This document includes a federal contract solicitation and related project plans. The solicitation is for improvements at the Mountain Home National Cemetery in Tennessee, including demolition of existing structures and construction of new facilities. Key work includes a new restroom building with informational kiosk, modifications to the committal shelter to improve ADA compliance, replacement of flag pole lights, resurfacing of cemetery roads, upgrades to the maintenance yard including a new building, and installation of an irrigation system across 43 acres. The solicitation is identified as W912P520B0002 and was issued by the U.S. Army Corps of Engineers Nashville District. The project plans provide additional details on the scope of grading, drainage and construction work required.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Drawing Number
Project Title
Location
Drawing Title
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
NCA: 864-CM3-010
JOHNSON CITY, TENNESSEE
Approved:
Submitted :
CHIEF, ENGINEERING & CONSTRUCTION DIVISION
BENJAMIN L. ROHRBACH, P.E.
CHIEF, CIVIL DESIGN BRANCH
ROBERT W. BAULSIR III, P.E.
CEMETERY IMPROVEMENTS
NATIONAL CEMETERY
MOUNTAIN HOME
SAINT PAUL, MN 55101
180 5th STREET EAST, SUITE 700
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
NASHVILLE, TN 37203
110 9th AVE. SOUTH
NASHVILLE DISTRICT
U.S. ARMY CORPS OF ENGINEERS
®of Engineers
US Army Corps
P lo t
D a te
P lo t T im e
/3 /2
:3
:0
P
M
F il e N a m e c u s e rs \h e c x d e k \d o c u m e n ts \p w w o rk \c e lr n \d m s \N
C A -M
H
C G -1
A .d g n
VA FORM 08 - 6231
Designed By Drawn By Checked By
SOLICITATION NO: W912P5-20-B-0002
CONTRACT NO: W912P5-20-C-XXXX
Issue Date
APRIL 2020
PLAN SET
Certified Final Documents - RTA
PROJECT AREA 3, MAINT. BLDG.
SITE GRADING PLAN
ACS ACS FCM
CG102A
6'
SEE SHEET S-102 FOR FOUNDATION PLAN
17201720
17201720
0+00 0+50 1+00 1+50 2+00 2+50
E L E
V A
T
IO
N
17201720
17201720
0+00 0+50 1+00 1+50 2+00 2+50
E L E
V A
T
IO
N
PIPE DETAIL
TYPICAL CROSS SECTION
FFE: 1693.00
F A
C E O
F W
A L L
SLOPE 1%
5% SLOPE
MAINTENANCE FACILITY SITE PROFILE 1
JOINTING DETAIL
CUT
GRASS AREA
15" RECOMPACTED SOIL
6" CORRUGATED HDPE PIPE
EXISTING EARTH
GEOGRID
GEOGRID
FILTER FABRIC
FILTER FABRIC
SEE SHEET CS-103C FOR DETAILS
COMPACTED TO 95% MDD
9" CRUSHED STONE
STONE
CRUSHED
5% SLOPE
4" TDOT #10 COMPACTED TO 95% LAB MDD
GEOGRID
MIN. 6" EXISTING SOIL
SCARIFY AND COMPACT
EXISTING EARTH
LAYOUT LINE
DETAILS AND DIMENSIONS
RETAINING WALL SECTION
SEE SHEET S-113 FOR
POLYFILTER SOCK
PERFORATED PIPE WITH
6" HDPE CORRUGATED
8" CONCRETE
3"
@ 60 F
½
95% LAB MDD
8" CRUSHED STONE COMPACTED TO
" (TYP.)4
CHAMFERED
ROUNDED OR
CORNERS TO BE
CONCRETE HEADER
" STEPPED2
CONCRETE HEADER
" STEPPED2
AT THE TIME OF CONCRETE POUR FOR APPROACH SLAB
COR TO VERIFY FORMED OPENING GAP IS CORRECT
4-in. @ 20° F, 2-in. @ 60° F, 0-in. @ 100° F
COMPRESSIVE JOINT SEALS.
PREFORMED ELASTOMERIC
REPORT, CATEGORY 7 -
QUALIFIED PRODUCTS LIST
WITHIN MOST RECENT TDOT
AND PROCEDURES LISTED
PERFORMED USING MATERIALS
ALL JOINT WORK SHALL BE
SHALLOW LIFTS
COMPACTED IN
WASHED TDOT #57
MIN. 3 FT WIDTH OF
FILTER FABRIC
BACKFILL MATERIAL WITH
ENCAPSULATE GRANULAR
o
STONE. REFER TO NOTE 10.
BETWEEN SUBGRADE AND CRUSHED
PLACE FILTER FABRIC AND GEOGRID
6" OF SUB-BASE
SCARIFY AND COMPACT
COMPACTED TO 95% MDD
9" CRUSHED STONE
CRUSHED STONE
12" THICKNESS
MIN. 6" EXISTING SOIL
SCARIFY AND COMPACT
REFER TO NOTE 10.
GRANULAR BASE MATERIAL.
COHESIVE SUBGRADE AND
PLACE FILTER FABRIC BETWEEN
OF STRUCTURE
MATCH TO TOP
SEED AND MULCH IN PLACE
COMPACT TO 90% LAB MDD
REPLACE 1' TOP SOIL MIN.
TO 95% LAB MDD
COMPACT EXCAVATED CUT
SEE NOTE 11
LINE - WILL VARY
THEORETICAL GRADING
WALL.
NOT APPLY TO THE AREA SUPPORTING THE RETAINING
THREE (3) DAYS PRIOR TO PROOF ROLLING. THIS SHALL
ELECTS THIS METHOD AND PROVIDE A MINIMUM OF
COMPACTED. NOTIFY THE COR IF THE CONTRACTOR
SURFACE MORE THAN 0.5 INCHES TO BE SUFFICIENTLY
LOADED DUMP TRUCK SHALL NOT PENETRATE THE
AND AT SPEEDS BETWEEN 2.5-3.5MPH. THE TIRE OF A
ENSURE THE NUMBER OF PASSES OVER ALL AREAS,
OPERATE THE TRUCK IN A SYSTEMATIC MANNER TO
LOADED WITH FOUR (4) CUBIC YARDS OF SOIL.
SOIL/STONE WITH SIX PASSES OF A DUMP TRUCK
COMPACTED. AFTER STRIPPING, PROOF ROLL THE
EXCAVATED SURFACE TO ENSURE FOUNDATION IS
BENEFICIAL TO THE GOVERNMENT. PROOF ROLL
PROOF ROLL TEST FOR COMPACTION IF DEEMED
PETITIONED, THE CONTRACTING OFFICER MAY ALLOW
MEET THE MAXIMUM DRY DENSITY REQUIREMENTS. IF
12. FOR SUBGRADE COMPACTION, THE CONTRACTOR MAY
PRIOR TO CONSTRUCTION OF THE RETAINING WALL.
PLAN TO THE CONTRACTING OFFICER FOR ACCEPTANCE
CONTRACTOR SHALL SUBMIT A SLOPING AND BENCHING
SAFETY AND HEALTH MANUAL CURRENT EDITION. THE
ING REQUIREMENTS CONTAINED WITHIN EM 385-1-1
TAINING WALL SHALL CONFORM TO SLOPING AND BENCH-
11. EXCAVATED SLOPES FOR CONSTRUCTION OF THE RE-
AND GEOGRID AT SUBGRADE/CRUSHED STONE INTERFACE.
UNDERNEATH CONCRETE PAVEMENT PLACE FILTER FABRIC
10. PLACE FILTER FABRIC IN ACCORDANCE TO SPECIFICATIONS.
LOCAL, STATE AND FEDERAL POLICIES.
OF GOVERNMENT PROPERTY IN ACCORDANCE WITH
EXCAVATED MATERIAL AND ALL PROJECT WASTE OFF
PROMPT HAUL AND DISPOSAL OF ALL EXCESS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
DESIGNATED STOCKPILE LOCATIONS ON PROJECT SITE.
9. CONTRACTOR SHALL STRIP TOPSOIL AND STORE IN
DAMAGE AT ALL TIMES.
SUBGRADE FROM THE EFFECTS OF WEATHER AND WATER
CONTRACTOR SHALL PROTECT OPEN EXCAVATIONS AND
TO MINIMUM 95% LABORATORY MDD TO 6" MIN DEPTH.
8. AFTER EXCAVATION SCARIFY AND COMPACT SUBGRADE
COMPACTED THICKNESS.
7. LIFTS FOR BACKFILL MATERIAL SHALL NOT EXCEED 9 INCHES
AREA 6.
AMOUNT OF ROCK IN PROJECT AREA 3 AND PROJECT
CONTRACTOR SHOULD ANTICIPATE ENCOUNTERING SOME
SUBSURFACE PROPERTIES. EXCAVATION IS UNCLASSIFIED,
6. REFER TO BORING LOGS AND SOIL DATA FOR GENERAL
BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION.
5. THE EXPANSION JOINT SYSTEM USED SHALL BE APPROVED
4. CONCRETE: TO BE CLASS 'A' (f'c= 4,000 PSI)
3. SEE SHEET CS-103 FOR DETAILS OF LOADING RAMP.
INCLUDE REBAR, DIMENSIONS, ETC.
2. SEE SHEET S-111 & 112 FOR RETAINING WALL DETAILS TO
PROJECT AREA 3, MAINT. BLDG.
1. SEE SHEET CG-102 FOR PLAN VIEW OF SITE GRADING PLAN
GENERAL NOTES: