This document package includes engineering drawings and specifications for an electrical substation upgrade project at Old Hickory Lock and Dam. Key details include installation of a new 1000kVA GSU transformer, replacement of 69kV switchgear, addition of a 15kV cable transition enclosure, installation of new lighting and seismic bracing, and upgrades to the transformer yard ductbank and grounding system. The opportunity is a firm fixed price construction contract issued by the US Army Corps of Engineers Nashville District for upgrades to the electrical substation that provides power to Old Hickory Lock and Dam facilities. Interested parties must submit required security documents to access the secured plans and specifications. The response due date and award timing are not provided in the available documents.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P O

W E

R H

O U

S E

C U

M B

E R

L A

N D

R

IV

E R

O L

D H

IC

K

O R

Y L

O C

K A

N D

D A

M

M A

H A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

J

R D

A N

S F

IN

K

P

.E

M G

U N

D R

U M

L

A B

A C

IO

A

E I

S L

A U

G H

L

IN

-1

-2

A D

D E

D A

M P

S R

A T

IN

G

F O

R T

H E

C O

P P

E R

T U

B U

L A

R B

U

IN

T A

L L

O M

A H

A

N E

B R

A S

K A

B

R O

A D

W

Y

O H

P

.0

E

-3

.d g n

E-301

CERTIFIED FINAL DOCUMENTS - RTA

GENERAL NOTES:

RESOURCE DRAWINGS:

T R

A N

S F

O R

M E

R Y

A R

D A

N D

S W

IT

C

H Y

A R

D

S E

C T

IO

N

V

IE

W

THE TERMINAL BLOCK.

BLOCK AND COMMON CONNECTIONS SHALL BE MADE AT

6. THE PT WIRES SHALL ALL BE LANDED ON THE TERMINAL

MADE AT THE SHORTING TERMINAL BLOCK.

TERMINAL BLOCK AND COMMON CONNECTIONS SHALL BE

5. THE CT'S WIRES SHALL ALL BE LANDED ON THE SHORTING

TYPE TERMINAL BLOCKS FOR THE METERING CTS

WINDOW, LOCKABLE BY A PADLOCK WITH SHORTING

4. PROVIDE NEW NEMA 4X ENCLOSURE WITH VIEWING

OF SIX (6) LOCATIONS.

ON EACH SIDE OF THE TAKE-OFF TOWERS FOR A TOTAL

3. NEW SUBSTATION TYPE LIGHT SHALL BE INSTALLED

AND SHALL BE SEISMICALLY BRACE.

BUS SYSTEM SHALL BE DESIGNED BY CONTRACTOR

2. 15KV CABLE TRANSITION ENCLOSURE TO THE 15KV

FOR OPTION 3.

BOLD/PURPLE INDICATES EQUIPMENT TO BE INSTALLED

1. BOLD/RED INDICATES EQUIPMENT TO BE INSTALLED.

PULL BOX AND DUCT DETAILSQ15-67/44

TRANSFORMER YARD TO PULL BOX 3 AND 3AQ15-67/43a

TO PROTECTIVE SCREEN

ENLARGED SITE PLAN-DUCT DETAILS AND ECTENSIONQ15-67/43

ADDITIONS IN TRANSFORMER YARDQ15-67/42

AND SECTIONS

69kV SWITCHYARD GENERAL ARRANGEMENT PLANSQ15-79-900.2

SECTION 69KV SWITCHYARD

SCALE: 3/32" = 1'-0"

E-7 E-101 B11

SCALE: NTS

DETAIL A

LEGEND:

BASE OPTION

OPTION 1

OPTION 2

OPTION 3

1.5" DIA COPPER TO 4 HOLE PAD

BOLTED TERMINAL TUBE TO FLAT

CONNECTOR, BRONZE 90-DEGREE

TO 4 HOLE PAD

FLAT TO FLAT, 4 HOLE PAD

BOLTED TEST TERMINAL

CONNECTOR, AL STRAIGHT

(SUPPLY BY OTHERS)

TOP TERMINAL STUD

HIGH VOLTAGE BUSHING

SILVER PLATED

(SURGE ARRESTER)

BUSHING TERMINAL

HIGH VOLTAGE

B11

E-301

B2

P lo t T im e

P lo t D a te

F il e N a m e

T im e

D a te

F il e

C

D

E

F

G

H

J

K

13121110987654321

B

A SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

N U

M B

E R

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E M

A R

K D

E S

C R

IP

T

IO

N

D A

T E

D E

S

IG

N E

D B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

S I Z

E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

AB

EL 496

69 KV,3P,1200 A,OCB

1200 A

DISCONNECTS

69 KV

CONTROL CABLE SHAFT

FENCE

STONE

CRUSHED

EL 495.75

AND FOUNDATIONS

TAKEOFF TOWER

C e n te r

"S1"

AND INSULATORS

15KV ALUMINUM BUS

CT (TYP)

METERING

STRAIN INSULATORS

AND OIL CONTAINMENT

TRANSFORMER FOUNDATION

CONCRETE

CONDUCTORS

844K CMIL ACSR

(SUPPLY BY OTHERS)

NEW TRANSFORMER

SEE NOTE 2

ENCLOSURE

TRANSITION

1/2 HIGH STRENGTH STEEL OHGW

COPPER TUBULAR BUS, HARD DRAWN

877A, 1.5" IPS, HIGH CONDUCTIVITY

NOTE 3

LIGHT, SUBSTATION TYPE

NOTE 4

BARE COPPER (TYP)

1000 KCMIL