AMENDMENT 0003 W912P621R0010 CHICAGO HBR LOCK CHAMBER FLOOR AND WALL REPAIR.pdf
PDF 4 MB Posted
- Solicitation number
- W912P621R0010
About this file
This solicitation package requests proposals for the Chicago Harbor Lock Chamber Floor and Wall Repair project in Chicago, Illinois. Under the contract, the selected contractor will be required to repair the chamber floor and walls at the Chicago Harbor Lock to create a secure and durable floor and ensure the north and south walls can withstand forces from extreme weather and passing vessels. Proposals are due by 4:30 p.m. Central Time on August 31, 2021. The estimated value of the construction work is between $25-100 million. The solicitation is available only in PDF format from the provided Internet site. The U.S. Army Corps of Engineers Chicago District is the contracting office for this full and open competition available to all business sizes.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6610966491
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: REQUEST FOR PROPOSALS (RFP) NO. W912P621R0010, CHICAGO HARBOR LOCK CHAMBER FLOOR AND WALL REPAIR, CHICAGO, COOK COUNTY, ILLINOIS
A. The Proposal Due Date is unchanged. The Proposal Due Time is changed by this Amendment. Therefore, proposals are due prior to 9:00 a.m. (Central Time) on September 7, 2021. -For further details regarding offer and evalutation inf ormation, please refer to Solictation Section 00 21 16 - Instructions to Proposers.
-- THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES --
1. CONTRACT ID CODE PAGE OF PAGES
1 29
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P621R0010
X 9B. DATED (SEE ITEM 11)
30-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2021
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P621R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
B. REVISED BID SCHEDULE: The government is providing a revised bid schedule (Section 00 10 00 – Solicitation Contrat Form), which corrects quantities of Item No. 0005AC (Cofferdam and Dewatering), Item No.
0005AD (New Steel Ladders) and Item No. 0005AE (New Steel Bullnose). As a result of the revisions, Proposers shall remove and replace the previously issued respective Section with the Revised Section 00 10 00 enclosed hereunder. Proposers shall provide their prices on the Revised Pricing Schedule.
C. AMENDED SPECIFICATION SECTIONS: The following Specification Sections have been revised. The revised sections are enclosed hereunder and replace the previously furnished sections.
SECTION 00 31 32.13, Subsurface Drilling and Sampling
• Paragraph 1.2 – Updated boring requirements and directives,
• Paragraph 3.2 – Updated requirements for subsurface investigation report
SECTION 03 30 53, Cast-In-Place Concrete
• Paragraph 2.2.4 – Updated fiber mesh requirements
SECTION 05 50 15, Civil Works Fabrication
• Paragraph 2.2.1 – Removed language referencing grouting
SECTION 31 63 33, Self - Drilling Hollow Bar Tension Micropiles
• Paragraph 3.6.2.1 – Updated testing accuracy to 1/1000 inch for micro piles. Updated testing location to be in parking lot, exact location to be specified by COR.
• Paragraph 3.6.3.1 - Updated testing accuracy to 1/1000 inch for micro piles. Updated bond breaker, underwater testing, and other misc requirements
D. AMENDED DRAWING SHEETS: The following Drawing Sheets have been revised and are hereunder enclosed replacing the previously furnished respective sheets.
SHEET REF.
NO.
SHEET TITLE DESCRIPTION
G-001 Location & Vicinity Map
Index Updated
SD-304 Wall Demolition w/o Bullnose section
New Sheet – Included section of the wall where no steel bullnose exists and showed demolition line
S-107, 108, 109, 110
Plan & Elevation Sheets
Added callout to steel bullnose placement areas
S-303 Lock Chamber Cross Section
Added callouts to clarify rock embedment for anchors
S-305 Wall Rehab w/ Bullnose Section
New Sheet – Included section of the wall where bullnose will be installed
E. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries.
INQUIRY 1: Specification notes that glass fiber reinforcement shall conform to relevant codes. Please identify which codes this material is required to meet.
USACE RESPONSE INQUIRY 1: The government is no longer specifying glass fiber reinforcement, but some form of fiber reinforcement is required. The relevant code is ASTM C-1116.
INQUIRY 2: Addendum 1 added a pay item for replacement of a portion of the steel bullnose section off the lock wall, however no cross sections or details were provided for the demo limits in these areas or how the new bullnose will be cast in place in concrete. Please provide additional details for this added work item.
USACE RESPONSE INQUIRY 2: See updated drawing sheets SD-304 and S-305 via this Amendment No.
0003.
INQUIRY 3: Section 01 22 00- 1.1.4.1 states “that whenever gates are opened the Contractor must again perform activities in approved Ecological protection plan to remove mudpuppies from lock chamber.” Does this refer to the east gates separating the lock from the lake, or both sets? If this refers to both sets of gates, is this work necessary if or when the west gates to the river remains open during construction? Additionally, Is this work required any time the gates are opened for ice flushing or water flushing due to leakage from the gates?
USACE RESPONSE INQUIRY 3: Section 1.1.4.1 refers to both gates. It applies when the west river gate remains open during construction. However, activities in the ecological protection plan need not be performed while there is no active work being performed that would negatively impact the mudpuppies.
INQUIRY 4: Specification section 05 50 15-2.2.1 mentions that “Tolerances apply before and after grouting of the panels” however the documents provide no other details or references to grouting requirements. If grouting of the new bull nose plates is required, please provide information on what type of grouting is expected.
USACE RESPONSE INQUIRY 4: There are no grouting requirements, plates will be installed during wall resurfacing and adhere to the cast in place concrete. See updated language Section 05 50 15 in amendment #003.
INQUIRY 5: Specification 01 11 00 -1.1.1 notes the precast panels are 6 feet x 27 feet x 8-inches, while drawing CS-301 note 3 states 6 feet x 27 feet x 8.5-inches. Please confirm the correct panel thickness.
USACE RESPONSE INQUIRY 5: The specification is correct; the existing precast panels are 6 feet x 27 feet x 8-inches.
INQUIRY 6: There will be a need for various levels of water use throughout construction. Is a water source present on site that would be available for the contractor to use?
USACE RESPONSE INQUIRY 6: There are no water utilities present on site.
INQUIRY 7: Please confirm that clean water discharged from dewatering pumps can be directly discharged into the lock area?
USACE RESPONSE INQUIRY 7: All water discharged from dewatering pumps would need to be clean and meet the water quality standards. As stated in the project specifications (see Subparagraph 1.7.3(q) of Section 01 57 20.01 03 (Environmental Protection for Illinois)), “For the Chicago Harbor Lock Floor and Wall Repair Project, the waste water management plan shall not allow the discharge of effluent from the dewatering operations or any waste water to Lake Michigan. The effluent from the dewatering operations must be discharged to the Chicago River side of the lock chamber.” Paragraph 3.3.1 (Cofferdams, Diversions, and Dewatering Operations) of this same section says, “For the Chicago Harbor Lock Floor and Wall Repair Project, the Contractor shall not discharge effluent from the dewatering operations or any waste water to Lake Michigan. The effluent from the dewatering operations must be discharged to the Chicago River side of the lock chamber; not within the lock chamber.” Paragraph 3.1 (Environmental Permits and Commitments) of Section 01 57 20.01 03 explains that the Contractor must comply with all applicable permits and Federal, State, regional, and local environmental laws and regulations.
INQUIRY 8: The Contractor anticipates a significant amount of power will be needed for maintenance of winter conditions. What level of power hookups are present on the site that would be available for contractor to utilize?
How many amps, what voltage, and what phase are the hookups?
USACE RESPONSE INQUIRY 8: The contractor is responsible for suppling power for construction activities. There is a 750 kVA transformer on the north chamber wall which has 480/277V on the secondary side. The contractor can coordinate with ComEd to hook-up and separately meter power from the transformer.
INQUIRY 9: The revised RFP deleted the requirement for a gantt chart to be included in the submission. If Contractor would like to include a gantt chart in the submission, would this gantt chart count against the specified page limit?
USACE RESPONSE INQUIRY 9: Please propose as shown in Evaluation Criteria paragraph 5.2.1, no additional information will be provided.
INQUIRY 10: Considering both the east and west sector lock gates have some level of water leakage, will there be a need for the USACE to periodically open the gates to manage the water level inside the lock throughout the project?
USACE RESPONSE INQUIRY 10: No. The water level within the chamber can fluctuate between the lake and river levels.
INQUIRY 11: Considering both the east and west sector lock gates have some level of water leakage, does the USACE have any parameters/specific requirements for water level inside the lock and how it relates to the water level of the lake and the river?
USACE RESPONSE INQUIRY 11: No. The water level in the chamber can vary between as high as the lake level or as low as the river level.
INQUIRY 12: Considering both the east and west sector lock gates have some level of water leakage, will the Contractor be permitted to open the west sector gate as needed to manage the water level inside the lock?
USACE RESPONSE INQUIRY 12: Yes. The contractor can open the west sector gate as needed to manage the water level inside the lock.
INQUIRY 13: The Environment Protection for Illinois Specification (Section 01 57 20.01 03), Subsection 1.7.3.q, requires the Contractor to filter or otherwise treat waste water or other water derived from the construction activities prior to any discharge to the Chicago River. Considering both the east and west sector lock gates have some level of water leakage there will be some amount of water flow from the lock chamber to the Chicago River. Is the Contractor expected to filter and treat all water that flows from the lock chamber to the Chicago River, or is the filter and treatment limited to water that is specifically generated from construction operations?
USACE RESPONSE INQUIRY 13: In accordance with subparagraph 1.7.3(q) of Section 01 57 20.01 03, the Contractor must prevent the water in the lock chamber from causing adverse impacts to the water quality of the adjacent waterways (Chicago River or Lake Michigan). This same subparagraph explains that for all the proposed work activities to repair to the Chicago Harbor Lock floor, such as excavation of existing floor panels, dredging, and placement of new materials and tremie concrete, the waste water management plan must provide the details of the controls, materials, procedures, and water quality monitoring that will be used to ensure compliance with all the terms and conditions of the Lake Michigan Regional General Permit and Section 401 Water Quality Certification for that permit. As discussed in the Contractor’s question, it is expected that there would be some level of water leakage under normal conditions, so some amount of water will flow from the lock chamber to the Chicago River. The amount of leakage varies with the difference in the water levels between Lake Michigan and the Chicago River. During July 2021, the leakage through the Chicago River Controlling Works was estimated to vary from 11.83 to 14.33 cubic feet per second. Since the lock gates were replaced in 2011, the leakage may be less. The amount of filtration and treatment that will be needed to meet the terms and conditions of the Lake Michigan General Permit and Section 401 Water Quality Certification depends upon the Contractor’s waste water management plan (i.e., the controls, materials, procedures, and water quality monitoring). The Contractor will be expected to prepare a detailed plan to ensure that the construction operations will not cause adverse impacts to the water quality of the adjacent waterways. As indicated in subparagraph 1.7.3(q) of Section 01 57 20.01 03, adverse impacts to the water quality, such as increased turbidity and pH, must be minimized, and it is presumed that the lock gates will generally remain closed during work activities. Also see the answer to Q14 below.
INQUIRY 14: The Environment Protection for Illinois Specification (Section 01 57 20.01 03), Subsection 1.7.3.q, states the lock gates must not be opened until the quality of the water contained within the lock chamber has been tested to ensure it meets the Illinois Environmental Protection Agency’s water quality standards. Considering both the east and west sector lock gates have some level of water leakage there will be some amount of continual water flow from the lock chamber to the Chicago River. Please clarify the expectations if and how the Contractor is expected to constantly monitor and treat water inside the lock chamber to meet the Illinois EPA water quality standards.
USACE RESPONSE INQUIRY 14: See answer to Q13. The Contractor will be expected to prepare a detailed plan explaining the controls, materials, procedures, and water quality monitoring that will be utilized to ensure that the construction operations will comply with the terms and conditions of the Lake Michigan General Permit and Section 401 Water Quality Certification and will not cause adverse impacts to the water quality of the adjacent waterways. As indicated in subparagraph 1.7.3(q) of Section 01 57 20.01 03, adverse impacts to the water quality, such as increased turbidity and pH, must be minimized, and it is presumed that the lock gates will generally remain closed during work activities. If the lock gates must be temporarily opened while the water in the lock chamber is turbid, the Contractor needs to use a silt turbidity curtain described in SECTION 01 57 19.10 03 SILT TURBIDITY CURTAIN to minimize any adverse impacts to the water quality while the lock gates are opened. The purpose of the water quality monitoring is to verify that the construction activities are not causing violations of the applicable water quality standards outside the lock chamber and they are not causing adverse impacts to the adjacent waterways. A silt curtain could also be used as a contingency if there is a large amount of leakage through the lock gates. Constant monitoring and/or treatment should not be necessary if periodic monitoring indicates the construction operations in the lock chamber are not causing violations of the water quality standards in the Chicago River. There are a variety of techniques and equipment, as well as controls, materials, and procedures that could be utilized for the different activities to minimize adverse impacts to the water quality and prevent violations of the applicable water quality standards of adjacent waterways. For instance, for mechanical dredging, the U.S.
Army Corps of Engineers (USACE) occasionally uses an enclosed clamshell bucket to help minimize the resuspension of the sediment during maintenance dredging. EM 1110-2-5025 (Dredging and Dredged Material Management – July 31, 2015), Appendix B, explains that the turbidity generated by a bucket dredge operation comes from four major sources: sediment suspension occurring upon bucket impact and withdrawal from the bottom, loss of material from the top and sides of a bucket as it is pulled up through the water column, spillage of turbid water out of the bucket when it breaks the water surface, and inadvertent spillage of material during barge loading or intentional overflow operations intended to increase barge effective load. A number of variables can affect the quantity of material suspended by the dredge, such as sediment type, bucket size and type (open or enclosed), volume of sediment dredged, hoisting speed, and hydrodynamic conditions at the dredging site. Operator training and performance are important contributing factors.
INQUIRY 15: We are seeing some discrepancies between bid item quantities within Ammendment 001 and quantities taken from the drawings. Bid item 0003AE DREDGING, 003AG AGGREGATE BASE & 0003AH REINFORCED TREMIE CONCRETE SLAB state a quantity of 12,115 SF AND Bid item 0003AF ROCK ANCHORS states a quantity of 40. This correlates with drawing No. S-105. This is assumed to be the only chamber floor resurfacing done within the Base Bid package of work.
-Option 2 – Floor West Side – Bid item 0008AC DREDGING, 008AE AGGREGATE BASE state a quantity of 120,005 SF. Bid item 008AF REINFORCED TREMIE CONCRETE SLAB states a quantity of 12,005 SF. It is interpreted that the 120,005 SF quantities are a typo and the dredging and aggregate base square footage is identical to the reinforced tremie concrete slab quantity of 12,005 SF. Bid Item 0008AD ROCK ANCHORS has quantity of
40. Also It is interpreted that these bid item quantities of 12,005 SF and 40 rock anchors are the ones shown on drawing NO. S-106.
-Detail C1 on drawing no. S-304, shows the detail of the new concrete slab transitioning into the existing concrete floor panels.
-Given the above three statements this would mean that extents of the chamber floor concrete slab, rock anchors, aggregate base, dredging, and existing pre-cast slab removal would take place in only the areas shown on drawings S-105 & S-106, and then transition into the pre-cast floor panels as shown on detail C1 on drawing S-304.
However, drawing S-107 and S-108 from Amendment 001 show two sections that are in the middle of the lock chamber with additional rock anchors, concrete slab, etc. Is it USACE’s intent to include these two drawings in this contract solicitation? If so what option do these areas fall into?
USACE RESPONSE INQUIRY 15: Please refer to Amendment No. 0002 of CLIN 0008AE. The original sheets S-107 and S-108 have been replaced in their entirety with new sheets (per Amendment No. 0001).
These sheets depict wall elevation and plan views. The old S-107 and S-108 which depicted the middle section of the floor are no longer apart of the contract set.
INQUIRY 16: We are requesting USACE to allow us to perform a site visit in order to perform a preliminary ROV inspection of the lock chamber floor. We are requesting to do this inspection within the week of 8-23-21 to 8-27-21.
We would be able to perform this inspection at anytime in order to avoid hindering lock operations. We have reached out via phone call to Lynn Ewing, but she was unavailable at the time, therefore we are submitting our request via this method.
USACE RESPONSE INQUIRY 16: USACE cannot permit any site visits beyond the pre-proposal meeting which was held on 10-August-2021.
INQUIRY 17: Would USACE allow a bid extension for this solicitation?
USACE RESPONSE INQUIRY 17: Please propose as shown, no additional information will be provided.
Please refer to Amendment No. 0002.
INQUIRY 18: Regarding the contractor experience for micro piles. The installation of the micro piles appears to be more of a post-tension anchor application being that the floor is being anchored down to prevent uplift. Will the Government consider past experience in drilling and installation of post-tension anchors as satisfactory experience?
USACE RESPONSE INQUIRY 18: As noted in S-302 - Note 6, the tension micropile is a passive system.
However, past experience in drilling and installing post-tensions anchors is acceptable for past experience.
INQUIRY 19: The plans and specifications indicate drilling for micro piles to be a minimum bond length of 16 FT into competent unfractured rock containing no voids greater than 2 IN in diameter. How will this be determined?
Will the Government have third party inspection to monitor the Contractor’s drilling? Or is the Contractor to base our depths on the geotech information provided?
USACE RESPONSE INQUIRY 19: See updated specification 00 31 32.13 and sheet S-303 for clarification via this Amendment No. 0003.
INQUIRY 20: During testing of micro piles the specifications state to record deflection of the hollow bars with a dial indicator to 1/1000 of a foot. Was this meant to be 1/1000 of an inch as is standard? Also, was this procedure intended to be performed above or below water? The accuracy of a dial indicator underwater will not be very accurate.
USACE RESPONSE INQUIRY 20: The specification will be updated to read 1/1000 inch. The readings procedure by dial indicator is intended to be performed above water for both verification and proof testing.
See updated specification 31 63 33 that provides clarification regarding the verification test that must be conducted in the parking lot and the proof testing underwater in this Amendment No. 0003.
INQUIRY 21: The plans and specifications do not indicate a bond breaker around the free length of the hollow bar above the bond zone within the bedrock. What is to be the assumed free length for deflection calculations? Does the Government feel a bond breaker is necessary?
USACE RESPONSE INQUIRY 21: Bond breaker is not required around the free length of the hollow bar above the bond zone of the bedrock.
INQUIRY 22: The plans show a bottom hex nut beneath the tension micro pile plate. This will hinder the testing of the anchor if it can’t be left loose enough and there would be no way to tighten it after testing with concrete around
it. With the elongation of the bar, the nut would likely be pulling against the bottom of the plate when testing to twice the design load. Can this bottom nut be omitted since it appears the micro piles are intended to prevent the uplift and not sinking?
USACE RESPONSE INQUIRY 22: For proof testing underwater, bond breaker must be applied for 10% of tension micropiles and their plates and bottom nuts to allow for elongation movement freely during testing;
see updated specification 31 63 33 - 3.6.3 in this Amendment No. 0003.
INQUIRY 23: Is the contractor required to perform additional borings as it appears to state in Section 00 31 32, or if the contractor feels the government supplied information is sufficient, are additional borings required?
USACE RESPONSE INQUIRY 23: Contractor to propose the contract as written.
INQUIRY 24: Please reference the below CLINS and QTY associated with them. We believe the quantities are incorrect. Please advise.
Item 0005AC Concrete Re-Surface with Bullnose quantity is listed as 11,465 linear foot
Item 0005AD New Steel Ladders quantity is listed as 36 each
Item 0005AE New Steel Bullnose quantity is listed as 11,900 linear foot
USACE RESPONSE INQUIRY 24: Quantities in error and are corrected by this Amendment No. 0003.
Offerors are to remove and replace previously furnished pricing schedule with revised pricing schedule via this Amendment No. 0003.
INQUIRY 25: For the tile gauge replacement: Please advise the square footage of replacement, depth of removal, & Environmental/dewatering/cofferdam requirements.
USACE RESPONSE INQUIRY 25: Typical square footage and total depth is unknown, contractor to field verify. No known environmental issues for disposal. Means and methods to replace the tile gauge to be determined by the Contractor.
INQUIRY 26: Please advise if pneumatically placed concrete (Shotcrete) would be acceptable method for wall construction.
USACE RESPONSE INQUIRY 26: Shotcrete is not acceptable.
Note: To avoid the government's inability to timely award this critical project, Offerors must submit any and all questions prior to 12:00 noon on Tuesday, August 31, 2021. Questions received after this date will not be considered.
F. POINT OF CONTACT: The Point of Contact for this Amendment is Ericka Hillard at ericka.d.hilard@usace.army.mil.
END OF AMENDMENT NO. 0003
(REVISED PRICING SCHEDULE AND REVISED SPECIFICATIONS AND DRAWINGS FOLLOWS
ON THE NEXT PAGES)
REVISED (VIA AMENDMENT NO. 0003)
Section 00 10 00 – Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE WORK -
FFP
WALLS PHASE 3 & 4, FLOOR EAST SIDE
WALL RESURFACING (BASE WORK - YEARS 2022/2023)
This is a Parent Line Item identifying the work that relates directly to its Sub-Line Items 0001AA through 0004; the Sub-Line Items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide the pricing separately at Sub-Items 0001AA through 0004.
PURCHASE REQUEST NUMBER: W81G6610966491
NET AMT
0001AA 1 Job
MOBILIZATION/DEMOBILIZATION
FFP
(FOR THE WORK OF 0001AB THROUGH 0001AD)
Under this CLIN, the contractor is required to perform mobilization and demobilization activities. Reference: SOLICITATION SECTION 00 70 00, SEE DFARS Clause 252.236-7004 Payment for Mobilization and Demobilization.
PSC CD: Y1PZ
0001AB 1 Job
COFFERDAM AND DEWATERING
FFP
0001AC 540 Linear
Foot
CONCRETE RE-SURFACE WITH BULLNOSE
0001AD 2 Each
NEW STEEL LADDERS
WALKWAY RESURFACING
FFP
(BASE WORK - YEARS 2022/2023)
This is a Parent Line Item identifying the work that relates directly to its Sub-Line Items 0002AA through 0002AE; the Sub-Line Items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide the pricing separately at Sub-Items 0002 through 0002AE.
0002AA 540 Linear
REINFORCED CONCRETE WALKWAY
0002AB 9 Each
RE-INSTALL YELLOW CLEATS
0002AC 19 Each
NEW RED CLEATS
0002AD 6 Each
NEW CHECKPOST
0002AE 540 Linear
NEW RAILING
TREMIE CONCRETE FLOOR
FFP
(BASE WORK - YEARS 2023/2024)
This is a Parent Line Item identifying the work that relates directly to its Sub-Line Items 0003AA through 0003AH; the Sub-Line Items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide the pricing separately at Sub-Items 0003AA through 0003AH.
0003AA 1 Job
UNDERWATER TREMIE CONCRETE DEMONSTRATION
0003AB 1 Job
MOBILIZATION/DEMOBILIZATION
FFP
(FOR THE WORK OF 0003AB THROUGH 0003AG)
Under this CLIN, the contractor is required to perform mobilization and demobilization activities. Reference: SOLICITATION SECTION 00 70 00, SEE
0003AC 1 Job
MUD PUPPIES - BAIT, TRAP, & RELEASE
FFP
PROGRAM
0003AD 1 Job
REMOVE EXISTING PRE-CAST FLOOR PANELS &
FFP
& CONCRETE DEBRIS
0003AE 12,115 Square
DREDGING
0003AF 40 Each
ROCK ANCHORS
0003AG 12,115 Square
AGGREGATE BASE
0003AH 12,115 Square
REINFORCED TREMIE CONCRETE SLAB
0004 1 Lot
PERFORMANCE AND PAYMENT BONDS
FFP
This item is for bond coverage, which is applicable to line items 0001AA through
0003AH
Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (Payments under Fixed Price Construction Contracts).
Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15, Performance and Payment Bonds- Construction).
OPTION GROUP OPTION 1 ITEMS - FLOOR WEST SIDE
FFP
WALL RESURFACING (OPTION WORK - YEARS 2024/2025)
This is a Parent Line Item identifying the work that relates directly to its Sub-Line Items 0005 through 0007; the Sub-Line Items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide the pricing separately at Sub-Items 0005 through 0007.
0005AA 1 Job
OPTION MOBILIZATION/DEMOBILIZATION
FFP
(FOR THE WORK OF 0005AB THROUGH 0005AF)
Under this CLIN, the contractor is required to perform mobilization and demobilization activities. Reference: SOLICITATION SECTION 00 70 00, SEE
0005AB 1 Job
OPTION COFFERDAM AND DEWATERING
0005AC 540 Linear
OPTION CONCRETE RE-SURFACE WITH BULLNOSE
0005AD 4 Each
OPTION NEW STEEL LADDERS
0005AE 105 Linear
OPTION NEW STEEL BULLNOSE
OPTION WALKWAY RESURFACING
FFP
(OPTION WORK - YEARS 2024/2025)
This is a Parent Line Item identifying the work that relates directly to its Sub-Line Items 0006; the Sub-Line Items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide the pricing separately at Sub-Items 0006.
0006AA 540 Linear
OPTION REINFORCED CONCRETE WALKWAY
0006AB 11 Each
OPTION RE-INSTALL YELLOW CLEATS
0006AC 17 Each
OPTION NEW RED CLEATS
0006AD 7 Each
OPTION NEW CHECKPOST
0006AE 540 Linear
OPTION NEW RAILING
0007 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
This item is for bond coverage, which is applicable to line items 0005AA through
0006AE
Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (Payments under Fixed Price Construction Contracts).
Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15, Performance and Payment Bonds-
OPTION GROUP OPTION 2 ITEMS - FLOOR WEST SIDE
FFP
TREMIE CONCRETE FLOOR (OPTION WORK - YEARS 2025/2026)
This is a Parent Line Item identifying the work that relates directly to its Sub-Line Items 0008 through 0010; the Sub-Line Items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide the pricing separately at Sub-Items 0008 through 0010.
0008AA 1 Job
OPTION MOBILIZATION/DEMOBILIZATION
FFP
(FOR THE WORK OF 0008AA THROUGH 0008AF)
Under this CLIN, the contractor is required to perform mobilization and demobilization activities. Reference: SOLICITATION SECTION 00 70 00, SEE
0008AB 1 Job
OPTION REMOVE EXISTING PRE-CAST FLOOR PANELS
0008AC 12,005 Square
OPTION DREDGING
0008AD 40 Each
OPTION ROCK ANCHORS
0008AE 12,005 Square
OPTION AGGREGATE BASE
0008AF 12,005 Square
OPTION REINFORCED TREMIE CONCRETE SLAB
0009 1 Job
OPTION MUD PUPPIES - BAIT, TRAP, & RELEASE
FFP
PROGRAM
0010 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
This item is for bond coverage, which is applicable to line items 0008AA through
Payment for bond premiums will be in accordance with paragraph (a) of FAR Clause 52.232-5 (Payments under Fixed Price Construction Contracts).
Adjustment(s) to the line item will also be made for any revisions associated with contract price changes (re: FAR 52.228-15, Performance and Payment Bonds-
SUMMATION OF PROPOSED PRICING
- THE CONTRACTOR SHALL ENSURE ITS PRCING SET FORTH BELOW IS ACCURATE AND
PROPERLY CALCULATED -
SUBTOTAL BASE WORK ITEMS (0001AA THROUGH 0004):
SUBTOTAL OPTION 1 WORK ITEMS (0005AA THROUGH 0007):
SUBTOTAL OPTION 2 WORK ITEMS (0008AA THROUGH 00010):
OVERALL PROPOSED PRICE (TOTAL OF ALL AFOREMENTIONED SUBTOTALS):
END OF REVISED PRICING SCHEDULE
PROJECT AREA
PROJECT AREA
ACCESS ROUTE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
P
R O J E
C T I
D
F
IL
E N
A M
E
F
IL
E N
A M
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
C O
N T
R A
C T N
U M
B E
R
CONTRACT NUMBER
C O
O K C
O U
N T
Y I L L
IN
O
IS
C H
IC
A G
O L
O C
K C
H A
M B
E R
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
COOK COUNTY ILLINOIS
CHICAGO LOCK CHAMBER
CHICAGO DISTRICT
4:26:11 PM 8/24/2021
...\FLOOR AND WALL REPAIRS-114419-OWINumber\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\AEC_G-001.dgn
PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
S
A
C
G -0
.d g n
ALL DRAWINGS IN THIS SET.
INDICATE OFFICIAL RECOMMENDATION OF
REQUIRED BY ER 1110-1-8152. SIGNATURES
THE SCOPE OF THEIR EMPLOYMENT AS
ON THESE PROJECT DOCUMENTS WITHIN
TION DESIGNATIONS OF INDIVIDUALS APPEAR
INITIALS OR SIGNATURES AND REGISTRA-
CHICAGO DISTRICT CORPS OF ENGINEERS. THE
THIS PROJECT WAS DESIGNED BY THE
REVIEWED BY:
DRAWINGS CONTAINED IN THE SHEET INDEX.
RECOMMENDATION AND APPROVAL FOR ALL
SIGNATURE AFFIXED BELOW INDICATE OFFICIAL
APPROVED BY:
APPROVAL RECOMMENDED BY:
JOHN GROBOSKI
F L
O O
R A
N D W
A L L R
E P
A
IR
FLOOR AND WALL REPAIRS
NN NN
LOCATION MAP VICINITY MAP
(N.T.S.) (N.T.S.)
SHEET INDEX
SHEET SHEET TITLE
NUMBER REFERENCE
1. G-001 LOCATION, VICINITY MAP AND SHEET INDEX
2. G-002 LEGEND, ABBREVIATIONS AND SYMBOLS
3. V-001 SURVEY CONTROL AND BENCHMARKS
4.
5.
6.
7.
S-101
8.
S-102
9.
S-103
10.
S-501
11.
S-502
12.
13.
14.
15.
16.
17.
18.
19.
SD-10120.
21.
22.
R-101
R-102
R-103
R-104
R-105
R-106
REFERENCE DRAWING
REFERENCE DRAWING
REFERENCE DRAWING
REFERENCE DRAWING
REFERENCE DRAWING
REFERENCE DRAWING
S-104
23.
24.
25.
26.
27.
of Engineers
US Army Corps
LOCK CHAMBER WALL REHABILITATION SECTIONS-301
S-108
S-105
S-106
S-107
28.
G-001G-001
L O
C A
T
IO
N
V
IC
IN
T Y M
A P A
N D S
H E
E T I
N D
E X
L O
C A
T
IO
N
V
IC
IN
T Y M
A P A
N D S
H E
E T I
N D
E X
LOCK CHAMBER NORTH WALL PLAN END-EAST (BASE)
LOCK CHAMBER NORTH WALL PLAN MID-EAST (BASE)
LOCK CHAMBER SOUTH WALL PLAN MID-EAST (BASE)
LOCK CHAMBER SOUTH WALL PLAN END-EAST (BASE)
LOCK CHAMBER FLOOR PLAN EJ4 - EJ5 (BASE)
LOCK CHAMBER FLOOR PLAN EJ1 - EJ2 (OPTION 2)
B-101 BORING HOLE LOCATIONS
CS-101
29.
30.
CD-101
SITE PLAN
C-101
C-102
CS-102
CS-301
CS-302
CS-303
CS-304
SD-303
S-503
S-504
31.
32.
33.
34.
35.
36.
37.
38.
39.
LOCK CHAMBER - CROSS SECTIONS 1
LOCK CHAMBER - CROSS SECTIONS 2
LOCK CHAMBER - CROSS SECTIONS 3
LOCK CHAMBER - CROSS SECTIONS 4
SITE ACCESS & STAGING
EXISTING CONDITIONS
DEMOLITION
S-302
S-303 LOCK CHAMBER FLOOR CROSS SECTIONS D-D
LOCK CHAMBER FLOOR CROSS SECTIONS A-A, B-B, C-C
LOCK CHAMBER WALL MOORING HOOK DETAILS
LOCK CHAMBER WALL DEMOLITION CROSS SECTION
LOCK CHAMBER WALL PANEL DETAILS
LOCK CHAMBER WALL AT RAMP DEMOLITION CROSS SECTION
SD-301 LOCK CHAMBER DEMOLITION CROSS SECTION
LOCK CHAMBER - PLAN & PROFILE WEST
CS-103 LOCK CHAMBER - PLAN & PROFILE EAST
J U
L Y
JULY 2021
LOCK CHAMBER FLOOR DETAILS A
N
S I
D
R A
N A S M
IS
H
R A P .E
J O
H N G
R O
B O
S K I, P .E
R A
N A S M
IS
H
R A P .E
J O
H N G
R O
B O
S K I, P .E
PROJECT MANAGER
MIKE NGUYEN, P.E.
ATR TEAM LEADER
BRENT ANDERSON, P.E.
MIKE NGUYEN
SD-102
40.
W P -2
-R -0
W912P6-21-R-0010
CHIEF, DESIGN BRANCH
JOHN GROBOSKI, P.E.
B-102
B-103
B-104
B-105
B-106
41.
42.
43.
44.
45.
BORING HOLE LOCATIONS - NORTH WALL BORINGS
BORING HOLE LOCATIONS - SOUTH WALL BORINGS
BORING HOLE LOCATIONS - CHAMBER CENTER BORINGS
BORING HOLE LOCATIONS - CHAMBER EAST SIDE BORINGS
BORING HOLE LOCATIONS - CHAMBER WEST SIDE BORINGS
S-601
46.
LOCK FURNITURE SCHEDULE
R A
N A S M
IS
H
R A P .E
R A
N A S M
IS
H
R A P .E
SD-302
S-505 LOCK CHAMBER WALL RAILING AND CLEAT DETAILS47.
CERTIFIED FINAL DOCUMENTS - RTA
CERTIFIED FINAL DOCUMENTS - RTA
LOCK CHAMBER WALL LADDER DETAILS
K E
N N
E T
H C
L A
IR
K E
N N
E T
H C
L A
IR
SD-103
SD-104
LOCK CHAMBER WALL DEMOLITION PLAN - NORTH WALL (PHASE 3)
LOCK CHAMBER WALL DEMOLITION PLAN - SOUTH WALL (PHASE 4)
LOCK CHAMBER NORTH WALL PLAN END-WEST (OPTION 1)
LOCK CHAMBER NORTH WALL PLAN MID-WEST (OPTION 1)
LOCK CHAMBER SOUTH WALL PLAN END-WEST (OPTION 1)
LOCK CHAMBER SOUTH WALL PLAN MID-WEST (OPTION 1)S-110
S-109
48.
49.
50.
51.
A M
D -U
P D
A T
E D S
H E
E T I
N D
E X
S-304 TRANSITION DETAIL
52.
LOCK CHAMBER WALL DEMOLITION PLAN - NORTH WALL (OPTION 1)
LOCK CHAMBER WALL DEMOLITION PLAN - SOUTH WALL (OPTION 1)
-2 -2
SD-304 LOCK CHAMBER WALL DEMOLITION AT BULLNOSE PLACEMENT SECTION
S-305 LOCK CHAMBER BULLNOSE PLACEMENT SECTION
53.
54.
-2
-2
A
M D
-N
E W S
H E
E T S A
D D
D
6" CONCRETE REMOVAL
8" CONCRETE REMOVAL
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
W
P -2
-R -0
C O
N T
R A
C T N
U M
B
11:21:19 AM 8/26/2021
...\FLOOR AND WALL REPAIRS-114419-OWINumber\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\SD-304.dgn
PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
K P
C
J E
R E
M Y H
A R
R
IS
A N
S I
D
J U
L Y
K P
C
J E
R E
M Y H
A R
R
IS
CERTIFIED FINAL DOCUMENTS - RTA
C O
O K C
O U
N T
Y I L L
IN
O
IS
F L
O O
R A
N D W
A L L R
E P
A
IR
S
C H
IC
A G
O L
O C
K C
H A
M B
E R
J U
L Y
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
A N
S I
D
K P
C
J E
R E
M Y H
A R
R
IS
B4
SCALE: 3" = 1' 6"0 3" 1'
F A
Y E L
E F F
L E
R P .E
F A
Y E L
E F F
L E
R P .E
F A
Y E L
E F F
L E
R P .E
K A
T H
Y S
IT
K O
K A
T H
Y S
IT
K O
K A
T H
Y S
IT
K O
S D -3
.d g n
D E
M O
L
IT
IO
N A
T B
U L L
N O
S E P
L A
C E
M E
N T S
E C
T
IO
N
SD-304
D E
M O
L
IT
IO
N A
T B
U L L
N O
S E P
L A
C E
M E
N T S
E C
T
IO
N
SD-304
D E
M O
L
IT
IO
N A
T B
U L L
N O
S E P
L A
C E
M E
N T S
E C
T
IO
N
SD-304
DEMOLITION AT BULLNOSE PLACEMENT SECTION
N E
W S
H E
E T A
D D
E D
/2
/2
REMOVE TEMPORARY CONCRETE AT CORNER
REINFORCEMENT TO REMAIN IN PLACE
EXTEND VERTICAL DEMOLITION LINE TO MEET 45° DEMOLITION LINE
E V
T
1" EXISTING MONOLITH JOINT
1" EXISTING MONOLITH JOINT
1" EXISTING MONOLITH JOINT
1" EXISTING MONOLITH JOINT
LOCATION AND ELEVATION OF HORIZONTAL AND VERTICAL MEMBERS.
REMOVE AND REPLACE HANDRAIL. MATCH
LOCATION AND ELEVATION OF HORIZONTAL AND VERTICAL MEMBERS.
REMOVE AND REPLACE HANDRAIL. MATCH
SEE NOTES 1 AND 2
LOCK LADDER 03
LADDER
NEW STEEL
AS SHOWN ON S-301
CHECK POST, REPLACE
REMOVE EXISTING
AS SHOWN ON S-301
CHECK POST, REPLACE
REMOVE EXISTING
M A
T C
H E
X
IS
T
IN
G T
Y P
SEE NOTES 1 AND 2
(SEE S-504)
EXISTING HOOK (TYP.)
CLEAT RED 20 CLEAT RED 21
CLEAT RED 22
CLEAT RED 23
CLEAT RED 20
CLEAT RED 21
CLEAT RED 22
CLEAT RED 23
CLEAT YELLOW 10
CLEAT YELLOW 11
CLEAT YELLOW 12
CLEAT YELLOW 13
CLEAT YELLOW 10
CLEAT YELLOW 11
CLEAT YELLOW 12
CLEAT YELLOW 13
EXISTING SHEETPILE
CHECK POST 07
CHECK POST 07
CHECK POST 08
CHECK POST 08
IN ORIGINAL LOCATION
LADDER TO BE REPLACED
JOINT SPACING VARIES - SEE NOTE 7
AREA OF BULLNOSE PLACEMENT
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
R A
C T N
U M
B
10:26:06 AM 8/26/2021
...\FLOOR AND WALL REPAIRS-114419-OWINumber\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\S-107.dgn
PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
S-107S-107
O K C
O U
N T
Y I L L
IN
O
IS
F L
O O
R A
N D W
A L L R
E P
A
IR
S
C H
IC
A G
O L
O C
K C
H A
M B
E R
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
S-107
S -1
.d g n
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
L O
C K C
H A
M B
E R N
O R
T H W
A L L
L O
C K C
H A
M B
E R N
O R
T H W
A L L
L O
C K C
H A
M B
E R N
O R
T H W
A L L
A1
SCALE: 3/16" = 1' 8'0 4' 16'
NORTH
PLAN
T R
U E N
8'0 4' 16'
NORTH
PLAN
T R
U E N
SCALE: 3/16" = 1'
E1
A N
S I
D A
N S I
D
J U
L Y
J U
L Y
F A
Y E L E
F F
L E
R P .E
F A
Y E L E
F F
L E
R P .E
F A
Y E L E
F F
L E
R P .E
GENERAL NOTES
W P -2
-R -0
SEE SCHEDULE ON S-601 FOR LOCK FURNITURE.8.
THREE FEET OF ANY WALL OR CHECKPOST FIXTURE.
OVERLAY. NO JOINT SPACINGS SHALL BE WITHIN
CRACK CONTROL JOINT AT THE MIDPOINT OF THE
SPACING EXCEEDING 16 FEET MUST INCLUDE A
SHALL NOT EXCEED 25 FEET. ANY EXPANSION JOINT
EXPANSION JOINT SPACING FOR WALL RESURFACING 7.
TO THE EXISTING RAILING.
SIGNS, LIFE RING CASES, AND LIFE RINGS MOUNTED
CONTRACTOR SHALL REMOVE AND REPLACE ALL 6.
EXISTING CONCRETE AND STEEL ARMOR.
MATCH OVERLAY JOINTS WITH MONOLITH JOINTS IN 5.
OVERLAY
CONTROL JOINTS AND EXPANSION JOINTS IN WALL
MATCH JOINTS IN WALKWAY OVERLAY WITH CRACK 4.
SECTION 05 50 15.
WITH MODULAR RAIL CONFORMING TO SPECIFICATION
REMOVE EXISTING RAILING AND REPLACE AS SHOWN 3.
SECTION 05 50 15.
NEW CLEATS CONFORMING TO SPECIFICATION
RED CLEATS WILL BE REMOVED AND REPLACED WITH 2.
OF CLEATS PRIOR TO REMOVAL.
REINSTALLED. CONTRACTOR WILL VERIFY LOCATION
YELLOW CLEATS WILL BE REMOVED AND 1.
K A
T H
Y S
IT
K O
K A
T H
Y S
IT
K O
K A
T H
Y S
IT
K O
CERTIFIED FINAL DOCUMENTS - RTA
NORTH WALL ELEVATION END-WEST (OPTION 1)
P L
A N E
N D -W
E S
T
O P
T
IO
N
P L
A N E
N D -W
E S
T
O P
T
IO
N
P L
A N E
N D -W
E S
T
O P
T
IO
N
NORTH WALL PLAN END-WEST (OPTION 1)
/5 /2
N E
W S
H E
E T A
D D
D
/2
/2
S E
C T
IO
N M
A R
K E
R A
D D
E D
B4 S-305
1" EXISTING MONOLITH JOINT
1" EXISTING MONOLITH JOINT
1" EXISTING MONOLITH JOINT
1" EXISTING MONOLITH JOINT
(SEE S-504)
EXISTING HOOK (TYP.)
AND ELEVATION OF ALL HORIZONTAL AND VERTICAL MEMBERS
REMOVE AND REPLACE HANDRAIL. MATCH LOCATION
AND ELEVATION OF ALL HORIZONTAL AND VERTICAL MEMBERS
REMOVE AND REPLACE HANDRAIL. MATCH LOCATION
M A
T C
H E
X
IS
T
IN
G T
Y P
CHECK POST 09
POST. REPLACE AS SHOWN ON S-301
REMOVE EXISTING CHECK
CHECK POST 09
POST. REPLACE AS SHOWN ON S-301
REMOVE EXISTING CHECK
LOCK LADDER 04
NEW STEEL LADDER
LOCK LADDER 04
CLEAT RED 24 CLEAT RED 25
CLEAT RED 26
CLEAT RED 27
CLEAT RED 28
CLEAT YELLOW 14
CLEAT YELLOW 14
CLEAT RED 25
CLEAT RED 26
CLEAT RED 27
CLEAT RED 28
JOINT SPACING VARIES - SEE NOTE 7
CLEAT RED 24
AREA OF BULLNOSE PLACEMENT
IN ORIGINAL LOCATION
LADDER TO BE REPLACED
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
R A
C T N
U M
B
10:36:19 AM 8/26/2021
...\FLOOR AND WALL REPAIRS-114419-OWINumber\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\S-108.dgn
S-108S-108
O K C
O U
N T
Y I L L
IN
O
IS
F L
O O
R A
N D W
A L L R
E P
A
IR
S
C H
IC
A G
O L
O C
K C
H A
M B
E R
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
S-108
S -1
.d g n
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
L O
C K C
H A
M B
E R N
O R
T H W
A L L
L O
C K C
H A
M B
E R N
O R
T H W
A L L
L O
C K C
H A
M B
E R N
O R
T H W
A L L
A1
SCALE: 3/16" = 1' 8'0 4' 16'
NORTH
PLAN
T R
U E N
8'0 4' 16'
NORTH
PLAN
T R
U E N
SCALE: 3/16" = 1'
D1
A N
S I
D A
N S I
D
J U
L Y
J U
L Y
F A
Y E L E
F F
L E
R P .E
F A
Y E L E
F F
L E
R P .E
F A
Y E L E
F F
L E
R P .E
GENERAL NOTES
W P -2
-R -0
SEE SCHEDULE ON S-601 FOR LOCK FURNITURE.8.
THREE FEET OF ANY WALL OR CHECKPOST FIXTURE.
OVERLAY. NO JOINT SPACINGS SHALL BE WITHIN
CRACK CONTROL JOINT AT THE MIDPOINT OF THE
SPACING EXCEEDING 16 FEET MUST INCLUDE A
SHALL NOT EXCEED 25 FEET. ANY EXPANSION JOINT
EXPANSION JOINT SPACING FOR WALL RESURFACING 7.
TO THE EXISTING RAILING.
SIGNS, LIFE RING CASES, AND LIFE RINGS MOUNTED
CONTRACTOR SHALL REMOVE AND REPLACE ALL 6.
EXISTING CONCRETE AND STEEL ARMOR.
MATCH OVERLAY JOINTS WITH MONOLITH JOINTS IN 5.
OVERLAY
CONTROL JOINTS AND EXPANSION JOINTS IN WALL
MATCH JOINTS IN WALKWAY OVERLAY WITH CRACK 4.
SECTION 05 50 15.
WITH MODULAR RAIL CONFORMING TO SPECIFICATION
REMOVE EXISTING RAILING AND REPLACE AS SHOWN 3.
SECTION 05 50 15.
NEW CLEATS CONFORMING TO SPECIFICATION
RED CLEATS WILL BE REMOVED AND REPLACED WITH 2.
OF CLEATS PRIOR TO REMOVAL.
REINSTALLED. CONTRACTOR WILL VERIFY LOCATION
YELLOW CLEATS WILL BE REMOVED AND 1.
K A
T H
Y S
IT
K O
K A
T H
Y S
IT
K O
K A
T H
Y S
IT
K O
CERTIFIED FINAL DOCUMENTS - RTA
NORTH WALL ELEVATION MID-WEST (OPTION 1)
P L
A N M
ID
-W
E S
T
O P
T
IO
N
P L
A N M
ID
-W
E S
T
O P
T
IO
N
P L
A N M
ID
-W
E S
T
O P
T
IO
N
NORTH WALL PLAN MID-WEST (OPTION 1)
N
E W S
H E
E T A
D D
E D
/0
/2
C
T
IO
N M
A R
K E
R A
D D
E D
/2
/2
3B4 S-305
E V
T
1" EXISTING MONOLITH JOINT
MONOLITH JOINT
1" EXISTING
M A
T C
H E
X
IS
T
IN
G T
Y P
JOINT SPACING VARIES - SEE NOTE 7
HORIZONTAL AND VERTICAL MEMBERS
LOCATION AND ELEVATION OF ALL
REMOVE AND REPLACE HANDRAIL. MATCH
SEE NOTES 1 AND 2
LOCK LADDER 05
NEW STEEL LADDER
LOCK LADDER 05
NEW STEEL LADDER
(SEE S-504)
EXISTING HOOK (TYP.)
STEEL SHEET PILE
CLEAT RED 29
CLEAT RED 30CLEAT RED 31
CLEAT RED 32
CLEAT RED 29
CLEAT RED 30CLEAT RED 31
CLEAT RED 32
CLEAT YELLOW 15
CLEAT YELLOW 15
CLEAT YELLOW 16
CLEAT YELLOW 16
CLEAT YELLOW 17
CLEAT YELLOW 17
CHECK POST 10
POST, REPLACE AS SHOWN ON S-301
REMOVE EXISING CHECK
CHECK POST 11
POST, REPLACE AS SHOWN ON S-301
REMOVE EXISING CHECK
CHECK POST 11
POST, REPLACE AS SHOWN ON S-301
REMOVE EXISING CHECK
CHECK POST 10
POST, REPLACE AS SHOWN ON S-301
REMOVE EXISING CHECK
AND VERTICAL MEMBERS
ALL HORIZONTAL
LOCATION AND ELEVATION OF
HANDRAIL. MATCH
REMOVE AND REPLACE
AREA OF BULLNOSE PLACEMENT1" EXISTING MONOLITH JOINT
MONOLITH JOINT
1" EXISTING
IN ORIGINAL LOCATION
LADDER TO BE REPLACED
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
R A
C T N
U M
B
11:01:06 AM 8/26/2021
...\FLOOR AND WALL REPAIRS-114419-OWINumber\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\S-109.dgn
S-109S-109
O K C
O U
N T
Y I L L
IN
O
IS
F L
O O
R A
N D W
A L L R
E P
A
IR
S
C H
IC
A G
O L
O C
K C
H A
M B
E R
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
S-109
S -1
.d g n
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
L O
C K C
H A
M B
E R S
O U
T H W
A L L
L O
C K C
H A
M B
E R S
O U
T H W
A L L
L O
C K C
H A
M B
E R S
O U
T H W
A L L
A1
SCALE: 3/16" = 1' 8'0 4' 16'
NORTH
PLAN
T R
U E N
8'0 4' 16'
NORTH
PLAN
T R
U E N
SCALE: 3/16" = 1'
D1
A N
S I
D A
N S I
D
J U
L Y
J U
L Y
F A
Y E L E
F F
L E
R P .E
F A
Y E L E
F F
L E
R P .E
F A
Y E L E
F F
L E
R P .E
GENERAL NOTES
W P -2
-R -0
SEE SCHEDULE ON S-601 FOR LOCK FURNITURE.8.
THREE FEET OF ANY WALL OR CHECKPOST FIXTURE.
OVERLAY. NO JOINT SPACINGS SHALL BE WITHIN
CRACK CONTROL JOINT AT THE MIDPOINT OF THE
SPACING EXCEEDING 16 FEET MUST INCLUDE A
SHALL NOT EXCEED 25 FEET. ANY EXPANSION JOINT
EXPANSION JOINT SPACING FOR WALL RESURFACING 7.
TO THE EXISTING RAILING.
SIGNS, LIFE RING CASES, AND LIFE RINGS MOUNTED
CONTRACTOR SHALL REMOVE AND REPLACE ALL 6.
EXISTING CONCRETE AND STEEL ARMOR.
MATCH OVERLAY JOINTS WITH MONOLITH JOINTS IN 5.
OVERLAY
CONTROL JOINTS AND EXPANSION JOINTS IN WALL
MATCH JOINTS IN WALKWAY OVERLAY WITH CRACK 4.
SECTION 05 50 15.
WITH MODULAR RAIL CONFORMING TO SPECIFICATION
REMOVE EXISTING RAILING AND REPLACE AS SHOWN 3.
SECTION 05 50 15.
NEW CLEATS CONFORMING TO SPECIFICATION
RED CLEATS WILL BE REMOVED AND REPLACED WITH 2.
OF CLEATS PRIOR TO REMOVAL.
REINSTALLED. CONTRACTOR WILL VERIFY LOCATION
YELLOW CLEATS WILL BE REMOVED AND 1.
K A
T H
Y S
IT
K O
K A
T H
Y S
IT
K O
K A
T H
Y S
IT
K O
CERTIFIED FINAL DOCUMENTS - RTA
SOUTH WALL ELEVATION END-WEST (OPTION 1)
P L
A N E
N D -W
E S
T
O P
T
IO
N
P L
A N E
N D -W
E S
T
O P
T
IO
N
P L
A N E
N D -W
E S
T
O P
T
IO
N
SOUTH WALL PLAN END-WEST (OPTION 1)
/0
/2
N E
W S
H E
E T A
D D
E D
S E
C T
IO
N M
A R
K E
R A
D D
E D
/2
/2
B4 S-305
1" EXISTING MONOLITH JOINT
1" EXISTING MONOLITH JOINT
1" EXISTING MONOLITH JOINT
1" EXISTING MONOLITH JOINT
LOCATION AND ELEVATION OF HORIZONTAL AND VERTICAL MEMBERS
REMOVE AND REPLACE HANDRAIL. MATCH
LOCATION AND ELEVATION OF HORIZONTAL AND VERTICAL MEMBERS
REMOVE AND REPLACE HANDRAIL. MATCH
REMOVE SEE NOTES 1 AND 2
LOCK LADDER 06
NEW STEEL LADDER
LOCK LADDER 06
NEW STEEL LADDER
EXISTING SHEET PILE
M A
T C
H E
X
IS
T
IN
G T
Y P
CHECK POST 13
REPLACE AS SHOWN ON S-301
REMOVE EXISTING CHECK POST,
CHECK POST 12
REPLACE AS SHOWN ON S-301
REMOVE EXISTING CHECK POST,
REPLACE AS SHOWN ON S-301
REMOVE EXISTING CHECK POST,
REPLACE AS SHOWN ON S-301
REMOVE EXISTING CHECK POST,
CLEAT YELLOW 18
CLEAT YELLOW 18
CLEAT RED 33
CLEAT RED 33
CLEAT RED 34
CLEAT RED 34
CLEAT RED 35
CLEAT RED 35
CLEAT RED 36
CLEAT RED 36
CLEAT YELLOW 19
CLEAT YELLOW 19
CLEAT YELLOW 20
CLEAT YELLOW 20
CHECK POST 12
CHECK POST 13
EXISTING HOOK (TYP.) (SEE S-504)
LADDER TO BE REPLACED IN ORIGINAL LOCATION
JOINT SPACING VARIES - SEE NOTE 7
AREA OF BULL NOSE PLACEMENT
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
O J E
C T I
D
F
IL
E N
A M
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
R A
C T N
U M
B
11:08:05 AM 8/26/2021
...\FLOOR AND WALL REPAIRS-114419-OWINumber\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\S-110.dgn
S-110S-110
O K C
O U
N T
Y I L L
IN
O
IS
F L
O O
R A
N D W
A L L R
E P
A
IR
S
C H
IC
A G
O L
O C
K C
H A
M B
E R
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
S-110
S -1
.d g n
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
K E
N N
E T
H C
L A
IR
J E
R E
M Y H
A R
R
IS
L O
C K C
H A
M B
E R S
O U
T H W
A L L
L O
C K C
H A
M B
E R S
O U
T H W
A L L
L O
C K C
H A
M B
E R S
O U
T H W
A L L
A1
SCALE: 3/16" = 1' 8'0 4' 16'
NORTH
PLAN
T R
U E N
8'0 4' 16'
NORTH
PLAN
T R
U E N
SCALE: 3/16" = 1'
D1
A N
S I
D A
N S I
D
J U
L Y
J U
L Y
F A
Y E L E
F F
L E
R P .E
F A
Y E L E
F F
L E
R P .E
F A
Y E L E
F F
L E
R P .E
GENERAL NOTES
W P -2
-R -0
SEE SCHEDULE ON S-601 FOR LOCK FURNITURE.8.
THREE FEET OF ANY WALL OR CHECKPOST FIXTURE.
OVERLAY. NO JOINT SPACINGS SHALL BE WITHIN
CRACK CONTROL JOINT AT THE MIDPOINT OF THE
SPACING EXCEEDING 16 FEET MUST INCLUDE A
SHALL NOT EXCEED 25 FEET. ANY EXPANSION JOINT
EXPANSION JOINT SPACING FOR WALL RESURFACING 7.
TO THE EXISTING RAILING.
SIGNS, LIFE RING CASES, AND LIFE RINGS MOUNTED
CONTRACTOR SHALL REMOVE AND REPLACE ALL 6.
EXISTING CONCRETE AND STEEL ARMOR.
MATCH OVERLAY JOINTS WITH MONOLITH JOINTS IN 5.
OVERLAY
CONTROL JOINTS AND EXPANSION JOINTS IN WALL
MATCH JOINTS IN WALKWAY OVERLAY WITH CRACK 4.
SECTION 05 50 15.
WITH MODULAR RAIL CONFORMING TO SPECIFICATION
REMOVE EXISTING RAILING AND REPLACE AS SHOWN 3.
SECTION 05 50 15.
NEW CLEATS CONFORMING TO SPECIFICATION
RED CLEATS WILL BE REMOVED AND REPLACED WITH 2.
OF CLEATS PRIOR TO REMOVAL.
REINSTALLED. CONTRACTOR WILL VERIFY LOCATION
YELLOW CLEATS WILL BE REMOVED AND 1.
K A
T H
Y S
IT
K O
K A
T H
Y S
IT
K O
K A
T H
Y S
IT
K O
CERTIFIED FINAL DOCUMENTS - RTA
SOUTH WALL ELEVATION MID-WEST (OPTION 1)
P L
A N M
ID
-W
E S
T
O P
T
IO
N
P L
A N M
ID
-W
E S
T
O P
T
IO
N
P L
A N M
ID
-W
E S
T
O P
T
IO
N
SOUTH WALL PLAN MID-WEST (OPTION 1)
N
E W S
H E
E T A
D D
E D
/0
/2
S E
C T
IO
N M
A R
K E
R A
D D
E D
/2
/2
B4 S-305
4"
4"
4'-0"
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .