This solicitation is for a firm fixed price construction contract for electrical work at the Old Hickory Power Plant in Hendersonville, Tennessee. The project scope includes installing two generator step-up transformers, extending the switchyard ground grid, furnishing and installing 15kV cables and transition enclosures, and associated electrical connections and conduit. Optional items include replacing distribution transformers and switchyard equipment. The pre-bid document contains project details, instructions for accessing plans and specifications, and security forms for the secured documents. Responses are due within 120 days of notice to proceed, with award dates to be determined. Pricing will be on a firm fixed price basis by line item numbers. The soliciting agency is the Army Corps of Engineers Nashville District.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSU Transformer Installation Old Hickory Lock and Dam W912P522R0008 Amendment 0002 Hendersonville, Tennessee
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00 GENERAL REQUIREMENTS
01 11 10.00 26 STATEMENT OF WORK
01 22 00.00 26 MEASUREMENT AND PAYMENT
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 50 PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 95 00 FORMS AND ATTACHMENTS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00.00 26 DEMOLITION
02 61 23 REMOVAL AND DISPOSAL OF PCB CONTAMINATED SOILS
02 82 00 ASBESTOS ABATEMENT WORK
02 84 00 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DI VI SI ON 03 - CONCRETE
03 30 53.00 26 CAST-IN-PLACE CONCRETE AND FOUNDATIONS
03 42 13 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
03 60 00.01 26 CONCRETE DEMOLITION AND REPAIR OF CONCRETE SURFACES
DI VI SI ON 05 - METALS
05 05 23.17 26 WELDING (STEEL), FABRICATION, AND MACHINE WORK
05 50 04.00 26 METALS: MATERIALS, PRODUCTS, AND MISCELLANEOUS ITEMS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 00.00 26 PREFABRICATED FIRE WALL
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 26 ELECTRICAL EQUIPMENT AND WORK
26 05 13.00 26 MEDIUM-VOLTAGE CABLE
26 05 19.00 26 INSULATED WIRE AND CABLE
26 05 26.00 26 GROUNDING AND GROUND TESTING
26 05 36.00 26 CABLE TRAYS FOR ELECTRICAL SYSTEMS
26 08 01.00 26 SYSTEMS TESTING AND COMMISSIONING
26 12 19.00 40 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS
(OPTION 1)
26 28 00.00 26 PANELBOARDS (OPTION 2)
DI VI SI ON 27 - COMMUNI CATI ONS
27 21 10.00 40 FIBER OPTIC DATA TRANSMISSION SYSTEM
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19.13 GEOTEXTILES FOR EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 23.01 26 QUENCH ROCK
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DI VI SI ON 33 - UTI LI TI ES
33 00 00.01 26 SWITCHYARD CIVIL STRUCTURES
33 71 01.10 26 HIGH VOLTAGE BARE SWITCHYARD CONDUCTOR
33 75 10.00 26 HIGH VOLTAGE GROUP-OPERATED DISCONNECT SWITCHES AND
GROUNDING SWITCHES (OPTION 3)
DI VI SI ON 44 - POLLUTI ON AND WASTE CONTROL EQUI PMENT
44 42 52.00 26 OIL-STORM WATER PROCESSING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 26
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.2 MEASUREMENT
1.3 PAYMENT
1.4 RETAINAGE OF PAYMENT
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 22 00.00 26 Page 1
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 22 00.00 26 Page 2
SECTION 01 22 00.00 26
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 GENERAL INFORMATION
In each instance, the contract price for a contract line item number (CLIN) will constitute full compensation as herein specified, as shown, or as otherwise approved. The contract price and payment will also constitute full compensation for all work incidental to completion of the CLIN, unless such work is otherwise specifically mentioned for separate payment under another CLIN. In the event any work is required by the specification sections or by the drawings and not specifically mentioned in the measurement and payment paragraphs separate or direct payment will not be made. All costs are therefore incidental to, and included in, the contract prices and payment for all CLINs listed in the price schedule.
1.2 MEASUREMENT
CLINs measured as a per job will be measured for payment as a complete job in the locations indicated. This measurement includes all incidental work and materials such as fasteners, electrical materials, and O&M manuals that are necessary to make a complete job. Unless the CLIN paragraph makes a specific exception of any item, incidental items will not be measured under any other CLIN, even though there is another listing for the work or material.
1.3 PAYMENT
Payment for all work specified, shown, or incidental to complete the work will be made as follows:
CLIN 0001 Mobilization and Demobilization
Payment will be made on a per job basis under CLIN 0001. Payment shall be made for all costs incurred prior to arriving onsite (mobilization) or immediately after departing the work site (demobilization). These costs include, but are not limited to, all preparatory work at the contractors shop, labor costs associated with travel to and from the work site, and transportation costs.
CLIN 0002 Remove and Dispose of Existing Transformers and Associated Components, Oil, Protective Screens and Takeoff Towers
Payment will be made on a per job basis under CLIN 0002. Payment shall be made for all materials, labor, and equipment needed to remove and dispose of the existing transformers and associated components, oil, protective screens and takeoff towers. This includes transformer rails and deluge system components.
CLIN 0003 Remove and Dispose of Existing 15kV cables and Associated Components.
Payment will be made on a per job basis under CLIN 0003. Payment shall be made for all materials, labor, and equipment needed to
SECTION 01 22 00.00 26 Page 3 remove and dispose of the existing 15kV cables, potheads, cable supports and all other associated components.
CLIN 0004 Transformer Rail Removal and Concrete Placement
Payment will be made on a per job basis under CLIN 0004.
Payment shall constitute full compensation for all plant, labor, materials, equipment and for performing all operations necessary for Transformer Rail Removal and Concrete Placement in the lower transformer area as specified in Section 03 30 53 CAST-IN-PLACE CONCRETE and indicated on the drawings. No separate payment will be made for stockpiling and disposition of removed materials. All costs in connection therewith will be considered as a subsidiary obligation of the contractor.
CLIN 0005 Security Fence
Payment will be made on a per job basis under CLIN 0005.
Payment for Fences and Gates acceptably placed, as specified in Section 32 31 13 CHAIN LINK FENCES AND GATES, will be made at the applicable contract unit price of job. Price and payment shall constitute full compensation for furnishing, hauling, handling, and placing until final acceptance by the Government. No additional payment will be made for clearing.
CLIN 0006 Stripping and Grading
Payment will be made on a per job basis under CLIN 0006. Payment shall constitute full compensation for all plant, labor, materials, equipment, and for performing all operations necessary for Stripping and Grading in the GSU area as specified in Section 31 00 00 - EARTHWORK and indicated in the drawings. No separate payment will be made for stockpiling and disposition of stripped materials. All costs in connection therewith will be considered as a subsidiary obligation of the Contractor. If regrowth of vegetation or trees occurs after stripping and before placement of fill, the Contractor is required to strip again prior to construction at no cost to the government.
CLIN 0007 Aggregate Work
Payment will be made on a per job basis under CLIN 0007.
Payment for Aggregate Fill (Crushed Stone and Shot Rock) acceptably placed, as specified in Section 32 11 23 AGGREGATE BASE COURSES. Price and payment shall constitute full compensation for furnishing, hauling, handling, placing, and maintaining the aggregate until final acceptance by the Government. No payment will be made for excess aggregate left in place. Existing stone placed in lieu of new stone from off-site sources will be excluded from measurement and payment.
CLIN 0008 Design of the Oil Containment and Transformer Pad
Payment will be made on a per job basis under CLIN 0008.
Payment for Design of the Oil Containment and Transformer Pad as specified in Section 33 00 00.01 26 SWITCHYARD CIVIL STRUCTURES and indicated on the drawings. Price and payment shall constitute full compensation for designing and furnishing plans and
SECTION 01 22 00.00 26 Page 4 calculations.
CLIN 0009 Seeding and Mulching
Payment will be made on a per job basis under CLIN 0009. Payment will cover all costs associated with seeding, mulching, incorporating, protecting, and maintaining. This price shall constitute full compensation for furnishing all plants, labor, equipment, materials, and performing all operations necessary for placing and maintaining seed and mulch as specified in Section 32 92 19 - SEEDING. No payment for seeding and mulching will be made until acceptance by the Contracting Officer or his/her representative. Payment will be made for costs associated with satisfactory performance of seeding.
CLIN 0010 Extend Switchyard Ground Grid
Payment will be made on a per job basis under CLIN 0010. Payment shall be made for all materials, labor, and equipment needed to extend existing switchyard ground grid on the North side of the switchyard.
CLIN 0011 Install Oil Containment and Transformer Pad
Payment will be made on a per job basis under CLIN 0011. Payment shall be made for all materials, labor, and equipment needed to install the oil containment and transformer pad. This includes concrete containment, foundations within containment, quenching stone, piping, valves, along with incidental components.
CLIN 0012 Furnish and Install Takeoff Tower
Payment will be made on a per job basis under CLIN 0012. Payment shall be made for all materials, labor, and equipment needed to furnish and install the transformer takeoff tower. This includes the concrete foundation, tower, anchorage, along with any incidental items required to install the takeoff towers.
CLIN 0013 Furnish and Install 15kV Cable Precast Concrete Trench
Payment will be made on a linear foot basis under CLIN 0013.
Payment will be made for costs associated with operations necessary for procurement and installation of the precast concrete trenches with interior measurements of 24" X 24" as shown on drawing S-101 "Proposed Layout, Trench Details". Payment shall include, but is not limited to costs associated necessary survey work, as well as adhesives or gaskets needed to connect the sections.
Measurement: The total quantity of measured lengths of the specified trenches for which payment shall be made is as shown on the drawings.
CLIN 0014 Install 15kV Precast Concrete Trench (Government Furnished Equipment)
Payment will be made on a per job basis under CLIN 0014. Payment shall be made for costs associated with operations necessary for procurement and installation of the precast concrete trenches with interior measurements of 24" X 24" as shown on drawing S-101
SECTION 01 22 00.00 26 Page 5
"Proposed Layout, Trench Details". Payment shall include, but is not limited to costs associated necessary survey work, as well as adhesives or gaskets needed to connect the sections.
Measurement: The total quantity of measured lengths of the specified trenches for which payment shall be made is as shown on the drawings.
CLIN 0015 Furnish and Install 750 Kcmil, triplexed, 15kV Cables , Protective Screens and Transition Enclosures.
Payment will be made on a per job basis under CLIN 0015. Payment shall be made for all materials, labor, and equipment needed to furnish and install the new 15kV cable, the projective screens and the cable transition enclosures to the precast concrete trench. This includes the new 15kV cable from the pothead cubicle to the new transformer location, 15kV cable terminations, pothead enclosure modification, transition enclosures to the duct bank system.
CLIN 0016 Furnish and Install 15kV Bus and Associated Structures
Payment will be made on a per job basis under CLIN 0016. Payment shall be made for all materials, labor, and equipment needed to furnish and install the new 15kV aluminum bus system and the supporting structures
CLIN 0017 Make External Connections Between New Transformers and New and Existing Equipment
Payment will be made on a per job basis under CLIN 0017. Payment shall be made for all materials, labor, and equipment needed to furnish and install the new power, control and annunciation cables and conduits, HV line, and make connections to the LV and HV transformer bushings. This also includes the installation of new feeders for the new switchyard lighting.
CLIN 0018 Furnish and Install Neutral Grounding Reactors
Payment will be made on a per job basis under CLIN 0018. Payment shall be made for all materials, labor, and equipment needed to furnish and install the new neutral grounding reactors and connection to the transformer neutral bushing.
CLIN 0019 Furnish and Install Metering CTs
Payment will be made on a per job basis under CLIN 0019. Payment shall be made for all materials, labor, and equipment needed to furnish and install the new new metering CTs and cables for connection to the powerhouse meters.
CLIN 0020 4" Perforated Corrugated Pipe
Payment will be made on a linear foot basis under CLIN 0020.
Payment will be made for the 217 linear feet of 4" perforated corrugated pipe shown on the package drawings. Payment shall include, but is not limited to necessary fittings, filter fabric, survey work, and connections as indicated on the drawings.
Measurement: Quantity of 4" perforated corrugated pipe shall be measured by the linear foot from the package drawings.
SECTION 01 22 00.00 26 Page 6
15kV cable minimum amperage is 627/phase. Calculated fault current is 41kA.
CLIN 0021 4" HDPE Drain Pipe
Payment will be made on a linear foot basis under CLIN 0021.
Payment will be made for 139 linear feet of 4" HDPE drain pipe shown on the package drawings. Payment shall include, but is not limited to necessary fittings, connections, survey work and drilling efforts as indicated on the drawings.
Measurement: Quantity of 4" HDPE drain pipe shall be measured by the linear foot from the package drawings.
CLIN 0022 Pipe Supports for Existing Oil Lines
Payment will be made on a per job basis under CLIN 0022. Payment shall include, but is not limited to costs associated with operations necessary for excavation, construction, and installation of the pipe supports as detailed on sheet S-103 "15kV Line Trench Layout and Details, Utility Relocations".
CLIN 0023 Rock Excavation
Payment will be made on a cubic yard basis under CLIN 0023.
Payment shall include, but is not limited to costs associated with excavation for the 15kV precast concrete trenches which includes performing required excavation loading and hauling and other operations incidental thereto, Contractor-furnished disposal area(s) and disposition of excess excavated material and unsuitable and frozen materials.
Measurement: The total quantity of excavated material for which payment will be made will be the theoretical quantity between the top of rock surface as determined by as-built records and the grade and slope of the theoretical cross sections indicated. No allowance will be made for over depth excavation or for the removal of any material outside the required slope lines unless authorized.
CLIN 0024 General Excavation Excluding Rock
Payment will be made on a cubic yard basis under CLIN 0024.
Payment shall include, but is not limited to costs associated with excavation for the 15kV precast concrete trenches which includes performing required excavation, loading and hauling and other operations incidental thereto, Contractor-furnished disposal area(s) and disposition of excess excavated material and unsuitable and frozen materials.
Measurement: The total quantity of excavated material for which payment will be made will be the theoretical quantity between the ground surface as determined by a survey and the grade and slope of the theoretical cross sections indicated. No allowance will be made for over depth excavation or for the removal of any material outside the required slope lines unless authorized.
CLIN 0025 6" SS Pipe Sleeve
Payment will be made on a linear foot basis under CLIN 0025.
Payment will be made for 15 linear feet of 6" stainless steel pipe
SECTION 01 22 00.00 26 Page 7 sleeve shown on the package drawings. Payment shall include, but is not limited to necessary fittings and connections as indicated on the drawings.
Measurement: Quantity of 6" stainless steel pipe sleeve shall be measured by the linear foot from the package drawings.
CLIN 0026 4" SS Pipe Sleeve
Payment will be made on a linear foot basis under CLIN 0026.
Payment will be made for 15 linear feet of 4" stainless steel pipe sleeve shown on the package drawings. Payment shall include, but is not limited to necessary fittings and connections as indicated on the drawings.
Measurement: Quantity of 4" stainless steel pipe sleeve shall be measured by the linear foot from the package drawings.
CLIN 0027 2" Galvanized Treated Water Line
Payment will be made on a linear foot basis under CLIN 0027.
Payment will be made for the total length of 2" galvanized treated water line as shown on the package drawings. Payment shall include, but is not limited to necessary fittings, connections, aggregate grading material, shoring, and aggregate back fill materials as indicated on the drawings.
Measurement: Quantity of 2" galvanized treated water line shall be measured by the linear foot from the package drawings.
CLIN 0028 4" Cast Iron Raw Water Line
Payment will be made on a linear foot basis under CLIN 0028.
Payment will be made for the total length of 4" cast iron raw water line as shown on the package drawings. Payment shall include, but is not limited to necessary fittings, connections, aggregate grading material, shoring, and aggregate fill materials as indicated on the drawings.
Measurement: Quantity of 4" cast iron raw water line shall be
CLIN 0029 Crushed Stone Leveling Course
Payment will be made on a cubic yard basis under CLIN 0029.
Payment will be made for costs associated with the crushed stone leveling course for the 15kV precast concrete trenches.
Measurement: The total quantity of crushed stone leveling course for which payment will be made will be the theoretical quantity between the top of rock surface as determined by as-built records and the bottom grade and slope required of the theoretical cross sections indicated.
CLIN 0030 Furnish Spare Parts
Payment will be made on a per job basis under CLIN 0030. Payment shall be made for all materials, labor, and equipment needed to furnish the spare parts listed in these specifications.
SECTION 01 22 00.00 26 Page 8
CLIN 0031 Commissioning Services and Training
Payment will be made on a per job basis under CLIN 0021. Payment shall be made for all materials, labor, and equipment needed to perform commissioning of installed equipment and training of project personnel.
CLIN 0032 Provide As-Built Drawings
Payment will be made on a per job basis under CLIN 0022. Payment shall be made for all materials, labor, and equipment needed to furnish as-built drawings of the installation.
CLIN 1001 (Option 1) Remove and Dispose of North Bank Distribution Transformers and Associated Equipment
Payment will be made on a per job basis under CLIN 1001. Payment shall be made for all materials, labor, and equipment needed to remove and dispose of the existing North Bank Transformers 1 & 2 and associated power and control cables and aluminum bus and structures.
CLIN 1002 (Option 1) Furnish and Install New 500kVA North Bank Distribution transformers
Payment will be made on a per job basis under CLIN 1002. Payment shall be made for all materials, labor, and equipment needed to furnish and install two new 500kVA distribution transformers.
CLIN 1003 (Option 1) Furnish and Install New 14.4 kV Load Disconnect Switch and Current Limiting Fuse.
Payment will be made on a per job basis under CLIN 1003. Payment shall be made for all materials, labor, and equipment needed to provide and install new load disconnect switch and current limiting fuse for the North bank transformers.
CLIN 1004 (Option 1) Furnish and Install 15kV Bus and Associated Structures
Payment will be made on a per job basis under CLIN 1004. Payment shall be made for all materials, labor, and equipment needed to furnish and install new 15kV bus and structures for the new North Bank Transformers.
CLIN 1005 (Option 1) Furnish and Install New Current Transformers and Potential transformers
Payment will be made on a per job basis under CLIN 1005. Payment shall be made for all materials, labor, and equipment needed to provide and install new current and potential transformers as shown on the contract drawings
CLIN 1006 (Option 1) Furnish and Install New 5kV Cables and Conduit to the Load.
Payment will be made on a per job basis under CLIN 1006. Payment shall be made for all materials, labor, and equipment needed to
SECTION 01 22 00.00 26 Page 9 provide and install new 5kV cables and conduit from the North Bank transformers to the load.
CLIN 1007 (Option 1) Commissioning Services and Training
Payment will be made on a per job basis under CLIN 1007. Payment shall be made for all materials, labor, and equipment needed to perform commissioning of installed equipment and training of project personnel.
CLIN 1008 (Option 1) Provide As-Built Drawings
Payment will be made on a per job basis under CLIN 1008. Payment shall be made for all materials, labor, and equipment needed to furnish as-built drawings of the installation.
CLIN 2001 (Option 2) Remove Existing Equipment in the Switchyard
Payment will be made on a per job basis under CLIN 2001. Payment shall be made for all materials, labor, and equipment needed to remove and dispose of the existing equipment in the switchyard, including water and sewer line and as shown on the contract drawings
CLIN 2002 (Option 2) Perform an Inventory of Switchyard Cable and Update the Design
Payment will be made on a per job basis under CLIN 2002. Payment shall be made for all materials, labor, and equipment needed to perform a comprehensive inventory of all existing switchyard cables and incorporate the differences in the design. This work shall be performed in accordance with the requirements of Section 26 00 00.00 26 ELECTRICAL EQUIPMENT AND WORK. Also includes preparation of drawings for approval in a submittal per Section
26 00 00.00 26 ELECTRICAL EQUIPMENT AND WORK.
CLIN 2003 (Option 2) Install Precast Concrete Transition Vaults (Government Furnished Equipment)
Payment will be made on a per job basis under CLIN 2003. Payment shall include, but is not limited to costs associated with operations necessary for installation of the precast concrete transition vaults shown on C-110 "Contract Option 2, Transition Vault Plan and Details", the L-Brackets specified on sheet C-110 "Contract Option 2, Transition Vault Plan and Details", survey efforts, and adhesives or gaskets.
CLIN 2004 (Option 2) General Excavation Excluding Rock
Payment will be made on a cubic yard basis under CLIN 2004.
Payment shall include, but is not limited to costs associated with excavation for the precast concrete trenches and transition vaults which includes performing required excavation, loading and hauling and other operations incidental thereto, Contractor-furnished disposal area(s) and disposition of excess excavated material and unsuitable and frozen materials.
Measurement: The total quantity of excavated material for which payment will be made will be the theoretical quantity between the ground surface as determined by a survey and the grade and slope
SECTION 01 22 00.00 26 Page 10 of the theoretical cross sections indicated. No allowance will be made for over depth excavation or for the removal of any material outside the required slope lines unless authorized.
CLIN 2005 (Option 2) Rock Excavation
Payment will be made on a cubic yard basis under CLIN 2005.
Payment shall include, but is not limited to costs associated with excavation for the precast concrete trenches and transition vaults which includes performing required excavation loading and hauling and other operations incidental thereto, Contractor-furnished disposal area(s) and disposition of excess excavated material and unsuitable and frozen materials.
Measurement: The total quantity of excavated material for which payment will be made will be the theoretical quantity between the top of rock surface as determined by as-built records and the grade and slope of the theoretical cross sections indicated. No allowance will be made for over depth excavation or for the removal of any material outside the required slope lines unless authorized.
CLIN 2006 (Option 2) Install 30" X 40" Precast Concrete Trench (Government Furnished Equipment)
Payment will be made on a linear foot basis under CLIN 2006.
Payment will be made for costs associated with operations necessary for installation of the precast concrete trenches with interior measurements of 30" X 40" as shown on drawing S-101 "Proposed Layout, Trench Details". Payment shall include, but is not limited to costs associated with necessary survey work, the adhesives or gaskets needed to connect the sections, and any necessary leveling course aggregate.
Measurement: The total quantity of measured lengths of the specified trenches for which payment shall be made is as shown on the drawings.
CLIN 2007 (Option 2) 4" HDPE Drain Pipe
Payment will be made on a linear foot basis under CLIN 2007.
Payment will be made for 242 linear feet of 4" HDPE drain pipe shown on the package drawings. Payment shall include, but is not limited to necessary fittings, connections, survey work and drilling efforts as indicated on the drawings.
Measurement: Quantity of 4" HDPE drain pipe shall be measured by the linear foot from the package drawings.
CLIN 2008 (Option 2)4" Perforated Corrugated Pipe
Payment will be made on a linear foot basis under CLIN 2008.
Payment will be made for 1166 linear feet of 4" perforated corrugated pipe shown on the package drawings. Payment shall include, but is not limited to necessary fittings, filter fabric, survey work, and connections as indicated on the drawings.
Measurement: Quantity of 4" perforated corrugated pipe shall be
SECTION 01 22 00.00 26 Page 11
CLIN 2009 (Option 2) Crushed Stone Leveling Course
Payment will be made on a cubic yard basis under CLIN 2009.
Payment will be made for costs associated with the crushed stone leveling course for the precast concrete trenches and transition vaults.
Measurement: The total quantity of crushed stone leveling course for which payment will be made will be the theoretical quantity between the top of rock surface as determined by as-built records and the bottom grade and slope required of the theoretical cross sections indicated.
CLIN 2010 (Option 2) Provide New Cable Trays
Payment will be made on a per job basis under CLIN 2010. Payment shall be made for all materials, labor, and equipment needed to furnish new cable trays and supports.
CLIN 2011 (Option 2) Provide New Junction Boxes
Payment will be made on a per job basis under CLIN 2011. Payment shall be made for all materials, labor, and equipment needed to furnish and install the junction boxes in the switchyard.
CLIN 2012 (Option 2) Provide New Cables and Conduit
Payment will be made on a per job basis under CLIN 2012. Payment shall be made for all materials, labor, and equipment needed to furnish and install new cables from the termination cabinets to the equipment in the switchyard and new conduit from the trench system to the junction boxes..
CLIN 2013 (Option 2) Provide New Termination Enclosures
Payment will be made on a per job basis under CLIN 2013. Payment shall be made for all materials, labor, and equipment needed to furnish and install the termination cabinets in the switchyard vault.
CLIN 2014 (Option 2) Provide New Panelboards LC14, LC15 and LC16
Payment will be made on a per job basis under CLIN 2014. Payment shall be made for all materials, labor, and equipment needed to furnish and install new panelboards LC14, LC15 and LC16 in the switchyard and replace load feeder cables to the first point of termination.
CLIN 2015 (Option 2) Provide As-Constructed Drawings
Payment will be made on a per job basis under CLIN 2015. Payment shall be made for all materials, labor, and equipment needed to furnish as-constructed drawings for the work performed under this option.
CLIN 3001 (Option 3) Remove Existing High Voltage Disconnect Switches
SECTION 01 22 00.00 26 Page 12
Payment will be made on a per job basis under CLIN 3001. Payment shall be made for all materials, labor, and equipment needed to remove existing 69kV, 600A and 1200A disconnect switches in the switchyard.
CLIN 3002 (Option 3) Remove Existing High Voltage 1 1/2" Aluminum Bus
Payment will be made on a per job basis under CLIN 3002. Payment shall be made for all materials, labor, and equipment needed to remove existing 69kV, 600A, 1 1/2" aluminum bus in the switchyard.
CLIN 3003 (Option 3) Provide High Voltage, 1200A Disconnect Switches
Payment will be made on a per job basis under CLIN 3003. Payment shall be made for all materials, labor, and equipment needed to furnish and install new 69kV, 1200 disconnect switches in the switchyard.
CLIN 3004 (Option 3) Provide New High Voltage, 1200A Aluminum Bus
Payment will be made on a per job basis under CLIN 3004. Payment shall be made for all materials, labor, and equipment needed to furnish and install new 69kV, 1200A aluminum bus in the switchyard.
CLIN 3005 (Option 3) Provide As-Constructed Drawings
Payment will be made on a per job basis under CLIN 3005. Payment shall be made for all materials, labor, and equipment needed to furnish as-constructed drawings for the work performed under this option.
1.4 RETAINAGE OF PAYMENT
Retainage in the amount of 10% of original contract amount will be withheld until the final submittals for Operation and Maintenance Data, Final Approved Version of Contractor Prepared Drawings and AS-BUILT CONTRACT DRAWINGS AND FIO DRAWINGS have been approved by the Government.
PART 2 PRODUCTS
(NOT USED)
PART 3 EXECUTION
(NOT USED)
-- End of Section --
SECTION 01 22 00.00 26 Page 13
SECTION 01 22 00.00 26 Page 14
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 00 00.00 26
ELECTRICAL EQUIPMENT AND WORK
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 General Requirements
1.3.1.1 Materials, Equipment and Installation
1.3.1.2 Standard Products
1.3.1.3 Corrosion Prevention
1.3.1.4 Storage and Handling
1.4 CONTRACT DRAWINGS
1.4.1 General
1.4.2 Departure From Drawings
1.4.3 Drawing Index
1.4.4 Bill of Materials
1.4.5 Interconnecting Diagrams
1.4.6 Conduit and Cable Schedule
1.4.7 Transformer Equipment Installation Details
1.4.8 Conduit Routing Drawings
1.4.9 Mounting Details
1.4.10 15kV Tubular Bus System Drawings
1.4.11 Prefabricated Cable Trench Transition Enclosures
1.4.12 Neutral Grounding Reactor
1.4.13 As-Built Drawings
1.4.14 Submission of Product Data
1.4.15 Submission of Design Data
1.4.16 Submission of Factory Test Results
PART 2 PRODUCTS
2.1 ESCUTCHEONS AND NAMEPLATES
2.2 CONDUIT, RACEWAYS, DUCTS, FITTINGS AND HANGERS
2.2.1 Rigid Metal Conduit
2.2.2 Liquid-Tight Flexible Metal Conduit
2.2.3 Non-Metallic Wiring Duct (Channel)
2.2.4 Rigid Metallic Conduit Fittings
2.2.5 Flexible Conduit Fittings
2.2.6 Conduit Hangers
2.2.7 Thread Compound
2.2.8 Supplementary Corrosion Protection
2.3 BOXES AND ENCLOSURES
2.3.1 Receptacle boxes and Pull Boxes
2.3.2 Enclosures
2.3.2.1 Precast Concrete Trench Transition Enclosures
2.3.2.2 Instrument Transformers Enclosures (Option 1)
2.3.2.3 Vault Termination Enclosures (Option 2)
2.3.2.3.1 Lighting, Convenience Receptacle, and Cabinet Heaters
2.3.2.4 Switchyard Equipment Junction Boxes (Option 2)
SECTION 26 00 00.00 26 Page 1
2.4 SWITCHYARD RECEPTACLES (OPTION 2)
2.5 ELECTRICAL DUCTBANK FOR 5KV NORTH BANK TRANSFORMER FEEDERS (OPTION
1)
2.5.1 Ducts and Fittings
2.5.2 Concrete
2.6 TERMINAL BLOCKS
2.6.1 Markings
2.6.2 Control Signal Type
2.6.3 Short-Circuiting Type
2.6.4 Power Terminal Blocks
2.6.5 Test Switches
2.7 INSTRUMENT TRANSFORMERS(OPTION 1)
2.7.1 Voltage (Potential) Transformers
2.7.1.1 Potential Transformer Secondary Fuses
2.7.2 Current Transformers
2.7.2.1 General
2.7.2.2 Window or Bushing Type Current Transformers
2.7.2.3 Rating
2.8 15kV INSULATORS
2.8.1 General
2.8.2 Suspension Insulators
2.8.3 Post Insulators
2.8.4 Porcelain and Glazing
2.8.5 Metal Parts
2.8.6 Mounting
2.8.7 Insulator Tests
2.8.7.1 General Information
2.8.7.2 Insulator Test Reports
2.9 SUBSTATION-YARD LIGHTING LUMINAIRES
2.10 15KV TUBULAR BUS CONDUCTORS
2.11 FLEXIBLE BRAIDS
2.12 TEST TERMINAL
2.13 NEUTRAL GROUNDING REACTOR
2.14 GROUP-OPERATED LOAD INTERRUPTER SWITCHES (OPTION 1)
2.15 POWER FUSES (OPTION 1)
2.16 15kV CABLE TERMINATION ENCLOSURES
2.16.1 Infra-Red (IR) Viewing Windows
2.17 15kV Cable Support Arms
2.18 TEMPORARY CABLE BARRIER WALL
2.19 SPARE PARTS
2.20 TEMPORARY SECURITY LIGHTING (OPTION 2)
PART 3 EXECUTION
3.1 ELECTRICAL CLEARANCES
3.2 CONTRACTOR ELECTRICAL DESIGN REQUIREMENTS
3.3 TRANSFORMER REPLACEMENT
3.3.1 General
3.3.2 Transformer Installation
3.4 OVERALL EQUIPMENT REPLACEMENT AND CUTOVER PLAN
3.4.1 General
3.4.2 Required Provisions
3.4.3 Conduit and Cable Plan (Option 2)
3.5 CONDUIT SYSTEM INSTALLATION
3.5.1 General
3.5.2 Thread Compound
3.5.3 Liquid-Tight Flexible Metallic Conduit
3.5.4 Cutting and Threading
3.5.5 Bends
SECTION 26 00 00.00 26 Page 2
3.5.6 Expansion Fittings
3.5.7 Coordination
3.5.8 Grounding and Bonding of Conduit
3.5.9 Conduit Cleaning
3.5.10 Soil To Concrete Transitions
3.5.11 Conduit Labeling
3.5.12 Conduit Inspection
3.6 GROUNDING
3.7 15KV ALUMINUM TUBULAR BUS
3.7.1 Tubular Bus Support Structure
3.7.1.1 Instrument Transformer
3.7.1.2 Insulator Supports
3.7.2 Bus Ends
3.7.3 Vibration Dampening
3.7.4 15kV Aluminum Tubular Bus Welding Requirements
3.8 PREPARATION OF BOLTED ELECTRICAL CONNECTIONS FOR POWER CIRCUITS
3.8.1 69kV Bolted Connections
3.8.2 15kV Bolted Connections
3.9 ESCUTCHEONS AND NAME PLATE INSTALLATION
3.10 BOX AND ENCLOSURE INSTALLATION
3.10.1 General
3.10.2 Installation
3.11 NEUTRAL GROUNDING REACTOR INSTALLATION
3.12 SEISMIC REQUIREMENTS
3.13 PAINTING
3.13.1 New Equipment
3.13.2 Existing Equipment
3.14 FIELD ACCEPTANCE TESTS
-- End of Section Table of Contents --
SECTION 26 00 00.00 26 Page 3
SECTION 26 00 00.00 26 Page 4
SECTION 26 00 00.00 26
ELECTRICAL EQUIPMENT AND WORK
PART 1 GENERAL
This section also applies to the equipment to be furnished and installed under Section 26 05 19.00 26, INSULATED WIRE AND CABLE; 26 05 26.00 26, GROUNDING AND GROUND TESTING; 26 05 36.00 26 CABLE TRAYS FOR ELECTRICAL
SYSTEMS. These sections are meant to be complimentary and where any conflict between them occurs apply the most stringent requirements. This section covers the electrical work required to connect and complete the installation of the Government supplied generator step-up transformers (GSU)at Old Hickory Dam. Electrical equipment and site-work includes but is not limited to:
a. Installation of two Government furnished 13.2-69/161kV GSU transformers. Transformers will be placed on the pad by others.
b. Furnishing and installing associated electrical connections, conduit, and cables for power and controls, including instrumentation and relay wiring from the new power transformers to the powerhouse.
c. Extending the existing switchyard grounding system as required by Section 26 05 26.00 26.
d. Installing transformer and takeoff tower grounding points to the switchyard grounding system.
e. Furnishing and installing new 15kV cables from the bus connection cubicle in the cable tunnel to the new transformer location, including the 15kV cable termination enclosures, the 15kV cable transition enclosures and the conduit.
f. Furnishing and installing new 15kV tubular bus conductors from the transition enclosure to the transformer low voltage terminals.
g. Furnishing and installing new high voltage conductor from the transformer bushings and surge arrester terminals to the new takeoff tower and from the new takeoff tower to the existing switchyard tower and down to the bus between the transformers' oil circuit breakers.
h. Furnishing and installing new prefabricated cable trench transition enclosures for the 15kV cables.
i. Furnishing and installing metering Current Transformers and Potential Transformers for each GSU transformer.
j. Furnishing and installing new neutral reactor for each GSU transformer.
k. Furnishing and installing two (2) new 500kVA North bank distribution transformers (Option 1).
l. Furnishing and installing new 15kV tubular bus conductors to the transformer high voltage terminals (Option 1).
SECTION 26 00 00.00 26 Page 5
m. Furnishing and installing new 15kV load disconnect switches and current limiting fuses for the North bank transformer (Option 1).
n. Furnishing and installing new low voltage cables from the North bank transformers to the pull box 4. (Option 1)
o. Furnishing and installing new relaying and metering current transformers and potential transformers to include secondary wiring to relays and meters. (Option 1)
p. Perform a comprehensive inventory of the existing switchyard cables and incorporate the differences in the design. (Option 2)
q. Furnishing and installing new vault termination enclosures in the switchyard vault. (Option 2)
r. Furnishing and installing new cable, conduit and junction boxes from the termination cabinets to the equipment in the switchyard. (Option 2)
s. Furnishing and installing new panelboards LC14, LC15 and LC16. (Option 2)
t. Repair existing ground grid in the switchyard. (Option 2)
u. Furnishing and installing new HV disconnect switches. (Option 3)
v. Furnishing and installing new 3" aluminum bus in the switchyard.
(Option 3)
p. Commissioning of the installed equipment.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A153/A153M (2016a) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A1011/A1011M (2018a) Standard Specification for Steel Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength
ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials
ASTM B221 (2021) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, SECTION 26 00 00.00 26 Page 6
Wire, Profiles, and Tubes
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C2 (2023) National Electrical Safety Code
IEEE C37.20.1 (2015) Standard for Metal-Enclosed Low-Voltage Power Circuit-Breaker Switchgear
IEEE C37.30.1 (2011)Standard Requirements for AC High-Voltage Air Switches Rated Above 1000 V
IEEE C57.32 (2015) Standard for Requirements,Terminology, and Test Procedures for Neutral Grounding Devices
IEEE 605 (2008) Guide for Bus Design in Air Insulated Substations
IEEE 1427 (2006) Guide for Recommended Electrical Clearences and Insulation Levels in Air Insulated Electrical Power Substations
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)
NECA 101 (2013) Standard for Installing Steel Conduit(Rigid, IMC, EMT
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C29.1 (2018) Test Methods for Electrical Power Insulators
ANSI C29.5 (1984; R 2002) Wet-Process Porcelain Insulators (Low and Medium Voltage Pin Type)
ANSI C80.1 (2020) American National Standard for Electrical Rigid Steel Conduit (ERSC)
NEMA 250 (2020) Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA C29.2B (2013) Wet Process Porcelain and Toughened Glass - Transmission Suspension Type
NEMA C29.5 (2015) Wet-Process Porcelain Insulators - Low- and Medium-Voltage Type
NEMA CC 1 (2018) Electric Power Connection for Substations
SECTION 26 00 00.00 26 Page 7
NEMA FB 1 (2014) Standard for Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit, Electrical Metallic Tubing, and Cable
NEMA WD 6 (2021) Wiring Devices Dimensions Specifications
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2023) National Electrical Code
UNDERWRITERS LABORATORIES (UL)
UL 6 (2007; Reprint Sep 2019) UL Standard for Safety Electrical Rigid Metal Conduit-Steel
UL 50 (2015) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations
UL 94 (2013; Reprint May 2021) UL Standard for Safety Tests for Flammability of Plastic Materials for Parts in Devices and Appliances
UL 248-8 (2011; Reprint Aug 2020) Low-Voltage Fuses
- Part 8: Class J Fuses
UL 360 (2013; Reprint Oct 2020) UL Standard for Safety Liquid-Tight Flexible Metal Conduit
UL 514A (2013; Reprint Jun 2022) UL Standard for Safety Metallic Outlet Boxes
UL 514B (2012; Reprint May 2020) Conduit, Tubing and Cable Fittings
UL 4248-8 (2018) UL Standard for Safety Fuseholders
- Part 8: Class J
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
New Transformer Installation Procedure; G, HDC
Overall Transformer Replacement and Cutover Plan (Option 2 and Option 3); G, HDC
Conduit and Cable Plan (Option 2); G, HDC
SD-02 Shop Drawings
SECTION 26 00 00.00 26 Page 8
Submit within 120 days after Notice To Proceed:
In accordance with paragraph "QUALITY ASSURANCE."
Drawing Index; G, HDC
Bill of Materials; G, HDC
Outline Drawings; G, HDC
Assembly and Detail Drawings; G, HDC
Wiring Diagrams; G, HDC
15kV Cable Termination Enclosures; G, HDC
Interconnecting Diagrams; G, HDC
Prefabricated Cable Trench Transition Enclosures; G, HDC
15kV Cable Installation in Prefabricated Cable Trench Drawings; G, HDC
Neutral Grounding Reactor; G, HDC
Transformer Equipment Installation Details; G, HDC
Conduit Routing Drawings; G, HDC
Conduit and Cable Schedule; G, HDC
Insulator Mounting Drawings; G, HDC
15kV Tubular Bus System; G, HDC
As-Built Drawings; G, HDC
SD-03 Product Data
Submit within 60 days after Notice To Proceed:
Rigid Metal Conduit; G, HDC
Liquid-Tight Flexible Metal Conduit; G, HDC
Rigid Metallic Conduit Fittings; G, HDC
Flexible Conduit Fittings; G, HDC
Conduit Hangers; G, HDC
Non-Metallic Wiring Duct (Channel); G, HDC
Thread Compound; G, HDC
Supplementary Corrosion Protection; G, HDC
Receptacle Boxes and Pull Boxes; G, HDC
SECTION 26 00 00.00 26 Page 9
Infra-Red (IR) Viewing Windows; G, HDC
Test Switches; G
Enclosures; G, HDC Medium-Voltage Tubular Bus System; G, HDC
Instrument Transformers; G, HDC
15kV Insulators; G, HDC
15kV Tubular Bus Conductors; G, HDC
Spare Parts; G, HDC
Escutcheons And Nameplates; G, HDC
Test Terminal; G, HDC
Flexible Braids; G, HDC
Neutral Grounding Reactor; G, HDC
Group-Operated Load Interrupter Switches; G, HDC
Power Fuses; G, HDC
Duct; G, HDC
Duct Fittings; G, HDC
Pullropes; G, HDC
Identification Tags; G, HDC
Substation-Yard Lighting Luminaires; G, HDC
15Kv Cable Support Arms; G, HDC
SD-05 Design Data
Submit within 120 days after Notice To Proceed:
15kV Cable Termination Enclosures; G, HDC
Prefabricated Cable Trench Transition Enclosures; G, HDC
Temporary Cable Barrier Wall; G, HDC
SD-06 Test Reports
Insulator Tests; G, HDC
Neutral Grounding Resistor Test; G, HDC
SD-08 Manufacturer's Instructions
Field Acceptance Test Procedure; G, HDC
SECTION 26 00 00.00 26 Page 10
1.3 QUALITY ASSURANCE
1.3.1 General Requirements
1.3.1.1 Materials, Equipment and Installation
Furnish new and unused materials and equipment except for equipment specified for reuse herein; replace or repair any defective material or equipment damaged in the course of installation. Perform testing to check the installation of and the proper operational functions of the accessory electrical equipment. Equipment must meet all applicable NEMA and UL construction and rating requirements. No equivalent will be acceptable.
Immediately notify the Contracting Officer of any requirements of the specifications or Contractor proposed materials or assemblies that do not comply with UL or NEMA. International Electrotechnical Commission (IEC) rated equipment will not be considered an acceptable alternative to specified NEMA ratings, except as approved. The installations must be in accordance with the National Electrical Code, NFPA 70 , and the National Electrical Safety Code, IEEE C2 , except where otherwise specifically shown or specified, in which case the drawings and specifications will govern.
Omission of details on the drawings or in the specifications must not be construed as permitting deviations from Code requirements. Terminate all exterior electrical connections as well as those with dissimilar metals using appropriate voltage rated anti-oxidant compound. Install all electrical connections using calibrated torque wrench following either the manufacturer's recommendations or general guidance in NFPA 70 or NETA ATS.
1.3.1.2 Standard Products
Material and equipment must be the standard products of manufacturers regularly engaged in the manufacture of these products and must essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.
1.3.1.3 Corrosion Prevention
Protect equipment to prevent deterioration from corrosion. The general requirements are specified below; however, other corrosion-resisting treatments that are the equivalent of those specified may be used.
a. Fastenings and Fittings . Ensure screws, bolts, nuts, pins, studs, springs, washers and other miscellaneous fastening and fittings are of corrosion-resistant material and are treated in an approved manner to render them resistant to corrosion. Fastenings exposed directly to the weather must be of corrosion-resisting material.
b. Corrosion-Resisting Materials . Corrosion-resisting steel, copper, brass, bronze, copper-nickel-copper alloys are acceptable corrosion-resisting materials.
c. Corrosion-Resisting Treatments . Treatments must be in accordance with ASTM A123/A123M or ASTM A153/A153M .
d. Finish . Final painting must be done in accordance with paragraph
"PAINTING."
SECTION 26 00 00.00 26 Page 11
1.3.1.4 Storage and Handling
Suitably protect materials and equipment from dampness, dust and physical damage, and store in accordance with the manufacturer's instructions.
1.4 CONTRACT DRAWINGS
1.4.1 General
The contract drawings indicate the work to be accomplished in as much detail as is practical. They constitute the working drawings for construction and for purchase of required materials. The contract drawings are not intended to dictate the actual design but only to indicate:
a. The limitations of space in which the transformers, associated equipment and appurtenances are to be installed.
b. The arrangement and functions of the connections and associated equipment for the new transformers and existing protective relays.
c. The powerhouse and switchyard general layouts, pertinent features and of the existing equipment installations with their general details as associated with this work.
Field verify all existing dimensions, details, and features relevant to requirements for equipment, apparatus, and other powerhouse and switchyard coordinating features required for the design, manufacture, and installation of the new transformers and accessories. If the contractor finds variations that significantly impacts contractors design, notify the COR immediately.
1.4.2 Departure From Drawings
If departures from the contract drawings are necessary, submit details of such departures and reasons for them not later than 90 days before scheduled installation date. Make no such departures without prior written approval. The control schemes shown on the contract drawings are not intended to exclude the Contractor's method for accomplishing the functions indicated. However, if any alternate equipment is approved, the Contractor will bear the cost and be responsible for furnishing and installing any additional wiring devices that are required.
1.4.3 Drawing Index
Submit shop drawings for each GSU transformer to provide complete installation details. Include a comprehensive index of shop drawings for each GSU transformer drawing set. The index must be part of the accompanying drawing set, having a title block, border, and sheet number compatible with the drawing set.
1.4.4 Bill of Materials
Submit a comprehensive bill of materials (schedule of equipment) for each GSU transformer installation shop drawing set. Schedule must be part of the drawing set, having a title block, border, and sheet number compatible with the drawing set. Schedule will provide a cross reference between manufacturer data and shop drawings, regardless of whether the product data is submitted at the same time as the shop drawing set. Schedule will include the total quantity, manufacturer, part number, and location of each item of equipment supplied.
SECTION 26 00 00.00 26 Page 12
1.4.5 Interconnecting Diagrams
Submit drawings showing interconnections between devices internal to panels and equipment enclosures, and between equipment assemblies and external interfaces. Terminal board connections, wire designations, and size and type of wire must be indicated on wiring diagrams.
1.4.6 Conduit and Cable Schedule
A cable and conduit schedule has been provided, which is based on the known requirements to remove the existing equipment and for the new equipment with estimated lengths to be used for bidding purposes.
Additional cables may be required due to the Contractor's equipment selection. Submit a comprehensive schedule of cable and conduit. Schedule shall appropriately cross reference with schematic drawings. Schedule shall have a title block and border.
1.4.7 Transformer Equipment Installation Details
Submit details showing the arrangement and location of the transformer equipment with weights, detail dimensions and complete mounting details.
1.4.8 Conduit Routing Drawings
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .