W912P821B0049 Amendment 0003.pdf

PDF 458 KB Posted

Attached to
Gulf Coast Regional Hopper Dredge Contract. Specification No. OM-21-300
Solicitation number
W912P821B0049
Issued by

About this file

This amendment modifies a solicitation for a Gulf Coast Regional Hopper Dredge contract. The contract requires furnishing one fully crewed and equipped self-propelled trailing suction hopper dredge for removal and satisfactory disposal of shoal material at the Mississippi River and Southwest Pass and Gulfport Harbor Bar Channel. The estimated value of the work is between $10 million and $25 million. The amendment responds to questions by revising staffing requirements to allow the safety and health officer to be collateral duty on a hopper dredge or for projects with a small workforce, and by restoring original language on quality control requirements. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District New Orleans and bids were due on or around June 16, 2021.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OM21300

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered Solicitation for Gulf Coast Regional Hopper Dredge (OM21300) has been amended to:

1. Respond to questions

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jul-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P821B0049

X 9B. DATED (SEE ITEM 11)

23-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jul-2022

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P821B0049

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - INSTRUCTIONS TO BIDDERS

The following have been added by full text:

AMENDMENT 0003

Amendment 1; SECTION 00100 - INSTRUCTIONS TO BIDDERS amended the original specifications with the following language:

12. Section 01 35 26, paragraph 1.3.1.1.1 “SSHO Staffing for USACE Dredging Contracts”: In subparagraph a, delete the second sentence that states “SSHO may be collateral duty in specific conditions listed below”. Also, delete subparagraph c and mark as “Reserved”. Also, delete subparagraph d and mark as “Reserved”.

13. Section 01 35 26, paragraph 1.3.1.1.2 “SSHO Requirements for Dredging”: Delete subparagraphs a through d in their entirety and replace with the following:

a In addition to requirements stated elsewhere in this specification, the SSHO shall be present at the project site, located so they have full mobility and reasonable access to all major work operations, for all work shifts in each 24 hour period when work is being done. The SSHO shall be a full-time, dedicated position. The SSHO shall report to a senior project (or corporate) official.

b The SSHO shall inspect all work areas and operations during initial set-up and provide personal oversight on a daily basis for each shift during dredging operations.

c When SSHO is temporarily off-site, an Alternate SSHO will be assigned to insure SSHO coverage for the project at all times work activities are conducted. The Alternate SSHO must meet the same requirements and assume the responsibilities of the project SSHO. The Alternate SSHO position may be a collateral duty when not acting as SSHO.

d If the SSHO is off-site for a period longer than 24 hours, a qualified replacement SSHO shall be provided and shall fulfill the same roles and responsibilities as the primary/initial SSHO.

Will the USACE please return the language to the original solicitation, permitting the SSHO to be collateral duty in specific conditions such as a hopper dredge? Current USACE contracts in the district do not have the additional requirement of a SSHO upon a hopper dredge on rental contracts.

ANSWER: Section 01 35 26 -- Delete paragraph 1.3.1.1.1 entitled "SSHO Staffing for USACE Dredging Contracts" and paragraph 1.3.1.1.2 "SSHO Requirements for Dredging" and replace with the following:

1.3.1.1.1 SSHO Staffing for USACE Dredging Contracts

a. Dredging contracts may include several project sites; this contract will require a minimum of one full time SSHO(s) assigned per project site. SSHO may be collateral duty in specific conditions listed below.

b. Example of one dredging project site is reflected in each of the following:

1) a mechanical dredge, tug(s) and scow(s), scow route, and material placement site; or

2) a hydraulic pipeline dredge, attendant plant, and material placement site; or,

3) a hopper dredge (include land-based material placement site - if applicable).

c. On individual dredging project sites with work force of less than 8 employees, the SSHO may be a collateral duty, with the same responsibilities of a full time SSHO.

d. Hopper dredges with USCG - Documented crews may designate an officer as a collateral-duty SSHO instead of having a full-time SSHO if the officer meets the SSHO training and experience requirements.

1.3.1.1.2 SSHO Requirements for Dredging

a. In addition to requirements stated elsewhere in this specification, the SSHO shall be present at the project site, located so they have full mobility and reasonable access to all major work operations, for at least one shift in

W912P821B0049 each 24-hour period when work is being done. The SSHO, or Alternate SSHO, shall be available during all shifts for immediate verbal consultation and notification, either by phone or radio. The SSHO shall be a full-time, dedicated position, except as noted above. The SSHO shall report to a senior project (or corporate) official.

b. The SSHO shall inspect all work areas and operations during initial set-up and at least monthly observe and provide personal oversight on each shift during dredging operations for projects with many work sites, more often for those with less work sites.

c. For projects with multiple shifts or when SSHO is temporarily off-site, an Alternate SSHO will be assigned to insure SSHO coverage for the project at all times work activities are conducted. The Alternate SSHO must meet the same requirements and assume the responsibilities of the project SSHO. The Alternate SSHO position may be a collateral duty.

d. If the SSHO is off-site for a period longer than 24 hours, a qualified replacement SSHO shall be provided and shall fulfill the same roles and responsibilities as the primary/ initial SSHO.

Amendment 1 17. Section 01 45 00.15 10, paragraph 1.6.3 “Quality Control (QC)”: Delete the current paragraph in its entirety and replace with the following:

The Contractor shall identify as CQC System Manager an individual within the onsite work organization who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the contractor. The CQC System Manager shall be a construction person with a minimum of 3 years (full time) experience in related equivalent work. This CQC System Manager shall be on the site at all times during construction and shall be employed by the prime contractor. The CQC System Manager may not have any other duties than quality control.

When the alternate for the CQC System Manager is activated, he shall also have no other duties other than quality control.

Will the USACE please return the language to the original solicitation? Rental hopper dredge contracts require frequent dredge location changes and do not have a designated “site” throughout the duration of the contract.

ANSWER: The amended language in Amendment 0001 for Section 01 45 00.15 10, paragraph 1.6.3 entitled "Quality Control (QC)" is the correct.

(End of Summary of Changes)