W912P523B0003 Plans RTA.pdf

PDF 33 MB Posted

Attached to
Department of Energy Former K-25 Viewing Platform/General Purpose Building Construction
Solicitation number
W912P523B0003
Issued by

About this file

This solicitation is for the construction of a viewing platform/general-purpose building, roads, and grounds improvements at the Department of Energy's former K-25 site in Oak Ridge, Tennessee. The project has an estimated value between $5-10 million and will be awarded as a firm fixed-price contract set aside for small businesses. Bids are due on January 19, 2023 and will be publicly opened via video conference. The selected contractor must furnish performance and payment bonds each valued at 100% of the contract price within ten days of award. A pre-bid site visit will be held on January 4, 2023 and all attendance requests must be submitted in advance. Questions regarding the solicitation should be submitted through the Procurement Integrated Enterprise Environment system no later than ten days prior to the bid due date.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING NUMBER

DRAWING TITLE

DRAWING SCALE

SHEET NUMBER

A101

SYMBOLS

A101

SIM

A101

1 Ref

R ef

1 Ref

R ef

SIM

A101R101

1 SIM

R101 A101

SECTION

NUMBER

SHEET ON WHICH

SECTION IS SHOWN

DIRECTION OF CUT

DETAIL

NUMBER

CALLOUT

DRAWING

NUMBER

VIEW

NUMBER

SHEET

NUMBER

ROOM

NAME

ROOM

NUMBER

DOOR TAG

WINDOW TAG

SPOT

ELEVATION

TITLE BAR

SECTION

INTERIOR ELEVATION

DETAIL

ELEVATION

KEY NOTE

16a

WALL TAG

Room name

150 SF

ROOM SQUARE

FOOTAGE

W25

SHEET ON WHICH

SECTION IS TAKEN

SHEET ON WHICH

ELEVATION IS

SHOWN

TAGS

MISC.

SHEET ON WHICH

SECTION IS SHOWN

SHEET ON WHICH

SECTION IS TAKEN

1. COORDINATE WITH APPLICABLE DIMENSIONS AND

DETAILS ON OTHER SHEETS.

2 COORDINATE WITH REQUIREMENTS OF UCOR/DOE

SUPPLIED EQUIPMENT AS REQUIRED.

3. THE CONTRACTOR FOR CONSTRUCTION SHALL

LAYOUT ALL PARTITIONS AND VERIFY ACCEPTABILITY OF

LAYOUT WITH ARCHITECT PRIOR TO START OF THIS

WORK.

4. DO NOT SCALE DRAWINGS, IF DIMENSIONS ARE IN

QUESTION, THE CONTRACTOR FOR CONSTRUCTION

SHALL OBTAIN WRITTEN CLARIFICATION FROM

ARCHITECT BEFORE CONTINUING WITH CONSTRUCTION.

5. SEE "BUILDING DESIGN K-25 PHASE II" FOR BUILDING

INFORMATION & "EXHIBIT DESIGN K-25 PHASE II" FOR

EXHIBIT INFORMATION.

GENERAL NOTES

Telephone:

Fax:

Contact:

E-Mail:

Web Site:

Telephone:

Fax:

Contact:

E-Mail:

Web Site:

Telephone:

Fax:

Contact:

E-Mail:

Web Site:

Telephone:

Fax:

Contact:

E-Mail:

Web Site:

Telephone:

Fax:

Contact:

E-Mail:

Web Site:

Telephone:

Fax:

Contact:

E-Mail:

Web Site:

Telephone:

Fax:

Contact:

E-Mail:

Web Site:

LANDSCAPE

HEDSTROM DESIGN

110 WEST MAGNOLIA AVENUE

KNOXVILLE , TENNESSEE 37917

865.329.0012 865.329.0064 www.hedstromdesign.com

ANDREW SPATZ

andrew@hedstromdesign.com

STRUCTURAL

Ross Bryan ASSOCIATES, INC. ENGINEERS

227 FRENCH LANDING DRIVE

NASHVILLE , TENNESSEE 37228

615.323.1300 615.327.4446 rossbryan.com

KURT BOYD

boyd@rossbryan.com

MP&E ENGINEER

FACILITY SYSTEMS CONSULTANTS

713 S CENTRAL ST #101

KNOXVILLE , TENNESSEE 37902

865.246.0164 865.246.1084 www.facilitysystems.org

LARRY HEADLA

lheadla@facilitysystems.com

CIVIL ENGINEER

FULGHUM MACINDOE & ASSOCIATES, INC.

10330 HARDIN VALLEY ROAD, SUITE 201

KNOXVILLE , TENNESSEE 37932

865.690.6419 865.690.4668 www.fulgrammacindoe.com

AARON GRAY

gray@fulghummacindoe.com

EXHIBIT DESIGNER

HILFERTY & ASSOCIATES, INC.

14240 ROUTE 550

ATHENS , OHIO 45701

740.448.3821

(865) 544-0402 www.hilferty.com

CRAIG DICKELMAN

craig@hilferty.com

ARCHITECTS

SMEE + BUSBY ARCHITECTS, P.C.

2554 SUTHERLAND AVE

KNOXVILLE , TENNESSEE 37919

865.521.7550 865.521.7551 www.smeebusby.com

GREGOR SMEE

gsmee@smeebusby.com

UCOR

PROJECT NAME:

SITE CLASS

TYPE REV

RPE

DATE

DRAWING REVISIONS

SCALE:LE DRAWING NUMBER

BUILDING

ELECTRONIC SIGNATURES

PROFESSIONAL SEAL

TITLE:

CD

U

ORG/

ENGR

ENGR

CHK

PROJ

ENGR

KAREA ETTP

PROJECT RECORD NUMBER:

AS SHOWN

CONFIGURATION MANAGEMENT LEVEL

DE-SC-0004645

an AECOM-led partnership with Jacobs

MANAGED FOR THE DEPARTMENT OF ENERGY

UNDER CONTRACT NUMBER DE-SC-0004645

OAK RIDGE TN 37830

OAK RIDGE RESERVATION

3/31/2022 CFC SUBMITTAL GC GC SB GS

ARCHITECTSSMEE + BUSBY

Knoxville, TN 37902

DRW

BY

GS

QA

SB

A1E-700NHP-

FOUNDATION VENTING ENGINEER

SHIELD ENGINEERING, INC.

4301 TAGGART CREEK ROAD

CHARLOTTE , NORTH CAROLINA 28208

704.394.6913 shieldengineering.com

RAY TANT

rtant@shieldengineering.com

REV. DATE DESCRIPTION

UCOR

OAK RIDGE, TENNESSEE

21026

BUILDING DESIGN K-25 PHASE II

SITE COVER SHEET

H742

12" = 1'-0"

VIEW NAME

DRAWING INDEX

A1E-700NHP-H742 SITE COVER SHEET

CODE SYNOPSIS

K-25 VIEWING PLATFORM BUILDING SITE IMPROVEMENTS

SITE IMPROVEMENTS DESIGN

CIVIL

C1E-700NHP-H743 DEMOLITION PLAN PHASE I & PHASE II

C1E-700NHP-H744 SITE LAYOUT PLAN PHASE I & PHASE II

C1E-700NHP-H745 EROSION PREVENTION AND SEDIMENT CONTROL PLAN - STAGE 1 PHASE I & PHASE II C1E-700NHP-H746 SITE GRADING AND EROSION PREVENTION AND SEDIMENT CONTROL PLAN - STAGE 2 PHASE I & PHASE II

C1E-700NHP-H747 STORM DRAINAGE AND SITE UTILITIES PLAN - PHASE I

C1E-700NHP-H748 SITE DETAILS - SHEET 1 PHASE I & PHASE II

C1E-700NHP-H749 SITE DETAILS - SHEET 2 PHASE I & PHASE II

C1E-700NHP-H750 LOOP ROAD OVERALL LAYOUT PHASE II

C1E-700NHP-H751 LOOP ROAD AND WAYSIDE EXHIBIT LAYOUT DETAILS - PHASE II

C1E-700NHP-H851 LOOP ROAD AND WAYSIDE EXHIBIT GRADING AND DRAINAGE DETAILS PHASE II

LANDSCAPE

L1E-700NHP-H752 SITE PLAN AND LANDSCAPE PREPARATION NOTES PHASE I & PHASE II

L1E-700NHP-H753 PERSPECTIVES PHASE I & PHASE II

L1E-700NHP-H754 CIRCULATION DIAGRAM PHASE I & PHASE II

L1E-700NHP-H755 VPB MATERIALS & LAYOUT PLAN PHASE I & PHASE II

L1E-700NHP-H756 SOUTHEASTERN SITE ENLARGEMENT PHASE II

L1E-700NHP-H757 NORTHEASTERN SITE ENLARGEMENT PHASE II

L1E-700NHP-H758 NORTHERN SITE ENLARGEMENT PHASE II

L1E-700NHP-H759 NORTHWESTERN SITE ENLARGEMENT PHASE II

L1E-700NHP-H760 SOUTHWESTERN SITE ENLARGEMENT PHASE II

L1E-700NHP-H761 SOUTHERN SITE ENLARGEMENT PHASE II

L1E-700NHP-H762 VIEWING PLATFORM BUILDING PLANTING PLAN PHASE I & PHASE II

L1E-700NHP-H763 HARDSCAPE DETAILS AND NOTES PHASE 1 & PHASE II

L1E-700NHP-H764 PLANTING DETAILS AND NOTES PHASE I & PHASE II

ELECTRICAL

E1E-700NHP-H765 ELECTRICAL SITE PLAN

2018 International Building Code (IBC) 2018 International Fire Code (IFC) 2018 International Plumbing Code (IPC) 2018 International Mechanical Code (IMC) 2018 International Fuel Gas Code (IFGC) 2018 International Energy Code (IECC)

2020 NEC (NFPA 70, NFPA 70E)

2018 NFPA 70E, Arc Flash Protection 2017 American National Standards Institute

2009 ICC A117.1 (ANSI)

2010 ADA Standards for Accessible Design

SHEET NUMBER SHEET TITLEREV

SITE IMPROVEMENT K-25 PHASE II

1 GC GC SB GS GSSBCFC SUBMITTAL - REVISION 104/26/2022

2 GC GC SB GS GSSBCLARIFICATION OF ABANDONMENT/REMOVALS08/02/2022

3 GC GC SB GS GSSB

REVISED CFC - REVISION CLOUDS AND TRIANGLES REMOVED TO

PRODUCE A CLEAN DRAWING SET FOR USACE TO START PROCUREMENT10/06/2022

10IN

POST

12IN

FP

LP

SQ

CO

CO

CO

WV

WV

LP

WM WV

30IN

SN

POST

PP

SQ

PTP

PTP

WV

FH

WV

PIV

BOLLARD

WV

WV

WV

PTLP

SN

FH

WV

PTP

MON

WV

WV

WV

WV

WV

SN

WM

WV

WV

WM

WV

CO

PTPLP

FF. EL. 787.93

GM

GV

IE-770.20,OUT

TC-781.10

SAMH

IRO

IRO

IE-775.80

TC-794.30

AREA DRAIN

PIV

LP

SP

LP

TC-782.12

PMH

TC-782.34

PMH

TC-782.04

PMH

CHILLER

TRANS.

S Y

S T

E M

F

IR

E

TANK

DIESEL

TRANS.

AC

PAVEMENT CUT

IE-786.61

TC-793.48

AREA DRAIN

TC-794.21

TMH

TC-788.51

PMH

GATE

GATE

TC-793.54

TMH

GRAVEL

TC-779.56

TMH

TC-780.24

TMH

TC-794.93

PMH

TC-794.94

WATER MH

K-1652

IE

.2

IE

-7

.7

R

C P

TC-778.76

AREA DRAIN

IE

-7

.8

IE

-7

.9

IE-774.76

8" RCP

TC-779.04

AREA DRAIN

8" RCP

IE-775.64

IE

-7

.8

IE

-7

.9

TC-778.73

AREA DRAIN

IE

-7

.9

IE

-7

.9

R

C P

IE-775.33IE-771.93

8" RCP12" RCP

10" RCP

IE-784.76,OUT(6"STP)

TC-787.21

AREA DRAIN

IE-782.31

IE-782.51,IN(8"PVC)

TC-788.11

STMH

8" P

VC

IE-783.168" STP

S

T P

IE-783.06,OUT(8"PVC)

IE-784.66,IN(8"STP)

TC-787.46

AREA DRAIN

TC-786.46

AREA DRAIN

IE-783.81

8" RCP

IE

.0

S

T P

IE

.0

" S

T P

TC-785.33

STMH

IE-781.93 IE

.0

R C

P

IE

-7

.6

IE

-7

.5

R

C P

R

C P

IE

-7

.4

V

P

IE

.3

12" VCP

IE

.3

IE-791.75

6" STP

P

TC-792.98

AREA DRAIN

IE-7

6.2

" P

V C

6"

IE-770.30

IE

.2

IE-789.93,IN(4")

IE-789.43,IN(6")

TC-787.43

SAMH

IE-FULL OF DEBRIS

IE-780.76 IE-780.81

IE

.4

8"

IE-780.36

IE

-7

.1

IE

.1

IE-GREATER THAN 25'

TC-793.99

SAMH

TC-793.76

ABANDONED

SAMH

P

V C

IE

1.6

A B

A N

IE

-7

.4

IE

-7

.5

V

C P

I E

.2

IE-790.45

12" VCP

TC-793.09

AREA DRAIN

IE

.4

IE

.6

P

IE

.4

IE

-7

.5

IE

.2

P

IE

.3

P

IE-790.33,IN

TC-793.04

AREA DRAIN

IE

.8

,3

R C

P

IE

.0

,6

V

C P

IE

.0

,6

V

C P

IE

.7

,3

R C

P

TC-778.85

AREA DRAIN

IE-775.64

TC-778.28

AREA DRAIN

R

C P

IE-770.85

IE

.7

P

24" RCP

IE-777.85

2" STP

IE-782.07

IE

-7

.1

CONCRETE

STOP SN

CONCRETE12" BRICK WALL

GRAVEL

OVERHEAD PIPE

GRAVEL

2ND FLOOR 801.83

1ST FLOOR 788.50

CHILLED WATER

CHILLED WATER

C H

IL

L

E D

W A

T E

R

C H

IL

L

E D

W A

T E

R

C H

IL

L

E D

W A

T E

R

C H

IL

L

E D

W A

T E

R

C H

IL

L

E D

W A

T E

R

C H

IL

L

E D

W A

T E

R

CHILLED WATER

8"

8" 8" (ABAN)

8"

16"

FIRE WATER (ABAN) FIRE WATER (ABAN)

FIRE WATER (ABAN)

F

IR

E

W A

T E

R

F

T E

R

A

B A

N

F

T E

R

F

T E

R

10"

14"

10"

U G

4" UG

E12

BURIED

AREA DRAIN

T

2-3" FIBER DUCTS

4-5" FIBER DUCTS

F I B

E R

D U

C T

S

4-3 1/2" FIBER DUCTS4-3 1/2" FIBER DUCTS ABANDONED

4-3 1/2" FIBER DUCTS

1 1/2" CONDUIT

F

D

TOP OF PIPE-783.45

TC-789.05

CHILLED WATER VAULT

CP-6

NAIL

PK

CP-4

PK

CP-3

CP-2

PK

CP-1

NAIL

CP-5

PK

CHILLED WATER

CUT AND CAPPED

CAPPED

CUT AND

CAPPED

CUT AND

CAPPED

CUT AND

CAPPED

CUT AND

CAPPED

CUT AND

CUT AND CAPPED

A B

A N

D O

N D

E D

F

IR

E W

A T

E R

F

IR

E W

A T

E R

A

B A

N

D U

C T

S

F

I B

E R

D.B. 1365, PG. 36

HERITAGE CENTER, LLC

ED-8E

PROPERTY LINE

CITY OF OAK RIDGE

2-6" CW

T C

.4

S A

M H

CAPPED

CUT AND

CAPPED

CUT AND

3"

CAPPED

CUT AND

4" 4"

10" 10" 10"

6"

F

IR

E W

A T

E R

I E

.5

GRAVEL

ASPHALT

PTP-UGT

GATE GATE

UGE

UGE

UGE

U G

E

UGE

U G E

U G

E

UGE

UGE

UGE

UGE

UGE

O H

OH

UGTUGT UGT UGT UGT UGT UGT UGT UGT UGT

U G

T

UGT

UGT

UGT

U G T

F O

C F

O C

F O

C F

O C

UGT UGT

OH

UGE UGE

U G

E U

G E

U G

E

UGEUGE

OH

U G

E U

G E

U G

E U

G E

UGE UGE

UGE

UGE

SN

SN

SN

SN

U G

E U

G E

U G

E U

G E

OH

ENRICHMENT ST.(7TH ST.)

(A V

E

"J

M E

R

IT

U S

A V

E

K O

P O

T

IC

W A

Y (A

V E

"K

K -2

A

V E

A

V E

"L

TC-794.83

PMH

ABANDONED/FILLED

PMH K-1066-C

IE-792.06,8" STP

IE-790.66,8" VCP

IE-790.36

12" RCP

I E

.6

V

C P

TC-793.61

AREA DRAIN

IE

-7

.1

IE

-7

.1

IE-792.83

12" RCP

IE-789.80,OUT

TC-793.39

STMH

V

C P

FH

RAD. BOUNDARY

PP

NC

9L2

L8H

7L1

7L3 7K1

PIV

FH

L8

12"

FH

K8X

PP

E10

K-1028-72

PORTAL #11

PP

PP

OH

O H

OH

CHILLED WATER ABAND.

WV

WM

PREVENTER

BACKFLOW

SIDEWALK

STRUCTURE

ABAND.

W

2"

W

K-25 HISTORY CENTER

SAMH

AREA DRAIN

TC-793.70

AREA DRAIN

SD

SD

S D

RD

R D

R D

SD

TC 794.08

AREA DRAIN

TC 794.27

SAMH

TC 794.21

AREA DRAIN TC 794.97

SAMH

TC 795.17

PMH

TC 794.33

TMH

FFE 801.83

2"

U G

E

UGE

UGE

UGEUGE

U G

E

UGE UGE UGE UGE

UGE

U G

E

U

G

U

G

4" UG (ABAN)

4" UG (ABAN)

4" UG

A

B A

N

B

A N

A

B A

N

A

B A

N

UG (ABAN)UG (ABAN)UG (ABAN) UG (ABAN)

U G

(A

B A N

A

B A

N

U

G

A B

A N

K-25 FOOTPRINT

K-25 FOOTPRINT

ASPHALT

K-601 SLAB

FORMER

PCB AREA 1

REMEDIATED

PCB AREA 2

REMEDIATED

U-234 AREA 1

REMEDIATED

AREA 2

U-234

REMEDIATED

REMEDIATED Tc-99 AREA

R E

M D

IA

T

D

T c

E A

Z2-23

Z2-22

R

C P

EI -790.44

TC-795.08

AREA DRAIN

EI -791.00

TC-794.40

AREA DRAIN

EI -790.11

EI -790.21

TC-794.86

AREA DRAIN

EI -789.00

TC-793.93

AREA DRAIN

TC-793.35

AREA DRAIN

TC-793.12

AREA DRAIN

K-1650

TC-794.95

SAMH

SS

A

B A

N

SS 8" SS

8"

S S

S S

S S

SS

WV

FORMER FOOTPRINT

WM

CO

FH

WV

PTP

PP

GP

LPLPLPTP

TP

WV

TP

FH

WV

PIV

GV

WV

G A

T E

GATE

G A

T E

GATE

GATE

G A

T E

G A

T E

FH

WV

WV FH

GVPIVGV

WM

WM

SPIGOT

(TYP 7)

BOLLARD

EJB

WV

PIV

EL 779.61

E -416.13

N -26244.24

CP-5

G A

T E

U G

T U

G T

U G

T U

G T

U G

T

G A

T E

GATE

TC-792.53

12" STEEL

12" CMP

IE-793.17

IE-793.37

TC-793.45

AREA DRAIN

TC-793.28

AREA DRAIN

LANDSCAPE PLANTER

LANDSCAPE PLANTER

ASPHALT PARKING

ASPHALT PAVEMENT

CONCRETE

CONCRETE

CONCRETE

CONCRETE

CONCRETE

GRAVEL

GRAVEL

A S

P H

A L

T P

A V

E M

E N

T

CONCRETE

S D

R

C P

S D

R

C P

R

C P

S D

R

C P

S D

A S

P H

A L

T

PK NAIL

CP-4N

T C

.1

A R

A

IN

TC-794.54

AREA DRAIN

TC-795.07

ABANDONED

SAMH

TC-793.25

AREA DRAIN

TC-779.86

SAMH

TC-779.53

SAMH

BOLLARDS

BOLLARDS

LANDSCAPE PLANTER

BOLLARDS

PK NAIL

CP-3N

TC-793.64

AREA DRAIN

TC-793.21

AREA DRAIN

TC-793.30

AREA DRAIN

TC-793.44

AREA DRAIN

VAULT

ELECTRIC

ASPHALT

AS

P

H

ALT

O H E

O H

E

EXCAVATION WALL

ASPHALT

ASPHALT

KNOXVILLE, TN 37932

10330 HARDIN VALLEY ROAD

SUITE 201

OFFICE: 865.690.6419

www.fulghummacindoe.com

CIVIL ENGINEER:

FMA PROJECT: 414.011

UCOR

PROJECT NAME:

SITE CLASS

TYPE REV

RPE

DRAWING REVISIONS

SCALE:LE DRAWING NUMBER

BUILDING

ELECTRONIC SIGNATURES

PROFESSIONAL SEAL

TITLE:

CAD FILENAME

CD

U

ORG/

ENGR

ENGR

CHK

PROJ

ENGR

KAREA ETTP

PROJECT RECORD NUMBER:

ESF/DWG/X

AS SHOWN

CONFIGURATION MANAGEMENT LEVEL

DE-SC-0004645

an AECOM-led partnership with Jacobs

MANAGED FOR THE DEPARTMENT OF ENERGY

UNDER CONTRACT NUMBER DE-SC-0004645

OAK RIDGE TN 37830

OAK RIDGE RESERVATION

ARCHITECTSSMEE + BUSBY

Knoxville, TN 37902

DRW

BY

19008

SITE IMPROVEMENT K-25

SB GS

QA

03/31/2022 AC AG AC AGCFC SUBMITTAL

04/26/2022 PHASING REVISION AC AG AC AG SB GS

DATEREV.

DESCRIPTION

SEE DEMOLITION NOTE 9

INSTALLATION

REQUIRED FOR STORM DRAINAGE

REMOVE STRUCTURES AND PIPING AS

DRAIN, AND CONNECTED PIPING IN PLACE

ABANDON EXISTING STORM MANHOLE, AREA

REF. DEMOLITION NOTE 9

TO DETERMINE REMOVAL OR ABANDONMENT

ELECTRIC TO BE EXPOSED FOR EVALUATION

EXISTING DE-ENERGIZED UNDERGROUND

OTHERS. REF. DEMOLITION NOTES 7 AND 8

EXISTING PIER PREVIOUSLY REMOVED BY

ASPHALT PAVEMENT, TYP.

SAWCUT AND REMOVE EXISTING

SEE DEMOLITION NOTE 9

AND CONNECTED PIPING IN PLACE

ABANDON EXISTING AREA DRAIN

I I I I I I I I I I

II

7 AND 8

REF. DEMOLITION NOTES

REMOVED BY OTHERS

EXISTING PIER PREVIOUSLY

DEMOLITION NOTES 7 AND 8

REMOVED BY OTHERS. REF.

EXISTING PIER PREVIOUSLY

I I I I I I I I I I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

COOR. EXTENTS WITH GOVERNMENT

REMOVE EXISTING FENCE

AND GOVERNMENT

COOR. WITH UCOR/DOE

AS REQUIRED

REMOVE EXISTING GRAVEL

ASPHALT PAVEMENT

CONNECTION TO PROPOSED

AND REMOVE FOR CLEAN

SAWCUT EXISTING ASPHALT

PAVEMENT MARKINGS

REMOVE EXISTING

NEAREST JOINT

REMOVE EXISTING SIDEWALK TO

SAWCUT AND REMOVE EXISTING CURB

29'

IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

I I I I I I I I I I I I I I I I I I I

UCOR/DOE AND GOVERNMENT

COOR. EXTENTS WITH

REMOVE EXISTING FENCE

IIIIIIIII

FOR ACCESS DRIVE

AND GATE AS REQUIRED

REMOVE EXISTING FENCE

SEE DEMOLITION NOTE 9

FLOWABLE FILL

TO NORTH AND FILL WITH

PLUG EXISTING 36" RCP

I I I I I I I I I I I I I I I I I I

I I I I I I I I I I I I I I I I I

I I I I I I I I I I I I I I I I I

TO REMAIN, TYP

EXISTING ASPHALT PAVEMENT

ASPHALT PAVEMENT

CONNECTION TO PROPOSED

AND REMOVE FOR CLEAN

SAWCUT EXISTING ASPHALT

PAVEMENT TO REMAIN

EXISTING ASPHALT

EXISTING ASPHALT

SAWCUT AND REMOVE

SIDEWALK

EXISTING CURB AND

SAWCUT AND REMOVE

II

SEE DEMOLITION NOTE 9

PLACE AS REQUIRED

TO BE ABANDONED IN

WATER, AND GAS LINES

EXISTING WATER, CHILLED

II

COOR. WITH UCOR/DOE AND GOVERNMENT

ABANDON EXISTING AREA DRAIN

I I I I I I I I I I I I I I I I I

I I I I I I I I I I I I I I I I I I

AS REQUIRED FOR PROPOSED SIDEWALK

SAWCUT AND REMOVE EXISTING SIDEWALK

IIIIIIII

I I I I I I I I I I I I I I I I I I I I I I I I I I I I

I I I I I I I I I I I I

I I I I I I

I I I I I I I

GOVERNMENT

DISPOSAL WITH LANDSCAPE ARCHITECT AND

REQUIRED. COOR. REMOVAL, REPLANTING, OR

REMOVE EXISTING LANDSCAPE PLANTINGS AS

AND GOVERNMENT

COOR. WITH UCOR/DOE

ABANDON VALVE IN PLACE

BOX AND COVER AND

REMOVE EXISTING VALVE

OTHERS. REF. DEMOLITION NOTES 7 AND 8

EXISTING PIER PREVIOUSLY REMOVED BY

LANDSCAPE ARCHITECT AND GOVERNMENT

COOR. REMOVAL, REPLANTING, OR DISPOSAL WITH

REMOVE EXISTING LANDSCAPE PLANTINGS AS REQUIRED.

LANDSCAPE PLANS PRIOR TO DEMOLITION

INSTALL TREE PROTECTION FENCING PER

(TYP OF 6)

REMOVE EXISTING BOLLARDS

(TYP OF 3)

REMOVE EXISTING BOLLARDS

I I I

I I

VEHICLE CHARGER INSTALLATION

AS REQUIRED FOR ELECTRIC

SIDEWALK TO NEAREST JOINT

SAWCUT AND REMOVE EXISTING

I I I I I I

I I I I I I

I I I I I I

I I

IIIIIIII

PHASE I

PHASE II

PHASE I

PHASE II

REF. SITE ELECTRIC PLAN

UNDERGROUND ELECTRIC AND COMMUNICATIONS INSTALLATION

SAWCUT AND REMOVE EXISTING PAVEMENT AS REQUIRED FOR

PHASE II

PHASE II

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

II

I I I I I I I I I I I I I I I I I I I I I I I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

IIIIIIIIIIIIIII

I I I I

IIII

II

II

I I I I I I I I I I I I I I I I I I I I I I I I I I

II

REF. DEMOLITION NOTE 10

ABANDONED IN PLACE

DEMOLISHED AND

VAULT TO BE PARTIALLY

UNDERGROUND ELECTRIC

EXISTING DE-ENERGIZED

IIIIIIIII

II

I

II

II

II

K-25 GRID NORTH

30 60

SCALE: 1" = 30'

LEGEND:

PROPERTY LINE

EXISTING STRUCTURE TO BE REMOVED

IIIIIIIIII

EXISTING GRAVEL SECTION TO BE REMOVED

AS REQUIRED FOR CONSTRUCTION

EXISTING ITEM TO BE ABANDONED IN PLACE/REMOVED

TYPICALTYP

DEMOLITION NOTES:

1.

2.

3.

4.

5.

6.

7.

S&ME GEOTECHNICAL REPORT PRIOR TO DEMOLITION WORK.

CONSTRUCTION CONTRACTOR TO REFERENCE THE 2015

GOVERNMENT OR UCOR/DOE.

WITH MINIMUM 200 PSI FLOWABLE FILL. COORDINATE WITH

(1-FT BELOW ELEVATOR SUMP GRADE). FILL REMAINING VAULT

INTERNAL EQUIPMENT, AND WALLS TO MAX. ELEVATION 787 FT

CONSTRUCTION CONTRACTOR TO REMOVE VAULT COVER,

END OF CUT AND CAPPED UTILITIES TO GOVERNMENT.

OR UCOR/DOE. SUBMIT COORDINATES AND ELEVATIONS OF EACH

COORDINATE ABANDONMENT AND REMOVALS WITH GOVERNMENT

PROCEDURE FOR ENSURING EACH LINE IS COMPLETELY FILLED.

BE SUBMITTED IDENTIFYING UTILITY ACCESS POINTS AND A

200 PSI FLOWABLE FILL. FOR ABANDONMENT, A PLAN SHALL

DISCONNECTED, CAPPED/PLUGGED, AND FILLED WITH MINIMUM

OR ABANDON IN PLACE. ABANDONED UTILITIES SHALL BE CUT/

CONSTRUCTION CONTRACTOR TO REMOVE EXISTING UTILITIES

IS APPROXIMATELY 6 FEET BELOW EXISTING GRADE.

DEPTH FOR THE EXISTING PIER LOCATED WITHIN GRID D-4

APPROXIMATELY 4 FEET BELOW EXISTING GRADE. EXCAVATION

BE REMOVED BY OTHERS. EXISTING DEEP PIER REMOVAL IS

EXISTING SHALLOW FOUNDATIONS (HATCHED AREAS) ARE TO

BY THE UCOR/DOE GEOTECHNICAL ENGINEER.

PER THE PROJECT SPECIFICATIONS AND REVIEWED AND APPROVED

CONTRACTOR. REPLACEMENT MATERIAL SHALL BE INSTALLED

SHALL BE REMOVED AND REPLACED BY THE CONSTRUCTION

FILL MATERIAL PLACED AT THE CONCRETE REMOVAL LOCATIONS

LIFE OF THE PROJECT.

PUBLIC SHALL BE PROVIDED AND MAINTAINED THROUGHOUT THE

CONTROL METHODS FOR THE PROTECTION AND SAFETY OF THE

NECESSARY BARRICADES, LIGHTS, SIGNS, AND OTHER TRAFFIC

ADDITIONAL COST.

EQUAL TO OR BETTER THAN THE EXISTING CONDITION AT NO

BE REPAIRED BY THE CONSTRUCTION CONTRACTOR TO A CONDITION

ANY STRUCTURES THAT ARE TO REMAIN THAT ARE DAMAGED SHALL

PROTECTED FROM DAMAGE DURING ALL PHASES OF CONSTRUCTION.

ALL STRUCTURES NOT LABELED FOR DEMOLITION SHALL BE

OF ALL UTILITIES IN COMPLIANCE WITH THE UTILITY COMPANIES.

READY FOR REMOVAL AND SHALL COORDINATE THE DISCONNECTION

AUTHORITIES WHEN WATER, GAS, AND ELECTRIC METERS ARE

SHALL NOTIFY THE RESPECTIVE UTILITY COMPANIES AND/OR

CONSTRUCTION CONTRACTOR. THE CONSTRUCTION CONTRACTOR

UTILITY COMPANY SHALL BECOME THE PROPERTY OF THE

ALL MATERIAL EXCEPT THAT BELONGING TO A PUBLIC OR PRIVATE

TO REMAIN.

PAVEMENT WHERE DEMOLITION BORDERS EXISTING PAVEMENT

PAVEMENT SHALL BE REMOVED TO SUBGRADE. SAW CUT

BETTER THAN THE EXISTING CONDITION.

DISTURBED SHALL BE RETURNED TO A CONDITION EQUAL TO OR

FROM DAMAGE DURING DEMOLITION WORK. ANY OFF-SITE AREAS

CONSTRUCTION CONTRACTOR SHALL PROTECT ALL ADJACENT LANDS

BY THE CONSTRUCTION CONTRACTOR PRIOR TO BEGINNING WORK.

ALL NECESSARY PERMITS FOR DEMOLITION SHALL BE OBTAINED

TO THE GOVERNMENT OR UCOR/DOE REPRESENTATIVE IMMEDIATELY.

DISCREPANCIES BETWEEN THE PLANS AND ACTUAL CONDITIONS

VERIFY ALL CONDITIONS IN THE FIELD AND REPORT

IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO

EXISTING CONCRETE/PIER REMOVAL AREA

8.

TO BE REMOVED

EXISTING ASPALT/CONCRETE PAVEMENT SECTION

C1E-700NHP-H743

9.

PHASE LINE

PHASE I & PHASE II

DEMOLITION PLAN08/02/2022 CLARIFICATION OF ABANDONMENT/REMOVALS AC AG AC AG SB GS

10/06/2022

10.

IIII

CONSTRUCTION

PLUGGED, FILLED, AND ABANDONED AS REQUIRED FOR

EXISTING ITEM TO BE CUT, REMOVED, AND CAPPED OR

11.

10/06/2022

PRODUCE A CLEAN DRAWING SET FOR USACE TO START PROCUREMENT

REVISED CFC - REVISION CLOUDS AND TRIANGLES REMOVED TO

AC AG AC AG SB GS

10IN

POST

12IN

FP

SQ

30IN

SN

POST

SQ

SN

MON

SN

FF. EL. 787.93

IRO

IRO

CHILLER

TRANS.

S Y

S T

E M

F

IR

E

TANK

DIESEL

TRANS.

AC

PAVEMENT CUT

GATE

GATE

GRAVEL

CIRCLE

1' CONCRETE

CIRCLE

1' CONCRETE

CIRCLE

1' CONCRETE

K-1652

CONCRETE

STOP SN

CONCRETE12" BRICK WALL

GRAVEL

GRAVEL

2ND FLOOR 801.83

1ST FLOOR 788.50

T

CP-6

NAIL

PK

CP-4

PK

CP-3

CP-2

PK

CP-1

NAIL

CP-5

PK

D.B. 1365, PG. 36

HERITAGE CENTER, LLC

ED-8E

PROPERTY LINE

CITY OF OAK RIDGE

O H

OH

OH OH

OH

ENRICHMENT ST.(7TH ST.)

(A V

E

"J

M E

R

IT

U S

A V

E

PP

K-1028-72

PORTAL #11

PP

PP

OH

O H

OH

-26500

-26500

-26500

-26500 -26500

-26500

-26700

-26900

-26900

-26900

-26900

-26900

-26900

-26700

-26700

-26700

-26700

-26700

-26300

-26300

-26300

-26300

-26300

-26100

-26100

-26100

-26100

SIDEWALK

K-25 HISTORY CENTER

FFE 801.83

K-25 FOOTPRINT

K-25 FOOTPRINT

PCB AREA 1

REMEDIATED

PCB AREA 2

REMEDIATED

U-234 AREA 1

REMEDIATED

AREA 2

U-234

REMEDIATED

REMEDIATED Tc-99 AREA

T c

E A

Z2-23

Z2-22

K-1650

G A

T E

GATE

GATE

G A

T E

G A

T E

(TYP 7)

BOLLARD

(TYP 2)

BOLLARD

G A

T E

GATE

LANDSCAPE PLANTER

LANDSCAPE PLANTER

ASPHALT PAVEMENT

CONCRETE

ASPHALT

CONCRETE

GRAVEL

GRAVEL

GRAVEL

A S

P H

A L

T P

A V

E M

E N

T

CONCRETE

A S

P H

A L

T

PK NAIL

CP-4N

TC-794.27

MANHOLE

LANDSCAPE PLANTER

PK NAIL

CP-3N

BOLLARD

CONCRETE

BOLLARD

HOLE

SMALL

TC-794.78

MANHOLE

TC-794.81

MANHOLE

ASPHALT

TC-779.62

MANHOLE

(TYP 63)

BOLLARD

O H E

O H

E

KNOXVILLE, TN 37932

10330 HARDIN VALLEY ROAD

SUITE 201

OFFICE: 865.690.6419

www.fulghummacindoe.com

CIVIL ENGINEER:

FMA PROJECT: 414.011

UCOR

PROJECT NAME:

SITE CLASS

TYPE REV

RPE

04/26/2022

DRAWING REVISIONS

SCALE:LE DRAWING NUMBER

BUILDING

ELECTRONIC SIGNATURES

PROFESSIONAL SEAL

TITLE:

CAD FILENAME

CD

U

ORG/

ENGR

ENGR

CHK

PROJ

ENGR

KAREA ETTP

PROJECT RECORD NUMBER:

ESF/DWG/X

AS SHOWN

CONFIGURATION MANAGEMENT LEVEL

DE-SC-0004645

an AECOM-led partnership with Jacobs

MANAGED FOR THE DEPARTMENT OF ENERGY

UNDER CONTRACT NUMBER DE-SC-0004645

OAK RIDGE TN 37830

OAK RIDGE RESERVATION

REV. DATE DESCRIPTION

ARCHITECTSSMEE + BUSBY

Knoxville, TN 37902

DRW

BY

19008

SITE IMPROVEMENT K-25

SB GS

QA

03/31/20220 AC AG AC AGCFC SUBMITTAL

1 04/26/2022 PHASING REVISION AC AG AC AG SB GS

VPB SITE CONSTRUCTION

APPROXIMATE LIMITS OF

VPB SITE CONSTRUCTION

APPROXIMATE LIMITS OF

TYP.

ASPHALT PAVEMENT, 5

'R

E -870.56

N -26,525.59

BEGIN EAST ACCESS DRIVE

STA. 0+00

R

C

E -933.75

N -26,210.73

END EAST ACCESS DRIVE

STA. 3+67.00

BUILDING

VIEWING PLATFORM

TYP

CONCRETE SIDEWALK,BAR

PAINTED STOP

TYP

ASPHALT PAVEMENT,

TYP.

ASPHALT PATH,

BOLLARD

REF. SHEET H751

LOOP ROAD ENTRANCE

8'

REF. LANDSCAPE ARCH. PLANS

LANDSCAPE SIDEWALK, TYP.

REF. LANDSCAPE ARCH. PLANS

LANDSCAPE SIDEWALK, TYP.

REF. LANDSCAPE ARCH. PLANS

LANDSCAPE SIDEWALK, TYP.

E -1,076.24

N -26,416.97

E -1,035.31

N -26,416.97

E -1,099.61

N -26,516.54 E -1,011.94

N -26,516.54

'R

'R

24'

'R

12' 12'

PAVEMENT

CONCRETE

11.33'

E -1,209.81

N -26,708.37

BEGIN WEST ACCESS DRIVE

STA. 0+00

E -1,164.57

N -26,233.89

END WEST ACCESS DRIVE

STA. 4+88.00

C

C

OVERLAY, TYP

1-1/2" ASPHALT

OVERLAY, TYP.

1-1/2" ASPHALT

12'

REF. SHEET H751

LOOP ROAD FROM AVENUE "M"

POLE LOCATION

PROPOSED FLAG

POLE LOCATION

PROPOSED FLAG

POLE LOCATION

PROPOSED FLAG

(30"x30")

(R5-1)

DO NOT ENTER

(30"x30")

(W11-2)

PEDESTRIAN CROSSING

(30"x30")

(W11-2)

CROSSING

PEDESTRIAN

TYP

BOLLARDS

(30"x30")

(R5-1)

DO NOT ENTER

H744 H749

H748 H744

H748 H744

H748 H744

H748 H744

H744 H748

H749 H744

12' BAR GATE 21

H749 H744

H749 H744

14' BAR GATE

H749 H744

CHARGING STATIONS

ELECTRIC VEHICLE

YELLOW LINE

DOUBLE SOLID

WHITE LINE, TYP

4" SINGLE SOLID

YELLOW LINE

DOUBLE SOLID

12' BAR GATE 21

H749 H744

PHASE I

PHASE II

PHASE I

PHASE II

PHASE II

PHASE II

K-25 GRID NORTH

30 60

SCALE: 1" = 30'

LEGEND:

PHASE LINE

TYPICALTYP

NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

OAK RIDGE, TN 37830

FEDERAL BUILDING

C/O DEPARTMENT OF ENERGY

U.S. ATOMIC ENERGY COMMISSION

CONCRETE PAVEMENT

POINT NUMBER

-26749.54

-26504.64

-26502.94

-26499.22

-26755.84

-26808.30 -835.07

-1115.59

-1154.73

-945.88

-564.50

-599.27

ASPHALT PATH PAVEMENT

CONTROL POINT COORDINATES

NORTHING EASTING

APPROXIMATE LIMITS OF VIEWING PLATFORM SITE CONSTRUCTION

HORIZONTAL CURVE DATA TABLE

NORTHING

P.I. COORDINATES

EASTING

TANGENTRADIUS LENGTH

NO.

CURVE

ANGLE

DELTA

-26,525.78 -935.05C1 29.00' 29.10' 45.66'

DIMENSIONS.

REFER TO ARCHITECTURAL PLANS FOR ACTUAL BUILDING

PROVIDE A SOLID BASE FOR THE CONCRETE CURB.

BEEN SPECIFIED (REFER TO THE CURB DETAIL) IN ORDER TO

UNDERNEATH LANDSCAPE AREAS UP TO THE LIMITS THAT HAVE

REMOVE OVER-PAVEMENT OF ASPHALT AND STONE FROM

OWNER:

AND RESEARCH.

ZONING FOR THE SITE IS FIR, FEDERAL INDUSTRY

029.AS SHOWN IN ROANE COUNTY CLT MAP

PROPERTY CONCERNED REFLECTS PARCEL 010.00

"MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES."

CONFORM TO THE FEDERAL HIGHWAY ADMINISTRATIONS

TRAFFIC CONTROL DEVICES AND PAVEMENT MARKING SHALL

SPECIFICATIONS.

AND CONSTRUCTION REQUIREMENTS OF TDOT STANDARD

CURB AND PAVEMENT SHALL MEET THE MATERIALS, EQUIPMENT,

COMPRESSIVE STRENGTH OF 4000 PSI AT 28 DAYS. CONCRETE

CONCRETE CURB AND PAVEMENT SHALL HAVE A MINIMUM

TRANSPORTATION (TDOT) STANDARD SPECIFICATIONS.

DRAWINGS, AND THE TENNESSEE DEPARTMENT OF

CONSTRUCTION, AND TESTING REQUIREMENTS OF THESE

COURSES SHALL MEET THE MATERIALS, EQUIPMENT,

THE MINERAL AGGREGATE BASE AND ASPHALTIC SURFACE

PAVEMENT OR OUTSIDE FACE OF BUILDING.

THE FENCE LINE, PROPERTY LINE, FACE OF CURB, EDGE OF

UNLESS NOTED OTHERWISE, DIMENSIONS ARE TAKEN FROM

DECEMBER 8, 2021.

SURVEY PROVIDED BY BARGE DESIGN SOLUTIONS, DATED

THE TOPOGRAPHIC & BOUNDARY DATA WAS TAKEN FROM

PHASE I & PHASE II

SITE LAYOUT PLAN

EXPOSURE UNIT AREA BOUNDARY

REMEDIATION AREA BOUNDARY

ASPHALT OVERLAY

-26,670.25 -1,209.81C2 32.00' 13.25' 25.13'

-26,625.00 -1,164.57C3 32.00' 13.25' 25.13'

ASPHALT PAVEMENT

C1E-700NHP-H744

4N -26507.35 -447.58

3N -26502.16 -1118.18

PROPERTY LINE

MW2

Oval

MW2

Typewritten Text Wayside 1 was relocated.

Not in Phase I scope.

MW2

Line

K-25 GRID NORTH

30 60

SCALE: 1" = 30'

LEGEND:

PROPERTY LINE

TYPICALTYP

INLET SEDIMENT CONTROL

SILT FENCE

EROSION CONTROL WATTLEECW

1.

2.

3.

DEWATERING NOTES:

1.

MAINTENANCE AND INSPECTION PROCEDURES

2.

3.

EROSION CONTROL NOTES:

1.

4.

5.

6.

8.

1.

2.

3.

7.

9.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

OR OTHER POLLUTANTS INTO THE STORMWATER SYSTEM OR OFF-SITE.

SHALL BE EMPLOYED TO PREVENT THE DISCHARGE OF SEDIMENT

AVENUE "M" ARE NO LONGER FUNCTIONING. ALL NECESSARY MEASURES

DURING LAND DISTURBING ACTIVITIES. THE STORM INLETS ALONG

INLETS ALONG AVENUE "J" SHALL BE PROTECTED AS REQUIRED

FOR LOOP ROAD AND WAYSIDE EXHIBIT CONSTRUCTION, ALL STORM

SWPPP FOR BMPs.

REQUIREMENTS OF THE PROJECT SWPPP. REFERENCE THE PROJECT

EXCAVATED MATERIALS. MANAGE TOPSOIL STOCKPILE PER THE

STRIP TOPSOIL FULL DEPTH (6-IN. MIN.) AND TEMPORARILY STOCKPILE

IS RESUMED.

EFFECTIVE CONTROLS SHALL BE IMPLEMENTED BEFORE THE ACTIVITY

BE INEFFECTIVE, THE DEWATERING ACTIVITY SHALL BE HALTED AND

CONTROLS ASSOCIATED WITH DEWATERING ACTIVITIES ARE FOUND TO

SEDIMENT IS BEING ADEQUATELY CONTROLLED. IF SEDIMENTATION

RECEIVING STREAMS) SHALL BE INSPECTED TO VERIFY THAT

DISCHARGED FROM THOSE ACTIVITIES (BOTH STORM DRAINS AND

DURING DEWATERING ACTIVITIES, LOCATIONS WHERE WATER IS

PREVENTING DISCHARGE OF SEDIMENT TO THE RECEIVING STREAM.

RECEIVING STREAM TO ENSURE THAT E&SCS ARE EFFECTIVELY

LOCATIONS WHERE STORM WATER RUNOFF IS DISCHARGED TO A

ROUTINE INSPECTIONS OF E&SCS SHALL INCLUDE OBSERVATIONS OF

ANY RAIN EVENT AND BEFORE THE END OF THE WORK SHIFT.

ACCOMPLISH WORK ACTIVITIES, BUT MUST BE REINSTALLED BEFORE

E&SCS MAY BE TEMPORARILY REMOVED IF NECESSARY TO

SITE BY STORM WATER RUNOFF.

SUCH A WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE

DEBRIS, WASTEWATER, AND OTHER SUBSTANCES ON THE SITE IN

THE CONSTRUCTION CONTRACTOR SHALL CONTROL WASTES, GARBAGE,

THE GOVERNMENT.

TO THE LIKELY POINT OF ORIGIN OR OTHER AREA APPROVED BY

FLUSHING THE AREA WITH WATER. SEDIMENT SHALL BE RETURNED

BULK CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE

ROADWAYS SHALL BE KEPT CLEARED OF ACCUMULATED SEDIMENT.

MINIMIZED.

WORK AND DISTURBANCE WITHIN RIPARIAN ZONES SHALL BE

PROJECT SITE.

SEDIMENT SHALL BE PREVENTED FROM DISCHARGING FROM THE

TO PREVENT EROSION, WITH STABILIZATION APPROVED BY THE GOVERNMENT.

DISPOSED OF ON-SITE PER GOVERNMENT REQUIREMENTS OR STABILIZED

COLLECTED IN E&SCS SHALL EITHER BE REMOVED AND PROPERLY

STABILIZATION, AND PROPER DISPOSAL OF E&SCS OFF-SITE. SEDIMENT

RESPONSIBLE FOR REMOVAL OF E&SCS, WITHOUT DAMAGING FINAL

BY THE GOVERNMENT, IS COMPLETE. CONSTRUCTION CONTRACTOR IS

E&SCS SHALL BE MAINTAINED UNTIL FINAL STABILIZATION, AS APPROVED

AND SEDIMENT CONTROL HANDBOOK AND PROJECT SWPPP.

E&SCS SHALL BE MAINTAINED IN ACCORDANCE WITH TDEC'S EROSION

OCCURS FIRST.

CALENDAR DAYS OR PRIOR TO THE NEXT RAIN EVENT, WHICHEVER

DAMAGED OR INEFFECTIVE SHALL BE REPAIRED OR MODIFIED WITHIN 7

COMPLETED AS PER THE SWPPP. E&SCS THAT ARE NOTED TO BE

SWPPP FOR INSPECTION REQUIREMENTS. INSPECTION FORMS SHALL BE

HOURS APART IN ACCORDANCE WITH THE TDEC CGP. REFERENCE THE

E&SCS SHALL BE INSPECTED AT LEAST TWICE PER WEEK, AT LEAST 72

PERSONNEL.

INSPECTIONS OF E&SCS SHALL BE COMPLETED BY TDEC QUALIFIED

AND CONSERVATION (TDEC) CONSTRUCTION GENERAL PERMIT (CGP). ALL

OF QUALIFIED PERSONNEL PER TENNESSEE DEPARTMENT OF ENVIRONMENT

E&SCS SHALL BE INSTALLED AND MAINTAINED UNDER THE SUPERVISION

REFER TO THE SWPPP FOR ADDITIONAL E&SC REQUIREMENTS.

FIELD MODIFICATION AS DIRECTED BY THE GOVERNMENT.

INSTALLED AND MAINTAINED PER THE SWPPP AND ARE SUBJECT TO

E&SCS SHALL BE STRICTLY ENFORCED. ALL E&SCS SHALL BE

STORM WATER RUN-ON FROM ADJACENT PROPERTIES.

GOVERNMENT/UCOR/DOE. E&SCS MAY ALSO INCLUDE CONTROL OF

DEPENDING ON AREAS OF DISTURBANCE, UPON APPROVAL BY THE

DESIGNED TO PROTECT. E&SCS MAY BE INSTALLED INCREMENTALLY,

PRIOR TO INITIATION OF THE ACTIVITIES THAT THE CONTROL IS

EACH EROSION AND SEDIMENT CONTROL (E&SC) SHALL BE INSTALLED 10.

EROSION.

NON-CONSTRUCTION AREAS WHICH SHOW SIGNS OF EXCESSIVE

THE DISTURBED AREA. APPLY PERMANENT SEEDING TO ALL

COMPLETED AND ALL CONSTRUCTION OPERATIONS WILL NOT IMPACT

APPLY PERMANENT SEEDING WHENEVER GRADING OPERATIONS ARE

THE SWPPP.

COMPLY WITH REQUIREMENTS IN SECTION 32 92 19-SEEDING AND

SEEDING AND MULCHING (BOTH TEMPORARY AND PERMANENT) SHALL

THE GOVERNMENT/UCOR/DOE.

EXCAVATION UNLESS AN ALTERNATIVE ARRANGEMENT IS APPROVED BY

EQUIPMENT AND STOCKPILES SHALL BE ON THE UPHILL SIDE OF THE

AND BACKFILL THAT IS COMPLETED ON THE SAME DAY. EXCAVATION

(BMP). SILT FENCE MAY NOT BE REQUIRED FOR TRENCH EXCAVATION

REFERENCE THE PROJECT SWPPP FOR BEST MANAGEMENT PRACTICES

DISTURBED AREA THAT SHALL REMAIN FOR MORE THAN ONE DAY.

CONTROL ON DOWNHILL/DOWNGRADIENT SIDE OF ANY STOCKPILE OR

CONSTRUCTION CONTRACTOR SHALL INSTALL APPROPRIATE SEDIMENTATION

MATTING.

OR OTHER AREAS AT LOCATIONS SHOWN ON PLANS WITH EXCELSIOR

COVER SEEDED SLOPES WHERE GRADE IS GREATER THAN 35 DEGREES

MEET GOVERNMENT'S APPROVAL.

PERFORMED TO ENSURE THAT STABILIZED AREAS CONTINUOUSLY

CONSTRUCTION ACTIVITIES ARE OCCURRING. MAINTENANCE SHALL BE

BEING USED FOR STORAGE, STOCKPILES, OR WHERE ACTIVE

THIS DOES NOT APPLY TO THOSE AREAS WHICH ARE CURRENTLY

GRADED AREAS.

FOURTEEN (14) CALENDAR DAYS FOR ALL OTHER DISTURBED OR B.

GREATER THAN 35 DEGREES, AND,

DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

A. SEVEN (7) CALENDAR DAYS FOR ALL PERIMETER CONTROLS,

WITHIN:

TEMPORARY OR PERMANENT STABILIZATION SHALL BE COMPLETED

THE PROJECT SITE PERMANENTLY OR TEMPORARILY CEASES,

FOLLOWING INITIAL SOIL DISTURBANCE, IF WORK ON A PORTION OF

EXISTING VEGETATION SHALL BE PROTECTED AS MUCH AS FEASIBLE.

CONSTRUCTION GENERAL PERMIT.

RESPONSIBILITIES SHALL BE QUALIFIED PER THE TDEC

PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE

INSPECTION INFORMATION.

REFER TO THE SWPPP FOR ADDITIONAL REQUIREMENTS AND

OF THE PROJECT.

POLLUTION PREVENTION CONTROLS THROUGHOUT THE LIFE

INSTALLATION AND MAINTENANCE OF SITE CONSTRUCTION

THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE FOR THE

PUMPING TO A GRASSY AREA FOR INFILTRATION INTO THE SOIL.

APPROVAL FROM THE GOVERNMENT'S REPRESENTATIVE PRIOR TO

ALL WATER TO BE REMOVED FROM TRENCHES SHALL RECEIVE

TRENCHES DURING DEWATERING PROCESS.

CONSTRUCTION CONTRACTOR TO MONITOR SETTLEMENT OF

ALLOW INSTALLATION OF PROPOSED PIPES IN DRY CONDITIONS.

CONSTRUCTION CONTRACTOR TO PROVIDE DEWATERING SYSTEMS TO

SITE CONSTRUCTION

APPROXIMATE LIMITS OF VPB

C1E-700NHP-H745

PHASE LINE

PHASE I & PHASE II

CONTROL PLAN - STAGE 1

EROSION PREVENTION AND SEDIMENT 10/06/2022

PRODUCE A CLEAN DRAWING SET FOR USACE TO START PROCUREMENT

REVISED CFC - REVISION CLOUDS AND TRIANGLES REMOVED TO

2 AC AG AC AG SB GS

10/06/2022

10IN

POST

12IN

FP

SQ

30IN

SN

POST

SQ

SN

MON

SN

FF. EL. 787.93

IRO

IRO

CHILLER

TRANS.

S Y

S T

E M

F

IR

E

TANK

DIESEL

TRANS.

AC

PAVEMENT CUT

GATE

GATE

GRAVEL

K-1652

A B

A N

CONCRETE

STOP SN

CONCRETE12" BRICK WALL

GRAVEL

GRAVEL

2ND FLOOR 801.83

1ST FLOOR 788.50

T

CP-6

NAIL

PK

CP-4

PK

CP-3

CP-2

PK

CP-1

NAIL

CP-5

PK

D.B. 1365, PG. 36

HERITAGE CENTER, LLC

ED-8E

PROPERTY LINE

CITY OF OAK RIDGE

GRAVEL

ASPHALT

PTP-UGT

GATE GATE

UGE

UGE

UGE

U G

E

UGE

U G E

U G

E

UGE

UGE

UGE

UGE

UGE

O H

OH

UGTUGT UGT UGT UGT UGT UGT UGT UGT UGT

U G

T

UGT

UGT

UGT

U G T

F O

C F

O C

F O

C F

O C

UGT UGT

OH

UGE UGE

U G

E U

G E

U G

E

UGEUGE

OH

U G

E U

G E

U G

E U

G E

UGE UGE

UGE

UGE

SN

SN

SN

SN

U G

E U

G E

U G

E U

G E

OH

ENRICHMENT ST.(7TH ST.)

(A V

E

"J

M E

R

IT

U S

A V

E

K O

P O

T

IC

W A

Y (A

V E

"K

K -2

A

V E

A

V E

"L

ABANDONED/FILLED

PMH K-1066-C

FH

RAD. BOUNDARY

L8H

FH

L8

PP

K-1028-72

PORTAL #11

PP

PP

OH

O H

OH

SIDEWALK

W

2"

W

K-25 HISTORY CENTER

SD

SD

S D

RD

R D

R D

SD

FFE 801.83

2"

U G

E

UGE

UGE

UGEUGE

U G

E

UGE UGE UGE UGE

UGE

U G

E

K-25 FOOTPRINT

K-25 FOOTPRINT

ASPHALT

K-601 SLAB

FORMER

PCB AREA 1

REMEDIATED

PCB AREA 2

REMEDIATED

U-234 AREA 1

REMEDIATED

AREA 2

U-234

REMEDIATED

REMEDIATED Tc-99 AREA

Z2-23

Z2-22

R

C P

K-1650

SS

A

B A

N

SS 8" SS

8"

S S

S S

S S

SS

FORMER FOOTPRINT

G A

T E

G A

T E

GATE

GATE

G A

T E

G A

T E

(TYP 7)

BOLLARD

(TYP 2)

BOLLARD

G A

T E

U G

T U

G T

U G

T U

G T

U G

T

G A

T E

GATE

LANDSCAPE PLANTER

LANDSCAPE PLANTER

ASPHALT PARKING

ASPHALT PAVEMENT

CONCRETE

ASPHALT

CONCRETE

GRAVEL

GRAVEL

GRAVEL

A S

P H

A L

T P

A V

E M

E N

T

CONCRETE

S D

R

C P

S D

R

C P

S D

SD

R

C P

S D

R

C P

S D

A S

P H

A L

T

PK NAIL

CP-4N

BOLLARDS

BOLLARDS

LANDSCAPE PLANTER

BOLLARDS

PK NAIL

CP-3N

ASPHALT

O H E

O H

E

EXCAVATION WALL

KNOXVILLE, TN 37932

10330 HARDIN VALLEY ROAD

SUITE 201

OFFICE: 865.690.6419

www.fulghummacindoe.com

CIVIL ENGINEER:

FMA PROJECT: 414.011

UCOR

PROJECT NAME:

SITE CLASS

TYPE REV

RPE

DRAWING REVISIONS

SCALE:LE DRAWING NUMBER

BUILDING

ELECTRONIC SIGNATURES

PROFESSIONAL SEAL

TITLE:

CAD FILENAME

CD

U

ORG/

ENGR

ENGR

CHK

PROJ

ENGR

KAREA ETTP

PROJECT RECORD NUMBER:

ESF/DWG/X

AS SHOWN

CONFIGURATION MANAGEMENT LEVEL

DE-SC-0004645

an AECOM-led partnership with Jacobs

MANAGED FOR THE DEPARTMENT OF ENERGY

UNDER CONTRACT NUMBER DE-SC-0004645

OAK RIDGE TN 37830

OAK RIDGE RESERVATION

ARCHITECTSSMEE + BUSBY

Knoxville, TN 37902

DRW

BY

19008

SITE IMPROVEMENT K-25

SB GS

QA

03/31/2022 AC AG AC AGCFC SUBMITTAL

04/26/2022 PHASING REVISION AC AG AC AG SB GS

DATEREV.

DESCRIPTION

EC

W

TYP

SILT FENCE,

TYP

INLET PROTECTION,

WATTLE, TYP

EROSION CONTROL

(9/H748)

CONSTRUCTION ENTRANCE,

EC

W

VPB SITE CONSTRUCTION

APPROXIMATE LIMITS OF

E C

W E

C W

NOTE 21

SEE EROSION CONTROL

LOOP ROAD AVENUE "J"

NOTE 21

SEE EROSION CONTROL

LOOP ROAD FROM AVENUE "M"

NOTICE OF COVERAGE

POST SWPPP AND

E C

W

H745 H748

H748 H745

H745 H748

H745 H748

PHASE I

PHASE II

PHASE I

PHASE II

PHASE II

PHASE II

VPB SITE CONSTRUCTION

APPROXIMATE LIMITS OF

K-25 GRID NORTH

30 60

SCALE: 1" = 30'

LEGEND:

PROPERTY LINE

TYPICALTYP

1.

EROSION CONTROL NOTES:

PROPOSED CONTOUR

EXISTING CONTOUR

795.50

PROPOSED SPOT ELEVATION

TO EXCAVATION.

FOLLOWED AND AUTHORIZATION ISSUED BY UCOR/DOE PRIOR

EXCAVATION PENETRATION PERMIT REQUIREMENTS TO BE

MANNER TO MINIMIZE TIME OF EXPOSURE TO WEATHER.

DISTURBED AREAS SHALL BE STABILIZED IN AN EXPEDIENT

DETERMINE STABILITY.

THAN 6-FT SHALL BE TESTED BY THE GOVERNMENT TO

SLOPES GREATER THAN 4:1 SLOPE AT A HEIGHT GREATER

0.10', PAVEMENTS 0.04', AND BUILDINGS 0.04'.

PLANS: SUBGRADE 0.1', UNPAVED AREAS 0.1', SIDEWALKS

TOLERANCES ABOVE OR BELOW THAT AS SHOWN ON THE

OF THE GRADING WORK TO WITHIN THE FOLLOWING

PROPOSED LINES, ELEVATIONS, SLOPES, AND CROSS-SECTIONS

VERIFY GRADES WHEREVER NECESSARY TO BRING THE

THE FINAL SURFACE IS ACHIEVED.

PROTECT AND MAINTAIN SUBGRADES UNTIL PLACEMENT OF

STABILIZATION MEASURES ARE IMPLEMENTED.

NO SLOPE SHALL EXCEED 3:1 UNLESS PROPER SLOPE

THE SITE FREE-DRAINING.

POND ON-SITE. PROVIDE NECESSARY MEASURES TO KEEP

DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS OR

ELEVATIONS AS SHOWN ON THE DRAWINGS.

THE AREAS TO BE SEEDED AND TO THE FINISH GRADE

A 6 IN. (MIN.) LAYER OF TOPSOIL SHALL BE PLACED OVER

CONTENT.

WITHIN -1 TO +3 PERCENT OF THE OPTIMUM MOISTURE

DRY DENSITY. MAINTAIN THE MOISTURE CONTENT TO

UPPER 12 IN. BENEATH BUILDING SLABS TO 100% MAXIMUM

THE UPPER 24 IN. OF FILL BENEATH PAVEMENTS AND THE

LAYER TO AT LEAST 98% MAXIMUM DRY DENSITY. COMPACT

LIFTS NOT EXCEEDING 8 IN. THICKNESS. COMPACT EACH

FILL MATERIAL SHALL BE PLACED IN LOOSE, HORIZONTAL

CONSTRUCTION

APPROXIMATE LIMITS OF VPB SITE

GRADING NOTES:

UCOR/DOE.

SOILS AT A LOCATION APPROVED BY THE GOVERNMENT OR

PT, OH, AND OL. LEGALLY DISPOSE OF UNSATISFACTORY

WET OR TOO SOFT, EXPANSIVE SOILS AND SOILS CLASSIFIED

UNSATISFACTORY SOILS INCLUDE MATERIALS THAT ARE TOO

DRY DENSITY OF 90 PCF OR GREATER.

FILL SOILS SHALL HAVE A PI LESS THAN 30 & A MAXIMUM

LARGER THAN 4 IN. IN THE TOP 6 IN. OF AN EMBANKMENT.

OF STONE OR OTHER MATERIAL LARGER THAN 6 IN. AND

MATERIAL, AND TRASH. FILL MATERIAL SHALL ALSO BE FREE

FROM ROOTS AND OTHER ORGANIC MATERIAL, FROZEN

FILL MATERIAL SHALL BE SATISFACTORY MATERIAL FREE

ENGINEERED FILL. TDOT NO. 57, OR TDOT NO. 67 STONE.

FOLLOWED BY BACKFILLING THE UNDERCUT AREAS USING AN

CONDITIONS SHALL BE UNDERCUT TO A FIRM LEVEL OF SOIL

AREAS THAT EXHIBIT WEAK SOIL OR OTHERWISE UNSUITABLE

APPROVED BY THE GOVERNMENT.

USING AN ENGINEERED FILL OR STABILIZED BY A METHOD

THE PROOF ROLLING SHALL BE UNDERCUT AND BACKFILLED

A CRISS-CROSS PATTERN (4 PASSES MIN.) AREAS FAILING

WITH A FULLY LOADED TANDEM AXLE DUMP TRUCK USING

PROOF ROLL ALL AREAS TO RECEIVE FILL. PROOF ROLL

DOWN HILL SIDE OF THE STOCKPILE.

OTHER APPROPRIATE EROSION CONTROL STRUCTURES ON THE

STOCKPILE EXCAVATED MATERIALS. INSTALL SILT FENCE OR

STRIP TOPSOIL FULL DEPTH (6-IN. MIN.) AND TEMPORARILY

BELOW SUBGRADE.

SUBGRADE. ROCK SHALL BE SCARIFIED TO DEPTH OF 1 FT

SHALL BE REMOVED TO A DEPTH OF 2 FT BELOW THE

ALL TREES STUMPS, BOULDERS, AND OTHER OBSTRUCTIONS

BURNING SHALL NOT BE PERMITTED ON SITE.

A LOCATION APPROVED BY THE GOVERNMENT OR UCOR/DOE.

MATERIALS RESULTING FROM CLEARING AND GRUBBING AT

LIMITS OF EXCAVATION. COMPLETELY DISPOSE OF ALL

THE SITE SHALL BE CLEARED AND GRUBBED WITHIN THE

IMMEDIATELY.

PLANS AND ACTUAL CONDITIONS TO THE GOVERNMENT

IN THE FIELD AND REPORT DISCREPANCIES BETWEEN THE

CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL CONDITIONS

DATA PROVIDED BY UCOR/DOE. IT IS THE CONSTRUCTION

THE ACCURACY OF THE GRADES IS DEPENDENT ON THE

PROPOSED CONTOURS ARE SHOWN AT 1-FT. INTERVALS.

ON THESE DRAWINGS ARE FINISHED GRADE. EXISTING AND

UNLESS NOTED OTHERWISE, THE PROPOSED GRADES SHOWN1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

EXPOSURE UNIT AREA BOUNDARY

REMEDIATION AREA BOUNDARY

AND LEGEND.

SEE SHEET C1E-700NHP-H745 FOR EROSION CONTROL NOTES

C1E-700NHP-H746

POINT NUMBER

-26749.54

-26504.64

-26502.94

-26499.22

-26755.84

-26808.30 -835.07

-1115.59

-1154.73

-945.88

-564.50

-599.27

CONTROL POINT COORDINATES

NORTHING EASTING

4N -26507.35 -447.58

ELEVATION

794.91

779.73

784.81

783.02

795.11

795.16

792.25

794.793N -26502.16 -1118.18

PHASE LINE

PHASE I & PHASE II

AND SEDIMENT CONTROL PLAN - STAGE 2

SITE GRADING AND EROSION PREVENTION

2 08/02/2022 CLARIFICATION OF ABANDONMENT/REMOVALS AC AG AC AG SB GS

3 10/06/2022

PRODUCE A CLEAN DRAWING SET FOR USACE TO START PROCUREMENT

REVISED CFC - REVISION CLOUDS AND TRIANGLES REMOVED TO

AC AG AC AG SB GS

10/06/2022

10IN

POST

12IN

FP

SQ

30IN

SN

POST

SQ

SN

MON

SN

FF. EL. 787.93

IRO

IRO

CHILLER

TRANS.

S Y

S T

E M

F

IR

E

TANK

DIESEL

TRANS.

AC

PAVEMENT CUT

GATE

GATE

GRAVEL

K-1652

A B

A N

CONCRETE

STOP SN

CONCRETE12" BRICK WALL

GRAVEL

GRAVEL

2ND FLOOR 801.83

1ST FLOOR 788.50

T

CP-6

NAIL

PK

CP-4

PK

CP-3

CP-2

PK

CP-1

NAIL

CP-5

PK

UGE

UGE

UGE

U G

E

UGE

U G E

U G

E

UGE

UGE

UGE

UGE

UGE

O H

OH

UGTUGT UGT UGT UGT UGT UGT UGT UGT UGT

U G

T

UGT

UGT

UGT

U G T

F O

C F

O C

F O

C F

O C

UGT UGT

OH

UGE UGE

U G

E U

G E

UGE

OH

U G

E U

G E

U G

E U

G E

UGE UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

OH

ENRICHMENT ST.(7TH ST.)

(A V

E

"J

M E

R

IT

U S

A V

E

RAD. BOUNDARY

PP

K-1028-72

PORTAL #11

PP

PP

OH

O H

OH

SIDEWALK

W

2"

W

K-25 HISTORY CENTER

SD

SD

S D

RD

R D

R D

SD

FFE 801.83

2"

K-25 FOOTPRINT

K-25 FOOTPRINT

K-601 SLAB

FORMER

PCB AREA 1

REMEDIATED

PCB AREA 2

REMEDIATED

U-234 AREA 1

REMEDIATED

AREA 2

U-234

REMEDIATED

REMEDIATED Tc-99 AREA

T c

E A

Z2-23

Z2-22

K-1650

SS

A

B A

N

SS 8" SS

8"

S S

S S

S S

SS

FORMER FOOTPRINT

G A

T E

GATE

GATE

G A

T E

G A

T E

(TYP 7)

BOLLARD

(TYP 2)

BOLLARD

U G

T U

G T

U G

T U

G T

U G

T

G A

T E

GATE

LANDSCAPE PLANTER

LANDSCAPE PLANTER

ASPHALT PAVEMENT

CONCRETE

ASPHALT

CONCRETE

GRAVEL

GRAVEL

GRAVEL

CONCRETE

S D

R

C P

S D

R

C P

S D

SD

R

C P

S D

R

C P

S D

A S

P H

A L

T

PK NAIL

CP-4N

LANDSCAPE PLANTER

PK NAIL

CP-3N

ASPHALT

O H E

O H

E

EXCAVATION WALL

KNOXVILLE, TN 37932

10330 HARDIN VALLEY ROAD

SUITE 201

OFFICE: 865.690.6419

www.fulghummacindoe.com

CIVIL ENGINEER:

FMA PROJECT: 414.011

UCOR

PROJECT NAME:

SITE CLASS

TYPE REV

RPE

DRAWING REVISIONS

SCALE:LE DRAWING NUMBER

BUILDING

ELECTRONIC SIGNATURES

PROFESSIONAL SEAL

TITLE:

CAD FILENAME

CD

U

ORG/

ENGR

ENGR

CHK

PROJ

ENGR

KAREA ETTP

PROJECT RECORD NUMBER:

ESF/DWG/X

AS SHOWN

CONFIGURATION MANAGEMENT LEVEL

DE-SC-0004645

an AECOM-led partnership with Jacobs

MANAGED FOR THE DEPARTMENT OF ENERGY

UNDER CONTRACT NUMBER DE-SC-0004645

OAK RIDGE TN 37830

OAK RIDGE RESERVATION

ARCHITECTSSMEE + BUSBY

Knoxville, TN 37902

DRW

BY

19008

SITE IMPROVEMENT K-25

SB GS

QA

03/31/2022 AC AG AC AGCFC SUBMITTAL

04/26/2022 PHASING REVISION AC AG AC AG SB GS

DATEREV.

DESCRIPTION

TYP

INLET PROTECTION,

TYP

SILT FENCE,

VPB SITE CONSTRUCTION

APPROXIMATE LIMITS OF

TYP

RIPRAP APRON,

AREA

CONCRETE WASHOUT

H748 H746

H746 H748

H749 H746

H749 H746

VPB SITE CONSTRUCTION

APPROXIMATE LIMITS OF

W6" 6" W

S D

SS

W2"

R D

SD

S D

SD

S D

R D

PIV

S D

SD S

D

U G E

U G C

UGC

UGC

UGC

UGE

U G

E

UGE

UGE

SD

SD

SS

S D

S D

S D

SD

SD

SD

GG

G

FDC

SD

S D

SD

794.8794.8

795.46

795.46

795.46

795.46

795.46

795.25 795.25

795.22

795.22

793.5

795.00

794.88

793.0

793.8

794.70

795.35

794.85794.85

794.5

794.80

794.70

794.78

794.80794.80

794.8

794.80

794.0

794.2

793.8

795.35

794.0

794.9

794.80

794.68794.68

794.3

794.2794.2

794.2

794.8

794.6

795.35

794.5 795.24

794.40

794.64 794.40

794.10

794.30

794.50

794.5

795.00

794.5

794.90

794.94

794.94

794.50

794.70

794.75 794.95

794.15

794.50

FOR CONTINUATION

REFERENCE SHEET H851

PHASE I

PHASE II

PHASE I

PHASE II

PHASE II

PHASE IIBUILDING

VIEWING PLATFORM

FFE 795.50

K-25 GRID NORTH

30 60

SCALE: 1" = 30'

LEGEND:

PROPERTY LINE

TYPICALTYP

ELEV. 794.91

E -1,154.73

N -26,499.22

CP-PK

BENCHMARK: CP-4

STORM PIPE NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

SS

W

PROPOSED SANITARY SEWER

PROPOSED WATER LINE

SD PROPOSED STORM DRAIN

PROPOSED AREA DRAIN

PROPOSED WATER METER

PROPOSED SANITARY SEWER CLEANOUT

CO

9.

UTILITY NOTES:

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

1.

2.

3.

4.

5.

6.

7.

8.

9.

20.

21.

22.

23.

24.

25.

INSTALLATION AND INSPECTION.

REFERENCE SPECIFICATION #331100 AND #333100 FOR PIPING

EXCAVATION AND RESTORATION TO MAKE ANY UTILITY CONNECTIONS.

THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL MATERIALS,

ALL UTILITY CONNECTIONS ARE TO BE PERFORMED BY THE UTILITIES.

SHALL BE SDR 26 PVC.

UNLESS OTHERWISE NOTED, ALL GRAVITY SANITARY SEWER LINES

SERVICE LINES, VALVES, AND WATER METERS.

DETERMINE ACTUAL FIELD LOCATION OF WATER SERVICE TAPS,

CONTRACTOR TO COORDINATE WITH THE UTILITY OWNER TO

LOCATION ONLY. PRIOR TO INSTALLATION, CONSTRUCTION

WATER SERVICES SHOWN ON THESE DRAWINGS ARE FOR GENERAL

AND PROPOSED UNDERGROUND LINES AND OBSTRUCTIONS.

INSTALL FITTINGS AS NEEDED TO AVOID CONFLICTS WITH EXISTING

UCOR/DOE APPROVED EQUAL.

SHALL BE RESTRAINED USING CONCRETE THRUST BLOCKING OR

ALL MECHANICAL JOINT FITTINGS FOR WATER LINES 4" OR GREATER

INSTALL SERVICE LATERALS ACROSS STREETS BEFORE PAVING STREETS.

AND APPROVED AND BEFORE ANY PAVEMENT IS INSTALLED.

UTILITIES SHALL BE INSTALLED AFTER GRADING IS COMPLETED

COMPLIANCE WITH THE PIPE MANUFACTURER'S RECOMMENDATIONS.

THE STONE BEDDING AND BACKFILL SHALL BE PLACED IN STRICT

DAYS PRIOR TO BACKFILL.

GOVERNMENT. CONTACT GOVERNMENT AT LEAST THREE (3) WORKING

ALL UNDERGROUND UTILITIES INSTALLATION WILL BE INSPECTED BY

EXCAVATIONS, LATEST REVISION.WITH OSHA 29 CFR 1926 SUBPART P,

TRENCH SHORING PROTECTION AND ENTRY SHALL BE IN ACCORDANCE

CONFORM WITH ALL APPLICABLE LOCAL, STATE, AND OSHA REGULATIONS.

THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND SHALL

TRENCH DESIGN AND SAFETY FOR PIPELINE CONSTRUCTION IS SOLELY

TO WORK OVER AND AROUND THE UTILITIES.

OF THIS PROJECT. FURNISH ANY SPECIAL EQUIPMENT REQUIRED

THE EXISTING UTILITIES FROM DAMAGE DURING THE CONSTRUCTION

PROVIDE ALL NECESSARY PROTECTIVE MEASURES TO SAFEGUARD

THE UTILITY COMPANIES INVOLVED.

DETERMINED IN THE FIELD BY POTHOLING AND BY CONTACTING

DRAWINGS ARE APPROXIMATE. THE EXACT LOCATIONS SHALL BE

THE LOCATIONS OF THE EXISTING UTILITIES SHOWN ON THESE

AND SANITARY SEWER MAINS.

TENNESSEE MUNICIPAL UTILITY LICENSE FOR CONSTRUCTION OF WATER

CONSTRUCTION CONTRACTOR MUST HAVE A VALID STATE OF

THE GOVERNMENT'S FIELD CONSTRUCTION REPRESENTATIVE.

HAND DIGGING OR SOME OTHER METHOD WHICH IS ACCEPTABLE TO

UTILITIES WHICH ARE TO REMAIN SHALL BE ACCOMPLISHED THROUGH

EXCAVATION WITHIN 2'-0" OF THE CENTERLINE OF ANY EXISTING

WORK.

CONSTRUCTION CONTRACTOR FROM EXERCISING CAUTION DURING SITE

ARE PROVIDED AS INFORMATION ONLY AND DOES NOT RELIEVE THE

LOCATED AND MARKED. THE EXCAVATION PERMIT AND UTILITY LOCATES

SHALL ARRANGE TO HAVE THE SUBSURFACE UTILITIES AND STRUCTURES

REVIEW THE EXCAVATION PERMIT. THE CONSTRUCTION CONTRACTOR

THE PLANS AND ACTUAL CONDITIONS TO THE GOVERNMENT IMMEDIATELY.

ALL CONDITIONS IN THE FIELD AND REPORT DISCREPANCIES BETWEEN

IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO VERIFY

PIPE INSTALLATION. COORDINATE WITH GOVERNMENT.

TO SUPPORT THE EXISTING ELECTRIC DUCT BANK DURING STORM

CONSTRUCTION CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS

SPECIFICATIONS.

PIPING AND INSTALLED IN ACCORDANCE WITH THE PROJECT

TRACER WIRE SHALL BE PROVIDED ALONG ALL UNDERGROUND

ALL REQUIREMENTS OF THE PERMIT.

PRIOR TO EXCAVATION. CONSTRUCTION CONTRACTOR SHALL FOLLOW

EXCAVATION PENETRATION PERMIT SHALL BE ISSUED BY UCOR/DOE

MATERIALS, COUPLINGS, AND BACKFILL.

SHORING, FURNISHING AND INSTALLATION OF PIPES, JOINT

COMPLETE SYSTEM AS SHOWN. INSTALLATION INCLUDES EXCAVATION,

INSTALL THE NECESSARY QUANTITY OF PIPE TO CONSTRUCT THE

VARY. THE CONSTRUCTION CONTRACTOR SHALL SUPPLY AND

DEDUCTIONS FOR STRUCTURES). ACTUAL QUANTITY OF PIPE MAY

FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE (NO

CLASS, SHAPE AND SIZE, AS MEASURED ALONG THE CENTERLINE

LENGTH COMPLETE IN PLACE REGARDLESS OF TYPE, DEPTH,

PIPE/CULVERTS ARE MEASURED IN TERMS OF HORIZONTAL

CONTRACTOR'S EXPENSE.

MISALIGNMENT SHALL BE REPLACED AT THE CONSTRUCTION

PIPE WITH DEFLECTION 5% OR GREATER OR WITH UNDUE

OTHER APPROVED METHOD.

PLACING THE BASE. TEST DEFLECTION WITH A MANDREL OR

BACKFILLING & COMPACTION ARE COMPLETE & PRIOR TO

PIPE DEFLECTION AND ALIGNMENT SHALL BE CHECKED AFTER

A REMOVABLE, PROTECTIVE WRAP BY THE MANUFACTURER.

BE MADE OF POLYISOPRENE AND INSTALLED AND COVERED WITH

MEETING ALL AASHTO AND ASTM REQUIREMENTS. JOINTS SHALL

HDPE PIPE SHALL BE INSTALLED WITH WATERTIGHT (WT) JOINTS

OR EQUAL.

DENSITY POLYETHYLENE PIPE IN ACCORDANCE WITH AASHTO M294

CLASS III REINFORCED CONCRETE PIPE OR SMOOTH INTERIOR HIGH

UNLESS NOTED OTHERWISE, STORM SEWER PIPE SHALL BE EITHER

LOCAL, STATE, AND OSHA REGULATIONS.CONFORM WITH ALL APPLICABLE

THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND SHALL

TRENCH DESIGN AND SAFETY FOR PIPELINE CONSTRUCTION IS SOLELY

THE TENNESSEE DEPARTMENT OF TRANSPORTATION SPECIFICATIONS.

THE MATERIALS, EQUIPMENT, AND CONSTRUCTION REQUIREMENTS OF

INSTALL STORM SEWER PIPING AND APPURTENANCES TO MEET

THE PLANS AND ACTUAL CONDITIONS TO THE GOVERNMENT IMMEDIATELY.

ALL CONDITIONS IN THE FIELD AND REPORT DISCREPANCIES BETWEEN

IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO VERIFY

26.

27.

APPROXIMATE LIMITS OF VP SITE CONSTRUCTION

CONSTRUCTION.

WITH BUILDING PLUMBING CONSTRUCTION CONTRACTOR PRIOR TO

TO COORDINATE FINAL LOCATIONS AND ELEVATIONS OF CONNECTIONS

THE PROPOSED BUILDING. SITE UTILITIES CONSTRUCTION CONTRACTOR

SITE UTILITIES SHALL EXTEND TO WITHIN 5 FEET OF THE EXTERIOR OF

HEATED, AND LOCKABLE.

EXTERIOR BACKFLOW PREVENTER ENCLOSURE SHALL BE INSULATED,

PRIOR TO CONSTRUCTION.

APPROVED VENDOR. UCOR/DOE TO APPROVE DESIGN AND DETAILS

OF REMOTE FILL STATION PORTS WITH GOVERNMENT AND UCOR/DOE

CONSTRUCTION CONTRACTOR SHALL COORDINATE DESIGN AND INSTALLATION

REFER TO SECTION 22 10 05 - PLUMBING PIPING.

REFERENCE DEMOLITION PLAN FOR UTILITY DISCONNECTS.

AND AUTHORIZATION ISSUED BY UCOR/DOE PRIOR TO EXCAVATION.

EXCAVATION PENETRATION PERMIT REQUIREMENTS TO BE FOLLOWED

EXISTING UTILITIES WITH UCOR/DOE PRIOR TO CONSTRUCTION.

CONSTRUCTION CONTRACTOR TO VERIFY OPERATIONAL STATUS OF

REPORTING.

METERING FOR ALL UTILITIES TO MEET UCOR/DOE STANDARDS FOR

THE HIGHEST LINE WITHIN THE EXCAVATED TRENCH.

LINES CROSS LESS THAN 18" VERTICALLY, THE WATER LINE SHALL BE

SANITARY OR STORM SEWERS. WHERE WATER AND SANITARY SEWER

SEPARATION SHALL BE MAINTAINED BETWEEN POTABLE WATER AND

EXCAVATION TRENCH. A MINIMUM OF 10 FEET CLEAR HORIZONTAL

STORM SEWER LINES SHALL NOT BE LAID PARALLEL WITHIN THE SAME

DEGREE ANGLE (WHERE POSSIBLE). POTABLE WATER AND SANITARY OR

FIRST LINE. THE CROSSING SHALL BE AT NOT LESS THAN A 4

LENGTH OF PIPE INSTALLED WITH ITS MIDPOINT LOCATED OVER THE

VERTICALLY WITHIN 18", THE LINE LAID LAST SHALL HAVE A FULL

WHERE WATER AND SANITARY OR STORM WATER HORIZONTALLY CROSS

SPECIFICATIONS.

PIPING AND INSTALLED IN ACCORDANCE WITH THE PROJECT

TRACER WIRE SHALL BE PROVIDED ALONG ALL UNDERGROUND

TOP OF ALL UNDERGROUND UTILITIES UNLESS NOTED OTHERWISE.

CONSTRUCTION CONTRACTOR SHALL MAINTAIN 30" MINIMUM COVER OVER

C1E-700NHP-H747

10.

28.

G PROPOSED GAS SERVICE

PROPOSED GAS METER

SITE UTILITIES PLAN - PHASE I

STORM DRAINAGE AND2 08/02/2022 CLARIFICATION OF ABANDONMENT/REMOVALS AC AG AC AG SB GS

10/06/2022

PRODUCE A CLEAN DRAWING SET FOR USACE TO START PROCUREMENT

REVISED CFC - REVISION CLOUDS AND TRIANGLES REMOVED TO

10/06/20223 AC AG AC AG SB GS

11.

10IN

POST

12IN

FP

LP

SQ

CO

CO

CO

WV

WV

LP

WM WV

30IN

SN

POST

PP

SQ

PTP

PTP

WV

FH

WV

WV

PTLP

SN

MON

WV

WV

WV

WV

WV

SN

WM

WV

WV

WM

WV

CO

PTPLP

FF. EL. 787.93

GM

GV

IE-770.20,OUT

TC-781.10

SAMH

IRO

IRO

IE-775.80

TC-794.30

AREA DRAIN

PIV

LP

SP

LP

TC-782.12

PMH

TC-782.34

PMH

TC-782.04

PMH

IE-786.61

TC-793.48

AREA DRAIN

TC-794.21

TMH

TC-788.51

PMH

GATE

GATE

TC-793.54

TMH

TC-779.56

TMH

TC-780.24

TMH

TC-794.93

PMH

TC-794.94

WATER MH

K-1652

TC-779.67

AREA DRAIN

IE

.2

IE

-7

.7

IE-774.07

12" STP

P R

C P

IE-776.84

6" STP

IE-775.44,OUT

TC-779.84

AREA DRAIN

TC-778.76

AREA DRAIN

IE

-7

.8

IE

-7

.9

IE-774.76

8" RCP

TC-779.04

AREA DRAIN

8" RCP

IE-775.64

IE

-7

.8

IE

-7

.9

TC-778.73

AREA DRAIN

IE

-7

.9

IE

-7

.9

R

C P

IE-775.33IE-771.93

8" RCP12" RCP

10" RCP

IE-784.76,OUT(6"STP)

TC-787.21

AREA DRAIN

IE-782.31

IE-782.51,IN(8"PVC)

TC-788.11

STMH

8" P

VC

IE-783.168" STP

S

T P

IE-783.06,OUT(8"PVC)

IE-784.66,IN(8"STP)

TC-787.46

AREA DRAIN

TC-786.46

AREA DRAIN

IE-783.81

8" RCP

IE

.0

S

T P

IE

.0

" S

T P

TC-785.33

STMH

IE-781.93 IE

.0

P

IE

-7

.6

IE

-7

.5

R

C P

R

C P

IE

-7

.4

P

IE

.3

12" VCP

IE

.3

IE-791.75

6" STP

P

IE-7

6.2

" P

V C

6"

IE-770.30

IE

.2

IE-789.93,IN(4")

IE-789.43,IN(6")

TC-787.43

SAMH

IE-FULL OF DEBRIS

IE-780.76 IE-780.81

IE

.4

8"

IE-780.36

IE

-7

.1

IE

.1

IE-GREATER THAN 25'

TC-793.99

SAMH

TC-793.76

ABANDONED

SAMH

P

V C

IE

1.6

A B

A N

IE

-7

.4

IE

-7

.5

V

C P

I E

.2

IE-790.45

12" VCP

TC-793.09

AREA DRAIN

IE

.4

IE-782.07

IE

-7

.1

CONCRETE

CONCRETE

GRAVEL

OVERHEAD PIPE

GRAVEL

2ND FLOOR 801.83

1ST FLOOR 788.50

CHILLED WATER

C H

IL

L

E D

W A

T E

R

C H

IL

L

E D

W A

T E

R

C H

IL

L

E D

W A

T E

R

C H

IL

L

E D

W A

T E

R

C H

IL

L

E D

W A

T E

R

C H

IL

L

E D

W A

T E

R

CHILLED WATER

8"

8" (ABAN)

8"

16"

FIRE WATER (ABAN)

FIRE WATER (ABAN)

F

T E

R

A

B A

N

F

T E

R

F

T E

R

10"

14"

10"

4" UG

E12

BURIED

AREA DRAIN

T

4-5" FIBER DUCTS

F I B

E R

D U

C T

S

4-3 1/2" FIBER DUCTS

4-3 1/2" FIBER DUCTS

1 1/2" CONDUIT

F

D

TOP OF PIPE-783.45

TC-789.05

CHILLED WATER VAULT

CHILLED WATER

CUT AND CAPPED

CAPPED

CUT AND

CAPPED

CUT AND

CAPPED

CUT AND

CUT AND CAPPED

A B

A N

D O

N D

E D

F

IR

E W

A T

E R

F

IR

E W

A T

E R

A

B A

N

D U

C T

S

F

I B

E R

D.B. 1365, PG. 36

HERITAGE CENTER, LLC

ED-8E

PROPERTY LINE

CITY OF OAK RIDGE

2-6" CW

T C

.4

S A

M H

CAPPED

CUT AND

CAPPED

CUT AND

3"

CAPPED

CUT AND

4" 4"

10" 10" 10"

6"

F

IR

E W

A T

E R

UGE

UGE

UGE

U G

E

UGE

U G E

U G

E

UGE

UGE

UGE

UGE

UGE

O H

OH

UGTUGT UGT UGT UGT UGT UGT UGT UGT UGT

U G

T

UGT

UGT

UGT

U G T

F O

C F

O C

F O

C F

O C

UGT UGT

OH

UGE UGE

U G

E U

G E

UGE

OH

U G

E U

G E

U G

E U

G E

UGE UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

OH

ENRICHMENT ST.(7TH ST.)

(A V

E

"J

M E

R

IT

U S

A V

E

TC-794.83

PMH

RAD. BOUNDARY

PP

NC

9L2

7L1

7L3 7K1

PIV

FH

K8X

PP

E10

K-1028-72

PORTAL #11

PP

PP

OH

O H

OH

CHILLED WATER ABAND.

WV

WM

PREVENTER

BACKFLOW

SIDEWALK

STRUCTURE

ABAND.

W

2"

W

K-25 HISTORY CENTER

SAMH

AREA DRAIN

TC-793.70

AREA DRAIN

SD

SD

S D

RD

R D

R D

SD

TC 794.08

AREA DRAIN

TC 794.27

SAMH

TC 794.21

AREA DRAIN TC 794.97

SAMH

TC 795.17

PMH

TC 794.33

TMH

FFE 801.83

2"

U

G U

G

4" UG (ABAN)

4" UG (ABAN)

4" UG

A

B A

N

B

A N

A

B A

N

A

B A

N

UG (ABAN)UG (ABAN)UG (ABAN) UG (ABAN)

U G

(A

B A N

A

B A

N

U

G

A B

A N

K-25 FOOTPRINT

K-25 FOOTPRINT

PCB AREA 1

REMEDIATED

PCB AREA 2

REMEDIATED

U-234 AREA 1

REMEDIATED

AREA 2

U-234

REMEDIATED

REMEDIATED Tc-99 AREA

T c

E A

Z2-23

Z2-22

R

C P

EI -790.44

TC-795.08

AREA DRAIN

EI -791.00

TC-794.40

AREA DRAIN

EI -790.11

EI -790.21

TC-794.86

AREA DRAIN

EI -789.00

TC-793.93

AREA DRAIN

TC-793.35

AREA DRAIN

TC-793.12

AREA DRAIN

K-1650

TC-794.95

SAMH

SS

A

B A

N

SS 8" SS

8"

S S

S S

S S

SS

WV

FH

WV

PTP

PP

GP

LPLPLPTP

TP

WV

TP

WV

PIV

GV

WV

G A

T E

GATE

GATE

G A

T E

G A

T E

FH

WV

WV FH

GVPIVGV

WM

WM

SPIGOT

(TYP 7)

BOLLARD

EJB

(TYP 2)

BOLLARD

WV

FH

PIV

U G

T U

G T

U G

T U

G T

U G

T

G A

T E

GATE

TC-793.45

AREA DRAIN

TC-793.28

AREA DRAIN

ASPHALT

CONCRETE

GRAVEL

GRAVEL

GRAVEL

S D

R

C P

S D

R

C P

S D

R

C P

S D

R

C P

S D

A S

P H

A L

T

T C

.1

A R

A

IN

TC-794.54

AREA DRAIN

TC-795.07

ABANDONED

SAMH

TC-793.25

AREA DRAIN

TC-779.86

SAMH

TC-793.64

AREA DRAIN

TC-793.21

AREA DRAIN

TC-793.30

AREA DRAIN

TC-793.44

AREA DRAIN

VAULT

ELECTRIC

ASPHALT

O H E

O H

E

KNOXVILLE,…