This is a synopsis for a solicitation seeking proposals for construction services. The U.S. Army Corps of Engineers, New Orleans District will issue a request for proposal on or around March 18, 2019 for construction of a railroad shoofly, Highway 61 bypass, relocation of Barnett Road and highway bridges with 150-foot long drilled shafts approximately 50 feet below a diversion channel, excavation of the diversion channel, utility relocations, rip-rap and articulated concrete block placement, temporary and permanent roadways, traffic control and coordination, access roads, stockpiling, turf establishment, coordination with utility companies, and work in proximity to existing utilities. The estimated value is between $25-100 million. Proposals will be evaluated based on past performance, technical approach, key personnel and project management plan, small business commitment document, and price. The anticipated proposal due date is April 19, 2019, with award to a single firm-fixed price contract.

W912P819R0033 Solicitation

View the file

Other files

File Type Posted
W912P819R0033 Am_0010.pdf PDF
Am_0009.pdf PDF
Am_0008.pdf PDF
W912P819R0033 Am_0007.pdf PDF
Am_0006.pdf PDF
Am_0003 4 of 6.pdf PDF
Am_0003 2 of 6.pdf PDF
W912P819R0033 Am_0005.pdf PDF
Am_0003 3 of 6.pdf PDF
Am_0003 6 of 6.pdf PDF
Am_0003 5 of 6.pdf PDF
W912P819R0033 Am_0004.pdf PDF
Am_0003_1_of_6.pdf PDF
W912P819R0033_Am_0002.pdf PDF
W912P819R0033_Am_0001_.pdf PDF
W912P8-19-R-0033__Final_Plans_4_of_4.pdf PDF
W912P8-19-R-0033__Final_Plans_1_of_4.pdf PDF
W912P8-19-R-0033__Final_Plans_2_of_4.pdf PDF
W912P8-19-R-0033__Final_Plans_3_of_4.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ED 18-035

US Army Corps of Engineers New Orleans District

Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project US Highway 61 and Kansas City Southern Railway Bridges, East Baton Rouge Parish, LA

Solicitation No. W912P8-19-R-0033

Construction Solicitation and Specifications

March 2019

SOLICITATION NUMBER: W912P8-19-R-0033

ALL QUESTIONS MUST CONTAIN THE SOLICITATION NUMBER IN

THE SUBJECT LINE.

IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATIONS; ALL

QUESTIONS MUST BE SUBMITTED IN WRITING. ANY QUESTIONS

RECEIVED IN ANY OTHER FORMAT WILL NOT WARRANT A

RESPONSE.

QUESTIONS MUST BE SENT VIA EMAIL AND RECEIVED BY 11:00 A.M.

CST, APRIL 1 , 2019. THE GOVERNMENT IS UNDER NO OBLIGATION

TO PROVIDE A RESPONSE TO LATE QUESTIONS.

ALL INQUIRIES REGARDING THIS SOLICITATION

SHOULD BE MADE TO THE FOLLOWING:

RACHEL A. WOODS, CONTRACT SPECIALIST

U.S. ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT

E-MAIL: RACHEL.A.WOODS@USACE.ARMY.MIL

DEPARTMENT OF THE ARMY

CORPS OF ENGINEERS, NEW ORLEANS DISTRICT

7400 LEAKE AVENUE

NEW ORLEANS, LA 70118-3651

ED 18-035

SOLICITATION: W912P8-19-R-0033 2019

FOR: Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, US Highway 61 and Kansas City Southern Railway Bridges, East Baton Rouge Parish, Louisiana (ED 18-035)

TO OPEN: Proposals are due by 2019, 11:00 a.m. CST, Local Time and Place, New Orleans, LA

I. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL OPPORTUNITY

CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.

II. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS SOLICITATION.

Bidders, offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause.

III. Prospective contractors must be registered in the System for Award Management (SAM) at time of offer.

See FAR Subpart 4.1102 and FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. You will be required to provide your company’s Dun and Bradstreet (D&B) D-U-N- S number. If you do not already have a D&B D-U-N-S number, one can be requested at http://fedgov.dnb.com/webform.

BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY THIS

SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE STATEMENTS IN BIDS

IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)

DESCRIPTION AND MAGNITUDE OF WORK: The work consists of construction of new diversion channel, railroad shoofly, highway 61 bypass roadway, demolition and installation of the new roadway, construction of the railroad and highway bridges, construction of drilled shafts, utility relocations, construction of access roads and culverts, maintaining storm water management during construction, pile installation, traffic control and coordination, and preventive measures taken to ensure existing facilities and utilities remain undamaged.

CAUTION TO BIDDERS: In delivery of hand-carried bids, bidders are cautioned to allow sufficient time for delays which may be encountered as a result of frequent trains which are subject to block all access roads to place of bid opening for various lengths of time. Such delays DO NOT permit acceptance or consideration of late bids.

NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH

THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS

MANUAL", DATED NOVEMBER 2014.

PTC-i ED 18-035

PROJECT TABLE OF CONTENTS

Division 00 – PROCUREMENT AND CONTRACTING

00010

00100 00130 00600 00700

Solicitation, Offer and Award

SF-1442

Bidding Schedule Instructions To Bidders Proposal Evaluation Criteria Representations and Certifications Contract Clauses

Division 01 - GENERAL REQUIREMENTS

01100 General Provisions 01 32 16.00 20 Construction Progress Documentation 01 33 00 Submittal Procedures 01 42 00 Sources for Reference Publications 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) 01 45 04.00 10 Contractor Quality Control 01 55 26.00 12 Traffic Control and Coordination 01 57 20.00 12 Environmental Protection 01 57 23.00 12 Storm Water Pollution Prevention Plan 01 57 23.01 12 Truck Wash-Down Racks 01 78 02.00 10 Closeout Submittals

Division 2 – EXISTING CONDITIONS

02 41 00 Demolition

Division 3 – CONCRETE

03 11 14.00 12 Formwork for Concrete 03 21 00.00 12 Reinforcing Steel 03 31 00.00 12 Cast-in-Place Structural Concrete 03 45 33.00 10 Precast Prestressed Structural Concrete

Division 5 – METALS

05 50 14 Structural Metal Fabrications 05 50 15 Civil Works Fabrications

PTC-ii ED 18-035

Division 7 – THERMAL AND MOISTURE PROTECTION

07 13 54 Railroad Deck 07 92 00 Joint Sealants

Division 10 – SPECIALTIES

10 00 12.00 12 US 61 Bridges 10 00 16.00 12 Permanent Right-of-Way Monuments, Witness Posts and

Traffic Signs 10 00 34.00 12 Rumble Strips 10 00 55.00 12 Fencing 10 00 64.00 12 Guard Rail 10 00 84.00 12 Highway Drainage 10 00 94.00 12 Concrete Approach Slabs

Division 31 – EARTHWORK

31 00 00 Earthwork 31 05 19 Geotextile 31 05 20 Geosynthetic Drainage Layer 31 11 00.00 12 Clearing and Grubbing 31 22 02 Grade Crossing Roadbed 31 23 16.16 12 Structural Excavation and Backfill 31 23 20.00 12 Unwatering 31 62 13.20 12 Prestressed Concrete Piles 31 62 14.00 12 Pile Load Tests 31 62 17.00 12 Steel Pipe Piles 31 63 29 Drilled Concrete Piers and Shafts

Division 32 – EXTERIOR IMPROVEMENTS

32 12 16.00 12 Asphaltic Pavement 32 15 00.00 12 Surfacing (Granular) 32 17 24.00 12 Pavement Markings 32 91 18.00 12 High Performance Turf Reinforced Mat (HPTRM) 32 92 19.00 12 Fertilizing and Seeding

Division 33 – UTILITIES

33 40 10 Railroad Drainage Pipe

PTC-iii ED 18-035

Division 34 – TRANSPORTATION

34 11 00 Railroad Track and Accessories 34 11 26.16 Subballast 34 11 35 Prefabricated Sectional Treated Timber Road Crossing

Division 35 – WATERWAY AND MARINE CONSTRUCTION

35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures

35 43 38.00 Channel Lining Articulating Concrete

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

W912P819R0033

US ARMY CORPS OF ENGINEERS, NEW ORLEANS

DISTRICT

CONTRACTING DIVISION

7400 LEAKE AVENUE

NEW ORLEANS, LA 70118

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Comite Hwy. 61 & Kasas City Southern RR

Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, US Highway 61 and Kansas City Southern Railway Bridges, East Baton Rouge Parish, LA ED; 18-035

This is an Unrestricted Best Value Procurement. The estimated value of this work is between $25,000,000 to $100,000,000.

The work consists of construction of new diversion channel, railroad shoofly, highway 61 bypass roadway, demolition and installation of the new roadway, construction of the railroad and highway bridges, construction of drilled shafts, utility relocations, construction of access roads and culverts, maintaining storm water management during construction, pile installation, traffic control and coordination, and preventive measures taken to ensure existing facilities and utilities remain undamaged.

The deadline for submitting questions for the subject request for proposal is 1 April 2019, 11:00 AM CST. Any questions received after this deadline will not be considered.

*See Section 00130 - Proposal Evaluation Criteria paragraph "RFP SUBMITTAL REQUIREMENTS".

US ARMY CORPS OF ENGINEERS, NEW ORLEANS

DISTRICT

ATTN: CEMVN-CT-W RACHEL WOODS

7400 LEAKE AVENUE, ROOM 326

NEW ORLEANS, LA 70118

Rachel A. Woods 504-862-1335

ED 18-035

0 / /2019 local time 0 / 6/2019

11:00 a.m

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

US Army Corps of Engineers New Orleans Area Office 7400 Leake Avenue, New Orleans, LA 70118

USACE Finance Center Attn: CEFC-AO-P 5720 Integrity Drive, Millington, TN 38054-5005

00010-3 ED 18-035

SECTION 00010 – BIDDING SCHEDULE

Flood Control Amite River and Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project

US Highway 61 and Kansas City Southern Railways Bridges East Baton Rouge Parish, Louisiana

Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount

BASE WORK

0001 MOBILIZATION AND

DEMOBILIZATION 1 JOB

0002 VIDEO AND PHOTOGRAPHIC

DOCUMENTATION 1 JOB

0003 RAILROAD FLAGGING

SERVICES 1,200 HR

0004 RAILROAD INSURANCE 1 JOB

0005 TRAFFIC CONTROL AND

COORDINATION 1 JOB

0006 STRAW BALES 10,000 LF

0007 SILT FENCES 51,500 LF

0008 TRUCK WASHDOWN RACKS 1 JOB

0009 DEMOLITION 1 JOB

0010 US 61 RECONSTRUCTION 1 JOB

0011 US 61 DIVERSION 1 JOB

EXCAVATION FOR US 61

RECONSTRUCTION AND US

61 DIVERSION

32,000 CY

NON-PLASTIC EMBANKMENT

FOR US 61

RECONSTRUCTION

1,500 CY

0014 NON-PLASTIC EMBANKMENT

FOR US 61 DIVERSION 20,000 CY

0015 EXCAVATION FOR US 61

DIVERSION REMOVAL 10,500 CY

0016 LIME TREATMENT (12” THICK) 49,600 SY

0017 CLASS II BASE COURSE (12”

THICK) 22,900 SY

0018 CLASS II BASE COURSE (10”

THICK) 5,000 SY

0019 CLASS II BASE COURSE (8

1/2” THICK) 8,300 SY

0020 GEOTEXTILE FABRIC

(ROADWAY) 58,000 SY

00010-4 ED 18-035

0021 ASPHALT WEARING COURSE 13,500 TN

0022 ASPHALT BINDER COURSE 14,500 TN

0023 ASPHALT BASE COURSE 8,500 TN

0024 ASPHALT MILLING 35,500 SY

0025 AGGREGATE DRIVEWAY

SURFACING 2,500 SY

0026 CB-01 2 EA

0027 CB-02 MODIFICATION 1 EA

0028 18” SIDE DRAIN PIPE 539 LF

0029 24” SIDE DRAIN PIPE 355 LF

0030 24” CROSS DRAIN PIPE RCPA 124 LF

0031 36” RCP 56 LF

0032 42” RCP 38 LF

0033 DRAIN SAFETY ENDS 6 EA

0034 CLEARING AND GRUBBING 1 JOB

0035 SITE GRADING 1 JOB

0036 FERTILIZING AND SEEDING 61 AC

0037 US 61 NB & SB BRIDGES 1 JOB

PRECAST PRESTRESSED

CONCRETE GIRDERS (TYPE

III)

4,169 LF

US 61 NB & SB BRIDGE END

BENTS/WINGWALLS,

STRUCTURAL EXCAVATION

AND BACKFILL

1 JOB

0040 TEST SHAFT (66”) 1 EA

0041 TRIAL SHAFT (66”) 1 EA

0042 DRILLED SHAFT (66”) 6,804 LF

PRECAST PRESTRESSED

CONCRETE PILE, 14-INCH X

14-INCH

264 LF

PRECAST PRESTRESSED

CONCRETE PILE, 18-INCH X

18-INCH

1,320 LF

0045 GUARD RAILS 1 JOB

00010-5 ED 18-035

0046 APPROACH SLABS 1 JOB

0047 KCS RAILROAD BRIDGE 1 JOB

0048 PRECAST PRESTRESSED

SINGLE CELL BOX GIRDERS 1,220 LF

KCS RAILROAD BRIDGE

ABUTMENTS/RETAINING

WALLS

1 JOB

0050 TRIAL SHAFT (144”) 1 EA

0051 DRILLED SHAFT (144”) 604 LF

0052 16” STEEL PIPE PILE 5,691 LF

0053 TEST PILE (18” PCP) 1 EA

0054 TEST PILE (16” PIPE PILE) 1 EA

0055 KCS SHOOFLY 1 JOB

0056 BALLAST 3,600 TN

0057 EXCAVATION FOR KCS

SHOOFLY 6,500 CY

0058 EMBANKMENT FOR KCS

SHOOFLY 750 CY

0059 SUBBALLAST 4,400 TN

0060 RAILROAD DRAINAGE PIPE

(48” CMP) 109 LF

0061 RAILROAD DRAINAGE PIPE

(24” CMP) 209 LF

0062 RAILROAD TRACK AND

ACCESSORIES 3311 LF

0063 CHANNEL EXCAVATION 710,000 CY

0064 CHANNEL RIPRAP (1/4 TON) 22,000 TN

0065 STABILIZATION RIPRAP (100

LB) 40 TN

0066 RANDOM RIPRAP (40 LB) 60 TN

0067 CHANNEL BEDDING

MATERIAL 2,600 CY

0068 CHANNEL FILTER MATERIAL 19,200 CY

CHANNEL LINING,

ARTICULATED CONCRETE

BLOCK

35,900 SY

0070 GEOTEXTILE FABRIC

(CHANNEL) 42,400 SY

0071 HIGH PERFORMANCE TURF

REINFORCEMENT MAT 33,000 SY

00010-6 ED 18-035

0072 CONSTRUCTION

UNWATERING 1 JOB

TOTAL BASE WORK: $

OPTIONAL WORK

0073 TRAFFIC CONTROL AND

COORDINATION - OW 1 JOB

0074 CLEARING AND GRUBBING -

OW 1 JOB

0075 RELOCATED BARNETT ROAD

- OW 1 JOB

EXCAVATION FOR

RELOCATED BARNETT ROAD

- OW

12,400 CY

NON-PLASTIC EMBANKMENT

FOR RELOCATED BARNETT

ROAD - OW

8,600 CY

0078 CLASS II BASE COURSE (8

1/2” THICK) - OW 4,388 SY

0079 GEOTEXTILE FABRIC

(ROADWAY) - OW 8,371 SY

0080 ASPHALT WEARING COURSE

- OW 630 TON

0081 ASPHALT BINDER COURSE -

OW 1,259 TON

0082 42” RCPA - OW 100 LF

0083 48” RCPA - OW 152 LF

0084 60” RCPA - OW 167 LF

0085 FENCING (PERMANENT) - OW 5,200 LF

TOTAL OPTIONAL WORK: $

TOTAL BASE + OPTIONAL WORK $

**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.

Award will be made as a whole to one bidder.

NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED

TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE

DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR

AWARD.

00010-7 ED 18-035

NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).

NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTION WORK Items by written notice to the Contractor. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.

NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.

Evaluation of options will not obligate the Government to exercise the option(s).

NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF

OPTIONAL WORK. In the event that OPTIONAL WORK items are exercised under the terms of the contract, the time required for completion of the contract will not be adjusted but shall be performed concurrent with the original contract duration of 634 calendar days established for the BASE WORK items specified in the Contract Clause entitled “COMMENCEMENT, PROSECUTION, AND

COMPLETION OF WORK (FAR 52-211-10 – APR 1984)”.

BID BOND

(See instructions on reverse)

OMB Control Number: 9000-0045 Expiration Date: 7/31/2019

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT

OF BID

PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION(S) THOUSAND(S) HUNDRED(S) CENTS

BID IDENTIFICATION

BID DATE INVITATION NUMBER

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1. 2.

2.

3.

3.

(Seal) (Seal) (Seal) Corporate Seal

INDIVIDUAL SURETY(IES)

SIGNATURE(S)

NAME(S)

(Typed)

1.

1.

2.

2.

(Seal) (Seal)

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2. Corporate Seal

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

FOR (Construction, Supplies or Services)

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

DATE BOND EXECUTED (Must not be later than bid opening date)

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

JOINT VENTURE

OTHER (Specify)

PARTNERSHIPINDIVIDUAL

CORPORATION

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.

The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

SU

R

ET

Y

B

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2. Corporate Seal

Corporate Seal

LIABILITY LIMIT ($)STATE OF INCORPORATION

2.

2.

1.

1.NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

C

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

D

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

E

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

F

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

G

STANDARD FORM 24 (REV. 8/2016) BACK

365 of award

NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OORTUNITY (APRIL 1984)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for Minority Participation Goals for Female Participation for Each Trade for Each Trade

2 . % 6.9%SMSA ( ) Counties Non-SMSA Counties . % 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Program Office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goal shall be a violation of the contract. Executive Order 11246, as amended, and the regulation in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Director, Office of Federal Contract Compliance Programs, within 10 working days following award of an y construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notifications shall list the -

(1) Name, address, and telephone number of the subcontractor;

(i) Employer identification number of the subcontractor

(2) Estimated dollar amount of the subcontract;

(3) Estimated starting and completion dates of the subcontract;

performed.

and

(4) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting form this solicitation, the "covered area" is (FAR 52.222-23) Economic Area 11 , , LA as follows:

Standard Metropolitan Statistical Area

(SMSA) Counties:

, LA ------------------------------------------- 2 %

LA

Non-Standard Metropolitan Statistical Area

(Non-SMSA) Counties ------------------------------------------ %

LA

Federal Register/Vol. 45 No. 194/Friday, October 3, 1980

00130-i

Section Table of Contents

SECTION 00130 – PROPOSAL EVALUATION CRITERIA

Contents

PART 1 GENERAL

1.1 SCOPE

1.2 SOURCE SELECTION USING THE TRADE-OFF PROCESS

1.3 EVALUATION FACTORS

1.4 RELATIVE IMPORTANCE OF PRICE TO THE TECHNICAL EVALUATION FACTORS .2

1.4.1 EVALUATION CRITERIA

1.4.2 EVALUATION APPROACH

1.5 DEFINITIONS:

1.6 SUBMITTAL REQUIREMENTS

1.7 NON-COST EVALUATION FACTORS & SUBMITTAL REQUIREMENTS

1.7.1 FACTOR 1. PAST PERFORMANCE - RATED AS FOLLOWS:

1.7.2 FACTOR 2. TECHNICAL APPROACH

1.7.3 FACTOR 3. KEY PERSONNEL AND PROJECT MANAGEMENT PLAN

1.7.4 FACTOR 4. SMALL BUSINESS COMMITMENT DOCUMENT (SBCD)

1.8 COST FACTOR

1.8.1 FACTOR 5. PRICE

1.9 RFP SUBMITTALS REQUIREMENTS

1.9.1 RFP SUBMITTALS

1.10 DISCUSSIONS

2.0 ATTACHMENTS

00130-2

SECTION 00130 – PROPOSAL EVALUATION CRITERIA

PART 1 GENERAL

1.1 SCOPE

This solicitation is a Request for Proposals (RFP). Proposals will be evaluated by a Source Selection Evaluation Board (SSEB) comprised of representatives of the New Orleans District Corps of Engineers. Proposals will be evaluated in accordance with the Best Value with Trade Off Source Selection Method.

The Government intends to evaluate proposals and award a contract without discussions. Therefore, offerors shall submit their best terms from a cost or price and technical standpoint as offerors may not be afforded an opportunity to revise their proposals.

1.2 SOURCE SELECTION USING THE TRADE-OFF PROCESS

The Government will select the offer that represents the best value to the Government by using the trade-off process described in FAR Part 15. This process permits tradeoffs between price and technical merit/quality and allows the Government to accept other than the lowest priced offer or other than the highest technically rated offer. The award decision will be based on a comparative assessment of proposals against all source selection criteria in the solicitation.

1.3 EVALUATION FACTORS

a) TECHNICAL NON-COST FACTORS:

1. Past Performance

2. Technical Approach

3. Key Personnel and Project Management Plan (PMP)

4. Small Business Commitment Document (SBCD)

b) COST FACTOR:

5. Price

1.4 RELATIVE IMPORTANCE OF PRICE TO THE TECHNICAL EVALUATION

FACTORS

The Government is concerned with striking the most advantageous balance between Technical Merit (i.e., quality and timeliness) and cost to the Government (i.e., price).

Where competing technical proposals are determined to be substantially equal, price could become the controlling factor.

00130-3

1.4.1 Evaluation Criteria

The Government will evaluate each of the four (4) non-cost factors and rate the proposals. Non- cost factors are not all equal in importance. The following terminology is used to describe the relative importance of each non-cost factor:

(1) SIGNIFICANTLY MORE IMPORTANT. This factor is of greater value than other factors. It is approximately twice as much as the next valued factor.

(2) SIGNIFICANTLY LESS IMPORTANT. This factor is approximately one-half (1/2) the value of the factor rated ahead of it.

(3) APPROXIMATELY EQUAL. The value is nearly the same as another factor;

any difference is slight and unimportant.

Factors 1 and 2 are approximately equal in importance and are significantly more important when compared to Factor 3. Factor 4 is significantly less important than Factors 1, 2, and 3. Factors 1, 2, 3, and 4, when combined, are significantly more important than Factor 5, cost or price.

Factor 5, which is Price, may become more significant in contributing to the source selection decision if competing proposals offer approximately equal Past Performance and Technical Approaches and due consideration is given to Key Personnel and Project Management Plan and Small Business Commitment Document (SBCD).

1.4.2 Evaluation Approach

All proposals shall be subject to evaluation by the Source Selection Evaluation Board (SSEB). The overarching evaluation approach for all factors is as follows:

a. Adequacy of Response. The proposal will be evaluated to determine whether the Offeror’s methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine the extent to which each requirement has been addressed in accordance with the proposal submission section of the RFP.

b. Feasibility of Approach. The proposal will be evaluated to determine the extent to which the proposed approach is workable and the end results achievable. The proposal will be evaluated to determine the extent to which successful performance is contingent upon proven devices and techniques. The proposal will be evaluated to determine the extent to which the Offeror is expected to be able to successfully complete the proposed tasks and technical requirements within the required schedule.

00130-4

1.5 DEFINITIONS:

1. Adverse Past Performance is defined as past performance information that supports a less than satisfactory rating

2. Best Value is the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirement.

3. Clarifications are limited exchanges between the Government and Offerors that may occur when award without discussions is contemplated.

4. Communications are exchanges, between the Government and Offerors, after receipt of proposals, leading to establishment of the competitive range.

5. Deficiency is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

6. Discussions are negotiations conducted in a competitive acquisition.

Discussions take place after establishment of the competitive range.

7. Due Diligence (Industry) - The process followed by prospective contractors to fully understand the government requirement in order to submit a complete, responsive proposal to the Government which will result in a successful acquisition. Methods may include such activities as conducting site visits, attending industry days, one-on-one sessions with the acquisition teams, pre-proposal conferences and responding to draft requests for proposals.

8. Due Diligence (Government) - The process followed by the Government acquisition team to ensure all prospective contractors are as informed of the Government requirement and method of acquisition as possible in order to receive a reasonable number of competitive proposals from industry. Methods may include such activities as providing for site visits, conducting industry days, one-on-one sessions with interested vendors, pre-proposal conferences and sending draft requests for proposals to industry.

9. Evaluation Findings are the written observations/judgments regarding the individual merits of the proposal against the solicitation requirements.

10. Evaluation Notice (EN) is the PCO’s written notification to the Offeror for purposes of clarifications, communications, or in support of discussions.

11. Large Business means businesses determined other than Small Business based upon industry size standards/NAICs codes. Includes: Large businesses, State and Local Government and non-profit companies. May also include: public utilities, educational institutions, and foreign-owned firms.

00130-5

12. Minor or Clerical Error is a minor informality or irregularity that is merely a matter of form and not of substance or a clerical error apparent on its face in the proposal.

13. Performance Confidence Assessment is an evaluation of the likelihood (or Government’s confidence) that the Offeror will successfully perform the solicitation’s requirements; the evaluation is based upon recent, relevant past performance information.

14. Quality, as it pertains to past performance information, is a measure of how well the contractor performed on recent/relevant contracts.

15. Rating is the adjective/color descriptor assigned by the evaluators’ to the non-Cost/Price Factors and corresponding Subfactors. It represents their conclusions as to the quality of the proposal, supported by narrative write-ups identifying the associated strengths, weaknesses, deficiencies, risks, and uncertainties. The strengths, weaknesses, etc., are the findings that support the rating adjective/color.

16. Recency, as it pertains to past performance information, is a measure of the time that has elapsed since the past performance reference occurred.

Recency is generally expressed as a time period during which past performance references are considered relevant.

17. Relevancy, as it pertains to past performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance.

18. Requirements Documents are all aspects of the RFP that convey the needs of the Government to Offerors, including the SOO, SOW, PWS, technical requirement documents, and system requirement documents.

19. Requiring Office is the entity (for example, a program management office or other organizational entity) responsible for translating user requirements into the requirements documents within the RFP that communicate those requirements to Offerors.

20. Risk, as it pertains to source selection, is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an Offeror’s proposed approach to achieving the technical factor or subfactor may involve risk of disruption of schedule, increased cost or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance. (For firm-fixed-price contracts, the reference

00130-6 to increased cost may be removed from the risk definition.)

21. Source Selection is the process used in competitive, negotiated contracting to select the proposal that offers the best value to the Government.

22. Source Selection Authority (SSA) is the official designated to make the source selection decision.

23. Significant Strength is an aspect of an Offeror's proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

24. Source Selection Team (SST) is a team that is tailored to the unique acquisition, tasked with carrying out a source selection. Composition of the team generally consists of the SSA, PCO (if different from the SSA), Source Selection Advisory Council, SSEB, Advisors, Cost/Price Experts, Legal Counsel, Small Business Specialists, and other subject-matter experts.

25. Significant Weakness in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

26. Source Selection Decision Document (SSDD) is the document that reflects the SSA's independent, integrated, comparative assessment and decision.

27. Source Selection Evaluation Board (SSEB) is a group of Government and, if needed, approved non-Government personnel, representing the various functional disciplines relevant to the acquisition.

28. Source Selection Plan (SSP) is a plan that describes how the source selection will be organized, how proposals will be evaluated and analyzed, and how source(s) will be selected.

29. Strength is an aspect of an Offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

30. Terms and Conditions Concerns are issues related to any of the contract provisions in the solicitation.

31. Tradeoff Process is the process which permits tradeoffs among cost or price and non-cost factors and allows the Government to accept other than the lowest priced proposal.

32. Uncertainty is any aspect of a non-cost/price factor proposal for which the intent of the offer is unclear (e.g. more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).

00130-7

33. Weakness means a flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001

1.6 SUBMITTAL REQUIREMENTS

VOLUME I:

1. Past Performance

2. Technical Approach

3. Key Personnel and Project Management Plan

VOLUME II:

4. Small Business Commitment Document

5. Price

1.7 NON-COST EVALUATION FACTORS & SUBMITTAL REQUIREMENTS

1.7.1 FACTOR 1. Past Performance - rated as follows:

An Offeror’s past performance will be evaluated to determine how relevant a recent effort accomplished by the Offeror is to the effort to be acquired through the source selection. Common aspects of relevancy include similarity of service/support, complexity, dollar value, contract type, and degree of subcontracting/teaming.

OFFEROR’S EXTENT OF PAST PERFORMANCE RELEVANCY SHALL BE

DESCRIBED USING THE ADJECTIVAL RATINGS AS FOLLOWS:

Table 1a. PAST PERFORMANCE RELEVANCY RATINGS Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant

Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

OFFEROR’S EXTENT OF PERFORMANCE QUALITY SHALL BE ASSESSED AS

FOLLOWS:

The quality of the Offeror’s recent/relevant past performance efforts will be evaluated. An Offeror’s past performance will also be evaluated to determine how

00130-8 well the Offeror performed on past contracts. Past Performance Quality will be rated in conjunction with the Past Performance Confidence assement rating scale based on the offeror’s overall record of recency and quality of performance.

Documented results from Past Performance Questionnaires, interviews, CPARS, CCASS, and other sources form the support and basis for this assessment.

The Offeror’s strengths, weaknesses, deficiencies, and uncertainties relative to how well the Offeror performed will be assessed using the information provided and gathered as described below.

OFFEROR’S PERFORMANCE CONFIDENCE ASSESSMENT SHALL BE

RATED AS FOLLOWS. THIS RATING CONSIDERS THE ASSESSED

RELEVANCY AND QUALITY OF PAST PERFORMANCE PRESENTED:

Table 1b. PERFORMANCE CONFIDENCE ASSESSMENT RATINGS Rating Description Substantial Confidence

Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.

Satisfactory Confidence

Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

Limited Confidence

Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.

No Confidence

Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.

Unknown Confidence (Neutral)

No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

Offerors will be evaluated on the quality of similar work performed within the last TEN

(10) YEARS using the evidence provided by the Offeror and other sources. Offerors shall submit at least FOUR (4) but no more than SIX (6) past projects for this factor.

Offerors are cautioned to take extreme care in selecting projects for review that are both relevant and accurately reflect the Offeror’s past performance capabilities.

Please note that if the Offeror chooses to provide more than SIX (6) projects, the Government will evaluate only the first SIX (6) projects submitted under this evaluation factor. Any additional projects submitted beyond the SIX (6) allowed will NOT be evaluated. Offerors submitting more than SIX (6) projects risk the Government selecting the first SIX (6) projects which may or may not be the Offeror’s most relevant past performance projects in response to this evaluation factor. Each project will be rated individually as well as collectively for an overall performance confidence assessment rating. The success of work performed on similar requirements as a prime or significant subcontractor will be evaluated.

00130-9

Offerors shall include relevant past performance history that demonstrates experience in providing:

Construction of water diversion channels and canals, inclusive of concrete slope pavement or heavy rip-rap scour material;

Working along busy highways & high traffic areas; Installation of traffic control and coordination mechanisms.

Construction of concrete Railroad and Highway Bridges;

Installation of drilled shafts and concrete piles and familiarity with the local area and the unique conditions of the soils in the Southeast Louisiana region;

Roadway Reconstruction and Asphaltic paving;

Design and installation of retaining walls and temporary structures;

The ability to develop safe and effective demolition methodologies.

Work in close proximity to existing active utilities (overhead transmission and underground pipelines).

Coordination with utility companies.

The emphasis should be on the capability and performance of construction, and should include project delivery within schedule, ability to adapt to changing requirements and conditions, and by providing specific examples of challenges faced and solutions proposed and executed. The Offeror shall include the percentage of the final contract amount that was self-performed work along with a description of that self-performed work.

The information evaluated may include parent or affiliated companies. If past performance information provided is from a parent or affiliated company, the proposal must contain a letter from the parent or affiliated company identifying which of their resources will be available to the Offeror for the proposed work. The letter must also identify what role the parent or affiliated company will have in performance of the proposed work.

Relevant past performance of a parent or affiliate will be evaluated on the same basis as relevant past performance of an individual Offeror, provided that sufficient information is supplied to establish the parent or affiliate's role in the contract work as well as the resources available for such work.

An Offeror relying on the past performance record of a parent or affiliate will not be penalized for that fact. However, such Offeror’s proposal must demonstrate there is a reasonable basis for such reliance; otherwise there will be no basis for crediting the Offeror with the past performance of the parent or affiliate.

The Past Performance Questionnaire (PPQ) included within Section 00130, (Attachment

1) is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor 1, Past Performance. Ensure correct phone numbers and email addresses are provided for the client’s point of contact.

Completed PPQs should be submitted with your proposal. If the Offeror is unable to

00130-10 obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). It is the Offerors’ responsibility to follow-up with clients/references to ensure timely submittal of questionnaires prior to the proposal closing date. As a courtesy, questionnaires shall also be submitted directly to the Government’s point of contact via email at Rachel.A.Woods@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.

However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Also, include performance recognition documents received within the last 10 years, such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through Construction Contract Administration Support System (CCASS) including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership,…