W912P521Q0036_TechChanges-Amendment 0001.pdf
PDF 107 KB Posted
- Attached to
- Pickwick Lock Sector Gear Fabrication
- Solicitation number
- W912P521Q0036
About this file
This document provides details for a federal contract solicitation to replace sector gear equipment at the Pickwick Lock. The solicitation seeks the fabrication and delivery of replacement components including one sector gear, one pinion gear, two gear bushings, two pinion keys, one trunnion block, two arm bushings, and one trunnion block pin. Questions regarding the solicitation are due by August 18, 2021 and quotes are due by September 1, 2021. The contract will be awarded by the U.S. Army Corps of Engineers Nashville District and requires the fabrication of replacement components for the lower miter gate operating machinery at the Pickwick Lock.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W912P521Q0036 Amendment No. 0001
I. CHANGES TO TECHNICAL SPECIFICATIONS
A. Section 35 20 15 SECTOR GEAR REPLACEMENT. Remove Section 35 20 15 in its entirety (19 pages). Replace with revised Section 35 20 15 (19 pages).
II. CHANGES TO CONTRACT DRAWINGS
A. The following CONTRACT DRAWINGS have been revised and replaced:
Drawing No. Description
64E250-3R2 Upper and Lower Gate Operating Machinery Sector, Pinion, and Misc Parts
B. The following CONTRACT DRAWING has been added to the package:
N/A N/A
C. The following REFERENCE DRAWING / FOR INFORMATION ONLY DRAWING has been added to the package:
N/A N/A
--- END OF AMENDMENT NO. 0001 TECHNICAL CHANGES---
| Solicitation No. W912P521Q0036 |
| Amendment No. 0001 |
| I. CHANGES TO TECHNICAL SPECIFICATIONS |
| A. Section 35 20 15 SECTOR GEAR REPLACEMENT. Remove Section 35 20 15 in its entirety (19 pages). Replace with revised Section 35 20 15 (19 pages). |
| II. CHANGES TO CONTRACT DRAWINGS |
| A. The following CONTRACT DRAWINGS have been revised and replaced: |
| B. The following CONTRACT DRAWING has been added to the package: |
| C. The following REFERENCE DRAWING / FOR INFORMATION ONLY DRAWING has been added to the package: |
File details come from the government source that posted it. Updated .