W912P520B0012 Solicitation.pdf

PDF 2 MB Posted

Attached to
Center Hill Lake Recreation Area Operations and Maintenance Services
Solicitation number
W912P520B0012
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 10:00 AM local time 11 Dec 2020

X

A X B X C

D

EX

X G F 127 - 139

140 - 152 X H 153

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 153

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912P5 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See Bid Instructions conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 6

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT

PACKAGING AND MARKING

7 - 104 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

106 - 107

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 108 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 109 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

110 - 126

PART II - CONTRACT CLAUSES

CONTRACTING BRANCH (IJT)

110 NINTH AVE SOUTH

MAILROOM: A405

NASHVILLE TN 37203-3817 (615) 736-5679

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

10 Nov 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912P520B0012

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Base Year

FFP

Center Hill Lake, FY21. The Contractor shall furnish all necessary management, supervision, inspection, personnel, materials, supplies, parts, tools, equipment, transportation, vehicles, and fuel except as otherwise provided for herein, required to perform the operation and maintenance services within the area of responsibility, of the Center Hill Lake Water Resources Development Project. Operations, maintenance and repair services include but are not limited to: Mowing, Cleaning Services of Recreational Facilities and Areas, Janitorial Service of Administrative and Operational areas, Facility Repair, Maintenance and Other Non-Routine Work, Primitive Camping/Remote Access Area Cleaning Services, Herbicide Application, Marking and Painting Boundary Lines, Pavement Sealing and Striping, Maintenance of Navigation Aids, Janitorial Service for Center Hill Power Plant, Center Hill Resident Office Septic Tank Pumping, Routine Environmental Cleaning and Disinfection Janitorial Services, Deep Cleaning of Project Facilities, BASE YEAR: 1 Feb 2021 to 31 Jan 2022

FOB: Destination

PSC CD: S216

NET AMT

OPTION Option Year One (1)

FFP

Center Hill Lake, FY22. The Contractor shall furnish all necessary management, supervision, inspection, personnel, materials, supplies, parts, tools, equipment, transportation, vehicles, and fuel except as otherwise provided for herein, required to perform the operation and maintenance services within the area of responsibility, of the Center Hill Lake Water Resources Development Project. Operations, maintenance and repair services include but are not limited to: Mowing, Cleaning Services of Recreational Facilities and Areas, Janitorial Service of Administrative and Operational areas, Facility Repair, Maintenance and Other Non-Routine Work, Primitive Camping/Remote Access Area Cleaning Services, Herbicide Application, Marking and Painting Boundary Lines, Pavement Sealing and Striping, Maintenance of Navigation Aids, Janitorial Service for Center Hill Power Plant, Center Hill Resident Office Septic Tank Pumping, Routine Environmental Cleaning and Disinfection Janitorial Services, Deep Cleaning of Project Facilities, BASE YEAR: 1 Feb 2022 to 31 Jan 2023

OPTION Option Year Two (2)

FFP

Center Hill Lake, FY23. The Contractor shall furnish all necessary management, supervision, inspection, personnel, materials, supplies, parts, tools, equipment, transportation, vehicles, and fuel except as otherwise provided for herein, required to perform the operation and maintenance services within the area of responsibility, of the Center Hill Lake Water Resources Development Project. Operations, maintenance and repair services include but are not limited to: Mowing, Cleaning Services of Recreational Facilities and Areas, Janitorial Service of Administrative and Operational areas, Facility Repair, Maintenance and Other Non-Routine Work, Primitive Camping/Remote Access Area Cleaning Services, Herbicide Application, Marking and Painting Boundary Lines, Pavement Sealing and Striping, Maintenance of Navigation Aids, Janitorial Service for Center Hill Power Plant, Center Hill Resident Office Septic Tank Pumping, Routine Environmental Cleaning and Disinfection Janitorial Services, Deep Cleaning of Project Facilities, BASE YEAR: 1 Feb 2023 to 31 Jan 2024

OPTION Option Year Three (3)

FFP

Center Hill Lake, FY24. The Contractor shall furnish all necessary management, supervision, inspection, personnel, materials, supplies, parts, tools, equipment, transportation, vehicles, and fuel except as otherwise provided for herein, required to perform the operation and maintenance services within the area of responsibility, of the Center Hill Lake Water Resources Development Project. Operations, maintenance and repair services include but are not limited to: Mowing, Cleaning Services of Recreational Facilities and Areas, Janitorial Service of Administrative and Operational areas, Facility Repair, Maintenance and Other Non-Routine Work, Primitive Camping/Remote Access Area Cleaning Services, Herbicide Application, Marking and Painting Boundary Lines, Pavement Sealing and Striping, Maintenance of Navigation Aids, Janitorial Service for Center Hill Power Plant, Center Hill Resident Office Septic Tank Pumping, Routine Environmental Cleaning and Disinfection Janitorial Services, Deep Cleaning of Project Facilities, BASE YEAR: 1 Feb 2024 to 31 Jan 2025

OPTION Option Year Four (4)

FFP

Center Hill Lake, FY25. The Contractor shall furnish all necessary management, supervision, inspection, personnel, materials, supplies, parts, tools, equipment, transportation, vehicles, and fuel except as otherwise provided for herein, required to perform the operation and maintenance services within the area of responsibility, of the Center Hill Lake Water Resources Development Project. Operations, maintenance and repair services include but are not limited to: Mowing, Cleaning Services of Recreational Facilities and Areas, Janitorial Service of Administrative and Operational areas, Facility Repair, Maintenance and Other Non-Routine Work, Primitive Camping/Remote Access Area Cleaning Services, Herbicide Application, Marking and Painting Boundary Lines, Pavement Sealing and Striping, Maintenance of Navigation Aids, Janitorial Service for Center Hill Power Plant, Center Hill Resident Office Septic Tank Pumping, Routine Environmental Cleaning and Disinfection Janitorial Services, Deep Cleaning of Project Facilities, BASE YEAR: 1 Feb 2025 to 31 Jan 2026

Section C - Descriptions and Specifications

SCOPE OF WORK

Scope of Work

SECTION C-1

GENERAL

C-1.1 PROJECT INFORMATION The Nashville District U.S. Army Corps of Engineers (USACE) anticipates a requirement for a firm-fixed-price requirements contract with a base and four (4) option years for operation and maintenance services at Center Hill Lake.

Center Hill Lake is located on the Caney Fork River, about 60 miles east of Nashville, Tennessee and 20 miles west of Cookeville, Tennessee. The areas of work are located in DeKalb, Putnam, White and Warren Counties of Tennessee. Principle cities in the area are Smithville, Cookeville and Sparta, Tennessee.

C-1.2 SCOPE OF WORK The Contractor shall furnish all necessary management, supervision, inspection, personnel, materials, supplies, parts, tools, equipment, transportation, vehicles, and fuel except as otherwise provided for herein, required to perform the operation and maintenance services within the area of responsibility, of the Center Hill Lake Water Resources Development Project. Hereafter referred to as Center Hill, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, Tables, etc., contained herein or incorporated by reference.

Incorporation by reference shall include any and all mandatory provisions required by the Federal Acquisition Regulation (FAR), whether referenced or not referenced, and current at time of award.

Estimated quantities and/or the work to be performed are approximate and are provided as information only to assist in preparation of proposals. They are not guaranteed and actual quantities may be more or less than shown.

Variation in these estimated quantities shall not be justification for modification of the contract or request for additional payment. It is the contractor's responsibility to verify quantities by an on-site review. Increased or decreased visitation shall not be a justification for a price increase.

The services and limited construction required in this contract are in addition to the routine operation and maintenance performed by Government personnel, however, the Government reserves the right to perform any or all of the services described herein with its own personnel or volunteers. The Contractor’s work and responsibility shall include, but shall not be limited to, planning, programming, administration, supervision, management and inspection, necessary to assure that all services are conducted in accordance with the contract and all applicable laws, regulations, codes, or directives. The Contractor shall ensure that all work meets or exceeds critical reliability rates or tolerances specified or included in referenced documents. The Contractor shall perform all related contractor administrative services necessary to perform the work such as supply, procurement, quality control, work scheduling, contractor financial control, and maintenance of accurate/complete records and files.

It is emphasized that the work described in this contract is a critical part of the Corps mission. The work will be performed in a public recreation area. The Corps is committed to “Customer Care” and providing quality professional service.

Minor repairs, renovation, lake fluctuation, or lack of funds may cause the temporary or permanent closing of some portions or all of some areas or may cause reduced frequency of services ordered. Such events will not be a basis for a claim under this contract. The contractor's work schedule shall be sufficiently flexible to meet these changing demands.

C-1.3 TASK ORDERS All work under this contract will be ordered by issuance of individual Task Orders (DD Form 1155, see Exhibit H). No work shall be performed under this contract before a Task Order has been issued by the Contracting Officer (KO). Only the KO by issuance of a modification, may make any change to a Task Order.

The Task Order will list those items from the bid schedule that are to be performed or used to perform the work.

C-1.4 NEGOTIATION Task Orders that are to be performed on an hourly basis will be agreed upon by negotiation between the Contractor and the Contracting Officer’s Representative (COR). This process will be overseen by the KO, and is outlined in Section C-5 of this document.

C-1.5 WORKING HOURS Normal working hours and days, except as otherwise specified or approved in advance by the Contracting Officer’s Representative (COR), shall be Monday through Friday, 6 am to 5:30 pm and for recreational area requirements shall include Saturdays and Sundays between 6 am and 5:30 pm.

The ten (10) Federal Holidays observed are:

New Year’s Day - January 1st Martin Luther King's Birthday - 3rd Monday in January Presidents Day - 3rd Monday in February Memorial Day - Last Monday in May Independence Day - July 4th Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veterans Day - November 11th Thanksgiving Day - 4th Thursday in November Christmas Day - December 25th

Work shall be performed on Memorial Day, Independence Day, Labor Day and Columbus Day holidays as scheduled, in parks and recreational areas only. Additional personnel may be required to adequately take care of heavy public visitation during holidays.

When one of the above holidays falls on Sunday, the following Monday will be observed as a legal holiday.

When a legal holiday falls on Saturday, the proceeding Friday is observed as a holiday. Work that interferes with other ongoing functions at Center Hill Lake shall be scheduled around normal working hours, as specified by the COR. Work shall be scheduled around the above listed Federal Holidays except as specified herein or as approved by the COR. Refer to the individual sections of this contract for specific technical provisions of work.

C-1.6 CONTRACTOR SUBMITTALS Unless otherwise specified, the Contractor shall submit the following information to the COR prior to the pre-work conference for this contract:

a. Quality Control Plan. This is submitted as a part of the contractor’s proposal and becomes a part of the awarded contract.

b. Contractor Quality Control Inspector. List names of Quality Control Inspectors.

c. Contractor Representative. List names of Contractor Representatives.

d. Accident Prevention Plan (APP). A suggested outline for the Contractor’s Accident Prevention Plan is in Exhibit D. See Section C-1.9 for APP requirements.

e. Emergency Contacts. A prioritized list, including phone numbers, of persons to be called in case of emergencies, usually the Contractor Representative.

f. Operators. List of names of qualified equipment/vehicle operators, including experience, training and qualifications to operate specific equipment.

g. Certificate of Insurance. See Section H.

h. Performance Bond (where applicable). See Section H.

i. Security Requirements. See Section H.

C-1.7 PERMITS AND LICENSES The Contractor shall, at their own expense, obtain any licenses or permits required to perform the contract. The Contractor shall comply with all current Federal, state, and local laws and regulations and any subsequent changes.

C-1.8 IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES The Contractor shall furnish uniforms to his/her regular employees, (other than office and clerical personnel), major subcontractors and their employees performing services under this contract. The uniforms shall be coveralls or shirt-pants combination. A company identification patch will be worn on the breast pocket or on the sleeve at the top of the arm. Such identification shall be provided within thirty days after notice of award of the contract. All vehicles used in the performance of work by the Contractor or subcontractor shall be identified with the company name prominently displayed in not less than two inch letters on the outside of both front doors of each vehicle in such a manner as to provide a readily visible means of identification.

Logos shall not be used in lieu of the above described vehicle identification.

C-1.9 SAFETY AND SECURITY REQUIREMENTS Work shall be completed in a safe manner. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the COR may issue an order stopping all or part of the work until satisfactory corrective action has been taken.

No part of the time lost due to any such stoppage shall be subject to claim for extension of time or for excess costs or damages to the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order. The Contractor shall comply with all current Environmental Compliance Regulations, provisions of the Occupational Safety and Health Act (OSHA), in addition to the standards of the Corps of Engineers Manual, EM 385-1-1, "Safety and Health Requirements Manual”. EM 385-1-1 can be viewed at website https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/u43544q/333835/.

The Contractor shall submit a written safety plan before the contract begins and an Activity Hazard Analysis (AHA) prior to commencing work on any task order.

The Contractor will be furnished keys to those buildings and areas where access is necessary to perform the work described herein or as determined to be necessary by the COR. The contractor or any contract/subcontractor employees shall not duplicate government keys. Additional keys required by the Contractor will be furnished by the COR. Security of the keys shall be the responsibility of the Contractor.

Failure by the Contractor to provide adequate key security or key damage/loss will result in a deduction from the payment due the Contractor in the amount of $50 per lost or damaged key and the cost to reconfigure any locks affected at the rate charged by the manufacturer plus the installation labor to perform the work.

The contractor is responsible for the actions of all personnel and subcontractors performing any work related to this contract. Critical areas are safety performance, activity hazard analysis, conduct standards enforcement and job duty documentation. The contractor shall provide all employees with pre-work AHA safety instruction and instruction in the use of any Protective Personnel Equipment that they are required to use.

Contract employee safety meetings will be held monthly. Reports will include the names of employees present with comments or recommendations, a permanent copy will be maintained in the Contractor’s files and a copy will be provided monthly to the COR.

All contractor and subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I Awareness Training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each applicable contract employee and subcontractor employee, to the COR or to the Contracting Officer (if a COR is not assigned), within 5 calendar days after completion of training by all contract personnel. AT Level I Awareness Training is available at the following https://tadlp.tradoc.army.mil/jko.html. Each contract employee must take the training individually to receive a training certificate.

All contractor and associated sub-contractor employees shall comply with all applicable project and local security policies and procedures (provided by the district representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by the District Security Management Office. Contractor workforce must comply with all personal identity verification requirements (FAR Clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

Investigation Requirements: The investigation requirements could vary, depending on whether the contractor will be working within a controlled area (such as janitorial personnel cleaning offices, etc.,) or if the contractor will ONLY be working in areas open to the General public (such as cleaning campgrounds, etc).

Guidance and forms for the background investigation requirements are available on the Nashville District Public Website: (http://www.lrn.usace.army.mil/BusinessWithUs/ContractSecurityRequirements.aspx)

Working Within Controlled Area - Background investigations for U.S. Citizens who will work (a) within a control area, (b) on a government information system and/or (c) have access to government funds will be submitted in accordance with the appropriate level in Category B. More than likely this contract will include individuals that need access for more than 6 months. Work being done within a controlled area for more than six months, the investigations requirements fall under Category B3 for US Citizens and Category C for Foreign Nationals. Controlled Area's also include individual office's or any area the general public is not allowed to navigate freely unsupervised.

Working Only in Areas Open to the General Public/Access Not Restricted - The background investigation requirements for those U.S. Citizens who will not work (a) within a control area, (b) on a government information system and/or (c) have access to government funds is provided in Category A.

Contract employees are not authorized to begin work on the contract until the investigation requirements as appropriate have been completed and notification has been made by the COR or the District Security Office.

Foreign National Contractors: Follow the guidance on the website specified in Category C – Foreign National Contractors

Convict Labor: For the work that is being performed in a restricted area, there are restrictions on use of persons either imprisoned or previously convicted of a felony. The Contractor shall not employ in the performance of this work any person undergoing a sentence of imprisonment imposed by any court of a State, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, or the U.S. Virgin Islands, or the US Federal Government. The Contractor shall not employ in the performance of this work any person who has been convicted of a felony imposed by any court of a State, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, or the US Federal Government.

Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, See Something, Say Something) -applies. Please use the revised wording below instead of the Proposed Language because it provides the web address to access the district-specific training on the LRN public website):

The contractor and all associated sub-contractors shall receive training on the local Suspicious Activity

Reporting Program. This locally developed training will inform employees of the types of behavior to watch for and provide guidance on who to contact to report suspicious activity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training."

The iWatch training for contractors is available on the Nashville District Public Website:

(http://www.lrn.usace.army.mil/BusinessWithUs/ContractSecurityRequirements.aspx).

Additional Optional Information Regarding Suspicious Activity Reporting is available at:

iWatch http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx; Eye On Kentucky program (report anonymously suspicious criminal or terrorist activity) http://homelandsecurity.ky.gov/Pages/Eye-on- Kentucky.aspx ; Tennessee Suspicious Activity Report http://www.tennessee.gov/safety/topic/report_susp_act; and Homeland Security “See Something Say Something” https://www.dhs.gov/see-something-say-something.

All new contractor employees will complete Level 1 OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC Awareness Training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the Contracting Officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC Awareness Training is available at the following website:

http://cdsetrain.dtic.mil/opsec/index.htm.

All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

Reports of Crime: Please ensure ALL reports of theft, suspected theft, vandalism, or ANY crime of Government OR Contractor property, OR crime against/by Contractor personnel is forwarded to the District Security Office. This information is critical for threat and risk assessments and may assist in obtaining funds for additional security measures.

C-1.10 ACCIDENT REPORTING The Contractor shall maintain an accurate record of, and shall report to the COR, in the manner and on the forms prescribed by the COR, all accidents within 24 hours of the occurrence. All serious accidents (those resulting in death or injury requiring medical attention) shall be reported immediately. The Contractor shall furnish once monthly by the 5th day of the month to the COR, a monthly Man Hour Accident Report, ORN-FL 31, provided by the COR.

C-1.11 DAMAGE REPORTS In all instances where Government property and/or equipment is damaged or lost by Contractor employees, a verbal notification shall be made by the next workday to the COR. A detailed written report of the incident and extent of such damage shall be submitted within two days (less weekends and holidays) of occurrence to the COR.

C-1.12 CONTRACT EMPLOYEES’ CONDUCT AND COMPETENCY All contract employees and subcontractors shall conduct themselves in a manner acceptable to the COR at all times. Since the majority of work will be performed in the presence of the general public, the conduct of all employees and/or subcontractors is critical and will be closely monitored. No alcoholic or intoxicating beverages, illegal drugs or controlled substances not prescribed by a physician, shall be possessed, consumed, or be under influence of while on duty.

The Contractor shall remove from the site any individual whose continued employment is deemed by the COR to be contrary to the public interest or inconsistent with the best interests of the U.S. Army Corps of Engineers.

The KO or the COR may require the Contractor to immediately remove from the work site anyone who is incompetent or who endangers persons, property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform the work. Notification to the Contractor will be made in writing if time and circumstances permit. Otherwise, notification will be verbal and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract and immediate replacement shall be made as required.

C-1.13 DAMAGE OR LOSS OF CONTRACTOR'S SUPPLIES AND PROPERTY The Contractor is responsible for taking the action necessary to protect all Contractor property and the personal property of Contractor employees from loss, damage or theft. Government assumes no responsibility for loss, damage, or theft, of the above.

C-1.14 SUPERVISION The Contractor shall act as, or provide a Superintendent physically on-site whenever the work specified herein is being performed. The Contractor shall furnish, in writing, to the COR, the name(s) of assigned Superintendent(s) and/or substitutes, for on-the-job contact and supervision purposes. The Superintendent shall deal directly with only the COR or a designated representative, for normal day-to-day administration of the contract provisions. The Superintendent shall conduct overall management coordination and be the central point of contact with the Government for performance of all work under this contract. The Superintendent and any individual designated to act for him/her, shall have full authority to contractually commit the Contractor for prompt action on matters pertaining to administration of the entire contract.

Superintendent(s) shall be required to attend pre-work conferences prior to commencing work under this contract. The Contractor's superintendent shall be equipped with suitable communication devices to allow constant communications between the contractor and Government representatives.

The Contractor or Superintendent shall contact the COR or a designated representative daily or as directed by the COR, to coordinate the work schedule in compliance with the terms of the contract and to arrange satisfactory working agreements. The Contractor shall develop and maintain a communications list to address day-to-day emergency communications with the Superintendent.

C-1.15 ENVIRONMENTAL PROGRAM The Contractor shall comply with federal, state, and local laws, regulations and standards regarding environmental protection. As an initial reference, many Federal regulations are identified in The Environmental Assessment and Management Guide (TEAM) and OSHA manuals. However, Tennessee State regulations are also applicable to work performed under this contract. All environmental protection matters shall be coordinated with the COR. The contractor shall identify all hazardous waste associated with conducting required work items, and properly label, handle and dispose of such waste in accordance with applicable regulations. The contractor shall address hazardous materials and hazardous waste on an AHA prior to commencing work. No hazardous materials or waste shall be stored or stockpiled on government facilities without prior COR approval. The contractor shall furnish the COR, Safety Data Sheets (SDS) and an inventory list for all items stored or in use by Contractor employees at Government facilities.

All lake project facilities operated by the Contractor may be inspected by the COR, or other Federal, State and local officials on a non-notice basis. Inspection access shall be granted upon request. Citations against Government facilities operated by the Contractor for noncompliance with environmental standards are a matter for resolution between the Government and the issuing office. The Government will pay assessment of fines or penalties associated with citations issued by Federal, state or local officials. If the citations are issued due to faulty operation or maintenance practices, the COR will deduct the fine from any money due the Contractor.

C-1.16 PERFORMANCE EVALUATION MEETINGS The Contractor or the Superintendent, or both, shall meet with the COR (or a designated representative) monthly or on a schedule determined by the COR.

However, a meeting will be held not later than one normal workday after a Contract Deficiency Report (CDR) is issued. Mutual effort shall be made to resolve any and all problems identified.

C-1.17 QUALITY CONTROL PROGRAM

a. General. The Contractor shall be responsible for maintaining adequate quality control to satisfactorily meet the specifications of this contract through the development of a Quality Control Plan The Government will assure quality performance though a Quality Assurance Surveillance Plan (see Exhibit A).

b. Quality Control. The Contractor shall establish a complete quality control program to assure the requirements of the contract are provided as specified under all sections of the contract. The Contractor’s Quality Control Plan will be implemented at the contract start-up; unless a new plan of the Contractor’s basic quality control program is submitted and approved by the COR. Updated versions of the plan will be submitted for approval by the COR as any changes occur thereafter. The program shall include, but not be limited to the following:

1. An inspection system that covers all of the services ordered under each section of the contract. This shall include inspection of work performed on weekends such as cleaning services, Section 5 task orders, and any work performed by subcontractors. It must specify the areas to be inspected, the inspection schedule (how and when the inspection will be done) and the individuals who will do the inspection.

2. A method of identifying and correcting deficiencies in the quality of services performed before the level of performance is unacceptable.

c. Inspections. The Contractor shall maintain a record of all Quality Control Inspection Reports conducted by the Contractor inspectors and shall furnish a copy daily to the COR within one business day.

Inspectors shall be employees of the Contractor. However, the Contractor's Superintendent and employees of a subcontractor shall not act as Quality Control Inspector. This daily record of inspection shall cover all work items scheduled to be performed, shall be signed by the Quality Control Inspector, and shall include the following items as a minimum:

a. Inspector's name 6. Items inspected

b. Park or area 7. Defects encountered

c. Date 8. Corrective actions taken

d. Weather 9. Safety violations

e. Time in/out of park/area 10. List of damaged, inoperable, or vandalized facilities

C-1.18 QUALITY ASSURANCE The Government will monitor the Contractor's performance in each functional area under this contract. The Government reserves the right to use whatever surveillance procedures are deemed appropriate.

If the Contractor fails to perform according to the performance standards, a Notification of Contract Deficiency or Contract Deficiency Report (CDR), will be issued by the COR. The Contractor shall explain, in writing, why performance was not satisfactory and how recurrence of the problem will be prevented in the future.

The Government will monitor the Contractor's services, as described in Exhibit A. The Government reserves the right to alter or change the type of inspection plan at its discretion at any time, and to make deductions accordingly.

Should the Contractor fail to satisfactorily perform any routine service (i.e. litter pickup, trash removal, restroom cleaning, etc.) that is required on a daily basis or at a specific time, that service will be rejected. If the nature and the schedule of this type of work do not afford an opportunity to re-perform the service, a deduction for the work not performed will be made in accordance with the current inspection method in use.

Defects and deficiencies in Contractor performance, and re-performance of same, will be in accordance with a payment analysis addressed in the Government's surveillance plan (QASP). However, the Government reserves the right to use Contract Clauses for this purpose in lieu of payment analysis. Deductions will be based on the Contractor’s bid schedule, or the Government cost to do the work, or the Government cost to have another contractor perform the work, or as outlined in the payments clause of the contract.

The Contractor's performance will be evaluated monthly and at the end of the performance period as set forth in the contract schedule. However, interim evaluations may be prepared at any time during the contract performance when determined to be in the best interest of the Government. Contractor’s written comments will be made a part of the official record.

C-1.19 INTERRUPTIONS TO SYSTEMS All work that would necessitate an interruption to the project utility systems or otherwise disrupt building occupants and/or the visiting public shall be fully coordinated and approved in advance by the COR.

C-1.20 GOVERNMENT FURNISHED ITEMS (GFI)

(2) General: A certain amount of Government owned facilities, materials, and supplies are on hand and may be available for use by the Contractor. The Contractor shall be responsible for the proper storage, inventory, maintenance, transportation, and security of all GFI. If both the Government and the Contractor have a simultaneous demand for facilities, materials, or supplies, the Government will have priority. The Contractor has the option to reject any or all Government furnished property or items. However, if rejected, Contractor shall provide all necessary property or items, adequate in quantity and suitable for the intended purpose, to perform all work and provide all services at no additional cost to the Government. All Government furnished facilities, property or items are provided in “as is” condition and shall be used only in connection with performance of work under this contract consistent with all Federal, Department of Defense, and Environmental Act Policies, standards, codes, or directives.

The Contractor should inspect this property prior to use to ascertain safe condition and to assure safe operation by his/her employees. The Contractor shall assume all liability for claims arising from its use or misuse while in the Contractor’s possession and shall hold the Government harmless from any claims by Contractor employees or others.

Should the Government require the Contractor to use any Government furnished equipment, the Government will provide all fuels, lubricants, or other materials, supplies and parts necessary to use such items. Should the Contractor request the use of Government furnished equipment, the Contractor shall provide all fuels, lubricants, or other materials, supplies and parts necessary to operate such items at no cost to the Government. Use of Government property is very limited and typically may include a skid loader, backhoe or dump truck. The Government will have the Contractor sign an ENG 4900 before Government equipment is used.

GFI will be made available from various storage areas on the project or from various suppliers in the vicinity of the project. The Contractor shall be responsible for the proper care, storage, safeguarding and transporting of all GFI. The Contractor will not be paid separately for the loading or transportation of incidental GFI (paint, plywood, lumber, parts or other items readily transportable by a pickup truck). Payment will be allowed and included in non- routine Task Order estimates for loading and transportation of large site specific GFI such as timbers, courtesy floats, etc. Any GFI that is lost or damaged through negligence of the Contractor shall be replaced or repaired by the Contractor to the satisfaction of the COR. The Contractor shall sign for all GFI on the forms provided by the Government.

Items that are procured for the proper and efficient operation, maintenance and repairs of the Center Hill Lake Project will remain the property of the Government. All items shall be maintained, stored and used in accordance with good maintenance and storage practices, procedures and regulations, which are subject to review, inspection and approval by the COR. The Contractor shall have an accounting system for tracking usage of GFI and any leftover or unused materials or supplies shall be returned to the Government.

(3) Government Furnished Facilities Suitable space will be provided for the Contractor’s use under this contract as listed below:

• Equipment building/area for tool and equipment storage.

• A site with all utilities for office trailer/residence for the Superintendent

The Contractor shall maintain such trailer and storage space to the same or higher standards as similar areas occupied by the Government and shall assume responsibility for the safekeeping of facilities provided. At the completion of the contract, all the Contractor’s equipment and supplies shall be removed from Government property and all GFI, facilities and equipment shall be returned to the Government in the same condition as received, except for reasonable wear and tear. The Contractor shall be held responsible for the cost of any repairs caused by negligence on the part of the Contractor or Contractor employees. Modifications or changes shall not be made to any GFI without prior written approval of the COR. Any modifications to the GFI shall be at the Contractor’s expense. The facilities provided consist of buildings and associated yard space, and shall include the existing hook- ups for electricity, water, and sewage. In the unlikely event that GFI utilities are not available at the site for either short or long term periods, the Contractor must obtain them from other sources at no additional expense to the Government.

The Contractor shall be responsible for maintaining physical security for Government furnished facilities and property. Should the Contractor reject any or all Government furnished facilities, the Contractor shall provide all necessary facilities at no cost to the Government. All GFI shall be used only for the performance of work specified herein. No personal vehicles or equipment shall be stored on Government property. Private vehicles shall not be parked overnight at Government facilities, except for in conjunction with the Superintendent’s residence.

(4) Telephones. The Contractor shall be responsible for providing all necessary telephones, communication systems, and services for Contractor functions under this contract at no cost to the Government. At least one telephone shall be installed at the Contractor’s office to provide communications with the COR.

(5) Utilities. The Contractor may use Government utilities where available. The Contractor shall make a dedicated effort to conserve utilities and shall comply with all Government regulations regarding energy conservation. Government furnished utilities shall be used only in the performance of work specified in this contract, or approved by the COR. Where water or electricity is not provided, the Contractor must obtain them from other sources at no additional expense to the Government.

(6) Forms. The Government will provide all Department of Defense forms required to be used under this Contract.

C-1.21 CONTRACTOR FURNISHED ITEMS (CFI)

a. General Except as described elsewhere in this contract, the Contractor shall furnish all personnel, management, inspection, facilities, vehicles, transportation, equipment, fuels, lubricants, operators, supplies, tools, materials, and parts necessary to accomplish all required services. All CFI shall meet all applicable Federal, Department of Defense, Department of the Army, State and local laws or regulations. The Contractor shall provide the COR an inventory list of all CFI being stored on the project. Contractor or Superintendent personal property will be retained at the mobile home site provided and maintained in a neat and orderly manner. Any personal property located on the project must receive prior approval by the COR.

Company property owned but not used at the Center Hill Lake shall not be stored on the project. Material Safety Data Sheets (MSDS) shall be provided for all chemicals, cleaners, etc. stored or used on Government property. Unless otherwise specified, when the Contractor provides services under a Task Order, the Contractor shall provide all necessary "tools of the trade" to accomplish the work. This includes the vehicles necessary to transport incidental GFI, materials, supplies, equipment, craft hand tools, common industry power tools, and/or Contractor personnel to and from the job site.

b. Contractor Office: The Contractor shall provide a facility for an office/residence and establish and maintain an office on the Lake Project at the area specified under C-1.20 GOVERNMENT FURNISHED ITEMS (GFI) for the sole purpose of conducting the day-to-day administration of this contract. This office shall have telephones and service provided by the contractor.

c. Quality: All Contractor furnished supplies, parts, and materials used shall be new and of a quality equal to or better than the items to be replaced. The items used shall be standard products of manufacturers regularly engaged in the production of such items. All Contractor furnished items are subject to approval by the COR prior to being used.

C-1.22 SAFEGUARDING GOVERNMENT PROPERTY The Contractor shall cooperate with Government personnel in safeguarding Government property. The Contractor shall be responsible for reporting all acts of vandalism, larceny, or pilferage to the COR. The Contractor shall establish security procedures and safeguards that are compatible with the Government's existing procedures to protect all equipment, materials, supplies, tools, and other resources. The Contractor shall cooperate with and provide any assistance necessary to the Government during any audits or usage checks of expendable property and inventories of nonexpendable property. The Contractor shall maintain accurate records and make them available to the Government upon request.

C-1.23 NOTIFICATION OF WORK TO BE DONE Upon notification of work required under these specifications, the Contractor shall begin work within forty-eight (48) hours after receipt of the notification, or unless approved in advance by the COR. With the exception of emergency work (Item #0027), which requires immediate action, absolutely no work shall begin prior to issuance of a Task Order.

C-1.24 MINIMUM PERSONNEL REQUIREMENTS The Contractor shall provide an adequate number of fully qualified personnel to perform the work specified herein. The Contractor shall provide a list of alternate contacts to the COR, in the event that emergency work must be initiated.

C-1.25 MINIMUM PERSONNEL QUALIFICATIONS Only properly trained, certified, or licensed employees and subcontractors shall be used in the appropriate expertise as required by Federal, State, County, or City Government in the performance of this contract. All employees and subcontractors shall have the education, experience and/or knowledge to provide a comprehensive understanding of the systems, components, and facilities to be serviced, operated, and maintained. All workers shall be subject to such Government regulations as are applicable during the time spent performing work under this contract. No one under the age of eighteen (18) shall be allowed to perform work under this contract.

C-1.26 OTHER CONTRACTS The Government may undertake or award other contracts or have lessees or volunteers performing certain work. The Contractor shall fully cooperate with such other contractors, lessees, volunteers, or government employees and carefully fit their own work to such other additional work as may be directed by the COR. The Contractor shall not commit or permit any act that will interfere with the performance of work by another contractor, lessee, or government employee. The COR can alter the work schedules of the other contractors, lessees, volunteers, government employees or the Service Contractor to avoid possible conflicts. Any such change or failure to make such a change by the COR shall not be the basis for a claim by the Contractor.

C-1.27 INCLEMENT WEATHER AND HOLIDAY WORK The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions can be approved by the COR when severe conditions make it impracticable or dangerous to perform the work. Work performed under sections of the contract for routine services shall be performed on holidays as scheduled in those specifications or as approved by the

COR.

C-1.28 APPLICABLE PUBLICATIONS The Contractor shall perform technical work in accordance with applicable publications. They include but are not limited to:

a. Operating Manuals

b. Repair Manuals

c. Maintenance Manuals

d. Industrial Standards and Codes

C-1.29 DAMAGE TO GOVERNMENT PROPERTY The Contractor shall use reasonable care to avoid damaging buildings, equipment, vegetation, and other Government property.