This Quality Assurance Surveillance Plan outlines requirements for surface preparation and painting aboard the dredge Wheeler. The U.S. Army Corps of Engineers Engineering District New Orleans will conduct 100% visual inspection of all field work and random visits to the contractor's shop to ensure zero defects. The contractor must re-perform any defective work at no additional cost. Performance objectives and the associated surveillance methods are provided for requirements in the Performance Work Statement paragraphs 1 through 9 to ensure conformance with specifications. All testing must occur under witness of a government inspector.
The related federal contract opportunity is solicitation number W912P821R0011 for surface preparation and painting on the dredge Wheeler issued by the U.S. Army Corps of Engineers Engineering District New Orleans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
SURFACE PREPARATION AND PAINTING ABOARD THE DREDGE WHEELER
1. This section identifies the method of surveillance the government’s Quality Assurance Personnel (QAP) will use to verify the quality of the contractor’s performance. Surveillance method is periodic inspection.
2. Re-performance of unacceptable services at no additional cost is the preferred course of action when appropriate.
3. Method of surveillance will be 100% inspection by the SAP. Surveillance will be performed as specified in the Service Delivery Summary (SDS) in paragraph 5 below.
4. Where appropriate, methods for administering and evaluating services not included in the Service Delivery Summary are to be developed by the SAP.
a. The government retains the right to inspect required tasks not shown on the Service Delivery Summary. Inspection of these services will be in the same general manner as SDS items. The results of these inspections shall be documented. Any results that require minor corrective actions, the government inspector shall discuss the deficiencies with the appropriate shipyard personnel. Any major deficiency shall be provided to the contracting officer for action.
b. The following non-SDS items may be observed periodically during the contract period.
* Employees identification badges if working on any repair work for the Dredge Wheeler whether on board or on the drydock.
* Work manner of employees.
* Safety compliance (Safety Plan & EM-385-1).
5. Service Delivery Summary
Performance
Objectives
PWS
Reference
Surveillance
Method
Performance
Threshold
All general contract requirements are complied without deficiencies or safety violations.
Items 1 - 9 100% visual inspection of field work and contractor shop (random visit)
Zero (0) defects allowed.
100% Re-performance of all defective work is required.
Other remedies allowed by FAR Clause 52.212-4 also apply.
Final Work conforms to specifications. All testing shall be performed under the witness of government inspector
Items 1 - 7 100% visual inspection of field work and contractor shop (random visit)
Zero (0) defects allowed.
100% Re-performance of all defective work is required.
Other remedies allowed by FAR Clause 52.212-4 also apply.