This document contains details for a federal solicitation to conduct improvement projects at the Mountain Home National Cemetery in Tennessee. The solicitation seeks contractors to demolish the existing administration building and storage shed, construct a new restroom building with informational kiosk, modify the committal shelter, replace flag pole lights, fog seal select cemetery roads, and upgrade the maintenance yard. The maintenance yard upgrade includes building a new maintenance facility with wash rack, storage, equipment housing, bulk material storage, and fueling area. The project will also install an irrigation system for the original 43 acre cemetery property. Responses are due by the date listed in the solicitation. The selected contractor will be responsible for demolition, construction, utility connection and landscaping work. The Army Corps of Engineers Nashville District will oversee the project.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORIA
L A
VENUE
BRIC
K
COLUMN
S
W
DEDI
CATI
ON
MONUMENT
C
R O
S S
W A
L K
STOP B
AR
STOP
BAR
CROSSWALK
BRI
CK
COLUMN
F R E E
D O
M R
O A
D
S U
N S
E T D
R
IV
E
S
ID
N E
Y S
T R
E E
T
LAMONT STREET
S
ID
N E
Y S
T R
E E
T
WES
T M
AIN
STREET
SUNSET D
RIV
E
ROAD "E"
W E S T
M A
IN
S
TR
E E T
WES
T M
AIN
STREET
M E
R
ID
IT
H S
T R
E E T
SHELBY STREET
R
O A
D
E
R O
A D E
PEACE AVENUE
R O
A D "E
R O
A D E
MEMORIA
L A
VENUE
S U
N S E T D
R
IV
E
VIC
TORY L
ANE
MARKET S
TREET
FREEDOM
ROAD
SUNSET D
RIV
E
S U
N S E T D
R
IV
E
MAINTENANCE
ROAD
SERVIC
E
R O
AD
S E
C O
N D S
T R
E E
T
Project Number
Drawing Number
Project Title
Location
Drawing Title
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
NCA: 864-CM3-010
JOHNSON CITY, TENNESSEE
Approved:
Submitted :
CHIEF, ENGINEERING & CONSTRUCTION DIVISION
BENJAMIN L. ROHRBACH, P.E.
CHIEF, CIVIL DESIGN BRANCH
ROBERT W. BAULSIR III, P.E.
CEMETERY IMPROVEMENTS
NATIONAL CEMETERY
MOUNTAIN HOME
SAINT PAUL, MN 55101
180 5th STREET EAST, SUITE 700
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
NASHVILLE, TN 37203
110 9th AVE. SOUTH
NASHVILLE DISTRICT
U.S. ARMY CORPS OF ENGINEERS
®of Engineers
US Army Corps
P lo t
D a te
P lo t T im e
/3 /2
:1
:2
P
M
F il e N a m e c u s e rs \h e c x d e k \d o c u m e n ts \p w w o rk \c e lr n \d m s \N
C A -M
H
G -1
.d g n
VA FORM 08 - 6231
Designed By Drawn By Checked By
SOLICITATION NO: W912P5-20-B-0002
CONTRACT NO: W912P5-20-C-XXXX
Issue Date
APRIL 2020
PLAN SET
Certified Final Documents - RTA
KEY MAP
NOTES:
1" = 500'
80' 160'0
1" = 80'
G101
MASTER PLAN & KEY PLAN
ACS ACS FCM
ACCEPTANCE 2 WEEKS PRIOR TO HAULING OPERATIONS BEGIN.
7. CONTRACTOR SHALL SUBMIT PROPOSED HAUL ROUTE TO COR FOR
TO MINIMIZE NOISE AND/OR POTENTIALLY STOP WORK IN AN AREA.
ARE TO BE CONDUCTED THE THE FOLLOWING DAY FOR THE CONTRACTOR
WITH THE SITE WORKERS TO DETERMINE IF OR WHEN ANY INTERMENTS
BY THE SITE PERSONNEL. CONTRACTOR SHALL COORDINATE DAILY
CONSIDERATIONS MUST BE MADE TO NOT INHIBIT THE ONGOING WORK
6. AS THE SITE WILL REMAIN OPEN AND ACTIVE DURING CONSTRUCTION,
(PROJECT AREA 3).
POWER LOCATED SOUTH OF EXISTING MAINTENANCE YARD
INCLUDES CONSTRUCTION OF AN ACCESS RAMP, CONCRETE PAD AND
5. OPTION 4 SHALL BE EXERCISED IF OPTION 1 IS NOT AWARDED. OPTION 4
BUILDING). SEE SHEET LI-103 FOR TIE-IN LOCATION TO OPTION 2.
4. OPTION 3 INCLUDES IRRIGATION SYSTEM FOR PROJECT AREA 3 (MAINTENANCE
LOCATION TO OPTION 3.
CEMETERY EXCEPT FOR PROJECT AREA 3. SEE SHEET LI-103 FOR TIE-IN
3. OPTION 2 INCLUDES PROJECT AREA 1 AND THE IRRIGATION SYSTEM FOR
AREA 6 (MAINTENANCE ROAD AND PARKING PAVEMENT).
2. OPTION 1 INCLUDES PROJECT AREA 3 (MAINTENANCE FACILITY) AND PROJECT
AND HIGH PERFORMANCE FOG SEALING OF SELECT CEMETERY ROADWAYS.
WORK FOR FLAG POLE AND COMMITTAL SHELTER (PROJECT AREAS 4 & 5),
INCLUDES: RESTROOM BUILDING AND KIOSK (PROJECT AREA 2), ELECTRICAL
1. CONTRACT WILL BE AWARDED BASED ON BASE AND OPTIONS. BASE BID
GENERAL CONTRACTOR NOTES
OPERATIONS.
ABILITY TO ACCESS THE BULK STORAGE SITE THROUGHOUT CONSTRUCTION
ONLY. THE CONTRACTOR SHALL NOT INFRINGE ON THE MAINTENANCE CREWS'
3. BULK MATERIAL STORAGE SHALL BE UTILIZED BY NCA MAINTENANCE CREWS
THE CURB SHALL BE REPLACED IN KIND BY COMPLETION OF CONSTRUCTION.
LAYDOWN AREA. IF SECTIONS OF THE CURB ARE REMOVED OR DAMAGED,
ALONG PEACE AVENUE OR PLACE TEMPORARY FEATURES TO ACCESS THE
2. CONTRACTOR LAYDOWN AREA 1 MAY ELECT TO REMOVE SECTIONS OF CURB
OUTSIDE OF THE INDICATED PAS.
SOME TASKS (E.G. UTILITY AND SURVEY WORK) WILL NECESSARILY OCCUR
TO FACILITATE LOCATION/REFERENCE AND DO NOT REPRESENT WORK LIMITS.
1. THE PROJECT AREAS (PA) INDICATED REPRESENT APPROXIMATE WORK AREAS
GENERAL NOTES
N
N
PA 6
PA 2
PA 5
PA 1
& LAYDOWN AREA
TEMP. SPOIL PILE
PA 4
PA 3
1718462.1261040053.893ST-23
1717961.2631039800.290ST-22
1717902.9661039842.967ST-21
1717696.0521039851.995ST-20
1717521.9821039922.577ST-19
1717406.0921040022.588ST-18
1717097.9791040166.303ST-17
1716896.8131040291.873ST-16
1716677.8031040454.179ST-15
1716639.0071040589.188ST-14
1717548.0131041155.477ST-13
1717636.6861041025.713ST-12
1717110.1971040697.863ST-11
1717276.2131040434.309ST-10
1717018.0801040268.777ST-09
1717427.5571040057.997ST-08
1717544.9721039958.689ST-07
1717691.1261039895.494ST-06
1717914.4611039879.079ST-05
1717959.6211039846.25ST-04
1718430.1261040085.688ST-03
1718472.2771040123.52ST-02
1718502.3591040090.005ST-01
LIMITS
NORTHING EASTINGSTAGING
STORAGE
STAGING AND STORAGE
STAGING AND
STORAGE
TEMP. BULK
File details come from the government source that posted it. Updated .