This amendment modifies a solicitation for surface preparation and painting services aboard the dredge Wheeler. The amendment adds Section B to specify cost line items for labor, equipment, consumables, and other reimbursables for the base year and four option years. Rate categories include straight time and overtime. Equipment includes ultra high pressure blast equipment, containment equipment, auxiliary ventilation, and scaffolding/rigging to be provided at actual cost plus a markup rate to be entered by the bidder. Bidders must provide pricing for all line items, including any items listed as actual cost plus markup. The response date remains unchanged. The solicitation is issued by the US Army Corps of Engineers Engineering District New Orleans for surface preparation and painting services aboard the dredge Wheeler.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P821R0011 Amendment 0004.pdf | ||
| Attachment A.pdf | ||
| Attachment B.pdf | ||
| Attachment C.pdf | ||
| W912P821R0011 Amendment 0002.pdf | ||
| W912P821R0011 Amendment 0001.pdf | ||
| W912P821R0011 Combined Synopsis-Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation for Surface Preparation and Painiting Aboard w ith Dredge Wheeler is amended as follow s:
1. This amendment adds Section B CLINS to attachment A.
2 Offeror question submission, and proposal response dates and times remain unchanged.
**Acknow ledge all amendments w ith BID**
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P821R0011
X 9B. DATED (SEE ITEM 11)
10-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Aug-2022
CODE
CONTRACTING DIV- CHIEF
7400 LEAKE AVENUE, ROOM 172
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P821R0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SECTION B
SECTION B.
CLIN Description QTY Unit Unit Cost Total Cost Base Year
0001 Supervisor, S.T. 500.00 Hours
0002 Supervisor, O.T. 50.00 Hours
0003 Painter, S.T. 2,500.00 Hours
0004 Painter, O.T. 100.00 Hours
0005 Laborer/Helper S.T. 1,500.00 Hours
0006 Laborer/Helper O.T. 100.00 Hours
0007 Ultra High Pressure Blast Equipment
40.00 Days
0008 Consumables-Paint, Thinner, Degreaser
1.00 Lot
0009 Containment Equipment/Special Blast
20.00 Days
0010 Auxiliary Equipment-Ventilation 40.00 Days
0011 Other Reimbursable Items- Freight
1.00 Lot
0012 Scaffolding/Rigging Equipment, AT ACTUAL COST
PLUS % MARK-UP
(FILL IN THE MARK-UP
PERCENT ONLY)
1.00 Lot
BASE YEAR GRAND TOTAL
Option Year 1
0013 Supervisor, S.T. 500.00 Hours
0014 Supervisor, O.T. 50.00 Hours
0015 Painter, S.T. 2,500.00 Hours
0016 Painter, O.T. 100.00 Hours
0017 Laborer/Helper S.T. 1,500.00 Hours
0018 Laborer/Helper O.T. 100.00 Hours
0019 Ultra High Pressure Blast Equipment
40.00 Days
0020 Consumables-Paint, Thinner, Degreaser
1.00 Lot
0021 Containment Equipment/Special Blast
20.00 Days
0022 Auxiliary Equipment-Ventilation 40.00 Days
0023 Other Reimbursable Items- Freight
1.00 Lot
0024 Scaffolding/Rigging Equipment, AT ACTUAL COST
PLUS % MARK-UP
(FILL IN THE MARK-UP
PERCENT ONLY)
OPTION YEAR 1 GRAND TOTAL
Option Year 2
0025 Supervisor, S.T. 500.00 Hours
0026 Supervisor, O.T. 50.00 Hours
0027 Painter, S.T. 2,500.00 Hours
0028 Painter, O.T. 100.00 Hours
0029 Laborer/Helper S.T. 1,500.00 Hours
0030 Laborer/Helper O.T. 100.00 Hours
0031 Ultra High Pressure Blast Equipment
40.00 Days
0032 Consumables-Paint, Thinner, Degreaser
1.00 Lot
0033 Containment Equipment/Special Blast
20.00 Days
0034 Auxiliary Equipment-Ventilation 40.00 Days
0035 Other Reimbursable Items- Freight
1.00 Lot
0036 Scaffolding/Rigging Equipment, AT ACTUAL COST
PLUS % MARK-UP (FILL
IN THE MARK-UP PERCENT
ONLY)
OPTION YEAR 2 GRAND TOTAL
Option Year 3
0037 Supervisor, S.T. 500.00 Hours
0038 Supervisor, O.T. 50.00 Hours
0039 Painter, S.T. 2,500.00 Hours
0040 Painter, O.T. 100.00 Hours
0041 Laborer/Helper S.T. 1,500.00 Hours
0042 Laborer/Helper O.T. 100.00 Hours
0043 Ultra High Pressure Blast Equipment
40.00 Days
0044 Consumables-Paint, Thinner, Degreaser
1.00 Lot
0045 Containment Equipment/Special Blast
20.00 Days
0046 Auxiliary Equipment-Ventilation 40.00 Days
0047 Other Reimbursable Items- Freight
1.00 Lot
0048 Scaffolding/Rigging Equipment, AT ACTUAL COST
PLUS % MARK-UP
(FILL IN THE MARK-UP
PERCENT ONLY)
OPTION YEAR 3 GRAND TOTAL
Option Year 4
0049 Supervisor, S.T. 500.00 Hour
0050 Supervisor, O.T. 50.00 Hour
0051 Painter, S.T. 2,500.00 Hour
0052 Painter, O.T. 100.00 Hour
0053 Laborer/Helper S.T. 1,500.00 Hour
0054 Laborer/Helper O.T. 100.00 Hour
0055 Ultra High Pressure Blast Equipment
40.00 Days
0056 Consumables-Paint, Thinner, Degreaser
1.00 Lot
0057 Containment Equipment/Special Blast
20.00 Days
0058 Auxiliary Equipment-Ventilation 40.00 Days
0059 Other Reimbursable Items- Freight
1.00 Lot
0060 Scaffolding/Rigging Equipment, AT ACTUAL COST
PLUS %
MARK-UP (FILL IN THE
MARK-UP PERCENT ONLY)
OPTION YEAR 4 GRAND TOTAL
NOTES:
1. Abbreviations used as follows:
S.T. = STRAIGHT TIME
O.T. = OVERTIME
HR = HOUR
DAY = DAY
LOT = LOT
2. A bidder must bid on all contract line items requiring pricing. Any line item that is listed as (FILL IN
THE MARK-UP PERCENT ONLY), the bidder only needs to enter his/her percentage mark- up (the bidder shall be paid for these line items for the actual cost plus his/her mark-up). If a bidder intends to waive costs associated with any contract line item, said bidder must insert descriptive words or abbreviations such as “no cost” or N/C. If a bidder omits both unit price and amount for any contract line item, the bid shall be declared NON-RESPONSIVE.
END OF SECTION B
(End of Summary of Changes)
File details come from the government source that posted it. Updated .