KYL_Lock_Excavation201_May2018_Industry_Day_Part_2.pdf

PDF 6 MB Posted

Attached to
Downstream Lock Excavation Construction
Solicitation number
W912P518B0005
Issued by

About this file

Industry Day Slides: PART 2

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.59

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

Nashville District May 2018

KENTUCKY LOCK ADDITION

LOCK EXCAVATION

File Name

EXISTING LOCK AND DOWNSTREAM COFFERDAM

ANCHORS

File Name

Anchor Locations

EXISTING LOCK ANCHORING– ANCHOR

INSTALLATION

UPSTREAM LOCK – ANCHOR INSTALLATION

UPSTREAM LOCK –

ANCHOR TENSIONING

UPSTREAM LOCK - ANGLED ANCHOR

DRILLING

Overhead obstruction at the existing lock operations building.

EXISTING LOCK ANCHORING

8 feet +/-

BRIDGE DEMOLITION

Bridge Demolition:

1. Former Powerhouse Access Bridge

2. Former P&L Railroad Bridge

3. Former US-62/641 HWY Bridge over

Lock

4. Abandoned US-62/641 HWY Bridge over RR

Plan of Former Access Bridge

X-Section

DOWNSTREAM STOPLOG SLOT INSTALLATION

Maintenance Building Demolition

Location of new Stoplog Slot

DOWNSTREAM STOPLOG SLOT INSTALLATION

Maintenance Building Demolition

1. Core holes have been pre-drilled

2. Slot will require wire saw cutting

3. Liners located at TROC in Florence, Alabama

LANDWALL GRATING UPGRADES

Upgrade location

LANDWALL GRATING UPGRADES

Grating as seen from top of lock wall.

Recent upgrades to river wall

CONSTRUCTION LIMITS – CURRENT CONTRACTS

Maintenance Building Demolition

New Maintenance Building

Disposal Area D

Dual Access Corridor

DS Cofferdam Construction Limits

SDU Construction Limits

DS Cofferdam Construction Limits

CONSTRUCTION LIMITS – DOWNSTREAM LOCK

EXCAVATION

File Name

Maintenance Building Demolition

New Maintenance Building

Disposal Area D

DS Cofferdam Construction Limits And Future Lock Excavation Construction Limits

Dual Access Corridor

Initial DS Lock Excavation Construction Limits

DS Cofferdam Construction Limits

Shared Contractor Laydown Area

Disposal Area A

CONSTRUCTION LIMITS – CURRENT CONTRACTS

Maintenance Building Demolition

New Maintenance Building

Disposal Area D

Dual Access Corridor

DS Cofferdam Construction Limits

SDU Construction Limits

DS Cofferdam Construction Limits

CONSTRUCTION LIMITS – DOWNSTREAM LOCK

EXCAVATION

File Name

Maintenance Building Demolition

New Maintenance Building

Disposal Area D

DS Cofferdam Construction Limits And Future Lock Excavation Construction Limits

Dual Access Corridor

Initial DS Lock Excavation Construction Limits

DS Cofferdam Construction Limits

Shared Contractor Laydown Area

Disposal Area A

Kentucky Lock Addition�Lock Excavation
Existing lock and downstream cofferdam anchors
Existing Lock Anchoring– Anchor Installation
Upstream Lock – Anchor Installation
Upstream Lock – Anchor Tensioning
Upstream Lock - Angled Anchor Drilling
Existing Lock Anchoring
Bridge Demolition
Bridge Demolition
Bridge Demolition
Downstream Stoplog Slot Installation
Downstream StoplOg Slot Installation
Landwall Grating Upgrades
Landwall Grating Upgrades
Construction Limits – Current contracts
Construction Limits – Downstream Lock Excavation
Slide Number 17
Construction Limits – Current contracts
Construction Limits – Downstream Lock Excavation

File details come from the government source that posted it.