AMENDMENT_0005_W912P619B0021_CHICAGO_LOCK_CHAMBERS_WALL_RESURFACING_WITH_ATTENDANCE_SHT_PREBID.pdf
PDF 811 KB Posted
- Attached to
- Chicago Harbor Lock Chamber Wall All Resurfacing Project, Chicago Harbor Lock, Chicago, IL
- Solicitation number
- W912P619B0021
About this file
This file contains Amendment No. 0005, wherein incorporating USACE responses to contractor's questions and it also includes the attendance sheet from the prebid meeting.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6691705897
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
INVITATION FOR BIDS NO. W912P619B0021, "CHICAGO LOCK CHAMBER WALL REPAIR"
THE ELEMENTS OF THIS AMENDMENT FOLLOW ON THE NEXT PAGE ----
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0021
X 9B. DATED (SEE ITEM 11)
23-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Sep-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS
A. The BID OPENING DATE AND TIME IS UNCHANGED by this Amendment, therefore, BIDS are due prior to 1:00 PM Central Time on September 26, 2019. –For further details regarding bid submission, please refer to Solicitation Section 00 22 13 - Supplementary Instructions to Bidders.
B. ACKNOWLEDGMENT OF THIS AMENDMENT MAY BE EXECUTED VIA EMAIL by transmitting the signed Amendment to Annette Lakes at annette.h.lakes@usace.army.mil with a copy to Regina Blair at regina.g.blair@usace.army.mil. HOWEVER, ANY AND ALL BIDS (to include the bid bond and representations and certifications) MUST BE FURNISHED BY REGULAR MAIL, OVERNIGHT MAIL OR HANDCARRIED as described in the Solicitation – See Section 00 22 13 Supplementary Instructions to Bidders. PLEASE BE SURE TO INCLUDE THE SOLICITATION NUMBER
“W912P619B0021” IN THE SUBJECT LINE OF YOUR EMAIL.
C. USACE RESPONSES TO CONTRACTOR’S QUESTIONS FOLLOW:
Question 1: Please advise what coating system needs to be applied to the plates. Spec sections 05 50 15 3.6 Finishes, and 09 97 02 Painting Hydraulic Structures do not specify.
USACE RESPONSE 1: "As per 09 97 02 paragraph 3.5, all surfaces of lock wall armor plates are to receive System No. 5-E-Z per the painting schedule."
Question 2: Please confirm all plates are hot dip galvanized per ASTM A123.
USACE RESPONSE 2: "As per 09 97 02 paragraph 3.5, all surfaces of lock wall armor plates are to receive System No. 5-E-Z per the painting schedule."
Question 3: Please advise if only the water side of the armor plates need to be painted or do both sides need to be painted?
USACE RESPONSE 3: "Yes, both sides of the armor plates are to be painted as per 09 97 02 paragraph 3.5. The painting schedule states that "All surfaces of lock wall armor plate panels and Vertical Ladders" are to receive System No. 5-E-Z."
Question 4: Further clarification is needed since the E-Z-5 coating system specifies a white metal blast cleaning that would strip the galvanizing off of the plates.
USACE RESPONSE 4: Are all steel plates galvanized or only specific items and if so, which items.
Question 5: If the steel plates are both galvanized and applied with the E-Z-5 Coating System there is a conflict with the Coating System successfully applying to galvanized surfaces.
W912P619B0021
USACE RESPONSE 5: "As per specification section 09 97 02, paragraph 3.5, all surfaces of lock wall armor plates and vertical ladders are to be painted with paint system 5-E-Z, not hot dipped galvanized."
Question 6: We’ve sent the insurance requirements found in the bidding documents to our Agent for review. Is Pollution Liability or any kind of Marine Insurance required. We didn’t see it mentioned. If so, what limits are required?
USACE RESPONSE 6: The insurance requirements are clearly delineated in Division 1 of the Specifications, Section 01 10 00 Pages 5 and 6. Requirements are set forth therein and speak to directly to ALL that's needed/required meaning if it’s not mentioned, it’s not required.
D. This Amendment includes the attendance sheet from the Pre-Bid Meeting. (see Attachment)
E. Point of Contact: Regina G. Blair at regina.g.blair@usace.army.mil
END OF AMENDMENT
File details come from the government source that posted it.