This solicitation seeks maintenance dredging services for the San Joaquin/Port of Stockton River Deep Water Ship Channel. The scope of work includes annual dredging of 14 reaches to depths of -35 to -40 feet MLLW plus 1 foot of overdepth allowance, and transport of dredged materials to various upland disposal sites. Bid quantities for dredging and disposal were provided across 22 line items with estimated totals of 175,900 CY and 178,900 CY respectively. Bids are due by May 23, 2022. The award will be a firm-fixed-price contract for an estimated value between $5-10 million. The solicitation and any amendments will be posted on SAM.gov, and interested parties must register on that site to access documents and updates. The Corps of Engineers District in San Francisco issued this solicitation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P722B0004
X 9B. DATED (SEE ITEM 11)
22-Apr-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to update the bid sheet w ith revised quantities, revise the safety specif ication, and replace the plan sheets.
RFI and answer is also posted.
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-May-2022
CODE
USACE, SAN FRANCISCO DISTRICT
450 GOLDEN GATE
SAN FRANCISCO CA 94102
W912P7 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
This amendment makes changes to the solicitation; these changes represent one of three types, either adding new information, deleting information, or revising existing information. Changes made by this amendment replace the previously issued sections of the advertisement, as referenced in the below summary of changes:
ADVERTISEMENT FRONT-END (DIVISION 00):
(1) Bid sheet updated with revised quantities.
TECHNICAL SPECIFICATIONS (DIVISION 01-49):
(1) Revise specification 01 35 26 page 9- Safety Personnel Training Requirements for Dredging
(2) Replace all plan sheets with plans dated 12 May.
REQUESTS FOR INFORMATION (RFI) - QUESTIONS AND ANSWERS.
All offerors are required to acknowledge this amendment and provide a signed copy of this amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Contract Line Item No.(CLIN)
Description of Supplies and Services *Quantity Unit Unit
Price($) Amount($)
0001 Mobilization and Demobilization 1 Job
0002 Site Prep ANTIOCH DUNES 1 Job
0003 Site Prep MCCORMACK PIT 1 Job
0004 Site Prep BRADFORD ISLAND 1 Job
0005 Site Prep MANDEVILLE 1 Job
0006 Site Prep ROBERTS ISLAND II 1 Job
0007 Site Prep ROBERTS ISLAND I 1 Job
0008 Site Prep ROUGH AND READY ISLAND 1 Job
0009 Dredging Reach 1 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
ANTIOCH DUNES 7,500 CY
7,800 CY
0010 Dredging Reach 2 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
ANTIOCH DUNES 4,100 CY
2,100 CY
0011 Dredging Reach 3 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
MCCORMACK PIT 4,400 CY
3,300 CY
0012 Dredging Reach 4 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
MCCORMACK PIT
5,600 CY
4,700 CY
SECTION 00 10 00
PRICING SCHEDULE
SAN JOAQUIN/STOCKTON DWSC FY22 MAINTENANCE DREDGING WITH DISPOSAL AT VARIOUS
UPLAND SITES
0013 Dredging Reach 5 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
BRADFORD ISLAND 5,800 CY
1,200 CY
0014 Dredging Reach 6 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
BRADFORD ISLAND 13,800 CY
0015 Dredging Reach 7 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
BRADFORD ISLAND 37,700 CY
46,300 CY
0016 Dredging Reach 8 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
MANDEVILLE 8,500 CY
8,300 CY
0017 Dredging Reach 9 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
MANDEVILLE 2,400 CY
0018 Dredging Reach 10 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
ROBERTS ISLAND II 900 CY
700 CY
0019 Dredging Reach 11 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
ROBERTS ISLAND II 1,300 CY
1,400 CY
0020 Dredging Reach 12 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
ROBERTS ISLAND II 7,900 CY
11,600 CY
0021 Dredging Reach 13 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at
ROBERTS ISLAND I 20,300 CY
7,900 CY
0022 Dredging Reach 14 to -40-ft MLLW with Disposal at ROUGH AND READY ISLAND 58,700 CY
80,600 CY
Total (Item 0001 and 0022) Total (Item 0001 and 0020) 175,900 CY + 8 Jobs
178,900 CY + 8 Jobs
Notes:
1 .
2 .
3 .
4 .
5 .
6 .
7 .
End of Document
The Contractor shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.
Dredge material placement shall meet the requirements in specification Section
01 11 00 SUMMARY OF WORK.
* - ALL QUANTITIES ARE ESTIMATES. SEE FAR 52.211-18, SECTION 00 72 00 (GENERAL
CONDITION) OF THE CONTRACT.
To be considered responsive, prices must be submitted on all individual items within Pricing Schedule. Failure to do so may be cause for rejection of bids.
Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms Page 1 and Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.
The term "Job", which appears on the Pricing Schedule (Section 00 01 00) under “Unit” for Bid Item No. 0001,0002,0003,0004,0005,0006,0007,0008 shall be considered as a Lump Sum. The Variation in Estimated Quantities contract clause, FAR 52.211-18, shall not apply to Bid Item No.
0001,0002,0003,0004,0005,0006,0007,0008.
BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214-19 Contract Award – Sealed Bidding – Construction.
The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.
San Joaquin-Stockton DWSC FY22 Maintenance Dredging 100% W912P722B0004
b. A DR shall be appointed for all remote work locations more than 45 minutes' travel time from the SSHO's duty location, typically including dredged material placement sites, towing and scow operations, and other operations.
c. The DRs will perform safety program tasks as designated by the SSHO and report safety findings to the SSHO/Alternate SSHO. The SSHO shall document results of safety findings and provide information for inclusion in the CQC reports to the Government Representative.
1.6.1.2.4 Safety Personnel Training Requirements for Dredging a.
The SSHO, and Alternate SSHO , and Designated Representatives for dredging contracts shall must take either the OSHA 30-hour Construction Safety Course or an equivalent 30 hours of a formal classroom or online safety and health training covering the subjects of the OSHA 30-hour Course in accordance with (see EM 385-1-1 Appendix A, paragraph 4. b) d.(3), applicable to dredging work and given by qualified instructors. In exception to EM 385-1-1, Section 01.A.17, comply with the following:
a. The SSHO must maintain competency through having taken 8 hours of formal classroom or online safety and health related coursework every year for, at minimum, the last 3 years. Hours spent as an instructor in such courses will be considered the same as attending them, but each course only gets credit once (for example, instructing a 1-hour asbestos awareness course five times in a year provides one hour credit for training).
b. The SSHO s and CDSO shall must also have a minimum of three years of experience within the past five years in one of the following: taken 24 hours of formal classroom or online safety and health related coursework in the past four (4) years. Hours spent as an instructor in such courses will be considered the same as attending them, but each course only gets credit once (i.e. Instructing a 1-hour asbestos awareness course 5 times in the past 4 years provides one hour credit for training).
c
(1) . The SSHO, Alternate SSHO, and Designated Representatives shall have a minimum of three years' continuous experience within the past 5 years in s Supervising/ managing dredging activities , marine or land-based construction, work ( managing safety programs or processes , or and conducting hazard analyses and developing controls in activities or environments with similar hazards ) .
(2) Supervising/ managing marine construction activities (managing safety programs or processes and conducting hazard analyses and developing controls in activities or environments with similar hazards).
(3) Supervising/ managing land-based construction activities (managing safety programs or processes and conducting hazard analyses and developing controls in activities or environments with similar hazards). This is in lieu of the experience required by paragraph 01.A.17.b, EM 385-1-1 .
SECTION 01 35 26 Page 9 Mar 30, 2022
S O L I C I T A T I O N
| W912P722B0004-S.JoaquinDWSC_FY22 - Amendment-1.pdf |
| SanJoaq-StocktonFY22_BidSchedule - Amendment(12May22).pdf |
| BidSchAlt1 (-35'+1'OD) |
File details come from the government source that posted it. Updated .