This federal contract opportunity solicitation seeks a firm fixed-price supply contract for the fabrication and delivery of replacement components for the lower miter gate operating machinery at Pickwick Lock. The required components include one sector gear, one pinion gear, two gear bushings, two pinion keys, one trunnion block, two arm bushings, one trunnion block pin, and miscellaneous items shown on the contract drawings. The sector gear must be fabricated from either forged or welded construction. Questions regarding the solicitation are due by August 18, 2021, with quotes due by September 1, 2021. The solicitation is being conducted by the Department of the Army Corps of Engineers Engineering District Nashville.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers

Nashville District

Solicitation No. W912P521Q0036

Sector Gear Replacement

Pickwick Lock Tennessee River Hardin County, Tennessee

TECHNICAL SPECIFICATIONS

Ready to Advertise (RTA) Certified Final

June 2021

THIS PAGE INTENTIONALLY LEFT BLANK

FOR DUPLEX PRINTING

Sector Gear Replacement Pickwick Lock W912P521Q0036 Ready to Avertise Hardin County, Tennessee

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 20 00 PRICE AND PAYMENT PROCEDURES

01 33 00 SUBMITTAL PROCEDURES

01 35 50 PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 78 00 CLOSEOUT SUBMITTALS

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 20 15 SECTOR GEAR REPLACEMENT

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 PAYMENTS TO THE CONTRACTOR

1.2 BASE BID

1.2.1 Fabricate and Deliver Replacement Sector Gear and Components

1.2.1.1 Payment

1.2.1.2 Unit of Measure

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 20 00 Page 1

SECTION 01 20 00 Page 2

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 PAYMENTS TO THE CONTRACTOR

Payment will be made upon delivery and acceptance of fabricated items that comply with all contract requirements as specified in the specifications, shown in the contract drawings, and defined in Contract Clause 52.232-1 PAYMENTS. Progress or partial payments for fabricated items, prior to delivery and acceptance, will not be considered on this contract.

1.2 BASE BID

Payment items for the work of this contract for which contract job payments will be made are listed in the SCHEDULE and described below.

All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.1 Fabricate and Deliver Replacement Sector Gear and Components

1.2.1.1 Payment

Payment will be made for costs associated with operations necessary for fabricating and delivering all parts to Pickwick Lock outlined in Section

35 20 15 SECTOR GEAR REPLACEMENT.

1.2.1.2 Unit of Measure

Unit of measure: job.

Amount: 1

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 20 00 Page 3

SECTION 01 20 00 Page 4

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Submittal Information

1.2 SUBMITTALS

1.3 SUBMITTAL CLASSIFICATION

1.3.1 Government Approved (G)

1.3.2 For Information Only

1.4 PREPARATION

1.5 QUANTITY OF SUBMITTALS

1.6 INFORMATION ONLY SUBMITTALS

1.7 SUBMITTAL REGISTER

1.8 SCHEDULING

1.9 GOVERNMENT APPROVING AUTHORITY

1.10 APPROVED SUBMITTALS

1.11 WITHHOLDING OF PAYMENT

1.12 STAMPS

PART 2 PRODUCTS

PART 3 EXECUTION

ATTACHMENTS:

ENG Form 4025

Submittal Register

SECTION 01 33 00 Page 1

SECTION 01 33 00 Page 2

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Submittal Information

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submit the following in accordance with this section.

SD-01 Pre-Fabrication Submittals

Submittal Register; G

1.3 SUBMITTAL CLASSIFICATION

1.3.1 Government Approved (G)

Government approval is required for any variations from the contract requirements and for other items as designated by the Government.

1.3.2 For Information Only

Submittals not requiring Government approval will be for information only.

1.4 PREPARATION

Use ENG Form 4025 transmittal form for submitting both Government-approved and information-only submittals. A sample of this form is attached to this Section. Submit in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contractor. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.

1.5 QUANTITY OF SUBMITTALS

Unless otherwise specified, submit one electronic (PDF format) set of each submittal.

SECTION 01 33 00 Page 3

1.6 INFORMATION ONLY SUBMITTALS

Submittals without a "G" designation are for information-only. Approval of the Contracting Officer is not required on information only submittals. The Contracting Officer will mark "receipt acknowledged" on submittals for information and will return only the transmittal cover sheet to the Contractor. Normally, submittals for information only will not be returned. However, the Government reserves the right to return unsatisfactory submittals and require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.7 SUBMITTAL REGISTER

A sample submittal register is provided as an attachment to this section.

Verify that all required submittals are listed and add missing submittals. Prepare and submit the Submittal Register. Complete the following fields on the register submitted:

Column (g) Contractor Submit Date: Scheduled date for the approving authority to receive submittals.

Column (h) Contractor Approval Date: Date that Contractor needs approval of submittal.

Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.

1.8 SCHEDULING

Schedule and submit concurrently product data and shop drawings covering component items forming a system or items that are interrelated. Submit pertinent certifications at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.

a. Coordinate scheduling, sequencing, preparing, and processing of submittals with performance of work so that work will not be delayed by submittal processing. The Contractor is responsible for additional time required for Government reviews resulting from required resubmittals. The review period for each resubmittal is the same as for the initial submittal.

b. Submittals required by the contract documents are listed on the submittal register. If a submittal is listed in the submittal register but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but that have been omitted from the register or marked "N/A."

c. Resubmit the submittal register and annotate it monthly with actual

SECTION 01 33 00 Page 4 submission and approval dates. When all items on the register have been fully approved, no further resubmittal is required.

Contracting Officer review will be completed within 30 calendar days after the date of submission.

1.9 GOVERNMENT APPROVING AUTHORITY

When the approving authority is the Contracting Officer, the Government will:

a. Note the date on which the submittal was received.

b. Review submittals for approval within the scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with comments and markings appropriate for the action indicated.

Upon completion of review of submittals requiring Government approval, stamp and date submittals. One copy of the submittal will be retained by the Contracting Officer and one copy of the submittal will be returned to the Contractor.

1.10 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals is not to be construed as a complete check, and indicates only that the general method of fabrication, materials, detailing, and other information are satisfactory.

Approval or acceptance by the Government for a submittal does not relieve the Contractor of the responsibility for meeting the contract requirements or for any error that may exist, because under the Quality Control (QC) requirements of this contract, the Contractor is responsible for ensuring information contained with in each submittal accurately conforms with the requirements of the contract documents.

After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.11 WITHHOLDING OF PAYMENT

No payment for materials incorporated in the work will be made unless all required approvals have been obtained.

1.12 STAMPS

Certify the submittal data as follows on Form ENG 4025: "I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

______NAME OF CONTRACTOR ______ SIGNATURE OF CONTRACTOR

SECTION 01 33 00 Page 5

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 33 00 Page 6

U.S. Army Corps of Engineers (USAGE) DATE .. TRANSMITTAL NO.

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this fonn, see ER 415-1-1 O; the proponent agency is CECW-CE.

SECTION 1- REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO: FROM: CONTRACT NO. CHECK ONE:

□ THIS IS A NEW TRANSMITTAL

' □ THIS IS A RESUBMITT AL OF

TRANSMITTAL

SPECIFICATION SEC. NO. (Cover only one section with each transmittal) PROJECT TITLE AND LOCATION THIS TRANSMITTAL IS FOR: (Check one)

□ FIO □ GA ODA OcR ODNCR ODNGA

CONTRACT DOCUMENT VARIATION USACE

ITEM

SUBMITTAL NO. CONTRACTOR Enter ''Y" if ACTION

NO. DESCRIPTION OF SUBMITTAL ITEM

REFERENCE

TYPE CODE OF REVIEW requesting CODE (See (Type size, model number/etc.) SPEC. DRAWING

(See Note 8) COPIES CODE a variation (Note 9) Note 3) PARA. NO. SHEET NO.

(See Note 6)

a. b. C. d. e. f. g. h. i.

REMARKS I certify that the above submitted items had been reviewed in detail and are correct and in strict confonnance with the contract drawings and specifications except as otherwise stated.

NAME OF CONTRACTOR SIGNATURE OF CONTRACTOR

SECTION II -APPROVAL ACTION

ENCLOSURES RETURNED (List by item No.) NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE OF APPROVING AUTHORITY DATE

ENG FORM 4025, MAY 2017 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of2

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash(-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal , then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data

SD-10 - O&M Data

SD-06 - Test Reports

SD-11 - Closeout SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal

Action Codes in column i of Section I. The Submittal Action Codes are:

A - Approved as submitted.

B - Approved, except as noted on drawings. Resubmission not required.

C - Approved, except as noted on drawings. Refer to attached comments.

Resubmission required.

D - Will be returned by separate correspondence.

E - Disapproved. Refer to attached comments.

F

X

G

K

R

Receipt acknowledged.

Receipt acknowledged, does not comply with contract requirements, as noted.

Other action required (Specify)

Government concurs with intermediate design. (For D-B contracts)

Design submittal is acceptable for release for construction. (For D-B contracts)

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

ENG FORM 4025, MAY 2017 Page 2 of2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES

W912P521Q0036

Pickwick Sector Gear Replacement

01 33 00 SD-01 Pre-Fabrication Submittals

1.7 GSubmittal Register

01 35 50 SD-01 Pre-Fabrication Submittals

1.3Verified/Eligible Contract

Employees

01 78 00 SD-11 Closeout Submittals

3.3 GFinal Approved Shop Drawings

35 20 15 SD-01 Pre-Fabrication Submittals

1.6.2 GContractor Qualifications

1.6.3 GQuality Control Plan

SD-02 Shop Drawings

1.7.1 GShop Drawings

SD-03 Product Data

3.2.3 GPainting

SD-05 Design Data

1.7.3 GFabrication Assembly Procedure

SD-06 Test Reports

3.3Component Weights

2.5 GHardness Test Report

3.1.3 G ECD-Ndt Report

SD-07 Certificates

3.1.1 GQualification of Welders and

Welding Operators

1.7.2 GLetter of Certification and

Technical Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES

W912P521Q0036

Pickwick Sector Gear Replacement

35 20 15 3.1.4.2 GRecord of Nondestructive Test and Examination Procedures

SD-09 Manufacturer’s Field

Reports

3.4.2 GShop Inspection Procedure

3.4.2 GShop Inspection Report

3.5.3 GHandling and storage Instructions

SD-11 Closeout Submittals

3.5.4 GDelivery of Equipment

1.7.1 GRecord Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 35 50

PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES

PART 1 GENERAL

1.1 GENERAL

1.2 SUBMITTALS

1.3 PRE-SCREENING CONTRACTOR'S EMPLOYEE CANDIDATES

1.4 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

1.5 ESCORTS

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

SECTION 01 35 50 Page 1

SECTION 01 35 50 Page 2

SECTION 01 35 50

PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES

PART 1 GENERAL

1.1 GENERAL

This is a supply contract. The Contrator will be delivering fabrications to a designated area in the Pickwick Lock site. Depending upon the level of security threat, some Project areas may or may not be open to the Contractor and Contractor employees. Guidance and forms for project site security requirements are available on the Nashville District Public Website:

http://www.lrn.usace.army.mil/BusinessWithUs/ContractSecurityRequirements.aspx

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Verified/Eligible Contract Employees

1.3 PRE-SCREENING CONTRACTOR'S EMPLOYEE CANDIDATES

The Contractor must pre-screen potential employees to work on this contract using the E-verify Program ( https://www.uscis.gov/e-verify ) website to meet the established eligibility requirements. The Contractor must ensure that the employee has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible contract employees must be provided to the COR no later than 3 business days after the initial contract award.

1.4 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

All Contractor and associated sub-contractor employees shall comply with all applicable project and local security policies and procedures (provided by the district representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by the District Security Management Office. Contractor workforce must comply with all personal identity verification requirements (FAR Clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

All contractors and all associated sub-contractors shall comply with

SECTION 01 35 50 Page 3 applicable District and local security policies and procedures (provided by the Government representative). The contractor shall provide any/all requested information required for background checks, background investigations and/or to meet installation/facility access requirements to be accomplished by the District Security Office. Refer to the next paragraph for current background investigation requirements. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

Background Investigation Requirements: Since the work to be performed by the Contractor onsite is for 1 or 2 days the Contractors must comply with the site visit request requirements, there is an initial background screening. Please visit:

http://www.lrn.usace.army.mil/Business-With-Us/Contract-Security-Requirements/

However, Contractor(s) who only arrive on-site to pick up or drop off (i.e. truck drivers) and are there specifically to provide a delivery and/or supply service, there are no investigation requirements.

Contractor(s) will be escorted by a USACE District employee at all times in the restricted area.

1.5 ESCORTS

All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

SECTION 01 35 50 Page 4

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 42 00

SOURCES FOR REFERENCE PUBLICATIONS

PART 1 GENERAL

1.1 REFERENCES

1.2 ORDERING INFORMATION

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 42 00 Page 1

SECTION 01 42 00 Page 2

SECTION 01 42 00

SOURCES FOR REFERENCE PUBLICATIONS

PART 1 GENERAL

1.1 REFERENCES

Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g., ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.

1.2 ORDERING INFORMATION

The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided.

AMERICAN GEAR MANUFACTURERS ASSOCIATION (AGMA)

1001 N. Fairfax Street, Suite 500 Alexandria, VA 22314-1587 Ph: 703-684-0211 Fax: 703-684-0242 E-mail: tech@agma.org Internet: https://www.agma.org/

AMERICAN IRON AND STEEL INSTITUTE (AISI)

25 Massachusetts Avenue, NW Suite 800 Washington, DC 20001 Ph: 202-452-7100 Internet: https://www.steel.org/

AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)

P.O. Box 28518 1711 Arlingate Lane Columbus, OH 43228-0518 Ph: 800-222-2768 or 614-274-6003 Fax: 614-274-6899 E-mail: tjones@asnt.org Internet: https://www.asnt.org/

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

Two Park Avenue New York, NY 10016-5990 Ph: 800-843-2763 Fax: 973-882-1717 E-mail: customercare@asme.org Internet: https://www.asme.org/

SECTION 01 42 00 Page 3

AMERICAN WELDING SOCIETY (AWS)

8669 NW 36 Street, #130 Miami, FL 33166-6672 Ph: 800-443-9353 Internet: https://www.aws.org/

ASTM INTERNATIONAL (ASTM)

100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 610-832-9500 Fax: 610-832-9555 E-mail: service@astm.org Internet: https://www.astm.org/

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

800 Trumbull Drive Pittsburgh, PA 15205 Ph: 877-281-7772 or 412-281-2331 Fax: 412-444-3591 E-mail: customerservice@sspc.org Internet: http://www.sspc.org

U.S. ARMY CORPS OF ENGINEERS (USACE)

CRD-C DOCUMENTS available on Internet:

http://www.wbdg.org/ffc/army-coe/standards Order Other Documents from:

Official Publications of the Headquarters, USACE E-mail: hqpublications@usace.army.mil Internet: http://www.publications.usace.army.mil/ or https://www.hnc.usace.army.mil/Missions/Engineering-Directorate/TECHINFO/

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

Not used

SECTION 01 42 00 Page 4

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 78 00

CLOSEOUT SUBMITTALS

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Working Shop Drawings

1.2.2 Final Approved Shop Drawings

1.3 SOURCE DRAWING FILES

1.3.1 Terms and Conditions

1.4 SUBMITTALS

1.5 QUALITY CONTROL

PART 2 PRODUCTS

2.1 GOVERNMENT FURNISHED MATERIALS

2.2 CAD DRAWINGS

2.3 PDF SHOP DRAWING FILES

2.4 REDLINES AND MARKUPS

PART 3 EXECUTION

3.1 WORKING SHOP DRAWINGS

3.1.1 Markup Guidelines

3.1.2 Shop Drawings Content

3.2 FINAL CAD DRAWINGS

3.3 FINAL APPROVED SHOP DRAWINGS

SECTION 01 78 00 Page 1

SECTION 01 78 00 Page 2

SECTION 01 78 00

CLOSEOUT SUBMITTALS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

ERDC/ITL TR-12-1 (2015) A/E/C Graphics Standard, Release 2.0

ERDC/ITL TR-12-6 (2015) A/E/C CAD Standard - Release 6.0

1.2 DEFINITIONS

1.2.1 Working Shop Drawings

Working shop drawings are the marked-up drawings, maintained by the Contractor, that depict actual conditions and deviations from the Contract Documents. These deviations and additions may result from coordination required by, but not limited to: contract modifications; official responses to submitted Requests for Information (RFI's); direction from the Contracting Officer; design that is the responsibility of the Contractor, and differing site conditions. Maintain the shop drawings throughout fabrication as red-lined hard copies on site and red-lined PDF files . These files serve as the basis for the creation of the record drawings.

1.2.2 Final Approved Shop Drawings

The final approved shop drawings are the final compilation of actual conditions reflected in the working shop drawings.

1.3 SOURCE DRAWING FILES

Request the full set of electronic contract drawings after award and at least 30 days prior to required use.

1.3.1 Terms and Conditions

Data contained on these electronic files must not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor must make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor must, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, SECTION 01 78 00 Page 3 including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.

These electronic CAD drawing files are not construction documents.

Differences may exist between the CAD files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic CAD files, nor does it make representation to the compatibility of these files with the Contractor hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished Source drawing files, the signed and sealed construction documents govern. The Contractor is responsible for determining if any conflict exists. Use of these Source Drawing files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project. If the Contractor uses, duplicates or modifies these electronic source drawing files for use in producing construction data related to this contract, remove all previous indicia of ownership (seals, logos, signatures, initials and dates).

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-11 Closeout Submittals

Final Approved Shop Drawings; G

1.5 QUALITY CONTROL

Additions and corrections to the contract drawings must be equal in quality and detail to that of the originals. Line colors, line weights, lettering, layering conventions, and symbols must be the same as the original line colors, line weights, lettering, layering conventions, and symbols.

PART 2 PRODUCTS

2.1 GOVERNMENT FURNISHED MATERIALS

The Government will provide an optical disc (CD or DVD) that contains the following:

One set of "as-designed" electronic CAD files in the specified software and format revised to reflect all amendments and the final contract PDF drawings. The CAD files are provided to enable preparation of as-built or as-constructed drawings. If discrepancies exist between the CAD files and the contract PDF drawings, correct the CAD files to show the contract PDF drawings.

2.2 CAD DRAWINGS

Prepare the CAD drawing files in MicroStation V8i (.dgn) format compatible with a Windows 10 operating system.

SECTION 01 78 00 Page 4

2.3 PDF SHOP DRAWING FILES

Provide electronic PDF "plots" of all contract drawings sheets associated with the shop drawing submittal. Compile and organize the PDF set to match the contract drawings.

2.4 REDLINES AND MARKUPS

Provide PDFs of the current working redlines and/or markups complying with the shop drawing and markup requirements contained in this specification.

PART 3 EXECUTION

3.1 WORKING SHOP DRAWINGS

Maintain the working shop drawings throughout fabrication as red-lined hard copies on site and red-lined PDF files.

3.1.1 Markup Guidelines

Make comments and markup the drawings complete without reference to letters, memos, or materials. Show what was changed, how it was changed, where item(s) were relocated and change related details. These working shop drawing markup prints must be neat, legible and accurate as follows:

a. Use base colors of red, green, and blue. Color code for changes as follows:

(1) Special (Blue) - Items requiring special information, coordination, or special detailing or detailing notes.

(2) Deletions (Red) - Over-strike deleted graphic items (lines), lettering in notes and leaders.

(3) Additions (Green) - Added items, lettering in notes and leaders.

b. Provide a legend if colors other than the "base" colors of red, green, and blue are used.

c. Add and denote any additional equipment or material facilities, service lines, incorporated under As-Built Revisions if not already shown in legend.

d. Use frequent written explanations on markup drawings to describe changes. Do not totally rely on graphic means to convey the revision.

e. Use legible lettering and precise and clear digital values when marking prints. Clarify ambiguities concerning the nature and application of change involved.

f. Wherever a revision is made, also make changes to related section views, details, legend, profiles, plans and elevation views, schedules, notes and call out designations, and mark accordingly to avoid conflicting data on all other sheets.

g. For deletions, cross out all features, data and captions that relate to that revision.

h. For changes on small-scale drawings and in restricted areas, provide

SECTION 01 78 00 Page 5 large-scale inserts, with leaders to the applicable location.

i. Indicate one of the following when attaching a print or sketch to a markup print:

1) Add an entire drawing to contract drawings

2) Change the contract drawing to show

3) Provided for reference only to further detail the initial design.

3.1.2 Shop Drawings Content

Revise Shop Drawings in accordance with ERDC/ITL TR-12-1 and ERDC/ITL TR-12-6 . Keep these working shop drawing markups current on a weekly basis and at least one set available in the fabrication shop at all times. Changes from the contract drawings which are made during fabricationor additional information which might be uncovered in the course of fabrication must be accurately and neatly recorded as they occur by means of details and notes. Show on the shop drawings, but not limited to, the following information:

a. Changes in details of design or additional information obtained from working drawings specified to be prepared or furnished by the Contractor.

b. Changes or Revisions which result from the final inspection.

c. Where contract drawings or specifications present options, show only the option selected for construction on the working shop drawing markups.

d. Modifications.

e. Unusual or uncharted obstructions that are encountered in the contract work area during fabrication.

3.2 FINAL CAD DRAWINGS

Prepare final cad drawings after the completion of the project. Transfer the changes from the approved working shop drawing markups to the electronic CAD drawing files. Modify the CAD drawing files to correctly show the features of the project shop drawings by bringing the working CAD drawing set into agreement with approved working shop drawing markups, and adding such additional drawings as may be necessary. Refer to ERDC/ITL TR-12-1 . Jointly review the working shop drawing markups with printouts from working CAD drawing PDF files for accuracy and completeness. Monthly review of working CAD drawing PDF file printouts must cover all sheets revised since the previous review. These PDF drawing files are part of the permanent records of this project. Any drawings damaged or lost must be satisfactorily replaced at no expense to the Government.

Drawing revisions (include within change order price the cost to change working and final record drawings to reflect revisions) and compliance with the following procedures.

a. Follow directions in the revision for posting descriptive changes.

SECTION 01 78 00 Page 6

b. The revision delta size must be 5/16 inch unless the area where the delta is to be placed is crowded. Use a smaller size delta for crowded areas.

c. Place a revision delta at the location of each deletion.

d. For new details or sections which are added to a drawing, place a revision delta by the detail or section title.

e. For minor changes, place a revision delta by the area changed on the drawing (each location).

f. For major changes to a drawing, place a revision delta by the title of the affected plan, section, or detail at each location.

g. For changes to schedules or drawings, place a revision delta either by the schedule heading or by the change in the schedule.

3.3 FINAL APPROVED SHOP DRAWINGS

Submit final approved project shop drawings (PDF and CAD Drawings Package) 30 days after delivery of the fabricated components.

Submit one electronic set of ANSI D size PDF and CAD files. The package must be complete in all details.

SECTION 01 78 00 Page 7

SECTION 01 78 00 Page 8

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 20 15

SECTOR GEAR REPLACEMENT

PART 1 GENERAL

1.1 SCOPE

1.2 PERIOD OF PERFORMANCE

1.3 APPLICABLE DRAWINGS

1.4 REFERENCES

1.5 SUBMITTALS

1.6 QUALITY ASSURANCE

1.6.1 Acceptable Contractor

1.6.2 Contractor Qualifications

1.6.3 Quality Control

1.6.4 Reporting

1.7 DRAWINGS / INFORMATION TO BE FURNISHED BY THE CONTRACTOR

1.7.1 Drawings

1.7.2 Letter of Certification and Technical Data

1.7.3 Fabrication Assembly Procedure

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Structural Steel plate

2.1.2 Steel Forgings

2.1.3 Steel Castings

2.1.4 Bushings

2.1.5 Sector Pin

2.1.6 Turn Bolts

2.2 FABRICATION

2.2.1 General

2.2.2 Dimensional Tolerances for Structural Work

2.2.3 Structural Steel Fabrication

2.3 WELDING

2.3.1 Welding Procedures for Structural Steel

2.3.2 Welding of Steel Castings

2.3.3 Welding Process

2.3.4 Welding Technique

2.3.4.1 Filler Metal

2.3.4.2 Preheat and Interpass Temperature

2.3.4.3 Stress Relief Heat Treatment

2.3.5 Workmanship

2.3.5.1 Preparation of Base Metal

2.3.5.2 Temporary Welds

2.3.5.3 Tack Welds

2.3.6 Welder Qualifications

2.3.6.1 Welder, Welding Operator, and Tacker Qualification

2.3.6.1.1 Previous Qualifications

2.3.6.1.2 Certificates

2.3.6.1.3 Renewal of Qualification

2.3.6.2 Inspector Qualification

SECTION 35 20 15 Page 1

2.4 MACHINE WORK

2.4.1 General

2.4.2 Finished Surfaces

2.4.3 Unfinished Surfaces

2.4.4 Gear Teeth

2.5 SURFACE HARDENING OF GEAR TEETH

PART 3 EXECUTION

3.1 TESTS, INSPECTION AND VERIFICATION

3.1.1 Qualification Of Welders And Welding Operators

3.1.2 Material Tests

3.1.3 Nondestructive Testing

3.1.4 Inspection of Structural Steel Welding

3.1.4.1 Visual Examination

3.1.4.2 Nondestructive Examination

3.1.4.3 Test Coupons

3.1.4.4 Supplemental Examination

3.1.5 Structural Steel Welding Repairs

3.1.6 Inspection of Forgings

3.2 CLEANING AND PAINTING

3.2.1 Cleaning

3.2.2 Surfaces to be Painted

3.2.3 Painting System

3.3 COMPONENT WEIGHTS

3.4 SHOP ASSEMBLY AND INSPECTION

3.4.1 Shop Assembly

3.4.2 Shop Inspection

3.5 DELIVERY, STORAGE AND HANDLING

3.5.1 General

3.5.2 Protection of Finished Surfaces

3.5.3 Handling and Storage Instructions

3.5.4 Notification Prior to Shipping

3.5.5 Place of Delivery

SECTION 35 20 15 Page 2

SECTION 35 20 15

SECTOR GEAR REPLACEMENT

PART 1 GENERAL

1.1 SCOPE

The work shall consist of fabricating and delivering to Pickwick Lock one set of replacement components for the operating machinery of one Pickwick Miter Gate Sector Gear. The total number of replacement components to be provided shall be as specified herein and on the contract drawings:

a. Sector Gear: Required one (1), MK 9^R

b. Pinion Gear: Required one (1), MK 14

c. Gear Bushing: Required two (2), MK 12

d. Pinion Keys: Required two (2), MK 13

e. Trunnion Block: Required one (1), MK 22

f. Arm Bushings: Required two (2), MK 11

g. Trunnion Block Pin: Required one (1), MK 42

h. Head screws, pipe plugs, dowels (MK 28, 29), grease fittings (MK 26), eyebolts (MK 30) and other miscellaneous items shown on drawing 64E250-3 shall also be provided by the Contractor. These items shall be shown on the shop drawings and product data shall be provide with shop drawings as applicable for approval.

The sector gear shall be of either forged or welded construction. The equipment listed above will be referred to collectively as sector gear equipment throughout these specifications. The installation of the replacement sector gear equipment at the site, including all field modifications necessary, and the preparation of the final as-built drawings will be performed by the Government.

1.2 PERIOD OF PERFORMANCE

The Period of Performance is 365 calendar days after the contract is awarded.

1.3 APPLICABLE DRAWINGS

a. Contract drawings: 64E250-3, 64E250-5.

All areas hashed on the drawings are NOT part of the project scope. All quantities shown on the drawings are incorrect, contractor should base all work on quantities in Section 1.1 of the this package.

b. Installation drawing: 64E250-2. This drawing is supplied for reference only. The work shown shall be performed by the Government personnel.

SECTION 35 20 15 Page 3

c. Reference drawings and for information only drawings: All Drawings designated as such.

1.4 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN GEAR MANUFACTURERS ASSOCIATION (AGMA)

ANSI/AGMA 2009 (2001B; R 2008) Bevel Gear Classification, Tolerances, and Inspection Methods

AMERICAN IRON AND STEEL INSTITUTE (AISI)

AISI 4130 H Alloy Steel

AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)

ANSI/ASNT CP-189 (2016) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel (ANSI/ASNT CP-105-2006)

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2020) Structural Welding Code - Steel

AWS QC1 (2016) Specification for AWS Certification of Welding Inspectors

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B4.1 (1967; R 1994; R 2004; R 2009; R 2020)

Preferred Limits and Fits for Cylindrical Parts

ASME B46.1 (2020) Surface Texture, Surface Roughness, Waviness and Lay

ASTM INTERNATIONAL (ASTM)

ASTM A148/A148M (2020; E 2020) Standard Specification for Steel Castings, High Strength, for Structural Purposes

ASTM A354 (2017; E 2017; E 2018) Standard Specification for Quenched and Tempered Alloy Steel Bolts, Studs, and Other Externally Threaded Fasteners

ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel

ASTM A449 (2014; R 2020) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

SECTION 35 20 15 Page 4

ASTM A572/A572M (2018) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel

ASTM A668/A668M (2020a) Standard Specification for Steel Forgings, Carbon and Alloy, for General Industrial Use

ASTM B22/B22M (2017) Standard Specification for Bronze Castings for Bridges and Turntables

ASTM E165 (2009) Standard Test Method for Liquid Penetrant Examination

ASTM E709 (2015) Standard Guide for Magnetic Particle Examination

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC 7/NACE No.4 (2007) Brush-Off Blast Cleaning

SSPC SP 2 (2018) Hand Tool Cleaning

SSPC SP 3 (2018) Power Tool Cleaning

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted:

SD-01 Preconstruction Submittals

Contractor Qualifications; G

Submit Contractor qualifications with bid. Copy required.

Quality Control Plan; G

Submit quality control plan 14 calendar days after Award of Contract.

SD-02 Shop Drawings

Shop Drawings; G

SD-03 Product Data

Painting; G

SD-05 Design Data

Fabrication Assembly Procedure ; G

Submit Fabrication Assembly Procedure prior to commencement of fabrication.

SECTION 35 20 15 Page 5

SD-06 Test Reports

Component Weights;

Submit component weights 7 days prior to Government inspection of Fabrication at Contractor's Facility.

Hardness Test Report; G

Ndt Report; G, ECD-E

SD-07 Certificates

Qualification of Welders and Welding Operators; G

Submit welder certification prior to commencement of fabrication.

Letter of Certification and Technical Data; G

Submit letters of certification (materials, paint and filler material) one week prior to Government inspection of Fabrication at Contractor's Facility.

Record of Nondestructive Test and Examination Procedures ; G

SD-09 Manufacturer's Field Reports

Shop Inspection Procedure; G

Submit shop inspection procedure 14 days prior to shop inspection.

Shop Inspection Report; G

Handling and storage Instructions; G

Submit handling and storage instructions 14 days prior to scheduled delivery date.

SD-11 Closeout Submittals

Delivery of Equipment; G

Delivery equipment within 180 days after notice to proceed.

Record Drawings; G

Provide as-built drawings 15 days after the delivery of equipment.

1.6 QUALITY ASSURANCE

1.6.1 Acceptable Contractor

The Contractor for the fabrication of the specified equipment shall be one who is in the business of fabricating precision gearing equipment. The Contractor shall have no less than 10 years experience in the fabrication of similar equipment. The manufacturer shall be subject to the government's approval.

SECTION 35 20 15 Page 6

1.6.2 Contractor Qualifications

A statement identifying the name of the contractor containing evidence that the contractor meets the experience requirements of paragraph "Acceptable Contractor".

1.6.3 Quality Control

The Contractor shall establish and maintain a quality control system to assure compliance with the requirements of these specifications and shall maintain records of quality control of all operations covered by these specifications. The contractor shall submit for review the quality control plan for the work to be performed. See paragraph Tests, Inspection and Verification for details.

a. The Contractor s facilities shall be open, during normal business hours, to the Contracting Officer or his authorized representative for the purpose of inspection of work, completed and in progress, on this contract. The aforementioned quality control records shall be available for inspection. The Government shall be notified at least 10 days prior to painting of gears to enable shop inspection of the gears by Government Inspectors at Contractor s facility.

b. The contractor shall submit a quality control plan for the work to be performed.

1.6.4 Reporting

Three copies of the records and tests, as well as the records of corrective action taken, shall be furnished to the government when requested.

1.7 DRAWINGS / INFORMATION TO BE FURNISHED BY THE CONTRACTOR

1.7.1 Drawings

The contractor shall be required to make a site visit prior to submitting shop drawings for technical approval in order to field verify all dimensional and connectivity information.

Shop drawings shall include fabrication and assembly details, type, grade, and class of materials, as appropriate. Elements of fabricated items inadvertently omitted on contract drawings shall be detailed by the fabricator and indicated on the shop drawings.

a. Shop drawings in PDF and CAD formation shall be provided for approval. Decisions on these drawings, either approval or disapproval, will be given by the Contracting Officer by letter or email. Within 15 calendar days after receipt, the Contracting Officer will return one copy to the Contractor marked Approved , Approved Except as Noted , or Returned for Correction . The notations Approved and Approved Except as Noted authorize the Contractor to proceed with the fabrication of the equipment covered by such drawings, subject to the corrections, if any, indicated thereon or described in the letter of transmittal. When drawings have been Returned for Correction , the Contractor shall make the necessary revisions on the drawings and shall submit prints for approval in the same routine as before. Every revision made during the life of the

SECTION 35 20 15 Page 7 contract shall be shown by the number, date, and subject in a revision block and a notation shall be made in the drawing margin to permit rapid location of the revision. The time consumed by the Contractor in submitting and obtaining approval of shop drawings shall be included in the time allowed for completion of the contract.

b. Record drawings that detail the fabricated equipment shall be submitted at the completion of the project.

c. contractor shall submit shop drawings and as-built drawings in PDF format and .dgn formats. Other format may also be acceptable.

1.7.2 Letter of Certification and Technical Data

Letters of certification shall be provided for steel, filler metal and paint. Technical data shall be provided for filler metal and paint.

Certified test reports for all required materials shall show that materials comply with applicable specifications. These reports shall note specific standards followed in the performance of tests. A certified letter documenting the final tooth surface hardness including the testing method shall be supplied. See paragraph "Surface Hardening of Gear Teeth" for details. Certification and Technical Data shall be submitted for approval.

1.7.3 Fabrication Assembly Procedure

A Fabrication Assembly Procedure shall be prepared by the Contractor and submitted to the Contracting Officer for approval. The procedure shall detail the order in which components of the sector gear will be fabricated and assembled, the welding procedures to be used for all welds and the methods the Contractor will employ to control distortion of the weldment.

It shall include all preparatory steps, post-weld treatments, joint dimensions and tolerances. All welding procedures approved for use shall receive a Government stamp identifying them as approved. Only welding procedures bearing a Government approval stamp shall be allowed for use during fabrication. Approval of any welding procedure does not relieve the Contractor of the responsibility for producing a finished structure meeting all requirements of these specifications. The Contractor may be directed or authorized to make any changes in previously approved welding procedures that are deemed necessary or desirable by the COR.

PART 2 PRODUCTS

2.1 MATERIALS

The Sector Gear MK 9R can be made from cast steel as shown on the contract drawings or can be fabricated from forged steel and other materials as shown on the for information only drawings. Requirements for both are listed below.

2.1.1 Structural Steel plate

Structural steel for the spokes of the sector gear shall conform to ASTM A36/A36M. Keeper plate shall conform to ASTM A572/A572M .

2.1.2 Steel Forgings

Forgings for the sector gear rim, pinion gear and Sector Gear hub shall conform to AISI 4130 H Alloy steel. The mechanical surfaces of the

SECTION 35 20 15 Page 8 sector gear teeth and pinion gear teeth shall be hardened per paragraph SURFACE HARDENING OF GEAR TEETH after machining of the teeth. The Trunnion Block will be forged to conform to ASTM A668/A668M Class E.

2.1.3 Steel Castings

Castings for the Sector Gear shall conform to at minimum ASTM A148/A148M Grade 90-60 Cast steel.

2.1.4 Bushings

Bushing material shall conform to ASTM B22/B22M, manganese bronze.

2.1.5 Sector Pin

The sector pin material shall conform to ASTM A668/A668M , Gr. H.

2.1.6 Turn Bolts

Turn bolts ( ASTM A354, Gr. BC) shall be galvanized. Bolts shall be furnished with galvanized nuts and washers.

Galvanized cap screw shall conform to ASTM A449. Provide galvanized lock washer with cap screw.

2.2 FABRICATION

2.2.1 General

Material must be straight before being laid off or worked. If straightening is necessary it shall be done by methods that will not impair the metal. Sharp kinks or bends shall be cause for rejection of the material. Material with welds will not be accepted except where welding is definitely specified, indicated or otherwise approved. Bends shall be made by approved dies, press brakes or bending rolls. Where heating is required, precautions shall be taken to avoid overheating the metal and it shall be allowed to cool in a manner that will not impair the original properties of the metal.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .