,SND
217754,276515.56,3725626.44,‐13.24,SND
217755,276530.79,3725646.27,‐13.24,SND
217756,276546.01,3725666.10,‐13.33,SND
217757,276561.23,3725685.93,‐13.42,SND
217758,276576.46,3725705.76,‐13.57,SND
217759,276591.68,3725725.59,‐13.84,SND
217760,276606.91,3725745.42,‐13.64,SND
217761,276622.13,3725765.25,‐13.72,SND
217762,276637.36,3725785.08,‐13.71,SND
217763,276652.58,3725804.91,‐13.80,SND
217764,276667.80,3725824.74,‐13.87,SND
217765,276683.03,3725844.57,‐13.92,SND
217766,276698.25,3725864.40,‐13.91,SND
217767,276713.48,3725884.23,‐13.98,SND
217768,276728.70,3725904.06,‐14.06,SND
217769,276743.93,3725923.89,‐14.07,SND
217770,276759.15,3725943.72,‐14.19,SND
217771,276774.38,3725963.55,‐14.23,SND
217772,276789.60,3725983.38,‐14.19,SND
217773,276804.82,3726003.21,‐14.30,SND
217774,276820.05,3726023.04,‐14.30,SND
217775,276835.27,3726042.87,‐14.38,SND
217776,276850.50,3726062.70,‐14.46,SND
217777,276865.72,3726082.53,‐14.50,SND
Barataria Borrow XYZ 5
217778,276880.95,3726102.36,‐14.54,SND
217779,276896.17,3726122.19,‐14.54,SND
217780,276911.40,3726142.02,‐14.63,SND
217781,276926.62,3726161.85,‐14.70,SND
217782,276941.84,3726181.68,‐14.73,SND
217783,276957.07,3726201.51,‐14.69,SND
217784,276972.29,3726221.34,‐14.86,SND
217785,276987.52,3726241.17,‐14.81,SND
217786,277002.74,3726261.00,‐14.88,SND
217787,277017.97,3726280.83,‐14.90,SND
217788,277033.19,3726300.66,‐14.96,SND
217789,277048.42,3726320.48,‐15.03,SND
217790,277063.64,3726340.31,‐15.09,SND
217791,277078.86,3726360.14,‐15.07,SND
217792,277094.09,3726379.97,‐15.19,SND
217793,277109.31,3726399.80,‐15.16,SND
217794,277124.54…