Amendment 0001 - W912P521Q0036.pdf
PDF 84 KB Posted
- Attached to
- Pickwick Lock Sector Gear Fabrication
- Solicitation number
- W912P521Q0036
About this file
This document contains an amendment to a federal solicitation for the fabrication and delivery of replacement components for lower miter gate operating machinery at Pickwick Lock. The contractor shall provide one set of replacement components including a sector gear, pinion gear, gear bushings, pinion keys, trunnion block, arm bushings, trunnion block pin, and miscellaneous items shown on contract drawings. Questions were due by August 18, 2021 and quotes are due by September 1, 2021 to the Department of the Army Corps of Engineers Engineering District Nashville. The amendment provides answers to questions received and updates plans, specifications and drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
W912P521Q0036 - Pickw ick Lock Sector Gear Fabrication
This solicitation is being amended to answ er questions received during the question period and attach updated plans, specif ications and draw ings. No additional questions w ill be accepted follow ing the issuance of this amendment.
FAR clause 52.252-3 has been updated.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P521Q0036
X 9B. DATED (SEE ITEM 11)
09-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2021
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P521Q0036
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
QUESTIONS AND ANSWERS
Solicitation No. W912P521Q0036 Amendment No. 0001
Question 1: The description says that sector gear assembly can either be forged or welded, but it does not mention anything about machining. Can the parts be machined from raw material instead of forged?
Answer 1: The parts can be machined from raw materials instead of forging. Materials shall be as shown on the reference drawings for Pickwick Sector Gear Replacement. Brinell hardness, heat treatment (induction hardening), etc. shall be as specified in the contract specifications. Section 35 20 15 of the specs has been updated to resolve this question.
Question 2: We would like to sublet the actual cutting and inspection of the sector gear. Would this process be acceptable?
Answer 2: Subcontracting is acceptable provided both prime contractor and subcontractor meet all requirements laid out in the solicitation and specifications.
Question 3: Will the furnished “as designed” CAD drawings depict the original design (cast sector gear, 12 -19-
1979) or the “as built” design (welded sector gear, 1-13-2016)?
Answer 3: The Contract drawings with page numbers 64E250-3 and 64E250-5, are the only drawings allowed to dimension all fabricated products for this project.
It is up to the contractor to decide to cast or weld the Sector gear (see Answer 1). The dimensions shown on drawing pages 11206-E1, 11206-1, 11206-2, 11206-3, 11206-4, and 11206-5 are NOT correct and shall not be used.
Question 4: Per section 1.1 of Section 35 20 15, the sector gear shall be of either forged or welded construction. Per paragraph 2.1.3 of this Section provides a cast material specification (90-60 cast steel, now UNS D5600, 620-15.)
Paragraph 2.1 of this Section allows the sector gear to be made from cast steel. Please resolve this conflict in specifications.
Answer 4: See response to question 1.
Question 5: Per note on drawing 64E250-3R2 0f 1979, pattern for MK 9 furnished by TVA. Is this correct?
Answer 5: If the Contractor wishes to cast the pattern for MK 9, TVA will NOT be providing any pattens or Core
Boxes. The Contractor is responsible for both.
Question 6: If the Contractor is to make the pattern and core boxes, will they become the property of USACE, to be boxed and delivered with the job?
Answer 6: If the Contractor makes patterns and core boxes, they will be the property of the Contractor and will not be delivered to the job.
Question 7: Strut pin MK 42 is not listed on Page 3 of the Summary of Work, but at A-10 on second page of drawing, 64E250-3R2 of 1979 it is highlighted. Is this pin part of the requirement?
Answer 7: Specification 35 20 15 section 1.1 lists MK 42 ‘Trunnion Block Pin’ as part of the scope. If there is a discrepancy between the specifications and drawings, the specifications always take precedent.
Question 8: Can the customer designate the grades of the forged material for the MK 14 pinion, MK 22 Trunnion
Block and MK 42 Strut Pin?
W912P521Q0036
Answer 8: MK 14 Pinion must be forged using AISI 4130 H as shown in reference drawing 11206-4 Rev 4, MK
11206-4-3 with the BHN as specified in Section 35 20 15, Paragraph “Surface Hardening of Gear Teeth.”
MK 22 Trunnion Block must be forged using AISI 4130 H and must be forged to conform to ASTM A668/A668M
Class E standards.
MK 42 Strut Pin must be forged using AISI 4130 H and must be forged to conform to ASTM A668/A668M
Question 9: Should the notes and call-outs on drawing 11206-4 be understood to apply to the manufacture of parts per drawing 64E250-3R2 of 1979, specifically the reference to hardening of gear teeth?
Answer 9: See Answer 8
Question 10: Paragraph 2.1.6 of section 35 20 15 deals with the manufacture of turn bolts and cap screws. To which bolts or screws does this paragraph pertain? These items are cross-hatched out on 64E250-3R2 of 1979.
Answer 10: Turned Bolts MK 16, ML 17, and MK 18 shown on drawing 64E250-3 and will be added to the scope.
MK 16 will be a quantity of 20, MK 17 will be a quantity of 2, and MK 18 will be a quantity of 2. Both the contract drawings and contract specifications will be updated to reflect these additions.
---------------End of Section---------------
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
W912P521Q0036 - Pickwick Lock Sector Gear Fabrication
This solicitation is being amended to answer questions received during the question period and attach updated plans, specifications and drawings. No additional questions will be accepted following the issuance of this amendment.
FAR clause 52.252-3 has been updated.
(End of Summary of Changes)