Amendment 0004 to Solicitation W912P6-14-B-0008.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6641117298

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: SOLICITATION W912P6-14-B-0008, "McCook Groundw ater Monitoring Wells"

CONTINUED ON NEXT PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jul-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-14-B-0008

X 9B. DATED (SEE ITEM 11)

24-Jun-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jul-2014

CODE

U. S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6-14-B-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

A. CONTRACTOR’S INQUIRIES: Enclosed with this amendment are the USACE’s responses to Contractor Inquiries.

B. The Bid Opening time and date remain unchanged at 2PM on 28 July 2014.

C. POINT OF CONTACT: The POC for this amendment is Alex Heinzel at (312) 846-5368 or alex.heinzel@usace.army.mil.

W912P6‐14‐B‐0008 AMD 0004

Contractor’s Inquiries

Q: Does Item 0005 include all seven (7) wells to be sampled and does not account for QA/QC samples or does it include the four wells identified in Item 0004 (G‐01, G‐02, G‐03, and G‐07) with two QA/QC samples and a source water sample?

A: Bid prices should be based on the description found in the Measurement and Payment Section. The quantity (7) includes one test per well (G‐01, G‐02, G‐03, and G‐07), two QA/QC sampling tests, and one source water sampling test.

Q: Item 0013 specifies a quantity of five (5). Does this assume the three wells (G‐04, G‐05, and G‐06) listed in the Measurement and Payment section 1.2.3.1 for this Item plus one QA/QC samples and a source water sample?

A: Bid prices should be based on the description found in the Measurement and Payment Section. The quantity (5) includes one test per well (G‐04, G‐05, and G‐06), one QA/QC sampling test, and one source water sampling test.

Q: The specifications say no bentonite or additives can be used that could affect water quality. Can those products be used during the overburden drilling only to assist in keeping the borehole open?

A: The use of bentonite or additives to the drilling fluid would be considered for the overburden drilling only. The Contractor should submit requested drilling fluid additives within the Drilling and Installation Work Plan (Reference Specification Section 33 24 13, Paragraph 1.2.1.b, DRILLING AND

INSTALLATION WORK PLAN).

Q: In the Section 33 24 13 Paragraph 3.1 it requires written approval from a utility company. If the utility company refuses to give permission in writing, will the JULIE/DIGGER one‐call “all‐clear” be an acceptable form of approval?

A: Any notification method as provided in the latest version of the J.U.L.I.E. 'Excavator Handbook' is acceptable (although written is preferred).

W912P6-14-B-0008-0004
GWMW_AMD0004_QuestionsAnswers _3_