W912P6-20-B-0005-0004.pdf

PDF 171 KB Posted

Attached to
SHEBOYGAN, WI, BREAKWATER REPAIR (PHASE 2), USACE CHICAGO DISTRICT ACQUISITION
Solicitation number
W912P6-20-B-0005
Issued by

About this file

This document contains an amendment to a solicitation for construction services as well as the original solicitation details. The amendment provides responses to contractor questions about a project to repair breakwaters in Sheboygan, Wisconsin. It clarifies that the Phase 1 contractor will remove its staging area prior to Phase 2 work commencing. The solicitation is for the Sheboygan Breakwater Repair Phase 2 project, consisting of demolishing and replacing sections of breakwater with new materials totaling 1,100 feet. The project magnitude is estimated between $1-5 million. The solicitation is reserved for HUBZone small businesses. Bids are due by September 21, 2020 and the contract is to be awarded by September 30, 2020. The U.S. Army Corps of Engineers Chicago District is the contracting office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6600999939

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REFERENCE SOLICITATION NUMBER W912P6-20-B-0005

The referenced Solicitation is NOT EXTENDED by this Amendment. Therefore, responses to this Solicitation shall be furnished no later than 2:00 p.m. (CDT) on 21 September 2020. Details regarding bid submission are contained at Section 00 21 13 of the solicitation document. The amendment particulars follow on the next pages, w herein including responses to contractors' questions.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P620B0005

X 9B. DATED (SEE ITEM 11)

19-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Sep-2020

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P620B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT PARTICULARS

CONTRACTOR INQUIRIES

By this Amendment 0004, the Chicago District, USACE provides its responses to contractor inquiries, continued from Amendment 0003:

Q31. Per the Prime contractor on PH1 of this project and per my site visit, they will not be complete before mid-summer of 2021 and utilizing the entire staging area they built. How is the PH2 work to start in spring of 2021 if that is the case?

USACE Answer to 31: The potential bidder shall refer to the commencement clause, wherein stating a 2-part notice to proceed (NTP), the second to be issued sometime between mid-Spring 2021 and 31 December 2021. Accordingly, in consideration of the clause provisions, the start of physical work and/or staging area concerns are non-issues for this contract. Provided below is the full text of the relevant clause:

“52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to commence work under this contract within 10 calendar days following its acknowledgement of the first Notice to Proceed letter and execute the work as stipulated in the following paragraph.

Upon the Contractor’s acknowledgement of the second Notice to Proceed letter, the Contractor shall be required to proceed with the entire contract work, prosecute the work diligently, and complete the entire work ready for use not later than 30 November 2023, which shall include final cleanup of the premises.

“The Contractor will be issued two separate Notice to Proceed Letters for this project.

“a. Notice to Proceed Letter #1 will be issued following the government’s approval of the Contractor’s Bonds and Insurance. Under this particular Notice, the Contractor will be authorized to initiate work that is considered to be administrative in nature, e.g., this Notice will not authorize any onsite PHYSICAL work.

“b. Notice to Proceed Letter #2 is anticipated for issuance by mid-Spring 2021 and at the latest 31 December 2021.

By way of the second Notice to Proceed Letter, the Contractor will be authorized to perform the entire work of the contract, prosecute the work diligently, and complete the entire work ready for use not later than 30 November 2023, which considers the award of the contract by 30 September 2020. The time stated for completion shall include final cleanup of the premises.

“(End of Clause)”

Q32. Per the Prime contractor on PH1 of this project and per my site visit, it is obvious that they have invested +- $100,000 in creating a large/stabilized staging area. The Prime on PH1 indicated this staging area will be removed when they demobilize from the site in mid-summer of 2021. Can the government pay the Prime contractor of PH1 to keep the large stabilized staging area in place? If not, this will require the government to essentially pay twice or +$200,000 to stabilize the same large staging area used for both phases of work.

USACE Answer to 32: The specifications at in Section 01 10 10 cover the staging area. For this phase II contract, the prime contractor may not require the same size area.

Q33. The answer for Q27 on Amendment 3 is incorrect. We are the contractor that installed the improvements to the laydown area for PH1, and we will be taking it out and restoring the site to preconstruction condition (grass/topsoil) in mid-summer (pending actual completion date). Please advise.

USACE Answer to 33: The response to question 27 should be this: “The Phase 1 laydown area will be restored and vacated by the Phase 1 Contractor prior to the construction of the Phase 2 Work.”