W912P722B00004 Amendment 2.pdf

PDF 564 KB Posted

Attached to
FY22 San Joaquin/Port of Stockton DWSC Maintenance Dredging
Solicitation number
W912P722B0004
Issued by

About this file

This document contains an amendment to a solicitation for annual maintenance dredging of the San Joaquin/Port of Stockton River Deep Water Ship Channel. The amendment extends the bid due date to May 31st, 2022 and updates specifications, drawings, and the bid sheet to reflect a change in disposal sites.

The solicitation seeks bids for dredging fourteen reaches of the channel to depths of -35 to -40 feet MLLW, plus one foot of overdepth, with dredged material to be disposed at various upland sites. Estimated quantities to be dredged total approximately 178,900 cubic yards. Bids are to be submitted using the pricing schedule detailing unit rates for dredging and disposal for each reach. The low bidder will be awarded a firm fixed-price contract for mobilization, site preparation at eight locations, and dredging and disposal. The bid due date is now May 31st, 2022.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P722B0004

X 9B. DATED (SEE ITEM 11)

22-Apr-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to extend the bid due date to Tuesday, May 31, 2022. The amendment also updates specifications, drawings, and the bid sheet to reflect a change in disposal site. See page 2 for more details

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-May-2022 CODE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

This amendment makes changes to the solicitation; these changes represent one of three types, either adding new information, deleting information, or revising existing information. Changes made by this amendment replace the previously issued sections of the advertisement, as referenced in the below summary of changes:

ADVERTISEMENT FRONT-END (DIVISION 00)

(1) Bid sheet updated to reflect disposal site changes

TECHNICAL SPECIFICATIONS (DIVISION 01-49):

(1) Revise Section 35 20 23 page 10 to reflect disposal site changes

DRAWINGS:

(1) Revised Attachment 6 & 7

(2) Revised G-03 drawing and corresponding footnotes

All offerors are required to acknowledge this amendment and provide a signed copy of this amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.

Contract Line Item No.(CLIN)

Description of Supplies and Services *Quantity Unit Unit

Price($) Amount($)

0001 Mobilization and Demobilization 1 Job

0002 Site Prep ANTIOCH DUNES 1 Job

0003 Site Prep MCCORMACK PIT SCOUR POND 1 Job

0004 Site Prep BRADFORD ISLAND 1 Job

0005 Site Prep MANDEVILLE 1 Job

0006 Site Prep ROBERTS ISLAND II 1 Job

0007 Site Prep ROBERTS ISLAND I 1 Job

0008 Site Prep ROUGH AND READY ISLAND 1 Job

0009 Dredging Reach 1 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

ANTIOCH DUNES 7,500 CY

7,800 CY

0010 Dredging Reach 2 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

ANTIOCH DUNES SCOUR POND 4,100 CY

2,100 CY

0011 Dredging Reach 3 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

MCCORMACK PIT SCOUR POND 4,400 CY

3,300 CY

0012 Dredging Reach 4 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

MCCORMACK PIT SCOUR POND

5,600 CY

4,700 CY

SECTION 00 10 00

PRICING SCHEDULE

SAN JOAQUIN/STOCKTON DWSC FY22 MAINTENANCE DREDGING WITH DISPOSAL AT VARIOUS

UPLAND SITES

0013 Dredging Reach 5 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

BRADFORD ISLAND 5,800 CY

1,200 CY

0014 Dredging Reach 6 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

BRADFORD ISLAND 13,800 CY

0015 Dredging Reach 7 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

BRADFORD ISLAND 37,700 CY

46,300 CY

0016 Dredging Reach 8 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

MANDEVILLE 8,500 CY

8,300 CY

0017 Dredging Reach 9 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

MANDEVILLE 2,400 CY

0018 Dredging Reach 10 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

ROBERTS ISLAND II 900 CY

700 CY

0019 Dredging Reach 11 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

ROBERTS ISLAND II 1,300 CY

1,400 CY

0020 Dredging Reach 12 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

ROBERTS ISLAND II 7,900 CY

11,600 CY

0021 Dredging Reach 13 to -35-ft MLLW including 1-foot of paid Over-depth with Disposal at

ROBERTS ISLAND I 20,300 CY

7,900 CY

0022 Dredging Reach 14 to -40-ft MLLW with Disposal at ROUGH AND READY ISLAND 58,700 CY

80,600 CY

Total (Item 0001 through 0022) 178,900 CY + 8 Jobs Total (Item 0001 and 0020) 175,900 CY + 8 Jobs__________________________ ___________________

Notes:

1 .

2 .

3 .

4 .

5 .

6 .

7 . Dredge material placement shall meet the requirements in specification Section

01 11 00 SUMMARY OF WORK.

* - ALL QUANTITIES ARE ESTIMATES. SEE FAR 52.211-18, SECTION 00 72 00 (GENERAL

CONDITION) OF THE CONTRACT.

To be considered responsive, prices must be submitted on all individual items within Pricing Schedule. Failure to do so may be cause for rejection of bids.

Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms Page 1 and Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.

The term "Job", which appears on the Pricing Schedule (Section 00 01 00) under “Unit” for Bid Item No. 0001,0002,0003,0004,0005,0006,0007,0008 shall be considered as a Lump Sum. The Variation in Estimated Quantities contract clause, FAR 52.211-18, shall not apply to Bid Item No.

0001,0002,0003,0004,0005,0006,0007,0008.

BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214-19 Contract Award – Sealed Bidding – Construction.

The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.

The Contractor shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.

SanJoaq-StocktonFY22_BidSchedule - Amendment2 (19May22).pdf
BidSchAlt1 (-35'+1'OD)

File details come from the government source that posted it. Updated .