AMENDMENT_NO._0001_W912P619B0021_CHICAGO_LOCK_CHAMBER_WALLS_RESURFACING_W_ATTACHMENTS.pdf
PDF 2 MB Posted
- Attached to
- Chicago Harbor Lock Chamber Wall All Resurfacing Project, Chicago Harbor Lock, Chicago, IL
- Solicitation number
- W912P619B0021
About this file
This file contains Amendment No. 0001 which includes the inclusion of marine wage rates IL18 and updates the non marine construction wage rates. Also included are revisions to several Drawing Sheets.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6691705897
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: INVITATION FOR BIDS NUMBERED W912P619B0021, “CHICAGO LOCK CHAMBER WALLS RESURFACING PROJECT," CHICAGO
HARBOR LOCK, CHICAGO, IL
THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0021
X 9B. DATED (SEE ITEM 11)
23-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Sep-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS
A. BID OPENING DATE: The BID OPENING DATE AND TIME IS UNCHANGED by this Amendment, therefore, BIDS are due prior to 11:00 AM Central Time on September 24, 2019. –For further details regarding bid submission, please refer to Solicitation Section 00 22 13 - Supplementary Instructions to Bidders.
B. USACE REPONSES TO THE CONTRACTOR’S INQUIRIES: In response to the contractor’s inquiries, the following are provided:
Q = QUESTION
Q1: I am wondering why the solicitation does not include IL18, which covers marine construction on the Great Lakes.
USACE RESPONSE TO Q1: The particular wage determination was inadvertently omitted and is hereby incorporated and enclosed via this Amendment – see General Decision Number: IL20190018, Modification Number 3 dated 04/26/2019 attached hereto.
Q2: Specification section 03 30 53 Section 2.1.3. Concrete Mixture Properties identifies the type of concrete that is to be used. Is this mix to be used for the panel seat shown on plan sheet S-505 in detail B6 and also the new concrete slab shown on S-501? Is there a specific mix proportions required for the non-shrink grout behind the armor plate that is also shown on S-501?
USACE RESPONSE TO Q2: Concrete specification 03 30 53 applies to the concrete panel seat and the horizontal surface concrete. Non Shrink Grout is to be in accordance with specification 05 50 15.
Q3: The only location in all of the plans that references the new armor plate thickness is on Sheet S-502 in detail E1 for the Top Anchor Detail. Here it is referenced that the armor plate is 1¼” thick. Is it safe to assume that this thickness is typical for the entire armor plate in all locations?
USACE RESPONSE TO Q3: The thickness for the armor plate is 1 1/4". Please see detail E1 on S-502 which shows the 1 1/4" armor plate. Also, see B6/S505 showing the 1 1/4" armor plate. Note that the panel depth will be 2 1/2" when you include the 1"x2 1/2" stiffeners as shown on S-502. "
Q4: Specification Section 00 22 13 - Supplementary Instructions to Bidders paragraph 2. Option Provisions states that Priority 1 and 2 items may be exercised within 240 calendar days of NTP and that Options 3, 4 and 5 may be exercised within 450 calendar days of NTP. The schedule to complete the base bid will not extend to 240 calendar days from NTP. This will require the contractor to demobilize and remobilize when the final 5 options are exercised. Where would the authority like the contractors to carry this cost? Can additional bid items to address this cost be added to the contract?
USACE RESPONSE TO Q4: The Option Provisions do not express a performance time of 240 calendar days for the base items neither implied is “the schedule to complete the base bid will not extend to 240 calendar days from NTP [Notice to Proceed].” Per Solicitation Section 00 22 13, the performance time of the contract is “1,080 calendar days.” This is also set forth at Block 11 on Page 1 of the Solicitation document (SF 1442). The performance time is also stated at Solicitation Section 00 70 00, FAR Clause 52.217-7 (OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEMS). The time required to complete the overall contract is 1,080 calendar days following the Contractor’s acknowledgement of the Notice to Proceed, regardless of when an option/option priority item is awarded; in this regard, the government will not extend the performance time
W912P619B0021 beyond the initial contract time of 1,080 calendar days following the Contractor’s acknowledgement of the Notice to Proceed.
Q5: Can the bid date be extended at all?
USACE RESPONSE TO Q5: The Bid Opening date is not being extended. Bids are required prior to 11a.m.
(Central time) on September 24, 2019 and shall be provided in accordance with the submittal instructions provided in the Solicitation document. –For further details regarding bid submission, please refer to Solicitation Section 00 22 13 - Supplementary Instructions to Bidders.
C. REVISED DRAWING SHEETS: The following Drawing Sheets have been revised and shall be replaced with the revised sheets contained herewith this Amendment.
Sheets S-102_AMD0001, S-103_AMD0001, S-104_AMD0001, S-105_AMD0001, and S- 504_AMD0001: the positions (elevations) of all hooks shall be relocated vertically near the curved steel armor of the wall to improve the hook function and provide better service for the traversing boats and barges.
D. WAGE RATES: In addition to the incorporation of the marine wage rates IL18, this Amendment provides the most current wage rates for the non-marine construction activities– SEE General Decision Number: IL20190009 08/30/2019, which is attached hereto.
E. POINT OF CONTACT: The point of contact for this Amendment is Annette Lakes at 312-846-5368.
END OF AMENDMENT
20'-7 3/8 "24'-8 3/8 "24'-8 3/8 "24'-8 3/8 "24'-8 3/16 " 6'-6 3/4 "
(SEE S-504)
NEW HOOK (TYP.)
SAW-CUT
6'-6 3/4 " *
10'-9 3/4 " *
RE-USE CLEATS
REMOVE AND
24'-8 3/16 " 24'-8 3/8 " 24'-8 3/8 "
(NOT IN CONTRACT)
BLOCK BOLLARD
EXISTING GATE
CHAIN LINE
DETACHABLE
EXPANSION JOINT
1" EXISTING MONOLITH
JOINT
EXPANSION
MONOLITH
1" EXISTING
CONTRACT)
IN
SLOT (NOT
STOP LOG
(NOT IN CONTRACT)
GATE BLOCK
EXISTING CONCRETE
24'-8 3/8 " 20'-7 3/8 "
NL1
STEEL SHEET PILE
EXISTING HANDRAIL
REMOVE AND RE-USE
140'-3 1/2 " *
SIGN
SAFETY
CENTERLINE OF LADDER
PRECAST CONCRETE LOCK FLOOR
NOT REMOVE
BOLLARD. DO
RE-USE STEEL
7'-6 3/8 " *6'-9 5/8 " *
NEW CONCRETE SEAT
10'-11"
4'-0"
JOINT
1" GROUTING
1'-0" CONCRETE SEAT
7'-2"±
5'-0" 5'-0"
MATCH EXISTING
MATCH EXISTING
7'-6 3/8 " *6'-9 5/8 " *
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:11:49 AM 9/5/2019
...\Chicago Lock Chamber Wall Repair-114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_S-102.dgn
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P
O J E
C T I
D
F
IL
E N
A M
E
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
F A
Y E L
E F F
L E
R P
E P
L A
N A N
D E
L E
V A
T
IO
N V
IE
W
N O
R T
H W
A L L
S-102
K P
C
S -1
.d g n
W P -1
-C -0
X
X
A N
S I
D
IC
A G
O
IL
L
IN
O
IS
C H
A M
B E
R W
A L L R
E P
A
IR
C H
IC
A G
O L
O C
K
W P -1
-B -0
F A
Y E L
E F F
L E
R P
E P
L A
N A N
D E
L E
V A
T
IO
N V
IE
W
N O
R T
H W
A L L
S-102
K P
C
D1
NORTH WALL PLAN VIEW
SCALE: 1/8" = 1'
NORTH
PLAN
0 8'4' 16'
A1
NORTH WALL ELEVATION VIEW
SCALE: 1/8" = 1'
NORTH
PLAN
0 8'4' 16'
A M
M A
R A
L J
A W
H A
R A
M M
A R A
L J
A W
H A
R
CERTIFIED FINAL DOCUMENTS - RTA
A U
G U
S T
D A
V
ID
F
O R
C E S
E D
A V
ID
F
O R
C E S
E
/0
/1
H
O O
K R
E L
O C
A T
IO
N
PLATE FABRICATION TO ENSURE ALL ELEVATIONS CAN BE MET.
CONTRACTOR SHALL VERIFY LOCK WALL ELEVATIONS PRIOR TO ARMOR 5.
THE HOOKS IAW THE HOOK DETAILS.
ADJUSTMENTS TO THE TYPICAL ARMOR PLATE DETAILS TO ACCOMMODATE
AT THE ELEVATION SHOWN ON S-504. CONTRACTOR SHALL MAKE
FABRICATION AND LOCATE NEW HOOKS DIRECTLY ABOVE EXISTING HOOKS
CONTRACTOR SHALL LOCATE ALL EXISTING HOOKS PRIOR TO PANEL 4.
BOLLARD AND CLEATS TO ENSURE LOCATIONS ARE MAINTAINED.
CONDUCT AND SUBMIT FOR APPROVAL A PRE AND POST SURVEY OF ALL
CONTRACTOR SHALL REMOVE AND REUSE ALL CLEATS. CONTRACTOR SHALL 3.
ALIGN WITH EXISTING MONOLITH JOINTS.
SURFACES OF THE EXISTING MONOLITH JOINTS TO ENSURE NEW PANELS
SHALL CLEAR THE JOINTS AS NECESSARY TO LOCATE ORIGINAL FORMED
MONOLITH JOINTS FROM THE LOCK CHAMBER SIDE. THE CONTRACTOR
THE CONTRACTOR SHALL LOCATE THE EXISTING CENTERLINE OF THE 2.
TO BEGINNING WORK.
SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR
ERECTION BRACING, RIGGING, AND SHORING. ALL PLANS AND DESIGNS
CONTRACTOR IS RESPONSIBLE FOR DESIGN AND EXECUTION OF ALL 1.
GENERAL NOTES
CAUTION
LOCK AREA
REQUIRED IN
LIFE JACKETS
LOCKAGE
BOAT DURING
ON OR OFF
DO NOT GET
CAUTION
LOCKAGE
BOAT DURING
ON OR OFF
DO NOT GET
CAUTION
DO NOT REMOVE
STEEL BOLLARDS,
RE-USE EXISTING REMOVE AND RE-USE CLEATS
A1 S-509
C EJC EJC EJC EJ
EXISTING MJ'S (TYP.)
MATCH SHAPE OF
MONOLITH JOINTS AND
PROVIDE EJ @
EL. 586
TO REMAIN
EXISTING CONCRETE
CL
A3 S-501
STEEL ARMOR PANEL
EL. 574 SAWCUT
B/GROUT EL. 575
HEIGHT)
PANEL
(NEW
A3 S-501
LLLL
1 1
C MJ
L
C EJ
L
C EJ
L
C EJ
L
C EJ
L
C EJ
L
C MJ
L
N
ISOLATION JOINT
PILE CELL BELOW
EXTENT OF SHEET
CONTRACT)
BLOCK (NOT IN
CONCRETE GATE
EXISTING
(NOT IN CONTRACT)
GATE BLOCK BOLLARD
EXISTING
EXPANSION JOINT
1" EXISTING MONOLITH
JOINT
EXPANSION
MONOLITH
1" EXISTING
JOINT
EXPANSION
STEEL SHEET PILE (TYP)
GRASS OVER FILL WITHIN
EXISTING CONCRETE OR
HANDRAILS
REUSE EXISTING
REMOVE AND
LADDER
STEEL
NEW
C CCJ
L
C CCJ
L
C CCJ
L
C CCJ
L
C CCJ
L
C EJ
L
128'-9 5/8 " *
7'-2 3/8 " *
10'-5 3/4 " *
128'-9 5/8 " *
7'-2 3/8 " *
10'-5 3/4 " *
3'-9 7/8 " *3'-9 7/8 " * 6'-6 3/4 "
PRIORITY 4OPTION - PRIORITY 2
20'-7 3/8 "20'-7 3/8 "20'-7 3/8 "24'-8 3/8 "24'-8 3/16 " 7'-2 3/8 " *6'-6 3/4 "
6'-6 3/4 "
PRIORITY 4OPTION - PRIORITY 2
20'-7 3/8 "20'-7 3/8 "20'-7 3/8 "24'-8 3/8 "24'-8 3/16 "
1'-0" CONCRETE SEAT
10'-11"
4'-0"
5'-0"
MATCH EXISTING
3'-9 3/4 " *
10'-5 3/4 " *
7'-2"±
20'-7 3/8 "20'-7 3/8 "20'-7 3/8 "24'-8 3/8 "24'-8 3/16 "
1'-0" CONCRETE SEAT
10'-11"
4'-0"
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:24:59 AM 9/5/2019
...\Chicago Lock Chamber Wall Repair-114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_S-103.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
Y
E L
E F F
L E
R P
E
N O
R T
H W
A L L P
L A
N S A
N D E
L E
V A
T
IO
N S
S-103
K P
C
S -1
.d g n
W P -1
-C -0
X
X
A N
S
IC
A G
O
IL
L
IN
O
IS
C H
A M
B E
R W
A L L R
E P
A
IR
C H
IC
A G
O L
O C
K
W P -1
-B -0
F A
Y E L
E F F
L E
R P
E
N O
R T
H W
A L L P
L A
N S A
N D E
L E
V A
T
IO
N S
S-103
K P
C
D1
NORTH WALL PLAN VIEW
SCALE: 1/8" = 1' 0 8'4' 16'
NORTH
PLAN
A1
NORTH WALL ELEVATION VIEW
SCALE: 1/8" = 1'
NORTH
PLAN
0 8'4' 16'
A M
M A
R A
L -J
A W
H A
R A
M M
A R A
L -J
A W
H A
R
CERTIFIED FINAL DOCUMENTS - RTA
A U
G U
S T
D A
V
ID
F
O R
C E S
E D
A V
ID
F
O R
C E S
E
/0
/1
H O
O K R
E L
O C
A T
IO
N
LOCKAGE
BOAT DURING
ON OR OFF
DO NOT GET
CAUTION
LOCKAGE
BOAT DURING
ON OR OFF
DO NOT GET
CAUTION
LOCKAGE
BOAT DURING
ON OR OFF
DO NOT GET
CAUTION
LOCKAGE
BOAT DURING
ON OR OFF
DO NOT GET
CAUTION
STEEL ARMOR PANEL
CL
CENTERLINE OF LADDERRE-USE CLEATS
REMOVE AND
EL. 586
EL. 574 SAWCUT
B/GROUT EL. 575
SAW-CUT
EXISTING CONCRETE
TO REMAIN
(NEW
PANEL
HEIGHT)
STEEL ARMOR PANEL
CL
CENTERLINE OF LADDERRE-USE CLEATS
REMOVE AND
EL. 586
EL. 574 SAWCUT
B/GROUT EL. 575
SAW-CUT
EXISTING CONCRETE
TO REMAIN
(NEW
PANEL
HEIGHT)
N
EXISTING HANDRAIL
REMOVE AND RE-USE
CHAIN LINE
DETACHABLE
STEEL SHEET PILE
C MJ
L
C EJ
L
C MJ
L
PRECAST CONCRETE LOCK FLOOR
C EJ
L
C EJ
L
C EJ
L
C EJ
L
NOT REMOVE
BOLLARDS. DO
RE-USE STEEL
JOINT
1" GROUTING
NEW CONCRETE SEAT
JOINT
EXPANSION
MONOLITH
1" EXISTING
JOINT
EXPANSION
MONOLITH
1" EXISTING
(SEE S-504)
NEW HOOK (TYP.)
N
A3 S-501
JOINT
ISOLATION
STEEL SHEET PILE (TYP)
EXISTING CONCRETE OR GRASS OVER FILL WITHIN
JOINT
EXPANSION
MONOLITH
1" EXISTING
HANDRAILS
RE-USE EXISTING
REMOVE AND DO NOT REMOVE
STEEL BOLLARDS.
RE-USE EXISTING
CLEATS
RE-USE
AND
REMOVE
LADDER
STEEL
NEW
JOINT
EXPANSION
MONOLITH
1" EXISTING
CL
C MJ
L
C EJ
L
C EJ
L
C EJ
L
C MJ
LLC EJ LC EJ
LC CCJLC CCJ LC CCJ LC CCJ LC CCJ
EXISTING MJ'S (TYP.)
MATCH SHAPE OF
MONOLITH JOINTS AND
PROVIDE EJ @
BOLLARD WITHIN NEW SLAB
REMOVE ABANDONED
N
EXISTING HANDRAIL
REMOVE AND RE-USE
CHAIN LINE
DETACHABLE
STEEL SHEET PILE
C MJ
L
C EJ
L
C MJ
L
PRECAST CONCRETE LOCK FLOOR
C EJ
L
C EJ
L
C EJ
L
C EJ
L
NOT REMOVE
BOLLARDS. DO
RE-USE STEEL
JOINT
1" GROUTING
NEW CONCRETE SEAT
JOINT
EXPANSION
MONOLITH
1" EXISTING
JOINT
EXPANSION
MONOLITH
1" EXISTING
(SEE S-504)
NEW HOOK (TYP.)
6'-6 3/4 " 24'-8 3/8 " 24'-8 3/8 " 24'-8 3/16 "
139'-8 1/2 " *
OPTION - PRIORITY 1
20'-7 3/8 " 24'-8 3/8 " 24'-8 3/8 " 24'-8 3/8 " 24'-8 3/16 "7'-8 5/8 " *
11'-0" *
24'-8 3/8 "7'-8 5/8 " * 20'-7 3/8 "
11'-0" *
6'-0 1/2 " *
10'-11"
4'-0"
1'-0" CONCRETE SEAT
7'-2"±
5'-0"5'-0"
MATCH EXISTING
6'-0 1/2 " *6'-6 3/4 "
50100150
CAUTION
ZONE
NO WADE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
EXISTING CLEATS
REMOVE AND RE-USE
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:29:56 AM 9/5/2019
...\Chicago Lock Chamber Wall Repair-114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_S-104.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
Y E L
E F F
L E
R P
E P
L A
N A
N D E
L E
V A
T
IO
N V
IE
W S
S O
U T
H W
A L L
S-104
K P
C
S -1
.d g n
W P -1
-C -0
X
X
A N
S
IC
A G
O
IL
L
IN
O
IS
C H
A M
B E
R W
A L L R
E P
A
IR
C H
IC
A G
O L
O C
K
W P -1
-B -0
F A
Y E L
E F F
L E
R P
E P
L A
N A
N D E
L E
V A
T
IO
N V
IE
W S
S O
U T
H W
A L L
S-104
K P
C
D1
SOUTH WALL PLAN VIEW
SCALE: 1/8" = 1'
NORTH
PLAN
0 8'4' 16'
A1
SOUTH WALL ELEVATION VIEW
SCALE: 1/8" = 1'
NORTH
PLAN
0 8'4' 16'
T R
U E N
BOLLARD AND CLEATS TO ENSURE LOCATIONS ARE MAINTAINED.
CONDUCT AND SUBMIT FOR APPROVAL A PRE AND POST SURVEY OF ALL
CONTRACTOR SHALL REMOVE AND REUSE ALL CLEATS. CONTRACTOR SHALL 4.
* IS DIMENSIONS TO VERIFY.3.
ADJACENT TO THE BOTH SIDES OF THE LADDERS AS NECESSARY.
CONTRACTOR SHALL ADJUST THE PANELS S6 (TYPE B) AND S7 (TYPE C) THAT 2.
THE PANELS AND LADDERS.
JOINTS AND LADDERS PRIOR TO STARTING THE FABRICATIOON PROCESS OF
CONTRTACTOR SHALL VERIFY ALL THE LOCATIONS OF THE MONOLITH 1.
GENERAL NOTES
A M
M A
R A
L J
A W
H A
R A
M M
A R A
L J
A W
H A
R
CERTIFIED FINAL DOCUMENTS - RTA
A U
G U
S T
D A
V
ID
F
O R
C E S
E D
A V
ID
F
O R
C E S
E
/0
/1
H O
O K R
E L
O C
A T
IO
N
A1 S-509
(NEW
PANEL
HEIGHT)
SAW-CUT
CENTERLINE OF LADDER
STEEL ARMOR PANEL
CLEATS
EXISTING
RE-USE
REMOVE AND
CL
EL. 574 SAWCUT
B/GROUT EL. 575
EL. 586
EXISTING CONCRETE
TO REMAIN
EXISTING GATE CONTROLS
CENTERLINE OF LADDER
EXISTING CONCRETE GATE BLOCK
EXPANSION JOINT
MONOLITH
1" EXISTING
(NOT IN CONTACT)
BLOCK BOLLARD
EXISTING GATE
CHAIN LINE
DETACHABLE
STEEL SHEET PILE
SLOT
LOG
STOP
SL1
JOINT
EXPANSION
MONOLITH
1" EXISTING
EXISTING HANDRAIL
REMOVE AND RE-USE
C MJ
L
C MJ
L
C EJ
L
C EJ
L
C EJ
L
C EJ
L
C EJ
L
PRECAST CONCRETE LOCK FLOOR
NOT REMOVE
BOLLARDS. DO
RE-USE STEEL
JOINT
1" GROUTING
NEW CONCRETE SEAT
( SEE S-504)
NEW HOOK (TYP.)
EXISTING
CONCRETE GATE
BLOCK
N
WAVE CREST WALL
EXPANSION JOINT
PILE CELL BELOW
EXTENT OF SHEET
ISOLATION JOINT
(NOT IN CONTACT)
BLOCK BOLLARD
EXISTING GATE
EXISTING
CONCRETE GATE
BLOCK
EXPANSION JOINT
MONOLITH
1" EXISTING
A3 S-501
LADDER
NEW STEEL
STEEL SHEET PILE (TYP)
EXISTING GRASS OR CONCRETE OVER FILL WITHIN
EXISTING HANDRAIL
REMOVE AND REUSE
EXPANSION JOINT
MONOLITH
1" EXISTING
DO NOT REMOVE
STEEL BOLLARDS.
REUSE EXISTING
C L
C MJ
L
C MJ
L
C EJ
L
C EJ
L
C EJ
L
C EJ
L
C EJ
L
L
C CCJ
L
C CCJ
L
C CCJ
L
C CCJ
L
C CCJ
EXISTING MJ'S (TYP.)
MATCH SHAPE OF
MONOLITH JOINTS AND
PROVIDE EJ @
4'-11 1/8 " *
6'-6 3/4 " 20'-7 3/8 "
131'-3 5/8 " *
24'-8 3/8 " 24'-8 3/16 "4'-11 1/8 " *
( SEE S-504)
NEW HOOK (TYP.)
OPTION - PRIORITY 5OPTION - PRIORITY 3
20'-7 3/8 " 20'-7 3/8 " 20'-7 3/8 " 24'-8 3/8 " 24'-8 3/16 "8'-7 1/8 " * 6'-6 3/4 "
11'-10 1/2 " *
20'-7 3/8 "8'-7 1/8 " * 20'-7 3/8 "
11'-10 1/2 " *
CLEATS
EXISTING
RE-USE
REMOVE AND
SAW-CUT
5'-0"
MATCH EXISTING
7'-2"±
STEEL SHEET PILE
SL1
JOINT
EXPANSION
MONOLITH
1" EXISTING
CENTERLINE OF LADDER
CHAIN LINE
DETACHABLE
EXISTING HANDRAIL
REMOVE AND RE-USE
JOINT
EXPANSION
MONOLITH
1" EXISTING
NOT REMOVE
BOLLARDS. DO
RE-USE STEEL
PRECAST CONCRETE LOCK FLOOR
10'-11"
1'-0" CONCRETE SEAT
4'-0"
JOINT
1" GROUTING
NEW CONCRETE SEAT
200250300
CAUTION
LOCK AREA
REQUIRED IN
LIFE JACKETS
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:46:19 AM 9/5/2019
...\Chicago Lock Chamber Wall Repair-114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_S-105.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
Y
E L
E F F
L E
R P
E
S O
U T
H W
A L L P
L A
N A
N D E
L E
V A
T
IO
N S
S-105
K P
C
S -1
.d g n
W P -1
-C -0
X
X
A N
S
IC
A G
O
IL
L
IN
O
IS
C H
A M
B E
R W
A L L R
E P
A
IR
C H
IC
A G
O L
O C
K
W P -1
-B -0
F A
Y E L
E F F
L E
R P
E
S O
U T
H W
A L L P
L A
N A
N D E
L E
V A
T
IO
N S
S-105
K P
C
D1
SOUTH WALL PLAN VIEW
SCALE: 1/8" = 1' 0 8'4' 16'
T R
U E N
NORTH
PLAN
NORTH
PLAN
0 8'4' 16'A1
SOUTH WALL ELEVATION VIEW
SCALE: 1/8" = 1'
A M
M A
R A
L J
A W
H A
R A
M M
A R A
L J
A W
H A
R
CERTIFIED FINAL DOCUMENTS - RTA
A U
G U
S T
D A
V
ID
F
O R
C E S
E D
A V
ID
F
O R
C E S
E
/0
/1
H O
O K R
E L
O C
A T
IO
N
A1 S-509
A3 S-501
C L
CL
STEEL ARMOR PANEL
HEIGHT)
PANEL
(NEW
EL. 574 SAWCUT
B/GROUT EL. 575
EL. 586
TO REMAIN
EXISTING CONCRETE
N
EXISTING HANDRAIL
REMOVE AND REUSE
EXPANSION JOINT
ISOLATION JOINT
PILE CELL BELOW
EXTENT OF SHEET
STEEL SHEET PILE (TYP)
EXISTING GRASS OR CONCRETE OVER FILL WITHIN
LADDER
NEW STEEL
EXPANSION JOINT
MONOLITH
1" EXISTING
EXPANSION JOINT
MONOLITH
1" EXISTING
BOLLARDS. DO NOT REMOVE
RE-USE EXISTING STEEL
C EJ
L
C EJ
L
C EJ
L
C EJ
L
C EJ
L
L
C CCJ
L
C CCJ
L
C CCJ
L
C CCJ
L
C CCJ
EXISTING MJ'S (TYP.)
MATCH SHAPE OF
MONOLITH JOINTS AND
PROVIDE EJ @
LC MJLC MJ
N
C MJ
L
C EJ
L
C EJ
L
C EJ
L
C EJ
L
C MJ
L
C EJ
L
9 1/2 " 14 1/2 "
54"
24'-7" (TYPICAL PANEL)
24'-8 3/8 " @ 32° F (TYPICAL ARMOR PLATE)
4'-1" (TYP.)
STUD ANCHORS 1/2"X5"X5/16"
4 ANCHORS - 1 1/2"X16"
SECTION
SIDE OF OPENING, SEE
ADDITIONAL #6 BARS EACH
STEEL HOOK OPENING
SIDE OF OPENING
#6 BARS AT EACH
PL 14 - 1/2"X14 1/2"X 2-1/2"
NON SHRINK GROUTING
OPENING
HOOK
STEEL
CONCRETE SAFETY YELLOW
GROUTING PLACEMENT. PAINT
FORM OPENING DURING
STIFFENERS
TO CLEAR
PLATE LOCATIONS ±4"
FABRICATION. ADJUST
PRIOR TO PANEL
LOCATE HOOKS
THICKNESS
PIPE SIZE AND WALL
PIPE CAP TO MATCH
I.D. 3.15", T 0.674")
PIPE 4XXS (O.D. 4 1/2",
12"
REINFORCEMENT
AND SHRINKAGE
#4 TEMPERATURE
HOLE
ANCHOR
3"Ø
12" SPLICES
1-1/4"X5" PLATE
1-1/4"X5" PLATE
1-1/4" STEEL PANEL
2 1/4 "
PL 14-1/2"X14 1/2"X 2-1/2"
52 1/4 "
OPENING
CONCRETE FOR THE HOOK
REQUIRED TO REMOVE THE
REINFORCEMENT ONLY AS
CUT INTO EXISTING
12"12"
8 3/4 "
5"
5"
6"
6"
6"
9"
1 1/4 "
9 1/4 "
2"
6"
6"
1" 3" 17" 3" 1"
11"11"
1 1/2 " 1 1/2 "
1"
5"
26"
3"
1"
1 1/2 "
16 1/2 "
16 1/2 "
1 1/2 "
8 1/4 "
5"
16 1/2 "
2 1/4 "
7 1/4 "
DETAIL S-502
HOOK, SEE ANCHOR
SIX ANCHORS PER
(TYP.)
1-1/4"X5" PLATES
STIFFENERS AT THE
DISCONTINUE
1" NON-SHRINK GROUT
12"
12" REINFORCEMENT SPLICES
1 3/4 " 1 3/4 "
8 1/4 "
4"
8"
38"
24"
24"
REINFORCEMENT
#4 TEMPERATURE AND SHRINKAGE
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:35:19 AM 9/5/2019
...\Chicago Lock Chamber Wall Repair-114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\114419_S-504.dgn
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
O J E
C T I
D
F
IL
E N
A M
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
Y
E L
E F F
L E
R P
E
S-504
K P
C
S -5
.d g n
W P -1
-C -0
X
X
A N
S
IC
A G
O
IL
L
IN
O
IS
C H
A M
B E
R W
A L L R
E P
A
IR
C H
IC
A G
O L
O C
K
W P -1
-B -0
F A
Y E L
E F F
L E
R P
E
S-504
K P
C
C1
SCALE: 1 1/2" = 1' 1' 2'0 6" C6
SCALE: 1 1/2" = 1'
SECTION
1' 2'0 6"
S T
E E
L P
A N
E L H
O O
K S
E C
T
IO
N S
S T
E E
L P
A N
E L H
O O
K S
E C
T
IO
N S
SECTION
A M
M A
R A
L J
A W
H A
R A
M M
A R A
L J
A W
H A
R
NON-SHRINK GROUT
AT CONCRETE REMOVAL LINE OVER 1" MAXIMUM
NOTE: CONTRACTOR SHALL INSTALL 2-1/2" PLATE
A U
G U
S T
CERTIFIED FINAL DOCUMENTS - RTA
D A
V
ID
F
O R
C E S
E D
A V
ID
F
O R
C E S
E
/0
/1
H
O O
K R
E L
O C
A T
IO
N
EXISTING CONCRETE
PEN
FULL
C6 S-510
C1 S-510
FULL PEN
EL. 586 (EL. +7 CCD)
EL. 581 (EL. +2 CCD)
EL. 582.83 (EL. +3.83 CCD)
"General Decision Number: IL20190009 08/30/2019
Superseded General Decision Number: IL20180009
State: Illinois
Construction Types: Building, Heavy, Highway and Residential
County: Cook County in Illinois.
BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act
Page 1 of 24beta.SAM.gov
9/15/2019https://beta.sam.gov/wage-determination/IL20190009/8/document
NON MARINE CONSTRUCTION WAGE RATES FOLLOW -
itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
1 01/11/2019
2 04/19/2019
3 06/07/2019
4 06/14/2019
5 06/21/2019
6 07/19/2019
7 07/26/2019
8 08/30/2019
ASBE0017-001 06/01/2019
Rates Fringes
ASBESTOS WORKER/INSULATOR
Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 50.50 27.80
Fire Stop Technician.............$ 40.40 24.54
HAZARDOUS MATERIAL HANDLER
includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain
Page 2 of 24beta.SAM.gov asbestos or not, from mechanical systems..........$ 37.80 24.54
BOIL0001-001 05/01/2017
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BRIL0021-001 06/01/2016
Rates Fringes
BRICKLAYER.......................$ 44.88 26.62
BRIL0021-004 06/01/2017
Rates Fringes
Marble Mason.....................$ 44.63 26.83
BRIL0021-006 06/01/2017
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 44.38 25.84
TILE FINISHER....................$ 38.56 22.10
TILE SETTER......................$ 45.49 25.72
BRIL0021-009 06/01/2017
Rates Fringes
MARBLE FINISHER..................$ 33.95 26.03
BRIL0021-012 06/01/2017
Page 3 of 24beta.SAM.gov
Rates Fringes
Pointer, cleaner and caulker.....$ 45.42 24.06
CARP0555-001 06/01/2018
BUILDING, HEAVY, AND HIGHWAY
Rates Fringes
CARPENTER
Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer
Building...................$ 47.35 32.83
Heavy & Highway............$ 47.35 32.83
CARP0555-002 10/01/2018
RESIDENTIAL CONSTRUCTION
Rates Fringes
CARPENTER........................$ 38.11 32.83
ELEC0009-003 06/03/2018
Rates Fringes
Line Construction
Groundman...................$ 40.48 61.52%
Lineman and Equipment
Operator....................$ 51.90 61.52%
ELEC0134-001 06/03/2019
Rates Fringes
Page 4 of 24beta.SAM.gov
ELECTRICIAN......................$ 49.35 3%+34.32
ELEC0134-003 06/03/2019
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 44.86 3%+24.72
The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.
ELEV0002-001 01/01/2019
Rates Fringes
ELEVATOR MECHANIC................$ 56.61 33.705+a+b
FOOTNOTES:
Page 5 of 24beta.SAM.gov
a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence
Day; Labor Day; Thanksgiving Day; Day after Thanksgiving
Day; Veterans' Day and Christmas Day.
b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service
* ENGI0150-006 06/01/2019
Building and Residential Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 51.10 41.00
GROUP 2....................$ 49.80 41.00
GROUP 3....................$ 47.25 41.00
GROUP 4....................$ 45.50 41.00
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;
Autograde*; Backhoes with Caisson attachment*:Batch Plant*;
Benoto(Requires two Engineers); Boiler and Throttle Valve;
Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe
Front Endloader Machine; Compressor and Throttle Valve;
Concrete Breaker (Truck Mounted)*; Concrete Conveyor;
Concrete Conveyor, Truck Mounted; Concrete Paver over 27E
cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete
Placer*; Concrete Placing Boom; Concrete Pump (Truck
Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;
Cranes, (GCI and similar type Requires two operators only);
Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front
Page 6 of 24beta.SAM.gov
Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside
Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;
Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac
(and similar equipment);Locomotives; Motor Patrol*; Pile
Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress
Machine; Pump Cretes Dual Ram(Requiring frequent
Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw
Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole
Drill*; Roto Mill Grinder (36"" and Over)*; Roto Mill
Grinder (Less Than 36"")*; Scoops-Tractor Drawn; Slip-Form
Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.
GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Broom, Power
Propelled; Bulldozers; Concrete Mixer (Two Bag and over);
Conveyor, Portable; Forklift Trucks; Greaser Engineer;
Highlift Shovels or Front End loaders under 2 1/4 cu yd;
Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer
Dragging Machine; Hoists, Tugger Single Drum; Laser Screed;
Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*;
Rollers; Steam Generators; Tractors; Tractor Drawn
Vibratory Roller (Receives an additional $.50 per hour);
Winch Trucks with ""A"" Frame.
GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;
Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or
Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3"" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;
Welding Machines (2 through 5); Winches, 4 Small Electric
Drill Winches; Bobcat (up to and including 3/4 cu yd)
GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick
Page 7 of 24beta.SAM.gov
Forklifts; Oilers
*-Requires Oiler
* ENGI0150-025 06/01/2019
Heavy and Highway Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1.....................$ 49.30 41.00
GROUP 2.....................$ 48.75 41.00
GROUP 3.....................$ 46.70 41.00
GROUP 4.....................$ 45.30 41.00
GROUP 5.....................$ 44.10 41.00
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;
Autograder/ GOMACO or similar; ABG Paver*, Backhoes with
Caisson attachment*, Ballast Regulator, Belt Loader*;
Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker
(truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All
Derricks; Derrick Boats; Derricks, traveling*; Dowell
Machine with Air Compressor ($1.00 above Class 1);
Dredges*; Field Mechanic Welder; Formless Curb and Gutter
Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver
Page 8 of 24beta.SAM.gov mounted*; Hoists, one, two, and three Drum; Hydraulic
Backhoes*; Backhoes with Shear attachments*; Mucking
Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;
Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36"" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form
(tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt
Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer
Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* &
Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*
GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle
Valve; Bulldozer; Car Loader Trailing Conveyors;
Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and
Throttle Valve; Compressor, common receiver (3); Concrete
Breaker or Hydro Hammer; Concrete Grinding Machine;
Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap
Machine; Belting Machine and Sealing Machine; Concrete
Wheel Saw; Conveyor Muck Cars (Haglund or similar type);
Drills (all); Finishing Machine-Concrete; Greaser Engineer;
Highlift Shovels or Front End Loader; Hoist- Sewer Dragging
Machine; Hydraulic Boom Trucks, all attachments;
Hydro-Blaster (requires two operators); Laser Screed*;
Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow
Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor
Drawn; Self- propelled Compactor; Spreader-Chip-Stone;
Scraper; Scraper-Prime Mover in Tandem regardless of size
(add $1.00 to Group 2 hourly rate for each hour and for
Page 9 of 24beta.SAM.gov each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply
Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift
Trucks; Grouting Machines; Hoists, Automatic; Hoists, all
Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low
Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump
Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;
Combination - Small Equipment Operator; Directional Boring
Machine; Generators - Small 50 kw and under; Generators -
Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants
(1 to 5); Pumps, over 3"" (1 to 3, not to exceed a total of
300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;
GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional
Boring
*Requires Oiler
* IRON0001-026 06/01/2019
Rates Fringes
IRONWORKER
Page 10 of 24beta.SAM.gov
Sheeter.....................$ 50.88 39.37
Structural and Reinforcing..$ 50.63 39.37
IRON0063-001 06/01/2018
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 48.05 35.93
IRON0063-002 06/01/2018
Rates Fringes
IRONWORKER
Fence Erector...............$ 40.88 28.74
IRON0136-001 07/01/2018
Rates Fringes
IRONWORKER
Machinery Movers; Riggers;
Macinery Erectors...........$ 41.00 33.96
Master Riggers..............$ 43.50 33.96
LABO0002-006 06/01/2018
Rates Fringes
LABORER (BUILDING &
RESIDENTIAL)
GROUP 1....................$ 42.72 28.19
GROUP 2....................$ 42.72 28.19
GROUP 3....................$ 42.80 28.19
GROUP 4....................$ 42.82 28.19
GROUP 5....................$ 42.87 28.19
GROUP 6....................$ 42.92 28.19
Page 11 of 24beta.SAM.gov
GROUP 7....................$ 42.95 28.19
GROUP 8....................$ 43.05 28.19
GROUP 9....................$ 43.07 28.19
GROUP 10....................$ 43.17 28.19
GROUP 11....................$ 43.00 28.19
GROUP 12....................$ 43.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Building Laborers; Plasterer Tenders; Pumps for
Dewatering; and other unclassified laborers.
GROUP 2: Fireproofing and Fire Shop laborers.
GROUP 3: Cement Gun.
GROUP 4: Chimney over 40 ft.; Scaffold Laborers.
GROUP 5: Cement Gun Nozzle Laborers (Gunite); Windlass and capstan person.
GROUP 6: Stone Derrickmen & Handlers.
GROUP 7: Jackhammermen; Power driven concrete saws; and other power tools.
GROUP 8: Firebrick & Boiler Laborers.
GROUP 9: Chimney on fire brick; Caisson diggers; & Well
Point System men.
GROUP 10: Boiler Setter Plastic Laborers.
GROUP 11: Jackhammermen on fire brick work only.
GROUP 12: Dosimeter use (any device) monitoring nuclear exposure); Asbestos Abatement Laborer; Toxic and Hazardous
Page 12 of 24beta.SAM.gov
Waste Removal Laborers.
LABO0002-007 06/01/2018
Rates Fringes
LABORER (HEAVY & HIGHWAY)
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 42.80 28.19
GROUP 3.....................$ 42.87 28.19
GROUP 4.....................$ 43.00 28.19
GROUP 5.....................$ 42.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Common laborer; Tenders; Material expeditor
(asphalt plant); Street paving, Grade separation, sidewalk, curb & gutter, strippers & All laborers not otherwise mentioned
GROUP 2: Asphalt tampers & smoothers; Cement gun laborers
GROUP 3: Cement Gun Nozzle (laborers), Gunite
GROUP 4: Rakers, Lutemen; Machine-Screwmen; Kettlemen;
Mixermen; Drun-men; Jackhammermen (asphalt); Paintmen;
Mitre box spreaders; Laborers on birch, overman and similar spreader equipment; Laborers on APSCO; Laborers on air compressor; Paving Form Setter; Jackhammermen (concrete);
Power drive concrete saws; other power tools.
GROUP 5: Asbestos Abatement Laborers; Toxic and Hazardous
Waste Removal Laborers, Dosimeter (any device) monitoring nuclear exposure
Page 13 of 24beta.SAM.gov
LABO0002-008 06/01/2018
LABORER (Compressed Air)
0 - 15 POUNDS...............$ 43.72 28.19
16 - 20 POUNDS..............$ 44.22 28.19
21 - 26 POUNDS..............$ 44.72 28.19
27 - 33 POUNDS..............$ 45.72 28.19
34 - AND OVER...............$ 46.72 28.19
LABORER (Tunnel and Sewer)
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 42.85 28.19
GROUP 3.....................$ 42.95 28.19
GROUP 4.....................$ 43.07 28.19
GROUP 5.....................$ 42.72 28.19
LABORER CLASSIFICATIONS (TUNNEL)
GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers
GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher
GROUP 3: Concrete repairmen; Lock tenders (pressure side);
Mortar men; Muckers; Grout machine operators; Track layers
GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;
Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;
Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;
skinners; Maintenance technician
Page 14 of 24beta.SAM.gov
GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABORER CLASSIFICATIONS (SEWER)
GROUP 1: Signalmen; Top laborers and All other laborers
GROUP 2: Concrete laborers and Steel setters
GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;
Mortar men; Scaffold men; Second Bottom men
GROUP 4: Air trac drill operator; Bottom men;
Bracers-bracing; Bricklayer tenders; Catch basin diggers;
Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;
Pipelayers; Rodders; Welder-burners; Well point systems men
GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABO0225-001 06/01/2018
Rates Fringes
LABORER (DEMOLITION/WRECKING)
GROUP 1.....................$ 37.52 28.19
GROUP 2.....................$ 42.72 28.19
GROUP 3.....................$ 42.72 28.19
LABORER CLASSIFICATIONS
GROUP 1 - Complete Demolition
GROUP 2 - Interior Wrecking and Strip Out Work
Page 15 of 24beta.SAM.gov
GROUP 3 - Asbestos Work with Complete Demolition/Wrecking or
Strip Out Work
PAIN0014-001 06/01/2018
Rates Fringes
PAINTER (including taper)........$ 46.55 27.24
PAIN0027-001 06/01/2019
Rates Fringes
GLAZIER..........................$ 44.85 37.72
PLAS0005-002 07/01/2015
Rates Fringes
PLASTERER........................$ 42.25 26.65
PLAS0502-001 06/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 45.25 33.48
PLUM0130-001 06/01/2019
Rates Fringes
PLUMBER..........................$ 51.00 31.47
PLUM0597-002 06/01/2018
Page 16 of 24beta.SAM.gov
PIPEFITTER.......................$ 48.50 31.44
ROOF0011-001 12/01/2018
Rates Fringes
ROOFER...........................$ 43.65 23.45
SFIL0281-001 01/01/2018
Rates Fringes
SPRINKLER FITTER.................$ 48.10 27.05
SHEE0073-001 06/08/2018
Rates Fringes
Sheet Metal Worker...............$ 44.25 37.02
SHEE0073-002 06/08/2018
Rates Fringes
Sheet Metal Worker
ALUMINUM GUTTER WORK........$ 31.32 37.02
TEAM0731-001 06/01/2017
COOK COUNTY - HEAVY AND HIGHWAY
Rates Fringes
TRUCK DRIVER
2 or 3 Axles................$ 35.60 22.10
Page 17 of 24beta.SAM.gov
4 Axles.....................$ 35.85 22.10
5 Axles.....................$ 36.05 22.10
6 Axles.....................$ 36.25 22.10
FOOTNOTES:
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and
Christmas Day.
B. 900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
C. An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
TEAM0731-002 03/01/2012
Rates Fringes
Traffic Control Device Monitor
TRAFFIC SAFETY WORKER:
Primary duties include but are not limited to the delivery, maintenance and pick-up of traffic control devices, the set-up and installation of traffic signs, pavement markings, barricades, crash barrels and glare screens, traffic control surveillance, the repair and maintenance trucks, cars, arrow
Page 18 of 24beta.SAM.gov boards, message signs, barricade and sign fabrication equipment.......$ 28.25 9.08
TEAM0786-001 06/01/2017
COOK COUNTY - BUILDING AND RESIDENTIAL
Rates Fringes
TRUCK DRIVER
2 & 3 Axles.................$ 39.942 0.25+a
4 Axles.....................$ 39.75 0.25+a
5 Axles.....................$ 39.967 0.25+a
6 Axles.....................$ 40.184 0.25+a
FOOTNOTES:
a. $719.00 per week.
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years -
2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Page 19 of 24beta.SAM.gov
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Page 20 of 24beta.SAM.gov
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Page 21 of 24beta.SAM.gov
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Page 22 of 24beta.SAM.gov
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
Page 23 of 24beta.SAM.gov
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
Page 24 of 24beta.SAM.gov
"General Decision Number: IL20190018 04/26/2019
Superseded General Decision Number: IL20180018
State: Illinois
Construction Types: Heavy (Dredging and Marine)
Counties: Illinois Statewide.
MECHANICAL DREDGING (CLAMSHELL, DRAGLINE, AND BACKHOE) AND
MARINE CONSTRUCTION):
ILLINOIS, INDIANA, MICHIGAN, MINNESOTA, NEW YORK, OHIO,
PENNSYLVANIA AND WISCONSIN DREDGING AND MARINE CONSTRUCTION
Dredging and Marine Construction Projects: floating/land equipment engaged in clamshell, backhoe and dragline dredging, marine construction, bridges,salvage operations and cranes, loaders, dozers, or other equipment used for disposal of dredge spoils or marine construction materials on land at the slip or dock, at the project site, where the above material/spoils is…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.