W912P520Q00460001 Amendment 1.pdf
PDF 516 KB Posted
- Solicitation number
- W912P520Q0046
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P520Q00460003 Amendment 3.pdf | ||
| W912P520Q00460002 Amendment 2.pdf | ||
| W912P520Q0046 Virtual Meeting Presentation.pptx | PPTX presentation | |
| W912P520Q0046_final.pdf | ||
| Foreign National Site Visit Request Form.pdf | ||
| Site Visit Request Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD001068650000
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT: Gearbox Inspections at Guntersville and Pickw ick Locks
PURPOSE: The purpose of this amnedment is to:
1. Provide the Government's response to vendors' questions.
2. Provide the pre-quote virtual meeting minutes and revised specif ications.
3. Provide the pre-quote virtual meeting Pow er Point presentation as a separate attachment.
FAR 52.252-3, Alterations in Solicitation, is updated.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P520Q0046
X 9B. DATED (SEE ITEM 11)
05-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2020
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P520Q0046
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
PRE-QUOTE MEETING MINUTES
CELRN-RCN 26 August 2020
MEMORANDUM FOR RECORD
SUBJECT: Gearbox Inspections at Guntersville and Pickwick Locks (W912P520Q0046), Pre-Quote Virtual Meeting
1. Purpose: To summarize the Pre-Quote Virtual Meeting held on 17 August 2020.
2. Attendees:
Government:
Mr. Ryan Johnson, Lock and Dam Equipment Mechanic, CELRN-OPT-GUL Ms. Kristal Jones, Contract Specialist, CELRN-RCN Mr. Randall King, Lock Master, CELRN-OPT-PIC Mr. Michael Murphy, Mechanical Engineer, CELRN-OPT-TRA
Vendors:
A. Atlanta Gear Works Mr. Craig Massa
B. Brad Foote Gearing
Mr. Richard Neumann Mr. Joseph White
C. Premiere Generator Services Mr. Suresh (Joe) Persad
3. Summary of Discussions: Mr. Michael Murphy started the meeting at 10:00 a.m. Central Time with a Power Point presentation. The presentation provided a brief overview of the projects and contracting requirements. The vendors were informed that the meeting area for the physical site visit at Guntersville Lock would be in the parking area past the entrance gate on the right and they would be required to have hardhat, steel toe shoes, safety glasses, and fall restraint harnesses. Life vests will be provided by USACE personnel at the project.
4. At the end of the presentation, Mr. Murphy opened the floor for questions. One question was asked, which will be included in the question and answer section of the amendment. He reiterated the dates and time of the physical site visits for Guntersville and Pickwick Locks before concluding the meeting. He also stated that the Power Point presentation would be provided via an amendment to the solicitation. The meeting ended at 10:30 a.m. Central Time.
Q & A
Gearbox Inspections at Guntersville and Pickwick Locks Questions and Answers Amendment 0001
1. Due to difficulty bringing materials in and out of the auxiliary lock; will it be acceptable to stage fluids on the lock wall overnight?
ANSWER: There is no specific wording in the contract that indicates that fluids must be removed from the lock wall every day. Materials and equipment can be staged on the lock walls but must be cleared before moving to another corner of the lock.
2. Can the environmentally friendly pressure washing fluid be washed down the drain when pressure washing the machinery area?
ANSWER: Pressure washing fluid is not acceptable in this environment. Use water only.
3. For clarification we are not inspecting any of the external pinions and bull gears?
ANSWER: Correct. External pinion and bull gear is not in scope
4. If metal is found in the gearbox what is the procedure?
ANSWER: If metal is found in the gearbox report the finding and recommend action based on type of metal found.
5. Is it known whether any of the old oil to be disposed of contains lead?
ANSWER: None of the existing oil is known to contain lead.
6. While on the site visit there were no oil filters on any of the gearboxes, can you confirm?
ANSWER: There are oil filters at Pickwick. The gearboxes at Guntersville do not have inline oil filters.
7. What is the temperature in January?
ANSWER: Grant AL temperatures average from high 20’s to high 40’s. Counce TN temperatures average from low 30’s to low 50’s.
8. It will be tough to record contact pattern because we will not be able to rotate the gearing.
Pictures will be able to show current contact pattern. Bore scope will allow us to see more of the gearing, but not the complete gear-set without rotating the gearing. Will this be acceptable?
ANSWER: If pictures clearly indicate contact patterns they will be acceptable
9. We cannot perform functional and operational test. We can observe equipment running. Will the equipment be allowed to run for testing after we are done?
ANSWER: Equipment will be allowed to run for testing after contractor has completed their work.
10. Can we use high quality digital photos instead of lift tapes? It may be difficult to get a good pull from the tape with the limited amount of space we have going in through the inspection covers.
ANSWER: If pictures clearly indicate contact patterns they will be acceptable.
REVISED SPEFICIATIONS
GEARBOX INSPECTION, CLEANING, AND REPORT
FOR
GUNTERSVILLE AND PICKWICK LANDING LOCKS
1. SCOPE
Furnish all plant, labor, materials, and equipment to perform Gearbox Inspection, Cleaning and Reporting in accordance with the Performance Work Statement on all work described herein on:
1.1 Guntersville Main Lock
Upper and Lower Miter Gates (4 High and 4 Low Speed Gearboxes) Filling and Empting Valves (4 Primary Gearboxes) Chamber Tow Haulage Unit (1 High and 1 Low Speed Gearbox)
1.2 Guntersville Auxiliary Lock
Upper and Lower Miter Gates (4 High and 4 Low Speed Gearboxes) Filling and Empting Valves (4 High and 4 Low Speed Gearboxes) Chamber Tow Haulage Unit (1 High and 1 Low Speed Gearbox)
1.3 Pickwick Landing Main Lock
Upper and Lower Miter Gates (4 High and 4 Low Speed Gearboxes) Filling and Empting Valves (4 High and 4 Low Speed Gearboxes)
USACE will provide equipment, equipment operator and qualified rigging personnel to provide contractor personnel safe access to the work specified here in.
2. PLACE OF PERFORMANCE
Guntersville Lock, 3780 Guntersville Dam Road, Grant AL 35747 Pickwick Landing Lock, 850 Carolina Lane, Counce TN 38326
3. PERIOD OF PERFORMANCE
Due to ongoing work at the project sites, performance of onsite work described herein cannot begin until 1 January 2021. All requirements herein shall be complete within one hundred-twenty (120) calendar days thereafter. At each worksite, all onsite work shall be completed within thirty (30) contiguous calendar days.
4. WORK HOURS
Onsite work shall be performed Monday through Thursday between the local hours of 0600 and 1430.
Guntersville and Pickwick Landing Lock are located in the US Central Time Zone.
Contractor shall comply with all special scheduling requirements listed herein for each work location.
Emergency Operation: In the rare event that the government deems that a lockage should be required for emergency or other inherently governmental purpose, the contractor shall immediately and diligently perform actions to return the lock to operation. Contractor shall perform their work in such a manner that the lock can be returned to operation in no more than two (2) hours.
All work shall be scheduled in such a manner that the lock is returned to operation by the end of each work day.
No onsite work shall be permitted at any worksite on federally observed holidays.
2019/2020 Federally Observed Holidays
Date Holiday Monday, November 11, 2019 Veterans Day Thursday, November 28, 2019 Thanksgiving Day Wednesday, December 25, 2019 Christmas Day Wednesday, January 1, 2020 New Year’s Day Monday, January 20, 2020 Birthday of Martin Luther King, Jr.
Monday, February 17, 2020 Washington’s Birthday Monday, May 25, 2020 Memorial Day Tuesday, July 3, 2020 (observed) Independence Day Monday, September 7, 2020 Labor Day Monday, October 12, 2020 Columbus Day Wednesday, November 11, 2020 Veterans Day Thursday, November 26, 2020 Thanksgiving Day Friday, December 25, 2020 Christmas Day Source: opm.gov
5. SAFETY
All contractor’s means and methods of performing the work shall be conducted in a safe manner. Applicable provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, as well as any and all federal, state and local requirements shall govern the work performed. The U.S. Army Corps of Engineers safety manual may be located at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
5.1 Lockout/Tagout Training:
In accordance with EM 385-1-1 Section 12.C; all persons performing work on site shall attend USACE lockout/tagout training prior to performing any onsite work.
5.2 Safety Meetings:
Conduct safety meetings to review past activities, plan for new or changed operations, review pertinent aspects of appropriate AHA (by trade), establish safe working procedures for anticipated hazards, and provide pertinent Safety and Occupational Health (SOH) training and motivation. Conduct meetings at least once a month for all supervisors on the project location. The SSHO, supervisors, foremen, or CDSOs must conduct meetings at least once a week for the trade workers. Document meeting minutes to include the date, persons in attendance, subjects discussed, and names of individual(s) who conducted the meeting. Maintain documentation on-site and furnish copies to the Contracting Officer on request. Notify the Contracting Officer of all scheduled meetings 7 calendar days in advance.
5.3 Accident Prevention Plan (APP)
A qualified person must prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of EM 385-1-1, Appendix A, and as supplemented herein. The APP must be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Work cannot proceed without an accepted APP.
5.4 Activity Hazard Analysis (AHA)
Before beginning each activity, task or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity must prepare an AHA. Format the AHA in accordance with EM 385-1-1, Section 1 or as directed by the Contracting Officer. Each employee performing work as part of an activity, task or DFOW must review the AHA for that work and sign a signature log specifically maintained for that AHA prior to starting work on that activity.
5.5 Mishap Notification
Notify the Contracting Officer and the lockmaster as soon as practical, but no more than twenty-four hours, after any mishaps, including recordable accidents, incidents, and near misses, as defined in EM 385-1-1 Appendix Q, any report of injury, illness, or any property damage. For LHE or rigging mishaps, notify the Contracting Officer as soon as practical but not more than 4 hours after mishap. The Contractor is responsible for obtaining appropriate medical and emergency assistance and for notifying fire, law enforcement, and regulatory agencies. Immediate reporting is required for electrical mishaps, to include Arc Flash; shock; uncontrolled release of hazardous energy (includes electrical and non-electrical); load handling equipment or rigging; fall from height (any level other than same surface); and underwater diving. These mishaps must be investigated in depth to identify all causes and to recommend hazard control measures.
Within notification include Contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any;
extent of injury, if known, and brief description of accident (for example, type of construction equipment used and PPE used). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted. Assist and cooperate fully with the Government's investigation(s) of any mishap.
5.6 Accident Reports
Conduct an accident investigation for recordable injuries and illnesses, property damage, and near misses, including accidents involving load handling equipment and rigging. The accident reports shall include: (1) Mishap summary description to include process, findings and outcomes; (2) Root Cause; (3) Direct Factors; (4) Indirect and Contributing Factors; (5) Corrective Actions; and (6) Recommendations. Complete the applicable USACE Accident Report Form 3394, and provide the report to the Contracting Officer and the lockmaster within 5 calendar day(s) of the accident. The lockmaster will provide copies of any required or special forms.
6. SECURITY
All contractors and all associated sub-contractors shall comply with applicable District and local security policies and procedures. The contractor shall provide any/all requested information required for background checks, background investigations and/or to meet installation/facility access requirements to be accomplished by the District Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Background Investigation Requirements:
This work is being performed in a controlled area, but is expected to last less than a month. The investigation requirements fall under Category B1 for US Citizens and Category C for Foreign Nationals.
Contract employees shall be escorted by a USACE employee while within the restricted area.
7. SCHEDULING OF WORK
A site visit is recommended so that the Contractor can determine accessibility of the work area, availability of utilities, and the type of equipment that will be needed. Site access should be coordinated with the Lockmaster.
8. UTILITIES
Contractor shall supply all utilities for employees including toilet, potable water, electrical, etc.
Electrical service will be made available to the contractor near each work location however distance, voltage rating, connection type and loading capability at each location may differ. It is the contractor’s responsibility to survey each site carefully prior to beginning the work. Should the governments service availability differ from the particular needs of the contractor, the government will not modify their service and the contractor shall provide alternate means at no additional cost to the government.
Service water is available near each work location however connection types, size, and available pressure may vary from location to location. Should the governments available water not meet the particular needs of the contractor, the contractor will be responsible for providing their own utility at no additional cost to the government.
Connection to the governments’ compressed air service will not be available to the contractor.
9. SUBMITTALS. The contractor shall submit the following for approval:
9.1 PROJECT SCHEDULE
Contractor’s initial project schedule shall be submitted for Government approval within ten (10) calendar days of notice of contract award. The contractor’s project schedule shall clearly indicate the work to be performed, deration of time required for each work item, and adherence to general and site specific scheduling requirements outlined herein. The project schedule shall be maintained and updated regularly. Submit schedule updates with the contractor’s monthly progress reports.
9.2 WEEKLY PROGRESS REPORTS
Contractor shall provide to the COR by the end of each work week, a narrative describing the work completed during that week. The weekly report shall also include the plan for the following week, any potential issues and an estimated work completion date.
9.3 ACTIVITY HAZARD ANALYSIS
All work shall be conducted in a safe and orderly manner. Contractor’s site specific Activity Hazard Analysis (AHA) shall be submitted for Government approval within ten (10) calendar days of notice of contract award. Government approval of this submittal is required prior to commencement of physical work. Allow ten (10) calendar days for Government review/approval.
9.4 ACCIDENT PREVENTION PLAN
Contractor shall prepare an Accident Prevention Plan within ten (10) calendar days of notice of contract award. This submittal shall include accident reporting procedures and emergency plans to ensure employee safety in case of fire, medical or other emergencies. Government approval of this submittal is required prior to commencement of physical work. Allow ten (10) calendar days for Government review/approval.
9.5 MATERIAL TRANSPORTATION, USE AND STORAGE PLAN
A plan indicating the contractor’s adherence to manufacturer recommendations, OSHA, NFPA and USACE safety and Occupational Health requirements for the transportation, use and storage of chemicals, materials, substances and waste shall be submitted for Government approval within ten (10) calendar days of notice of contract award. This submittal shall clearly demonstrate the contractor’s ability to control and prevent leakage, spills or any other action that could contaminate people, animals, food, water, equipment, materials and/or environment. Allow ten (10) calendar days for Government review/approval.
9.6 PRODUCT DATA
Product data for all materials, fluids, and equipment to be installed shall be submitted for Government approval within ten (10) calendar days of notice of contract award. Product data shall provide the Government sufficient information for proper operation and maintenance of the equipment as-well-as demonstrate the products appropriateness of the given application. Allow ten (10) calendar days for Government review/approval.
9.7 TEST AND ANALYSIS
All tests and analysis performed shall be included as an attachment to each gearbox report.
9.8 REPORT OF GEARBOX CONDITION
Reports shall include sufficient detail in words, photographs, graphs, charts or other methods specified herein, to fully describe the ‘as found’ and ‘as left’ condition of the equipment. The reports shall include a section discussing recommended work. The report shall include a section detailing suggested materials and equipment to be maintained at the worksite for ideal maintenance/operation of the equipment.
10. WARRANTY
The Contractor shall warranty all work for a period of one (1) year from acceptance by the Government.
11. COORDINATION
The Contractor shall establish and maintain coordination with the U.S. Army Corps of Engineers throughout the project.
Point of Contact Guntersville Lock:
Ryan Johnson 256-582-3263 Ryan.P.Johnson@usace.army.mil
Pickwick Landing Lock:
Brian Brewer 731-925-2334 Brian.D.Brewer@usace.army.mil
Technical POC:
Michael Murphy 423-870-7674 Michael.K.Murphy@usace.army.mil
12. DESCRIPTION OF WORK
Inspect and report the as-found condition of all gearboxes Clean machinery area Perform laboratory analysis of existing oil Remove existing oil Thoroughly clean interior of gearboxes including the lubrication system Inspect the lubrication system and adjust as needed Inspect and report the as-found condition of the inside of the gearbox Replace oil filters Remove and replace desiccant canisters/air breather as specified herein Replace oil Reassemble gearbox and return to service
Perform functional and operational tests upon completion of work Provide written report of all findings Provide sufficient quantity of spare oil filters for twelve (12) month maintenance cycle
13. EXECUTION OF TASKS
13.1 General
The work covered under this contract shall consist of the contractor furnishing all equipment, labor, materials, and supervision required to perform the required work. The Contractor shall complete all work using standard methods used throughout the industrial machine industry. This section describes the minimum requirements for work required in section 12. DESCRIPTION OF WORK.
13.1.1 Inspection:
A comprehensive visual inspection and report of the gearboxes shall be provided.
13.1.1.1 External Gearbox examination:
Perform a thorough external examination of the gearboxes taking note of any signs of leakage, or other damage. Note the condition of all structural fasteners and measure and report their tightening torque. Inspect all surfaces including structural interfaces for corrosion or movement. Examine the inspection port cover(s) for bolt tightness and for proper seal. Inspect all external surfaces and components for signs of overheating. Inspect the breather. Report any oil leaks at the shaft seals.
13.1.1.2 Internal Gearbox examination:
Areas around the access point shall be cleaned prior to the internal inspection to prevent the ingress of contaminants. Take care when removing the inspection port to prevent objects such as bolts, tools or other contaminates from entering the gearbox. Inspect, by use of a borescope, internal surfaces and components for signs of overheating, wear, and all other forms of degradation. Contractor shall use the inspection port, oil fill port, drain, and/or other methods of access to the inside of the gearbox to perform the internal inspection. The gearbox case shall not be split. Observe the condition of the gears, shafts, and internal coating. Document the condition of each component with photographs and written descriptions. (Gearboxes which cannot be inspected internally without splitting the case are not included in this requirement.)
13.1.1.3 Inspection of Lubricant:
Collect samples of the lubricant from an area near the gearset for analysis. Provide results of the laboratory analysis with the inspection report.
13.1.1.4 Inspection of Lubrication System:
The gearbox lubrication system shall be examined, cleaned and adjusted as required to insure proper operation.
13.1.1.5 Inspection of Filtration System:
The oil filters and magnetic plugs shall be examined for wear debris and contamination.
13.1.1.6 Gear Tooth Contact Patterns:
Record gear tooth contact patterns for loaded condition using machinist’s layout lacquer and transparent tape. Other methods or recording gear tooth contact patterns may be submitted for approval.
Gear tooth contact patterns may only be obtained through the gearbox inspection ports or by the removal of safety covers. Splitting of gearbox cases will not be permitted. In such cases where gearboxes do not have inspection ports or safety covers and in other cases where access to the gear teeth are impractical, the contractor shall refer to paragraph 13.1.1.2 Internal Gearbox Examination.
13.1.1.7 Macropitting:
Record macropitting on gear teeth using marking grease and transparent tape.
Fully describe the tooth location and orientation with the record.
13.1.1.8 Micropitting:
Record micropitting with graphite and transparent tape. Fully describe the tooth location and orientation with the record.
13.1.2 Clean Machinery Area:
Remove excess open gear grease from the work area using hand tools and buckets. Pressure wash the entire machinery area including walls, machinery, floor, and other surfaces to remove all dirt, grime, and mold from the work space.
13.1.3 Drain Oil:
Drain the existing oil. Oil to be removed from service shall become the property of the contractor.
All oil must be removed from the lock wall area of the worksite each day. Lockmaster will designate a staging area where the contractor may relocate materials.
13.1.4 Thoroughly clean interior of gearboxes
Clean all internal surfaces by high pressure spraying and thorough flushing of the gearbox, pre-lube systems and drains to remove water, rust, sludge, varnish/lacquer and other chemical contaminants, sediments, and all organic and inorganic particulate matter present due to construction, normal ingress, internal generation and/or component wear. Flushing fluid shall be fully compatible with all system components and new lubricating fluids. Flushing fluid shall be of a lower viscosity than the new lubricating fluid.
13.1.5 Remove and replace Air Breather/Desiccant Canisters
Replace Air Breather on all gearboxes ref. Replacement breather shall be Faulk AirMax (6721116) or other such screw on type air breather system meeting the following performance features.
Operating range shall be -40°F to 200°F, 2-year scheduled changeout, and internal media shall prevent the ingress of water and the egress for oil in high humidity environments. Submit product data for approval.
13.1.6 Replace oil
Guntersville Lock: Supply SAE 80W-90 mineral based gear lubricant specially blended to be fully compatible with the Lock’s existing supply of Chevron 80W-90. New oil shall be filtered on site. Independent laboratory test shall confirm particle count meets or exceeds 17/15/12 per ISO 4406:99 for oil cleanliness to be acceptable. Submit product data and compatibility test results for approval.
Fill gearboxes to manufacturers’ recommended level. Oil volumes provided are estimated based on established maintenance practices. Actual fill volumes will vary. Contractor’s quote shall account for refill volume, flushing and all other usage of lubricant. The base contract quote shall be based on 2,000 gallon. Oil usage in excess of the contract amount shall be at the contractor’s own expense unless prior approval is obtained by the Government. Unit price for oil shall be provided with the contractor’s quote. Provide additional one (1) 55-gallon drum of makeup oil for each lock location. Excess oil shall be removed from the project site. Approximate oil quantities for each gearbox is provided below:
Main Lock Miter Gates High Speed Gearbox, Quantity - 4, Approximate Oil Volume - 5 Gallons Miter Gates Low Speed Gearbox, Quantity - 4, Approximate Oil Volume - 50 Gallons Chamber F/E Valve Gearbox, Quantity – 4, Approximate Oil Volume - 70 Gallons Chamber Tow Haulage Low Speed Gearbox, Quantity – 1, Approximate Oil Volume - 25 Gallons
Auxiliary Lock Miter Gates High Speed Gearbox, Quantity - 4, Approximate Oil Volume - 12 Gallons Miter Gates Low Speed Gearbox, Quantity - 4, Approximate Oil Volume - 60 Gallons Chamber F/E Valve High Speed Gearbox, Quantity – 4, Approximate Oil Volume - 30 Gallons Chamber F/E Valve Low Speed Gearbox, Quantity – 4, Approximate Oil Volume - 165 Gallons Chamber Tow Haulage Low Speed Gearbox, Quantity – 1, Approximate Oil Volume - 25 Gallons
Pickwick Landing Lock: Supply AGMA 4EP mineral based gearbox lubricant, ISO-VG 150 and specially blended to be fully compatible with the Lock’s existing supply of Shell Omala 220. New oil shall be filtered on site. Independent laboratory test shall confirm particle count meets or exceeds 17/15/12 per ISO 4406:99 for oil cleanliness to be acceptable. Submit product data and compatibility test results for approval.
Fill gearboxes to manufacturers’ recommended level. Oil volumes provided are estimated based on established maintenance practices. Actual fill volumes will vary. Contractor’s quote shall account for refill volume, flushing and all other usage of lubricant. The base contract quote shall be based on 1,500 gallon. Oil usage in excess of the contract amount shall be at the contractor’s own expense unless prior approval is obtained by the Government. Unit price for oil shall be provided with the contractor’s quote. Provide additional one (1) 55-gallon drum of makeup oil for each lock location. Excess oil shall be removed from the project site. Approximate oil quantities for each gearbox is provided below:
Miter Gates High Speed Gearbox, Quantity - 4, Approximate Oil Volume - 1.1 Gallons Miter Gates Low Speed Gearbox, Quantity - 4, Approximate Oil Volume - 210 Gallons Chamber F/E Valve High Speed Gearbox, Quantity – 4, Approximate Oil Volume - 1.1 Gallons Chamber F/E Valve Low Speed Gearbox, Quantity – 4, Approximate Oil Volume - 58 Gallons
13.1.7 Reassemble gearbox and return to service
Reassemble gearboxes in a professional manner being sure that all surfaces are properly mated, bolts are properly torqued, and no contaminates have entered the gearboxes.
13.1.8 Perform function and operation tests upon completion of work
Upon completion of reassemble and in the presence of the Governments representative; perform functional and operational static and dynamic tests that verifies proper alignment and operation.
13.1.9 Provide written report of all findings
Contractor shall provide within fourteen (14) days of the completion of the work a detailed and compressive report of all findings. The report shall additionally include a section detailing suggested O&M practices, recommended upgrades and/or repairs, and a list of suggested spare/on-hand parts.
14. WORK SITE & ENVIRONMENTAL PROTECTION
The Contractor shall be responsible for the protection of the work area from damage and upon completion of the work shall leave existing works in a condition equal to that which existed when the work started. All work, storage of materials, and construction plant shall be kept within the limits of the areas assigned. Prior to construction operations, the Contractor shall confer with the Lockmaster to determine the proximity of any possible in wall, under-ground obstructions, pipe or equipment which could be damaged as a result of construction operations.
15. MOBILIZATION AND DEMOBILIZATION
Mobilization shall include the equipment required to complete all work requirements. Demobilization shall consist of the removal from the site of all Contractors provided equipment after completion of the work.
The site shall be clean.
16. QUALITY CONTROL.
Contractor Quality Control. The contractor shall establish and maintain quality control to ensure compliance with the contract requirements and to maintain records of operations and quality control for all operations including, but not limited to, the following:
(1) The use of only approved materials and equipment.
(2) Qualified personnel
(3) The contractor shall provide the Government a copy of all records and tests
*****END OF SECTION*****
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001:
PROJECT: Gearbox Inspections at Guntersville and Pickwick Locks
PURPOSE: The purpose of this amnedment is to:
1. Provide the Government's response to vendors' questions.
2. Provide the pre-quote virtual meeting minutes and revised specifications.
3. Provide the pre-quote virtual meeting Power Point presentation as a separate attachment.
(End of Summary of Changes)