This solicitation notice seeks bids for the construction of the Indiana Harbor and Canal Confined Disposal Facility Dike Expansion project located in East Chicago, Indiana. The United States Army Corps of Engineers - Chicago District will oversee construction which includes raising the crest elevation of an existing 8,833 foot long compacted clay dike by 3 feet, widening a 2,000 foot segment by 40 feet, and optional additional work that could raise the crest another 8 feet and widen the remaining dike segment. The project will place approximately 350,000 cubic yards of compacted fill and perform other tasks such as installing access ramps, placing riprap, constructing a chimney drain and filter, and replacing infrastructure. Bids are reserved exclusively for small businesses and must be submitted by September 3, 2020 to the USACE Chicago District office. The estimated cost range for construction is between $10-25 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6693037733
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: INVITATION FOR BIDS NO. W912P620B0026, "INDIANA HARBOR AND CANALCONFINED DISPOSAL FACILITY DIKE
EXPANSION, EAST CHICAGO, INDIANA"
BIDS AND ANY BID FORMS (BID BONDS, PRE AWARD SURVEY FORM) SHALL BE SUBMITTED BY MAIL (VIA REGULAR OR OVERNIGHT);
THEREFORE WHEREIN MENTIONED IN THE PREVIOUSLY ISSUED SOLICITATION THAT ELECTRONIC BIDS OR BID FORMS WERE ACCEPTABLE, THIS AMENDMENT DELETES THAT PARTICULAR FORM OF DELIVERY (E.G. ELECTRONIC SUBMITTED BIDS AND FORMS).
-- DESCRIPTION OF THIS AMENDMENT CONTINUES ON THE NEXT PAGES --
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P620B0026
X 9B. DATED (SEE ITEM 11)
03-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2020
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P620B0026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A. BID OPENING DATE AND TIME:
The Bid Opening Date and Time is NOT EXTENDED by this Amendment. Therefore, bids are due by 2:00 p.m. (Central Time) on September 3, 2020. Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document – See “IMPORTANT BID NOTES.”
B. REVISED DRAWING SHEETS: The following Drawing Sheets have been revised and are hereunder enclosed replacing the previously furnished respective sheets.
G-002 Updated Sheet Index
RC000 Added sheet to show perimeter ditch stationing for cap cross section locations on Sheets RC000 through RC012
RC014 Added sheet to show obstruction removals along the slurry wall alignment in the vicinity of the proposed weather station pad and anchor pads near slurry wall stations 20+38 through 20+65, and in the vicinity of existing Lift Station 2 near slurry wall station 26+00.
RC015 Added sheet to show obstruction removals along the slurry wall alignment in the vicinity of existing Lift Station 1 near slurry wall station 104+45.
RC016 Added sheet to show elevations of buried anchor wall and tierods for the South Cutoff Wall at the southeast corner of the property for reference when constructing the proposed weather station pad and anchor pads.
RC017 Added sheet to show slurry wall stationing for obstruction removal locations on Sheets RC014 and
RC015.
RS006 Added sheet to show plan view location of anchor wall and tierods in the vicinity of proposed weather station pad and anchor pads.
C. SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following provision has been modified and is incorporated in full text:
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
20.9% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Indiana, county of Lake, and City of East Chicago.
(End of provision)
D. REVISIONS TO SECTION 00 22 13 - SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
Paragraph’s d and f of the “Important Bid Notes” have been revised and are replaced as follows:
IMPORTANT BID NOTES
d. VIRTUAL BID OPENING PROVISIONS/ PARTICIPATION:
THE VIRTUAL BID OPENING WILL BEGIN AT 2:00 P.M. CDT ON 03 SEPTEMBER 2020.
Individuals interested in participating in the virtual bid opening can participate by navigating to a WEBEX link that will be provided under an update to the existing Solicitation Notice, wherein the Bid Set is published (beta.sam.gov Website). The updated Solicitation Notice will posted no later than 24 hours prior to the Bid Opening date and time. This particular update will also include the audio information for dialing into the Bid Opening.
The bids will be read aloud and individuals will be able to view the information on the WEBEX screen as the bids are entered into a bid tabulation sheet. Should technological issues ensue from the visual viewing at the WEBEX, the audio access will take precedence and satisfy the conditions of bids being communicated publicly/read aloud.
f. ATTACHMENT A – PREAWARD SURVEY FORM – The bidder shall complete the enclosed Attachment A and submit it with its bid submission. The preaward survey form is to aid in expediting the award of this project. Only the winning bidder’s information will be surveyed.
E. REVISIONS TO SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following clause has been modified and is incorporated in full text:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Ref Sheet Sheet Title Num Index
1 G-001 TITLE SHEET, LOCATION AND VICINITY MAPS
2 G-002 SHEET INDEX, LEGEND, ABBREVIATIONS AND NOTES
3 V-001 SURVEY CONTROL AND BENCHMARKS
4 B-101 BORING - WEST PLAN AND PROFILE
5 B-102 BORING - NORTH PLAN AND PROFILE
6 B-103 BORING - EAST PLAN AND PROFILE
7 B-104 BORING - SOUTH PLAN AND PROFILE
8 C-101 SITE PLAN
9 C-102 ALIGNMENT PLAN / KEYMAP
10 CS101 BASE SCOPE PLAN - DIKE STA. 0+00 TO STA. 10+00
11 CS102 BASE SCOPE PLAN - DIKE STA. 10+00 TO STA. 22+00
12 CS103 BASE SCOPE PLAN - DIKE STA. 22+00 TO STA. 32+00
13 CS104 BASE SCOPE PLAN - DIKE STA. 32+00 TO STA. 40+00
14 CS105 BASE SCOPE PLAN - DIKE STA. 40+00 TO STA. 51+00
15 CS106 BASE SCOPE PLAN - DIKE STA. 51+00 TO STA. 62+00
16 CS107 BASE SCOPE PLAN - DIKE STA. 62+00 TO STA. 74+00
17 CS108 BASE SCOPE PLAN - DIKE STA. 74+00 TO STA. 81+00
18 CS109 BASE SCOPE PLAN - DIKE STA. 81+00 TO STA. 88+33
19 CS110 OPTION 2 PLAN - DIKE STA. 0+00 TO STA. 10+00
20 CS111 OPTION 2 PLAN - DIKE STA. 10+00 TO STA. 22+00
21 CS112 OPTION 2 PLAN - DIKE STA. 22+00 TO STA. 32+00
22 CS113 OPTION 2 PLAN - DIKE STA. 32+00 TO STA. 40+00
23 CS114 OPTION 2 PLAN - DIKE STA. 40+00 TO STA. 51+00
24 CS115 OPTION 2 PLAN - DIKE STA. 51+00 TO STA. 62+00
25 CS116 OPTION 2 PLAN - DIKE STA. 62+00 TO STA. 74+00
26 CS117 OPTION 2 PLAN - DIKE STA. 74+00 TO STA. 81+00
27 CS118 OPTION 2 PLAN - DIKE STA. 81+00 TO STA. 88+33
28 CS301 TYPICAL CROSS SECTION
29 CS302 TYPICAL CROSS SECTIONS
30 CS303 TYPICAL CROSS SECTIONS
31 CS304 CROSS SECTIONS
32 CS305 CROSS SECTIONS
33 CS306 CROSS SECTIONS
34 CS307 CROSS SECTIONS
35 CS308 CROSS SECTIONS
36 CS309 CROSS SECTIONS
37 CS310 CROSS SECTIONS
38 CS311 CROSS SECTIONS
39 CS312 CROSS SECTIONS
40 CS313 CROSS SECTIONS
41 CS314 CROSS SECTIONS
42 CS315 CROSS SECTIONS
43 CS316 CROSS SECTIONS
44 CS317 CROSS SECTIONS
45 CS318 CROSS SECTIONS
46 CS501 RAMP, DESIGNATED OVERTOPPING LOCATION AND DIKE TURNAROUND
DETAILS
47 CS502 TAR SEEP DETAILS
48 CS503 BOLLARD AND PIEZOMETER DETAILS
49 SD-101 DECANT STRUCTURE EXISTING CONDITION AND DEMOLITION PLAN
50 S-101 DECANT STRUCTURE PLAN AND ELEVATIONS
51 S-102 DECANT STRUCTURE BRIDGE PLAN
52 S-301 DECANT STRUCTURE ACCESS BRIDGE CONCRETE SECTIONS
53 S-302 DECANT STRUCTURE ACCESS BRIDGE STEEL SECTIONS
54 S-501 DECANT STRUCTURE ACCESS BRIDGE CONCRETE DETAILS
55 S-502 DECANT STRUCTURE BRIDGE STEEL DETAILS
56 MD-101 LIFT STATION 1 DEMOLITION
57 MD-102 LIFT STATION 2 DEMOLITION
58 M-101 LIFT STATION 1
59 M-102 LIFT STATION 2
60 M-301 LIFT STATION PLAN AND SECTION OPTION 2
61 M-302 FORCE MAIN PROFILE
62 M-601 SCHEDULES
63 ES-101 ELECTRICAL ALIGNMENT PLAN / KEYMAP
64 ES-102 AIR MONITORING STATION AND LIGHT POLE LOCATIONS STA. 0+00 TO STA.
10+00
65 ES-103 AIR MONITORING STATION LOCATION STA. 10+00 TO STA. 22+00
66 ES-104 AIR MONITORING STATION AND LIGHT POLE LOCATION STA. 22+00 TO STA.
32+00
67 ES-105 AIR MONITORING STATION LOCATION STA. 32+00 TO STA. 40+00
68 ES-106 AIR MONITORING STATION LOCATION STA. 40+00 TO STA. 51+00
69 ES-107 AIR MONITORING STATION LOCATION STA. 51+00 TO STA. 62+00
70 ES-108 AIR MONITORING STATION AND LIGHT POLE LOCATIONS STA. 62+00 TO STA.
74+00
71 ES-109 AIR MONITORING STATION LOCATION STA. 74+00 TO STA. 81+00
72 ES-110 LIGHT POLE LOCATIONS STA. 81+00 TO STA. 87+00
73 E-501 ELECTRICAL DETAILS
74 E-502 ELECTRICAL DETAILS
75 E-503 LIGHT POLE DETAILS
76 E-601 ONE LINE DIAGRAMS - 1 OF 5
77 E-602 ONE LINE DIAGRAMS – 2 OF 5
78 E-603 ONE LINE DIAGRAMS - 3 OF 5
79 E-604 ONE LINE DIAGRAMS - 4 OF 5
80 E-605 ONE LINE DIAGRAMS - 5 OF 5
81 RC-001 REFERENCE DRAWING 0
82 RC-001 CIVIL REFERENCE DRAWING 1, AS-BUILT CAP CROSS SECTION
83 RC-002 CIVIL REFERENCE DRAWING 2
84 RC-003 CIVIL REFERENCE DRAWING 3
85 RC-004 CIVIL REFERENCE DRAWING 4
86 RC-005 CIVIL REFERENCE DRAWING 5
87 RC-006 CIVIL REFERENCE DRAWING 6
88 RC-007 CIVIL REFERENCE DRAWING 7
89 RC-008 CIVIL REFERENCE DRAWING 8
90 RC-009 CIVIL REFERENCE DRAWING 9
91 RC-010 CIVIL REFERENCE DRAWING 10
92 RC-011 CIVIL REFERENCE DRAWING 11
93 RC-012 CIVIL REFERENCE DRAWING 12
94 RC-013 CIVIL REFERENCE DRAWING 13
95 RC-014 CIVIL REFERENCE DRAWING 14
96 RC-015 CIVIL REFERENCE DRAWING 15
97 RC-016 CIVIL REFERENCE DRAWING 16
98 RC-017 CIVIL REFERENCE DRAWING 17
99 RS-001 DECANT STRUCTURE PLAN AND ELEVATION VIEWS
100 RS-002 DECANT STRUCTURE STANDARD CONCRETE AND CONTRACTION DETAILS
101 RS-003 DECANT STRUCTURE SIDE SECTION AND CONCRETE DETAILS
102 RS-004 DECANT STRUCTURE STANDARD CONCRETE AND CONTRACTION DETAILS
103 RS-005 DECANT STRUCTURE ACCESS BRIDGE SECTION VIEWS
104 RS-006 ANCHORED CUTOFF WALL
105 RM-001 DEBRIS PILE SURVEY
106 RM-002 EXTRACTION WELL, MONITORING WELL, AND MANHOLE SCHEDULES
(End of clause)
(End of Summary of Changes)
F. WAGE DETERMINATION: This Amendment encloses the most recent Wage Determination, General Decision IN20200001 08/07/2020.
G. PRE-BID MEETING ATTENDANCE: By this Amendment, the Chicago District is enclosing a copy of the Attendance Sheet from the pre-bid meeting held on August 12, 2020.
H. SITE VISIT ATTENDANCE: By this Amendment, the Chicago District is enclosing a copy of the Attendance Sheet from the site visit held on August 17, 2020.
I. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846- 5378; email: ericka.d.hillard@usace.army.mil.
END OF AMENDMENT NO. 0002
(The aforementioned Drawing Sheets, Wage Determination, Pre-bid Meeting Attendance Sheet and Site Visit
Attendance Sheet follows)
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
G-002
W
IT
O L
D K
L U
Z A
A N
S I
D
W P -2
-B -0
P
R O J E
C T I
D
F
IL
E N
A M
E
A
S T C
H
IC
A G
O
IN
D
IA
N A
IN
D
IA
N A H
A R
B O
R A
N D C
A N
A L C
D F
W P -2
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
M
IS
H R
A
R A
N A P .E
S E
P
D A
V E S
C H
IE
M A
N N
G -0
.d g n
D
IK
E E
X P
A N
S
IO
N P
R O J E
C T
A R
K
S H
E E
T I
N D
E X L E
G E
N D
A B
B R
E V
IA
T
IO
N S
A N
D G
E N
E R
A L N
O T
E S
GENERAL NOTES
STANDARD ABBREEVIATIONS
LEGEND
OR DETAIL
SECTION
NUMBER OF
R-09
SHOWN
OR DETAIL IS
WHERE SECTION
SHEET NUMBER
S1 S1
B A
S5 S5
OR DETAIL
SECTION
LETTER OF
TAKEN
OR DETAIL IS
WHERE SECTION
SHEET NUMBER
SHOWN
OR DETAIL IS
WHERE SECTION
SHEET NUMBER
OR DETAIL
SECTION
LETTER OF
SHOWN
OR DETAIL IS
WHERE SECTION
SHEET NUMBER
TAKEN
OR DETAIL IS
WHERE SECTION
SHEET NUMBER
SECTION MARKER SECTION TITLE
SECTION TITLE
FIRE HYDRANT
FLAG POLE
POST
DROP INLET
CATCH BASIN
CULVERT
LOCATED OBJECT
INDEX CONTOUR
INTERMEDIATE CONTOUR
DEPRESSION CONTOUR
APPROXIMATE CONTOUR
WATER VALVE
SHRUB
GRASS/TURF
GROUND/GRADE
GRASS/TURF
FIRE HYDRANT
EXTRACTION WELL
EXISTING GROUND SPOT ELEVATION
BY PATRICK ENGINEERING INC.
MONITORING WELL INSTALLED
BY ENVIRONMENTAL RESOURCE
MONITORING WELL INSTALLED
GRATE DRAIN
GRATED MANHOLE
ELECTRIC MANHOLE
MONUMENT
EDGE OF WATER
CUT OFF WALL/SLURRY WALL
OVERHEAD POWER LINES
WORK LIMITS
RAILROAD LINE
LIGHT POLE
POLE
MANHOLE
TRAFFIC SIGNAL
FENCE LINE
ROAD - GRAVEL
SHARED WITH OTHERS
GRAVEL ROAD TO BE
AIR MONTORING PAD BY OTHERS
FP
P
732.3
W.V.
OH
M
G.M.H.
G.D.
MW
EXISTING OR PROPOSED MONITORING WELL
CDF MONITORING WELL
AM
LOCAL CONTROL PANELLCP
ELECTRICAL MAN HOLEEMH
ELECTRICAL HAND HOLEEHH
WELL POINTSWP
MONITORING WELLMW
EXTRACTION WELLEN
GRADE AT FOUNDATIONGF
FINISH FLOORFF
CENTERLINECL
FIRE HYDRANTFH
NORTH AMERICAN VERTICAL DATUMNAVD
OCEAN SURVEYS, INC.OSI
CORPS OF ENGINEERSCOE
ARMY CORPS OF ENGINEERSACOE
DIGITAL TERRAIN MODELDTM
CORRUGATED METAL PIPECMP
REINFORCED CONCRETE PIPERCP
STEEL SHEET PILESSP
CONTRACTING OFFICER'S REPRESENTATIVECOR
MANHOLEMH
VERIFY IN FIELDVIF
PIPE SLOPES
HORIZONTALH
VERTICALV
MINIMUMMIN
NOT TO SCALENTS
SHEET INDEX
SHEET SHEET TITLE
NUMBER ID
1 G-001
V-0013
B-101 BORING - WEST PLAN AND PROFILE4
B-102 BORING - NORTH PLAN AND PROFILE5
B-103 BORING - EAST PLAN AND PROFILE6
B-104 BORING - SOUTH PLAN AND PROFILE7
C-1018
C-102 ALIGNMENT PLAN / KEYMAP9
CS10110
CS10211
CS10312
CS10413
CS10514
CS10615
CS10716
CS10817
CS109
CS301 TYPICAL CROSS SECTION
CS302 TYPICAL CROSS SECTIONS
CS501
S-101 DECANT STRUCTURE PLAN AND ELEVATIONS
S-302
S-501
S-502
M-101 LIFT STATION 1
M-102 LIFT STATION 2
M-301
MD-101 LIFT STATION 1 DEMOLITION
MD-102 LIFT STATION 2 DEMOLITION
S-102 DECANT STRUCTURE BRIDGE PLAN
M-302
M-601 SCHEDULES
CS502 TAR SEEP DETAILS
S-301
CS-503 BOLLARD AND PIEZOMETER DETAILS
SD-101
CS110
CS111
CS112
CS116
CS113
CS114
CS117
CS115
CS118
BASE SCOPE PLAN - DIKE STA. 0+00 TO STA. 10+00
BASE SCOPE PLAN - DIKE STA. 10+00 TO STA. 22+00
BASE SCOPE PLAN - DIKE STA. 22+00 TO STA. 32+00
BASE SCOPE PLAN - DIKE STA. 32+00 TO STA. 40+00
BASE SCOPE PLAN - DIKE STA. 40+00 TO STA. 51+00
BASE SCOPE PLAN - DIKE STA. 51+00 TO STA. 62+00
BASE SCOPE PLAN - DIKE STA. 62+00 TO STA. 74+00
BASE SCOPE PLAN - DIKE STA. 74+00 TO STA. 81+00
BASE SCOPE PLAN - DIKE STA. 81+00 TO STA. 88+33
TYPICAL CROSS SECTIONS
CS30330
CS304 CROSS SECTIONS31
CS306 CROSS SECTIONS
CS307 CROSS SECTIONS
CS308 CROSS SECTIONS
CS309 CROSS SECTIONS
CS310 CROSS SECTIONS
CS311 CROSS SECTIONS
CS312 CROSS SECTIONS
CS313 CROSS SECTIONS
CS314 CROSS SECTIONS
FORCE MAIN PROFILE
CS315 CROSS SECTIONS
CS316 CROSS SECTIONS
CS317 CROSS SECTIONS
CS318 CROSS SECTIONS
ES-101
ES-102
ES-103
ES-104
ES-105
ES-106
ES-107
AIR MONITORING STATION LOCATION STA. 10+00 TO STA. 22+00
AIR MONITORING STATION LOCATION STA. 32+00 TO STA. 40+00
AIR MONITORING STATION LOCATION STA. 40+00 TO STA. 51+00
AIR MONITORING STATION LOCATION STA. 51+00 TO STA. 62+00
ES-108
ES-109
E-501
E-502
E-601
AIR MONITORING STATION LOCATION STA. 74+00 TO STA. 81+00
ELECTRICAL DETAILS
ELECTRICAL DETAILS
E-602
E-603
E-604
E-605
TITLE SHEET, LOCATION AND VICINITY MAPS
G-002 SHEET INDEX, LEGEND, ABBREVIATIONS AND NOTES
CROSS SECTIONSCS305
ES-110
E-503 LIGHT POLE DETAILS
CONTRACT LINE ITEM NUMBERS BEGINNING WITH "0002".
ALL REFERENCES IN THE DRAWINGS TO "OPTION 2" REFER TO OPTIONAL WORK CORRESPONDING TO 5.
SCOPE CORRESPONDING TO CONTRACT LINE ITEM NUMBERS BEGINNING WITH "0001".
ALL REFERENCES IN THE DRAWINGS TO "OPTION 1" REFER TO OPTIONAL WORK UNDER THE BASE 4.
THE ACCURACY OF THESE DRAWINGS.
PROBABLITY OF ENCOUNTERING SUBSURFACE OBSTRUCTIONS. USACE MAKES NO CLAIM REGARDING
R-SHEETS ARE HISTORIC ARCHIVIAL DRAWINGS PROVIDED AS REFERENCE TO SHOW THE HIGH 3.
SEE SPECIFICATIONS FOR BORING LOGS.2.
SEE SHEET V-001 FOR SURVEY DATA AND CONTROL INFORMATION.1.SURVEY CONTROL AND BENCHMARKS
SITE PLAN
RAMP, DESIGNATED OVERTOPPING LOCATION AND DIKE TURNAROUND DETAILS
DECANT STRUCTURE EXISTING CONDITION AND DEMOLITION PLAN
DECANT STRUCTURE ACCESS BRIDGE CONCRETE SECTIONS
DECANT STRUCTURE ACCESS BRIDGE STEEL SECTIONS
DECANT STRUCTURE ACCESS BRIDGE CONCRETE DETAILS
DECANT STRUCTURE BRIDGE STEEL DETAILS
LIFT STATION PLAN AND SECTION OPTION 2
ELECTRICAL ALIGNMENT PLAN / KEYMAP
AIR MONITORING STATION AND LIGHT POLE LOCATIONS STA. 0+00 TO STA. 10+00
AIR MONITORING STATION AND LIGHT POLE LOCATION STA. 22+00 TO STA. 32+00
AIR MONITORING STATION AND LIGHT POLE LOCATIONS STA. 62+00 TO STA. 74+00
LIGHT POLE LOCATIONS STA. 81+00 TO STA. 87+00
ONE LINE DIAGRAMS - 1 OF 5
ONE LINE DIAGRAMS - 2 OF 5
ONE LINE DIAGRAMS - 3 OF 5
ONE LINE DIAGRAMS - 4 OF 5
ONE LINE DIAGRAMS - 5 OF 5
OPTION 2 PLAN - DIKE STA. 0+00 TO STA. 10+00
OPTION 2 PLAN - DIKE STA. 10+00 TO STA. 22+00
OPTION 2 PLAN - DIKE STA. 22+00 TO STA. 32+00
OPTION 2 PLAN - DIKE STA. 32+00 TO STA. 40+00
OPTION 2 PLAN - DIKE STA. 40+00 TO STA. 51+00
OPTION 2 PLAN - DIKE STA. 51+00 TO STA. 62+00
OPTION 2 PLAN - DIKE STA. 62+00 TO STA. 74+00
OPTION 2 PLAN - DIKE STA. 74+00 TO STA. 81+00
OPTION 2 PLAN - DIKE STA. 81+00 TO STA. 88+33
SHEET SHEET TITLE
NUMBER ID
SHEET INDEX
RS-001
RS-002
RS-003
RS-004
RS-005
RM-001
RM-002
RC-001
RC-002
RC-010
RC-003
RC-004
RC-005
RC-006
RC-007
RC-008
RC-009
RC-011
RC-012
CIVIL REFERENCE DRAWING 2
CIVIL REFERENCE DRAWING 3
CIVIL REFERENCE DRAWING 4
CIVIL REFERENCE DRAWING 5
CIVIL REFERENCE DRAWING 6
CIVIL REFERENCE DRAWING 7
CIVIL REFERENCE DRAWING 8
CIVIL REFERENCE DRAWING 9
CIVIL REFERENCE DRAWING 10
CIVIL REFERENCE DRAWING 11
CIVIL REFERENCE DRAWING 12
DECANT STRUCTURE PLAN AND ELEVATION VIEWS
DECANT STRUCTURE STANDARD CONCRETE AND CONTRACTION DETAILS
DECANT STRUCTURE SIDE SECTION AND CONCRETE DETAILS
DECANT STRUCTURE STANDARD CONCRETE AND CONTRACTION DETAILS
DEBRIS PILE SURVEY
EXTRACTION WELL, MONITORING WELL, AND MANHOLE SCHEDULES
RC-013 CIVIL REFERENCE DRAWING 13
RC-000 CIVIL REFERENCE DRAWING 0
CIVIL REFERENCE DRAWING 1
CIVIL REFERENCE DRAWING 10
CIVIL REFERENCE DRAWING 11
CIVIL REFERENCE DRAWING 12
CIVIL REFERENCE DRAWING 13
RC-014
RC-015
RC-016
RC-017
RS-006
DECANT STRUCTURE ACCESS BRIDGE SECTION VIEWS
ANCHORED CUTOFF WALL
S H
E E
T S A
D D
E D
/2
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:59:44 AM 8/11/2020
...\Indiana Harbor Canal Dike Raise Phase 2 - 115264\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\115264_RC000.dgn
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
S T C
H
IC
A G
O
IN
D
IA
N A
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
RC000
W P -2
-C -0
X
IN
IA
N A H
A R
B O
R A
N D C
A N
A L C
D F
W P -2
-B -0
S E
P
RC000
REFERENCE DRAWING
M
IS
H R
A
R A
N A P .E
A R
K
A N
S I
D
M
IS
H R
A
R A
N A P .E
A R
K
D A
V E S
C H
IE
M A
N N
D A
V E S
C H
IE
M A
N N
K L
U Z
A
W
IT
O L
D K
L U
Z A
W
IT
O L
D
R E
F E
R E
N C
E D
R A
W
IN
G
R E
F E
R E
N C
E D
R A
W
IN
G
R C
.d g n
D
IK
E E
X P
A N
S
IO
N P
R O J E
C T
S H
E E
T A
D D
E D
/2
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:04:11 AM 8/11/2020
...\Indiana Harbor Canal Dike Raise Phase 2 - 115264\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\115264_RC014.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
S T C
H
IC
A G
O
IN
D
IA
N A
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
RC014
W P -2
-C -0
IA
N A H
A R
B O
R A
N D C
A N
A L C
D F
W P -2
-B -0
S E
P
RC014
R
K
A N
S I
D
A
K
R C
.d g n
D
IK
E E
X P
A N
S
IO
N P
R O J E
C T
S
H E
E T A
D D
E D
/2
M
IS
H R
A
R A
N A P .E
R E
F E
R E
N C
E D
R A
W
IN
G
M
IS
H R
A
R A
N A P .E
R E
F E
R E
N C
E D
R A
W
IN
G
D
A V
E S
C H
IE
M A
N N
D A
V E S
C H
IE
M A
N N
K L
U Z
A
W
IT
O L
D K
L U
Z A
W
IT
O L
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:07:22 AM 8/11/2020
...\Indiana Harbor Canal Dike Raise Phase 2 - 115264\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\115264_RC015.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
S T C
H
IC
A G
O
IN
D
IA
N A
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
RC015
W P -2
-C -0
IA
N A H
A R
B O
R A
N D C
A N
A L C
D F
W P -2
-B -0
S E
P
RC015
R
K
A N
S I
D
A
R C
.d g n
D
IK
E E
X P
A N
S
IO
N P
R O J E
C T
S
H E
E T A
D D
E D
/2
M
IS
H R
A
R A
N A P .E
R E
F E
R E
N C
E D
R A
W
IN
G
M
IS
H R
A
R A
N A P .E
R E
F E
R E
N C
E D
R A
W
IN
G
D
A V
E S
C H
IE
M A
N N
D A
V E S
C H
IE
M A
N N
K L
U Z
A
W
IT
O L
D K
L U
Z A
W
IT
O L
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:23:03 AM 8/11/2020
...\Indiana Harbor Canal Dike Raise Phase 2 - 115264\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\115264_RC016.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
S T C
H
IC
A G
O
IN
D
IA
N A
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
RC016
W P -2
-C -0
IA
N A H
A R
B O
R A
N D C
A N
A L C
D F
W P -2
-B -0
S E
P
RC016
R
K
A N
S I
D
A
R C
.d g n
D
IK
E E
X P
A N
S
IO
N P
R O J E
C T
S H
E E
T A
D D
E D
/2
M
IS
H R
A
R A
N A P .E
R E
F E
R E
N C
E D
R A
W
IN
G
M
IS
H R
A
R A
N A P .E
R E
F E
R E
N C
E D
R A
W
IN
G
D
A V
E S
C H
IE
M A
N N
D A
V E S
C H
IE
M A
N N
K L
U Z
A
W
IT
O L
D K
L U
Z A
W
IT
O L
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:28:26 AM 8/11/2020
...\Indiana Harbor Canal Dike Raise Phase 2 - 115264\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\115264_RC017.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
S T C
H
IC
A G
O
IN
D
IA
N A
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
RC017
W P -2
-C -0
IA
N A H
A R
B O
R A
N D C
A N
A L C
D F
W P -2
-B -0
S E
P
RC017
R
K
A N
S I
D
A
R C
.d g n
D
IK
E E
X P
A N
S
IO
N P
R O J E
C T
S
H E
E T A
D D
E D
/2
M
IS
H R
A
R A
N A P .E
R E
F E
R E
N C
E D
R A
W
IN
G
M
IS
H R
A
R A
N A P .E
R E
F E
R E
N C
E D
R A
W
IN
G
D
A V
E S
C H
IE
M A
N N
D A
V E S
C H
IE
M A
N N
K L
U Z
A
W
IT
O L
D K
L U
Z A
W
IT
O L
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:41:56 AM 8/11/2020
...\Indiana Harbor Canal Dike Raise Phase 2 - 115264\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\115264_RS006.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
S T C
H
IC
A G
O
IN
D
IA
N A
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
RS006
R S .d g n
W P -2
-C -0
IA
N A H
A R
B O
R A
N D C
A N
A L C
D F
W P -2
-B -0
S E
P
RS006
F A
Y E L
E F F
L E
R P
E
K P
C
A M
M A
R A
L J
A W
H A
R
A N
S I
D
F A
Y E L
E F F
L E
R P
E
K P
C
A M
M A
R A
L J
A W
H A
R D
IK
E E
X P
A N
S
IO
N P
R O J E
C T
A N
N A M
H A
Y E
S P
E A
N N
A M
H A
Y E
S
N
C H
O R
E D C
U T
O F F W
A L L
N
C H
O R
E D C
U T
O F F W
A L L
S H
E E
T A
D D
E D
/2
"General Decision Number: IN20200001 08/07/2020
Superseded General Decision Number: IN20190001
State: Indiana
Construction Types: Building, Heavy and Highway
Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/07/2020 3 02/14/2020 4 02/21/2020 5 04/03/2020 6 05/01/2020 7 05/29/2020 8 06/05/2020 9 06/12/2020 10 06/26/2020 11 07/03/2020 12 07/10/2020 13 07/24/2020 14 08/07/2020
ASBE0017-002 06/01/2019
LAKE AND PORTER COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 50.50 27.80
HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL
SCRAPPING, VACUUMING, BAGGING
AND DISPOSAL OF ALL
INSULATION MATERIALS, WHETHER
THEY CONTAIN ASBESTOS OR NOT,
FROM MECHANICAL SYSTEMS).........$ 37.80 24.54
ASBE0075-001 06/01/2019
REMAINING COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 32.00 24.54
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40
BOIL0001-005 05/01/2017
LAKE COUNTY, City of Hammond; North of 114th Street
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BOIL0374-003 03/01/2018
Rates Fringes
BOILERMAKER......................$ 37.22 27.65
BRIN0004-011 06/01/2019
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
BRICKLAYER
Bricklayer; Stone Mason;
Pointer, Cleaner, Caulker...$ 38.12 24.40 Marble Finisher; Tile Finisher....................$ 30.00 15.54 Marble Mason; Terrazzo Worker; Tile Layer..........$ 37.05 21.64 Terrazzo Finisher...........$ 30.00 15.54
BRIN0004-018 06/01/2019
SOUTH BEND: ST. JOSEPH COUNTY
BRICKLAYER
BRICKLAYER; STONE MASON;
POINTER, CAULKER, CLEANER...$ 29.49 16.77
MARBLE AND TILE FINISHER....$ 30.00 15.54
MARBLE AND TILE LAYER.......$ 30.57 18.36
TERRAZZO FINISHER...........$ 30.00 15.54
TERRAZZO WORKER.............$ 31.57 18.36
CARP0413-002 04/01/2020
St. Joseph County
Rates Fringes
CARPENTER........................$ 28.77 22.11
CARP0765-001 06/01/2020
LAKE, LAPORTE AND PORTER COUNTIES
Rates Fringes
CARPENTER........................$ 39.19 29.24
MILLWRIGHT.......................$ 39.88 29.20
CARP1029-001 06/01/2020
ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,
HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.
JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES
MILLWRIGHT.......................$ 28.58 25.21
ELEC0153-001 06/03/2019
ST JOSEPH COUNTY
Rates Fringes
Communication Technician.........$ 26.50 18.33
ELECTRICIAN......................$ 34.67 24.27
Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.
* ELEC0531-001 06/01/2020
LAPORTE and PORTER COUNTIES
ELECTRICIAN......................$ 40.75 27.32
ELEC0697-001 06/01/2020
LAKE COUNTY
Rates Fringes
ELECTRICIAN......................$ 42.75 29.93
ELEC0697-004 08/26/2019
LAKE COUNTY
Rates Fringes
Telecommunication Technician.....$ 34.00 26.70
Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).
Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC1393-003 12/02/2019
LAKE & PORTER COUNTIES
(Calumet Area, North of U.S. Hwy 30)
Rates Fringes
Line Construction:
EQUIPMENT OPERATOR 1:
(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 31.77 29%+6.75
EQUIPMENT OPERATOR 3
(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 39.19 29%+6.75
GROUNDMAN...................$ 25.04 29%+6.75
GROUNDMAN-TRUCK DRIVER......$ 26.14 29%+6.75
LINEMAN.....................$ 41.61 29%+6.75
ELEV0002-005 01/01/2019
ELEVATOR CONSTRUCTION
LAKE AND PORTER COUNTIES
Rates Fringes
ELEVATOR MECHANIC................$ 56.61 33.705+a+b
FOOTNOTES:
a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.
ELEV0044-002 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 51.35 34.765+a+b
a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;
6% for less than 5 years' service.
ENGI0150-001 06/01/2019
BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:
LAKE, LAPORTE, and PORTER COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 41.00 36.13
GROUP 2.....................$ 40.20 36.13
GROUP 3.....................$ 35.90 36.13
GROUP 4.....................$ 33.70 36.13
GROUP 5.....................$ 28.25 36.13
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;
Concrete paver 27E cu. ft. & under; Concrete placing boom;
Concrete pump/grout pump with boom (truck mounted);
Concrete pump with boom (truck mounted); concrete tower;
Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);
Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);
Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;
Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks
GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over 210; Air compressor (2) feeding a common receiver;
Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;
Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm & similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches
GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen
GROUP 5: Fork lifts (Housing and commercial only)
ENGI0150-012 06/01/2019
BUILDING CONSTRUCTION
ST. JOSEPH COUNTY
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 29.85 29.60
GROUP 2.....................$ 28.50 29.60
GROUP 3.....................$ 27.70 29.60
GROUP 4.....................$ 26.90 29.60
GROUP 5.....................$ 24.30 29.60
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form Paver, Tournapull, Tractor with Boom & Side Boom, Trenching Machine (12 or more inches in width), Combination Backhoe Front End Loader Machine with backhoe 1/2 yd bucket or attachments.
GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat (over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker (truck mounted), Concrete Mixer (of moore than 21 cu. ft.
capacity), Forklift (with fixed or tilt mast), Greaser Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks (with ""a"" frame.
GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators (material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than 12 inches in width, Welding Machines (8 through 15).
GROUP 4: Bobcat (up to and including 3/4 cu. yd.).
Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist (tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4
cu. yd. and under), Tractors (farm type) Welding Machines (2 through 8).
GROUP 5: Bobcats and forklifts (commercial or residential).
ENGI0150-014 05/01/2020
POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY
LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 41.55 36.05
GROUP 2.....................$ 41.10 36.05
GROUP 3.....................$ 40.65 36.05
GROUP 4.....................$ 39.45 36.05
GROUP 5.....................$ 38.40 36.05
POWER EQUITMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt plants (construction), Asphalt plant (permanent), Auto Patrol (Maintainer), Automatic Dry Batch Plant, Automated Concrete Placer, Automated Sub-Grader, Automated Slip Form Paver, Automated Finish Machine, Combination Backhoe Front, End Loader Machine (1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader (stationary), Boring Machine (road), Bulldozer, Concrete Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post Driver (truck mounted), Lead Greaser, Helicopter, Highlift
Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver (Hetherington), Pile Driver (Skid or Crawler), Road Paving Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck Mounted), Ross Carrier, Roto Mill Grinder (36"" and over), Roto mill grinder (less than 36""), Throttle Valve and Compressor or Clever Brooks Type Combination, Throttle Valve and Fireman Combination or Horizontal or Upright Boiler, Tournapull or similar type equipment, Tractor (boom), Tractor Drawn Belt Loader with attached Pusher (requires two engineers), Trench Machine, Tug Boat Operator, Wheel Excavator, Winch Tractor with ""a"" frame, Scoops, Turnapull or similar types machine used in Tandem (add $1.00 to class l hourly rate for each machine attached there to).
GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Highlift Shovels (under 3 cu. yds.), Jersey Spreader or Base Paver, Pavement Bump Grinder (self-propelled), Roller (Asphalt, waterbound, Macadam, Bituminous Macadam, Brick Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.
GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing Machine, Concrete Spreader (power driven), Digger, Post Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot (self-propelled), Sub-grader, Tamper, Mutipile Vibrating (earth and subbase material), Tractaire with Drill, Tractor (with all drawn attachements except backhoe and including Highlift, Endloader of 1 cu. yd. capacity and less.
GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine (self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine (paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.
GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater (1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw (Concrete Power Driven), Water Pump, Grasscutter.
IRON0292-001 06/01/2019
ST. JOSEPH and LAPORTE (Remainder of County) COUNTIES
IRONWORKER.......................$ 30.95 22.25
IRON0395-001 06/01/2020
LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50
MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE
ON W. TO 3 MILES E. OF IN. COUNTIES
IRONWORKER
SHEETER.....................$ 41.30 34.54
STRUCTURAL & ORNAMENTAL.....$ 41.05 34.54
LABO0041-001 06/01/2020
BUILDING CONSTRUCTION
LAKE COUNTY (Western Half)
Rates Fringes
Laborers:
CAISSON AND TUNNEL WORK
(Compressed & Free Air).....$ 37.90 23.93
GROUP 1.....................$ 36.40 23.93
GROUP 2.....................$ 37.15 23.93
GROUP 3.....................$ 37.40 23.93
LABORER CLASSIFICATIONS:
GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Railroad Workers, Masonry Wall Workers, (interior & exterior);
Portable Water, Pumps with discharge up to 3 indches;
Handling of Creosote Lumber or Like Treated Material (excluding railroad material); Asphalt Rakers and Lutemen;
Earth compactors; Jackmen and Sheetmen Working Ditches Deeper than Six (6) Feet in Depth; Laborers Working Ditches Six (6) Feet in Depth or Deeper; Assembly of Unicrete Pump;
Tile Layers (sewer or field) and Sewer Pipe Layers (metallic or non-metallic); Motor Driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers;
Core Drill Operators; Cement, Lime or Silica Clay Handler (bulk or bag); Handling of Toxic Materail Damaging to Clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain Saw and Demolition Saw Operators; Concrete Saw; Concrete Conveyor Assemblers; Applying of Curing Compound; Sinking of Wellpoints; Dewatering Header Systems
GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;
Welders (acetylene or electric); Cutting Torch or Burner;
Cement Nozzle Laborers; Cement Gun Operators; Scaffold Builders for Plasterers; Scaffold Builders for Masons;
Water Blast Machine Operators; Air Tool Operators and all Pneumatic Tool Operators, Air and Electric Vibrators and Chpping Hammer Operators; Asbestos Removal; Hazardous Waste Removal; All Boiler Setters Laborers, including expediters, bottom men, bell men, and Mason Tenders
GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives.
CAISSON AND TUNNEL WORK (Compressed & Free Air)
GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men, Concrete Repairmen, Motor Men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Sttl Setters, Tuggers, Switchmen, Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine, Dynamite Men, Drillers-air track or wagon drilling for explosives.
Premium for all employees working in compressed air shall be as follows:
0 - 15 lbs. $1.00 per hour 16 - 20 lbs. 1.50 per hour 21 - 26 lbs. 2.00 per hour 27 - 33 lbs. 3.00 per hour 34 & over 4.00 per hour
LABO0041-004 04/01/2020
UTILITY CONSTRUCTION
LAKE COUNTY
Rates Fringes
LABORERS
Group 1.....................$ 30.91 20.51 Group 2.....................$ 31.21 20.51 Group 3.....................$ 31.91 20.51
LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)
GROUP 1: Construction Laborer, Carpenter Tender, Fence Erector, Grade Checker, Guard Rail Erector, Continuous Steel Rod or Mat Installer, Wire Mesh Layer, Joint Man (Mortar, Mastic, and all other types), Lighting Installer (Permanent or Temporary), Lineman for Automatic Grade Maker on Paving Machines, Mortar Man, Multi-Plant Erector, Rip-rap Installer (all Products and Materials), Road Marking and Delineation Laborer, Setting and Placing of all Precast Concrete Products, Sing Installation including supporting structure, Spraying of all Epoxy, Curing Compound, or Like Material, Flagperson, Air Tool, Power Tool Operator, Asphalt Raker Man, Batch Truck Dumper, Bridge Hand Rail ERector, Handler (bulk or bag cement), Chain Saw Man, Concrete Puddler, Concrete Rubber, Concrete Saw Operator, Core Drill Operator, Eye Level, Hand Blade Operator Hydro Seeder Man, Motor Driven Georgia Buggy Operator, Power Driven Compactor or Taper Operator, Power Saw Operator, Pump Crete Assembly Man, Sreed Man or Screw Man on Asphalt Paver, Regar Installer, Sandblaster Man, Sealer Applicator for Asphalt (toxic), Setting and Placing pre-stressed on Pre-cast Concrete Structural Members, Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement), Spreader Box Tender (manua or power driven), Straw Blower Man, Subsureface Drain and Culvert Pipe Layer, Concrete Conveyor, Horizonal Boring and Jackman and
Sheetman, Pipe Greade Man, Winch and Windless Operator Conduit Installer, Sod Layer
GROUP 2: Cutting Torch Burner, Laser Beam Aligner, Manhole Erector,…