Department of Energy Former K-25 Viewing Platform/General Purpose Building Construction
Solicitation number
W912P523B0003
Issued by

About this file

This federal contract solicitation seeks construction services for the Department of Energy Former K-25 Viewing Platform/General Purpose Building project. Key details include a request for a firm-fixed price construction contract between $5-10 million for the East Tennessee Technology Park National Historic Preservation project. The solicitation is a 100% small business set-aside, with a NAICS code of 236220 and size standard of $39.5 million. Bids are due on January 19, 2023 and will be publicly opened via video conference. The solicitation requires compliance with FAR and DFARS clauses and adherence to Davis-Bacon wage rates. Insurance, bid bonds, and performance/payment bonds valued at 100% of the contract price are required.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps Of Engineers

Nashville District

Solicitation No. W912P523B0003

VIEWING PLATFORM BUILDING

Office of Environmental Management National Historic Preservation K-25 History Center Oak Ridge, Roane County, Tennessee

Technical Specifications

Amendment 0003

January 2023

Viewing Structure K-25 History Center W912P523B0003 Ready to Advertise Amendment 0003 Oak Ridge, Tennessee

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.01 GENERAL REQUIREMENTS

A. Tennessee Motor Vehicle Laws B. Operating Facilities C. Training

1. Lock Out /Tag Out Training

2. Confined Space Training D. Material Delivery, Storage and Handling E. Evacuation

1.02 SUBMITTALS

1.03 SPECIAL SCHEDULING REQUIREMENTS

1.04 CONTRACTOR ACCESS AND USE OF PREMISES

A. Activity Regulations

1. Subcontractors and Personnel Contacts

2. Identification Badges and Installation Access

3. No Smoking Policy B. Facility Hours C. Construction Working Hours D. Work Outside Regular Construction Working Hours E. Occupied Buildings F. Utility Cutovers and Interruptions

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 14 00 Page 1

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 01 14 00 Page 2

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.01 GENERAL REQUIREMENTS

A. Tennessee Motor Vehicle Laws

Contractor shall comply with all Tennessee Motor vehicle laws when on-site. In addition cell phones and radios require hands free operations while vehicle is in operation. The Government will monitor Contractor's compliance and forward non-compliance observations to Contractor for action. Contractor shall ensure compliance of Contractor personnel including taking corrective action for those individuals violating the policy.

B. Operating Facilities

Facilities may be in operation during Contractor's work. The Contracting Officer Representative will coordinate operating Facilities' activities and Contractor's work. Contractor shall request permission from the Contracting Officer Representative forty-five (45) calendar days in advance of the need to perform work that will affect operating facilities. Contractor shall protect Government equipment, tools, materials, and facilities during execution of work and is responsible for repair of damages.

C. Training

1. Lock Out /Tag Out Training

Lock Out /Tag Out Training shall be provided by the Contractor. A plan for the LOTO procedure, including the training plan, shall be submitted by the Contractor to the Government for approval before proceeding with the training and subsequent work.

2. Confined Space Training

Confined Space Training shall be provided by the Contractor. A plan for the Confined Space procedure, including the training plan, shall be submitted by the Contractor to the Government for approval before proceeding with the training and subsequent work.

D. Material Delivery, Storage and Handling

1. All bills of lading for deliveries shall be addressed to Contractor and state the specific delivery location and point of contact. The Contracting Officer Representative is available to assist with delivery coordination.

2. The Government will not accept deliveries for Contractor.

SECTION 01 14 00 Page 3

3. Identify materials delivered to facility with a weather-resistant tag or label with Contractor's name and contact, subcontract number, and contents.

4. Only materials and equipment used in the performance of this contract may be stored at facility. Contractor is responsible for all loss, destruction, or damage to material (including work in progress). Limit laydown and storage to areas designated by the Government. Contractor is responsible for maintaining good housekeeping in storage and laydown areas and shall immediately correct deficiencies noted by the Contracting Officer Representative.

5. Excess material and equipment which is Government property shall be returned to the Contracting Officer Representative for disposition. All other excess material and equipment shall be removed from facility.

Do not store combustible materials within 30 feet of existing facilities.

6. Contractor is responsible for protection and maintenance of Government-Furnished Equipment/Material (GFE) that has been placed in Contractor's care. Damaged GFE shall be repaired or replaced at Contractor's expense.

E. Evacuation

1. Observe and participate in notices to evacuate the work area. The Government will establish requirements for evacuation of work area personnel, as needed, to a designated assembly area. Contractor must account for all personnel on-site at the time of an evacuation. Contractor will be required to participate in drills and exercises.

2. Before evacuating the work area, shut down equipment or make conditions safe unless doing so endangers personnel.

3. Perform evacuation in accordance with Government public address announcements.

1.02 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Contractor Regulations; G-RO

Transportation of Personnel, Materials, and Equipment; G-RO

List of Contact Personnel; G-RO

Personnel List; G-RO

SECTION 01 14 00 Page 4

Vehicle List; G-RO

1.03 SPECIAL SCHEDULING REQUIREMENTS

a. The entire facility will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

b. Permission to interrupt any Activity road or utility service must be requested in writing a minimum of 45 cal endar days prior to the desired date of interruption

Contractor must request approval from COR 45 cal endar days in advance of need to bring power actuated fastener cartridges on site. Once on-site power actuated fastener cartridges must be keep in locked when not in use.

1.04 CONTRACTOR ACCESS AND USE OF PREMISES

A. Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1. Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

2. Identification Badges and Installation Access

Application for and use of badges will be as directed.

Contractor requests for training, badges, vehicle access, and permits, and the processing of submittals are to be made during regular Construction Work Hours. The Contracting Officer Representative will process Contractor requests during normal Facility Work Hours.

3. No Smoking Policy

Contractor shall comply with the facility Smoking Policy.

The Government will designate and post smoking area for existing trailers, buildings, and structures. Contractor shall designate and post smoking areas for Contractor's construction laydown and storage areas and temporary trailers/facilities located at the facility. Designated smoking areas shall have a boundary barrier, butt receptacle and "Smoking Area" posting.

SECTION 01 14 00 Page 5

B. Facility Hours

Normal Facility hours are from 7:00 a.m. to 5:30 p.m., Monday through Thursday, excluding Federal Holidays. The Government observes the following Federal Holidays on an annual basis:

New Year's Day MLK Day Washington's Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

C. Construction Working Hours

Regular construction working hours must consist of an 8 1/2 hour period minimum established by the Contracting Officer, between 7:00 a.m. and 5:30 p.m., Monday through Thursday, excluding Federal Holidays. Contractor shall not schedule work on observed Federal Holidays without prior Contracting Officer Representative approval.

D. Work Outside Regular Construction Working Hours

Work outside regular construction working hours requires Contracting Officer approval. Make application 14 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular construction working hours. Make utility cutovers after regular construction working hours or on Saturdays, Sundays, and Federal Holidays unless directed otherwise.

E. Occupied Buildings

The Contractor will be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

F. Utility Cutovers and Interruptions

1. Government will be responsible for Emergency Notification, Fire Alarm, Telecommunication, and Data Communications tie-in to the plant systems. Government will tie-in power to the plant power system.

2. Coordinate with Contracting Officer to make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Federal Holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR CONSTRUCTION

WORKING HOURS.

SECTION 01 14 00 Page 6

3. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

4. Interruption to potable water, fire water, electrical service, sanitary sewer, and natural gas are considered utility cutovers pursuant to the paragraph WORK OUTSIDE

REGULAR CONSTRUCTION WORKING HOURS.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 14 00 Page 7

SECTION 01 14 00 Page 8

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

PART 1 GENERAL

1.01 REFERENCES

1.02 DEFINITIONS

A. Class I and II Ozone Depleting Substance (ODS) B. Contractor Generated Hazardous Waste C. Environmental Pollution and Damage D. Environmental Protection E. Hazardous Debris F. Hazardous Materials G. Hazardous Waste H. Land Application I. National Pollutant Discharge Elimination System (NPDES) J. Oily Waste K. Regulated Waste L. Sediment M. Solid Waste

1. Debris

2. Green Waste

3. Material not regulated as solid waste

4. Non-Hazardous Waste

5. Recyclables

6. Surplus Soil

7. Scrap Metal

8. Wood N. Surface Discharge O. Wastewater

1. Stormwater P. Waters of the United States Q. Wetlands R. Universal Waste

1.03 SUBMITTALS

1.04 ENVIRONMENTAL PROTECTION REQUIREMENTS

1.05 QUALITY ASSURANCE

A. Preconstruction Survey and Protection of Features B. Regulatory Notifications C. Environmental Brief D. Environmental Manager E. Employee Training Records F. Non-Compliance Notifications

1.06 ENVIRONMENTAL PROTECTION PLAN

A. General Overview and Purpose

1. Descriptions

2. Duties

3. Procedures

4. Communications

SECTION 01 57 19 Page 1

5. Contact Information B. General Site Information

1. Drawings

2. Work Area

3. Documentation C. Management of Natural Resources D. Protection of Historical and Archaeological Resources E. Stormwater Management and Control F. Protection of the Environment from Waste Derived from

Contractor Operations G. Prevention of Releases to the Environment H. Regulatory Notification and Permits I. Clean Air Act Compliance

1. Haul Route

2. Pollution Generating Equipment

3. Stationary Internal Combustion Engines

4. Refrigerants

5. Air Pollution-engineering Processes

6. Compliant Materials

1.07 LICENSES AND PERMITS

1.08 ENVIRONMENTAL RECORDS BINDER

1.09 SOLID WASTE MANAGEMENT REPORT

1.10 FACILITY HAZARDOUS WASTE GENERATOR STATUS

PART 2 PRODUCTS

PART 3 EXECUTION

3.01 PROTECTION OF NATURAL RESOURCES

A. Flow Ways B. Vegetation

3.02 STORMWATER

A. Construction General Permit

1. Stormwater Pollution Prevention Plan

2. Stormwater Notice of Intent for Construction Activities

3. Inspection Reports

4. Stormwater Pollution Prevention Plan Compliance Notebook

5. Stormwater Notice of Termination for Construction Activities B. Erosion and Sediment Control Measures C. Work Area Limits D. Contractor Facilities and Work Areas

3.03 SURFACE AND GROUNDWATER

A. Cofferdams, Diversions, and Dewatering B. Waters of the United States

3.04 PROTECTION OF CULTURAL RESOURCES

A. Archaeological Resources

3.05 AIR RESOURCES

A. Preconstruction Air Permits B. Oil or Dual-fuel Boilers and Furnaces C. Burning D. Accidental Venting of Refrigerant E. EPA Certification Requirements F. Dust Control

1. Particulates

2. Abrasive Blasting G. Odors

3.06 WASTE MINIMIZATION

A. Salvage, Reuse and Recycle

SECTION 01 57 19 Page 2

3.07 WASTE MANAGEMENT AND DISPOSAL

A. Storage and Handling B. Waste Identification and Labeling for Sanitary and Industrial

Waste C. Sanitary and Industrial Landfill Requirements D. Transportation E. Waste Control F. Waste Determination Documentation G. Solid Waste Management

1. Solid Waste Management Report

2. Control and Management of Solid Wastes H. Control and Management of Hazardous Waste

1. Hazardous Waste/Debris Management

2. Waste Storage/Satellite Accumulation

3. Hazardous Waste Disposal

a. Responsibilities for Contractor's Disposal

1) Services

2) Samples

3) Labeling

4. Universal Waste Management

5. Disposal Documentation for Hazardous and Regulated Waste I. Releases/Spills of Oil and Hazardous Substances

1. Response and Notifications

2. Clean Up J. Mercury Materials K. Wastewater

1. Disposal of wastewater must be as specified below.

a. Treatment

b. Surface Discharge

c. Land Application

3.08 HAZARDOUS MATERIAL MANAGEMENT

3.09 PREVIOUSLY USED EQUIPMENT

3.10 CONTROL AND MANAGEMENT OF POLYCHLORINATED BIPHENYLS (PCBS)

3.11 PETROLEUM, OIL, LUBRICANT (POL) STORAGE AND FUELING

A. Used Oil Management

3.12 INADVERTENT DISCOVERY OF PETROLEUM-CONTAMINATED SOIL OR HAZARDOUS

WASTES

3.13 SOUND INTRUSION

3.14 POST CONSTRUCTION CLEANUP

-- End of Section Table of Contents --

SECTION 01 57 19 Page 3

SECTION 01 57 19 Page 4

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

PART 1 GENERAL

1.01 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.120 Hazardous Waste Operations and Emergency Response

40 CFR 112 Oil Pollution Prevention

40 CFR 122.26 Storm Water Discharges (Applicable to State NPDES Programs, see section 123.25)

40 CFR 241 Guidelines for Disposal of Solid Waste

40 CFR 243 Guidelines for the Storage and Collection of Residential, Commercial, and Institutional Solid Waste

40 CFR 258 Subtitle D Landfill Requirements

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 261.7 Residues of Hazardous Waste in Empty Containers

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 262.31 Standards Applicable to Generators of Hazardous Waste-Labeling

40 CFR 262.34 Standards Applicable to Generators of Hazardous Waste-Accumulation Time

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and

SECTION 01 57 19 Page 5

Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities

40 CFR 268 Land Disposal Restrictions

40 CFR 273 Standards For Universal Waste Management

40 CFR 273.2 Standards for Universal Waste Management - Batteries

40 CFR 273.4 Standards for Universal Waste Management - Mercury Containing Equipment

40 CFR 273.5 Standards for Universal Waste Management - Lamps

40 CFR 279 Standards for the Management of Used Oil

40 CFR 300 National Oil and Hazardous Substances Pollution Contingency Plan

40 CFR 300.125 National Oil and Hazardous Substances Pollution Contingency Plan - Notification and Communications

40 CFR 355 Emergency Planning and Notification

40 CFR 403 General Pretreatment Regulations for Existing and New Sources of Pollution

40 CFR 50 National Primary and Secondary Ambient Air Quality Standards

40 CFR 60 Standards of Performance for New Stationary Sources

40 CFR 63 National Emission Standards for Hazardous Air Pollutants for Source Categories

40 CFR 64 Compliance Assurance Monitoring

40 CFR 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

SECTION 01 57 19 Page 6

49 CFR 178 Specifications for Packagings

1.02 DEFINITIONS

A. Class I and II Ozone Depleting Substance (ODS)

Class I ODS is defined in Section 602(a) of The Clean Air Act. A list of Class I ODS can be found on the EPA website at the following weblink.

http://www.epa.gov/ozone/science/ods/classone.html .

Class II ODS is defined in Section 602(s) of The Clean Air Act.

A list of Class II ODS can be found on the EPA website at the following weblink.

http://www.epa.gov/ozone/science/ods/classtwo.html .

B. Contractor Generated Hazardous Waste

Contractor generated hazardous waste is materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e.

methyl ethyl ketone, toluene), waste thinners, excess paints, excess solvents, waste solvents, excess pesticides, and contaminated pesticide equipment rinse water.

C. Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally or historically.

D. Environmental Protection

Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics;

noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material, as well as other pollutants.

E. Hazardous Debris

As defined in paragraph SOLID WASTE, debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) in accordance with 40 CFR 261 .

Hazardous debris also includes debris that exhibits a characteristic of hazardous waste in accordance with 40 CFR 261 .

F. Hazardous Materials

Hazardous materials as defined in 49 CFR 171 and listed in

SECTION 01 57 19 Page 7

49 CFR 172 .

Hazardous material is any material that: Is regulated as a hazardous material in accordance with 49 CFR 173 ; or requires a Safety Data Sheet (SDS) in accordance with 29 CFR 1910.120 ; or during end use, treatment, handling, packaging, storage, transportation, or disposal meets or has components that meet or have potential to meet the definition of a hazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D. Designation of a material by this definition, when separately regulated or controlled by other sections or directives, does not eliminate the need for adherence to that hazard-specific guidance which takes precedence over this section for "control" purposes. Such material includes ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs).

G. Hazardous Waste

Hazardous Waste is any material that meets the definition of a solid waste and exhibit a hazardous characteristic (ignitability, corrosivity, reactivity, or toxicity) as specified in 40 CFR 261 , Subpart C, or contains a listed hazardous waste as identified in 40 CFR 261 , Subpart D.

H. Land Application

Land Application means spreading or spraying discharge water at a rate that allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur. Comply with federal, state, and local laws and regulations.

I. National Pollutant Discharge Elimination System (NPDES)

The NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.

J. Oily Waste

Oily waste are those materials that are, or were, mixed with Petroleum, Oils, and Lubricants (POLs) and have become separated from that POLs. Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, POLs and may be appropriately tested and discarded in a manner which is in compliance with other state and local requirements.

This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that: It is not prohibited in other state regulations or local ordinances; the amount generated is "de minimus" (a small amount); it is the result of

SECTION 01 57 19 Page 8 minor leaks or spills resulting from normal process operations;

and free-flowing oil has been removed to the practicable extent possible. Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, perform a hazardous waste determination prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.

K. Regulated Waste

Regulated waste are solid wastes that have specific additional federal, state, or local controls for handling, storage, or disposal.

L. Sediment

Sediment is soil and other debris that have eroded and have been transported by runoff water or wind.

M. Solid Waste

Solid waste is a solid, liquid, semi-solid or contained gaseous waste. A solid waste can be a hazardous waste, non-hazardous waste, or non-Resource Conservation and Recovery Act (RCRA) regulated waste. Types of solid waste typically generated at construction sites may include:

1. Debris

Debris is non-hazardous solid material generated during the construction, demolition, or renovation of a structure that exceeds 2.5-inch particle size that is: a manufactured object; plant or animal matter; or natural geologic material (for example, cobbles and boulders), broken or removed concrete, masonry, and rock asphalt paving; ceramics;

roofing paper and shingles. Inert materials may not be reinforced with or contain ferrous wire, rods, accessories and weldments. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.

2. Green Waste

Green waste is the vegetative matter from landscaping, land clearing and grubbing, including, but not limited to, grass, bushes, scrubs, small trees and saplings, tree stumps and plant roots. Marketable trees, grasses and plants that are indicated to remain, be re-located, or be re-used are not included.

3. Material not regulated as solid waste

Material not regulated as solid waste is nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended; suspended or dissolved materials in domestic sewage effluent or irrigation return

SECTION 01 57 19 Page 9 flows, or other regulated point source discharges; regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.

4. Non-Hazardous Waste

Non-hazardous waste is waste that is excluded from, or does not meet, hazardous waste criteria in accordance with

40 CFR 263 .

5. Recyclables

Recyclables are materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable, wiring, insulated/non-insulated copper wire cable, wire rope, and structural components. It also includes commercial-grade refrigeration equipment with Freon removed, household appliances where the basic material content is metal, clean polyethylene terephthalate bottles, cooking oil, used fuel oil, textiles, high-grade paper products and corrugated cardboard, stackable pallets in good condition, clean crating material, and clean rubber/vehicle tires. Metal meeting the definition of lead contaminated or lead based paint contaminated may not be included as recyclable if sold to a scrap metal company. Paint cans that meet the definition of empty containers in accordance with 40 CFR 261.7 may be included as recyclable if sold to a scrap metal company.

6. Surplus Soil

Surplus soil is existing soil that is in excess of what is required for this work, including aggregates intended, but not used, for on-site mixing of concrete, mortars, and paving. Contaminated soil meeting the definition of hazardous material or hazardous waste is not included and must be managed in accordance with paragraph HAZARDOUS

MATERIAL MANAGEMENT.

7. Scrap Metal

This includes scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe, and wire that are recovered or collected and disposed of as scrap. Scrap metal meeting the definition of hazardous material or hazardous waste is not included.

8. Wood

Wood is dimension and non-dimension lumber, plywood, chipboard, or hardboard. Treated or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included. Treated wood includes, but is not limited to, lumber, utility poles, crossties, and other wood products with chemical treatment.

SECTION 01 57 19 Page 10

N. Surface Discharge

Surface discharge means discharge of water into drainage ditches, storm sewers, creeks or "waters of the United States". Surface discharges are discrete, identifiable sources and require a permit from the governing agency. Comply with federal, state, and local laws and regulations.

O. Wastewater

Wastewater is the used water and solids from a community that flow to a treatment plant.

1. Stormwater

Stormwater is any precipitation in an urban or suburban area that does not evaporate or soak into the ground, but instead collects and flows into storm drains, rivers, and streams.

P. Waters of the United States

Waters of the United States means Federally jurisdictional waters, including wetlands, that are subject to regulation under Section 404 of the Clean Water Act or navigable waters, as defined under the Rivers and Harbors Act.

Q. Wetlands

Wetlands are those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions.

R. Universal Waste

The universal waste regulations streamline collection requirements for certain hazardous wastes in the following categories: batteries, pesticides, mercury-containing equipment (for example, thermostats), and lamps (for example, fluorescent bulbs). The rule is designed to reduce hazardous waste in the municipal solid waste (MSW) stream by making it easier for universal waste handlers to collect these items and send them for recycling or proper disposal. These regulations can be found at

40 CFR 273 .

1.03 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Preconstruction Survey

Solid Waste Management Permit; G-RO

SECTION 01 57 19 Page 11

Regulatory Notifications; G-RO

Environmental Protection Plan; G-RO

Stormwater Notice of Intent (for NPDES coverage under the general permit for construction activities)

Dirt and Dust Control Plan; G-RO

Employee Training Records; G-RO

Environmental Manager Qualifications; G-RO

SD-06 Test Reports

Laboratory Analysis

Inspection Reports

Solid Waste Management Report; G-RO

SD-07 Certificates

Employee Training Records; G-RO

Erosion and Sediment Control Inspector Qualifications

SD-11 Closeout Submittals

Stormwater Pollution Prevention Plan Compliance Notebook; G-RO

Stormwater Notice of Termination (for NPDES coverage under the general permit for construction activities); G-RO

Waste Determination Documentation; G-RO

Disposal Documentation for Hazardous and Regulated Waste; G-RO

Assembled Employee Training Records; G-RO

Solid Waste Management Permit; G-RO

Solid Waste Management Report; G-RO

Hazardous Waste/Debris Management; G-RO

Regulatory Notifications; G-RO

Contractor Certification

1.04 ENVIRONMENTAL PROTECTION REQUIREMENTS

Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the

SECTION 01 57 19 Page 12 project. Protect the environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire duration of this Contract. Comply with federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution.

Tests and procedures assessing whether construction operations comply with Applicable Environmental Laws may be required. Analytical work must be performed by qualified laboratories; and where required by law, the laboratories must be certified.

1.05 QUALITY ASSURANCE

A. Preconstruction Survey and Protection of Features

This paragraph supplements the Contract Clause PROTECTION OF

EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS. Prior to start of any onsite construction activities, perform a Preconstruction Survey of the project site with the Contracting Officer, and take photographs showing existing environmental conditions in and adjacent to the site.

Submit a report for the record. Include in the report a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. The Contractor and the Contracting Officer will sign this survey report upon mutual agreement regarding its accuracy and completeness. Protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference that their preservation may cause to the work under the Contract.

B. Regulatory Notifications

Provide regulatory notification requirements in accordance with federal, state and local regulations. In cases where the Government will also provide public notification (such as stormwater permitting), coordinate with the Contracting Officer.

Submit copies of regulatory notifications to the Contracting Officer at least 14 days prior to commencement of work activities. Typically, regulatory notifications must be provided for the following (this listing is not all-inclusive):

demolition, renovation, NPDES defined site work, construction, removal or use of a permitted air emissions source, and remediation of controlled substances (asbestos, hazardous waste, lead paint).

C. Environmental Brief

Attend an environmental brief to be included in the preconstruction meeting. Provide the following information:

types, quantities, and use of hazardous materials that will be brought onto the site; and types and quantities of wastes/wastewater that may be generated during the Contract.

Discuss the results of the Preconstruction Survey at this time.

SECTION 01 57 19 Page 13

Prior to initiating any work on site, meet with the Contracting Officer to discuss the proposed Environmental Protection Plan (EPP). Develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural and cultural resources, required reports, required permits, permit requirements (such as mitigation measures), and other measures to be taken.

D. Environmental Manager

Appoint in writing an Environmental Manager for the project site. The Environmental Manager is directly responsible for coordinating contractor compliance with federal, state, and local requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements (including hazardous waste handling, storage, manifesting, and disposal); implement the EPP; ensure environmental permits are obtained, maintained, and closed out; ensure compliance with Stormwater Program requirements; ensure compliance with Hazardous Materials (storage, handling, and reporting) requirements; and coordinate any remediation of regulated substances (lead, asbestos, PCB transformers). This can be a collateral position; however, the person in this position must be trained to adequately accomplish the following duties: ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure Contractor personnel are trained in 40 CFR requirements in accordance with their position requirements;

coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out. Submit Environmental Manager Qualifications to the Contracting Officer.

E. Employee Training Records

Prepare and maintain Employee Training Records throughout the term of the contract meeting applicable 40 CFR requirements.

Provide Employee Training Records in the Environmental Records Binder. Submit these Assembled Employee Training Records to the Contracting Officer at the conclusion of the project, unless otherwise directed.

Train personnel to meet EPA and state requirements. Conduct environmental protection/pollution control meetings for personnel prior to commencing construction activities. Conduct additional meetings for new personnel and when site conditions change.

Include in the training and meeting agenda: methods of detecting and avoiding pollution; familiarization with statutory and contractual pollution standards; installation and care of devices, vegetative covers, and instruments required for monitoring purposes to ensure adequate and continuous environmental protection/pollution control; anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants;

recognition and protection of archaeological sites, artifacts, waters of the United States, and endangered species and their habitat that are known to be in the area. Provide copy of the Erosion and Sediment Control Inspector Certification as required by the state.

SECTION 01 57 19 Page 14

F. Non-Compliance Notifications

The Contracting Officer will notify the Contractor in writing of any observed noncompliance with federal, state or local environmental laws or regulations, permits, and other elements of the Contractor's EPP. After receipt of such notice, inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted or equitable adjustments allowed for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the contract, or in accordance with the Federal Acquisition Regulation or Federal Law.

1.06 ENVIRONMENTAL PROTECTION PLAN

The purpose of the EPP is to present an overview of known or potential environmental issues that must be considered and addressed during construction. Include in the EPP measures for protecting natural and cultural resources, required reports, and other measures to be taken.

Meet with the Contracting Officer or Contracting Officer Representative to discuss the EPP and develop a mutual understanding relative to the details for environmental protection including measures for protecting natural resources, required reports, and other measures to be taken. Submit an outline for the EPP no more than 30 days after NTP. Submit the full EPP so that Government approval is obtained no more than 60 days after issuance of the NTP. Revise the EPP throughout the project to include any reporting requirements, changes in site conditions, or contract modifications that change the project scope of work in a way that could have an environmental impact. No requirement in this section will relieve the Contractor of any applicable federal, state, and local environmental protection laws and regulations. During Construction, identify, implement, and submit for approval any additional requirements to be included in the EPP.

Maintain the current version onsite.

The EPP includes, but is not limited to, the following elements:

A. General Overview and Purpose

1. Descriptions

A brief description of each specific plan required by environmental permit or elsewhere in this Contract such as stormwater pollution prevention plan;spill control plan;

solid waste management plan; wastewater management plan;air pollution control plan; contaminant prevention plan;

historical, archaeological, cultural resources, biological resources and wetlands plan; traffic control plan;

Hazardous, Toxic and Radioactive Waste (HTRW) Plan;

Non-Hazardous Solid Waste Disposal Plan; borrowing material plan.

2. Duties

The duties and level of authority assigned to the person(s)

SECTION 01 57 19 Page 15 on the job site who oversee environmental compliance, such as who is responsible for adherence to the EPP, who is responsible for spill cleanup and training personnel on spill response procedures, who is responsible for manifesting hazardous waste to be removed from the site (if applicable), and who is responsible for training the Contractor's environmental protection personnel.

3. Procedures

A copy of any standard or project-specific operating procedures that will be used to effectively manage and protect the environment on the project site.

4. Communications

Communication and training procedures that will be used to convey environmental management requirements to Contractor employees and subcontractors.

5. Contact Information

Emergency contact information (office phone number, cell phone number, and e-mail address).

B. General Site Information

1. Drawings

Drawings showing locations of proposed temporary excavations or embankments for haul roads, stream crossings, jurisdictional wetlands, material storage areas, structures, sanitary facilities, storm drains and conveyances, and stockpiles of excess soil.

2. Work Area

Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Include measures for marking the limits of use areas, including methods for protection of features to be preserved within authorized work areas and methods to control runoff and to contain materials on site, and a traffic control plan.

3. Documentation

A letter signed by an officer of the firm appointing the Environmental Manager and stating that person is responsible for managing and implementing the Environmental Program as described in this contract. Include in this letter the Environmental Manager's authority to direct the removal and replacement of non-conforming work.

C. Management of Natural Resources

a. Land resources

b. Replacement of damaged landscape features

SECTION 01 57 19 Page 16

c. Temporary construction

D. Protection of Historical and Archaeological Resources

a. Objectives

b. Methods

E. Stormwater Management and Control

a. Ground cover

b. Erodible soils

c. Temporary measures

(1) Structural Practices

(2) Temporary and permanent stabilization

d. Effective selection, implementation and maintenance of Best Management Practices (BMPs).

F. Protection of the Environment from Waste Derived from Contractor Operations

Control and disposal of solid and sanitary waste. Control and disposal of hazardous waste.

This item consists of the management procedures for hazardous waste to be generated. The elements of those procedures will coincide with the DOE Hazardous Waste Management Plan. The Contracting Officer will provide a copy of the DOE Hazardous Waste Management Plan. As a minimum, include the following:

a. List of the types of hazardous wastes expected to be generated

b. Procedures to ensure a written waste determination is made for appropriate wastes that are to be generated

c. Sampling/analysis plan, including laboratory method(s) that will be used for waste determinations and copies of relevant laboratory certifications

d. Methods and proposed locations for hazardous waste accumulation/storage (that is, in tanks or containers)

e. Management procedures for storage, labeling, transportation, and disposal of waste (treatment of waste is not allowed unless specifically noted)

f. Management procedures and regulatory documentation ensuring disposal of hazardous waste complies with Land Disposal Restrictions ( 40 CFR 268 )

g. Management procedures for recyclable hazardous materials such as lead-acid batteries, used oil, and similar

SECTION 01 57 19 Page 17

h. Used oil management procedures in accordance with 40 CFR 279 ;

Hazardous waste minimization procedures

i. Plans for the disposal of hazardous waste by permitted facilities; and Procedures to be employed to ensure required employee training records are maintained.

G. Prevention of Releases to the Environment

Procedures to prevent releases to the environment.

Notifications in the event of a release to the environment.

H. Regulatory Notification and Permits

List what notifications and permit applications must be made.

Some permits require up to 180 days to obtain. Demonstrate that those permits have been obtained or applied for by including copies of applicable environmental permits. The EPP will not be approved until the permits have been obtained.

I. Clean Air Act Compliance

1. Haul Route

Submit truck and material haul routes along with a Dirt and Dust Control Plan for controlling dirt, debris, and dust on roadways. As a minimum, identify in the plan the subcontractor and equipment for cleaning along the haul route and measures to reduce dirt, dust, and debris from roadways.

2. Pollution Generating Equipment

Identify air pollution generating equipment or processes that may require federal, state, or local permits under the Clean Air Act. Determine requirements based on any current site permits and the impacts of the project. Provide a list of all fixed or mobile equipment, machinery or operations that could generate air emissions during the project to the Contracting Officer.

3. Stationary Internal Combustion Engines

Identify portable and stationary internal combustion engines that will be supplied, used or serviced. Comply with 40 CFR 60 Subpart IIII, 40 CFR 60 Subpart JJJJ, 40 CFR 63 Subpart ZZZZ, and local regulations as applicable. At minimum, include the make, model, serial number, manufacture date, size (engine brake horsepower), and EPA emission certification status of each engine. Maintain applicable records and log hours of operation and fuel use. Logs must include reasons for operation and delineate between emergency and non-emergency operation.

4. Refrigerants

Identify management practices to ensure that heating, ventilation, and air conditioning (HVAC) work involving

SECTION 01 57 19 Page 18 refrigerants complies with 40 CFR 82 requirements.

Technicians must be certified, maintain copies of certification on site, use certified equipment and log work that requires the addition or removal of refrigerant. Any refrigerant reclaimed is the property of the Contractor.

5. Air Pollution-engineering Processes

Identify planned air pollution-generating processes and management control measures (including, but not limited to, spray painting, abrasive blasting, demolition, material handling, fugitive dust, and fugitive emissions). Log hours of operations and track quantities of materials used.

6. Compliant Materials

Provide the Government a list of and SDSs for all hazardous materials proposed for use on site. Materials must be compliant with all Clean Air Act regulations for emissions including solvent and volatile organic compound contents, and applicable National Emission Standards for Hazardous Air Pollutants requirements. The Government may alter or limit use of specific materials as needed to meet site permit requirements for emissions.

1.07 LICENSES AND PERMITS

Obtain licenses and permits required for the construction of the project and in accordance with FAR 52.236-7. Notify the Government of all general use permitted equipment the Contractor plans to use on site. This paragraph supplements the Contractor's responsibility under FAR 52.236-7.

1.08 ENVIRONMENTAL RECORDS BINDER

Maintain on-site a separate three-ring Environmental Records Binder and submit at the completion of the project. Make separate parts within the binder that correspond to each submittal listed under paragraph CLOSEOUT SUBMITTALS in this section.

1.09 SOLID WASTE MANAGEMENT REPORT

Quarterly, submit a solid waste disposal report to the Contracting Officer. For each waste, the report will state the classification (using the definitions provided in this section), amount, location, and name of the entity receiving the solid waste.

1.10 FACILITY HAZARDOUS WASTE GENERATOR STATUS

The K-25 Complex was historically designated as a Large Quantity Generator. Meet the regulatory requirements of this generator designation for any work conducted within the boundaries of the K-25 site. Comply with provisions of federal, state, and local regulatory requirements applicable to this generator status regarding training and storage, handling, and disposal of construction derived wastes.

PART 2 PRODUCTS

Not Used.

SECTION 01 57 19 Page 19

PART 3 EXECUTION

3.01 PROTECTION OF NATURAL RESOURCES

Minimize interference with, disturbance to, and damage to fish, wildlife, and plants, including their habitats.

Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work that is consistent with the requirements of the DOE representative through the Contracting Officer or as otherwise specified. Confine construction activities to within the limits of the work indicated or specified.

A. Flow Ways

Do not alter water flows or otherwise significantly disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as specified and permitted.

B. Vegetation

Except in areas to be cleared, do not remove, cut, deface, injure, or destroy trees or shrubs without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages unless authorized by the Contracting Officer. Where such use of attached ropes, cables, or guys is authorized, the Contractor is responsible for any resultant damage.

Protect existing trees that are to remain to ensure they are not injured, bruised, defaced, or otherwise damaged by construction operations. Remove displaced rocks from uncleared areas.

Coordinate with the Contracting Officer and DOE representative to determine appropriate action for trees and other landscape features scarred or damaged by equipment operations.

3.02 STORMWATER

Do not discharge stormwater from construction sites to the sanitary sewer. If the water is noted or suspected of being contaminated, it may only be released to the storm drain system if the discharge is specifically permitted. Obtain authorization in advance from the Contracting Officer for any release of contaminated water.

A. Construction General Permit

Provide a Construction General Permit as required by 40 CFR 122.26 or the State of Tennessee General Permit. Under the terms and conditions of the permit, install, inspect, maintain BMPs, prepare stormwater erosion and sediment control inspection reports, and submit SWPPP inspection reports. Maintain construction operations and management in compliance with the terms and conditions of the general permit for stormwater discharges from construction activities.

SECTION 01 57 19 Page 20

1. Stormwater Pollution Prevention Plan

Submit a project-specific Stormwater Pollution Prevention Plan (SWPPP) to the Contracting Officer for…