W912P4-14-R-0002_Final_Luckey_Solicitation.pdf

PDF 502 KB Posted

Attached to
Luckey FUSRAP Remediation
Solicitation number
W912P4-14-R-0002
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Amendment_4.doc DOC document
Questions_and_Answers_Round_6_Responses.docx DOCX document
Section_5.1.2.3_from_Final_Scope_of_Work_-_RFP_rev02.pdf PDF
CELRB_CBDPP_BHA_BWP_outlines.pdf PDF
UFGS_02_61_13_rev03.pdf PDF
UFGS_02_81_00_rev03.pdf PDF
Questions_and_Answers_Set_5_Responses.docx DOCX document
Service_Contract_Wage_Determination.pdf PDF
Final_Scope_of_Work_-_RFP_rev02.pdf PDF
CELRB_Beryllium_Variance_Updated_2014-09-12.pdf PDF
Davis_Bacon_Wage_Determination.pdf PDF
Final_Amendment_3.docx DOCX document
Task_Order_001_PWS_(Phase_I)_rev01.pdf PDF
UFGS_01_32_01.00_10_rev01.pdf PDF
UFGS_02_81_00_rev02.pdf PDF
site_vist_attendance_list.pdf PDF
Final_Amendment_2.doc DOC document
SOW_Att_3_-_Volume_Estimate_Summary_rev01.pdf PDF
UFGS_02_61_13_rev02.pdf PDF
Questions_Set_4_Responses_23_dec.docx DOCX document
RFP_Questions_Set_3_Responses_ernest_23_dec.docx DOCX document
RFP_Questions_Set_2_Responses.docx DOCX document
Sample_PWS__2_(Phase_III)_rev01.docx DOCX document
Final_Scope_of_Work_-_RFP_rev01.docx DOCX document
UFGS_02_61_13_rev01.pdf PDF
Amendment_1.doc DOC document
Final_Questions_and_Answers_Round_1_Responses.docx DOCX document
UFGS_01_57_23_rev01.pdf PDF
UFGS_02_81_00_rev01.pdf PDF
Scope_of_Work_-_Revised_20_Aug_2014.pdf PDF
Sample_Project__2_PWS_(Phase_III).pdf PDF
Task_Order_001_(Phase_I)_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
Task_Order_001_PWS_(Phase_I).pdf PDF
Sample_Project__2_(Phase_III)_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
Wage_Determination.pdf PDF
PPQ_0_Form.doc DOC document
Sample_Project__1_PWS_(Phase_II).pdf PDF
Sample_Project__1_(Phase_II)_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
Section_M_-_Evaluation_Factors_for_Award_09May14.pdf PDF
Section_L_-_Instruction _Conditions_and_notices_9MAY14.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local t ime 07 Jan 2015

X

A X B X C

D

EX

X G F 55 - 61

62 - 75 X H 76 - 82 jeffrey .g.ernest@usace.army .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 82

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912P4 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

N/A conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

JEFFREY ERNEST 716-879-4173

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 3

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

4 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

5 - 12

13 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 14 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 15 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

16 - 53

PART II - CO NTRACT CLAUSES

DEPARTMENT OF THE ARMY

USACE, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199 716-879-4134

716-879-4353FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

03 Nov 2014

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912P4-14-R-0002

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job Base Period, FUSRAP Luckey SATOC

CPFF

Remediation of Soils will be accomplished using Cost Plus Fixed Fee task orders. The maximum ordering amount under the contract (for all CLINs) is $100,000,000. This includes the base work and the option work.

FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0002 Job Base Period, FUSRAP Luckey SATOC

FFP

Perform fixed price tasks such as Infrastructure, Operations & Maintenance, and Work Plans as ordered under individual task order Statements of Work. The maximum ordering amount under the contract (for all CLINs) is $100,000,000.

This includes the base work and the option work.

NET AMT

0003 Job OPTION Option Period, FUSRAP Luckey SATOC

CPFF

Remediation of Soils will be accomplished using Cost Plus Fixed Fee task orders. The maximum ordering amount under the contract (for all CLINs) is $100,000,000. This includes the base work and the option work.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0004 Job OPTION Option Period, FUSRAP Luckey SATOC

FFP

Perform fixed price tasks such as Infrastructure, Operations & Maintenance, and Work Plans as ordered under individual task order Statements of Work. The maximum ordering amount under the contract (for all CLINs) is $100,000,000.

This includes the base work and the option work.

NET AMT

SATOC OVERVIEW

The Maximum Ordering amount under this SATOC is $100,000,000.00. There is a base ordering period of 5 years (2 Apr 2015 – 1 Apr 2020) and an optional ordering period for an additional 5 years (2 Apr 2020 – 1 Apr 2025).

Task orders will be issued either as Firm Fixed Price (FFP) or Cost Plus Fixed Fee (CPFF) depending on the nature of work. The majority of the task orders are anticipated to be CPFF. The base period (2 Apr 2015 – 1 Apr 2020) has two Contract Line Item Numbers (CLINs). There is a CLIN for the FFP task orders and a CLIN for the CPFF task orders. The option period (2 Apr 2020 – 1 Apr 2025) also has two CLINS for the FFP task orders and CPFF task orders.

The Guaranteed minimum for this contract is $10,000.00.

Offerors are not required to add any information to these CLINs. These CLINs are for administrative/ordering purposes only. The only prices required are for the task orders as outlined in Section L.

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

The Performance Work Statement is attached. See Section J.

Section E - Inspection and Acceptance

QASP

Quality Assurance Surveillance Plans (QASPs) will be issued with each task order in accordance with the terms and conditions of the Performance Work Statement (PWS) accompanying each task order. The following is an example or sample of the Plan.

Quality Assurance Surveillance Plan

Formerly Utilized Sites Remedial Action Program (FUSRAP) Luckey Site, Luckey, Ohio Soils Remedial Action

1.0 Overview

This Quality Assurance Surveillance Plan (QASP) sets forth the procedures and guidance that the Contract Officer Representative (COR), in consultation with the Project Manager (PM), will use in evaluating the technical performance of the Contractor in accordance with the terms and conditions of the Performance Work Statement (PWS). The QASP objective is to explain Government procedures to be used to verify that appropriate performance and quality assurance methods are used in the management of the task order. The purpose of the QASP is to ensure that performance of specific activities are accomplished in accordance with all requirements set forth in the PWS.

This QASP depicts a planned process to monitor the performance of the Contractor by using systematic methods and surveillance. This QASP explains what work will be monitored under the task order; how monitoring will take place; who will conduct the monitoring; and how monitoring efforts and results will be documented. This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the task order. This QASP may be revised as needed throughout the project by the Government after consultation with the Contractor. At a minimum, the Government and Contractor will review the QASP prior to the exercising of a task order modification or issuance of a new task order. Necessary revisions to the QASP will be made and incorporated by a contract modification.

2.0 Role and Responsibilities of USACE personnel

The Project Manager is responsible for acquiring the budget that is available for the project.

In addition, the Project Manager has the primary responsibility for coordination with federal and state regulatory involvement on environmental activities at the site. The U.S. Army Corps of Engineers (USACE), Buffalo District (LRB) acts as the lead agency on this project.

The Contracting Officer’s Representative (COR) is responsible for technical administration of the project and assures proper surveillance of the Contractor’s performance. The COR will be assigned from USACE - LRB.

The COR, in consultation with the Project Manager, will be responsible for monitoring, assessing, recording, and reporting on the technical performance of the Contractor on a day-to-day basis. The Project Manager will raise all performance issues to the COR for resolution.

The USACE Contracting Officer (KO) has overall responsibility for overseeing the Contractor’s performance. The KO is responsible for the day-to-day monitoring of the Contractor’s performance in the areas of contract compliance, and contract administration; reviewing the COR’s assessment of the Contractor’s performance; and resolving all differences between the COR’s assessment and the Contractor’s assessment of performance. It is the KO that ensures the Contractor receives impartial, fair, and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance. The KO is the only one authorized to obligate the Government on this contract.

The COR is responsible for administering the contract and ensuring that USACE receives technically accurate and appropriate deliverables. The Project Manager will review and provide comment on written deliverables through the COR. The COR will coordinate all Government comments on written deliverables, and will evaluate and rate the Contractor during and at the end of the contract, with technical assistance from the Project Delivery Team (PDT). USACE will work with the Contractor to identify and correct any deficiencies prior to those deficiencies adversely impacting the project.

3.0 Quality Assurance Surveillance Monitoring

The USACE will perform quality assurance surveillance monitoring of Contractor activities related to achieving the agreed upon contractual milestones/objectives included in each task order. Table 1- Performance Objectives, Acceptance Criteria and Monitoring Methods found below outlines the milestones/objectives, performance standards/acceptance criteria and associated surveillance methods.

Additionally, the USACE will evaluate performance on the key quality control activities and events specified in the Contractor Quality Control Plan. USACE surveillance activities may include, but are not limited to, the following:

Work plan review and approval Oversight of drilling, field sampling activities Oversight of construction activities Oversight of loadout and waste handling activities Oversight of onsite laboratory activities Review of all waste management documentation Separate/split laboratory QA samples Review and approval of permit applications Review and approval of meeting minutes from Project meetings Review and approval of deliverables to regulatory agencies Review of quality control documentation Review of project safety record Review contractor activities for adherence to and compliance with the Contractor Quality Control Plan

4.0 Quality Assurance for Written Deliverables

The USACE PDT shall provide written comments on all written deliverables (work plans, reports, technical memorandums, etc) submitted by the Contractor. Upon receipt of comment responses, the USACE PDT will evaluate whether the comment response is acceptable. If the comment response is not acceptable, the USACE PDT will work with the contractor to resolve any outstanding issues. The USACE PDT shall back check all comments and responses. The PDT shall review all deliverables to ensure that the comments have been appropriately addressed in the document.

5.0 Quality Assurance of Field Activities

Quality assurance during field activities will be conducted as part of the project’s quality assurance program.

These field activities may include, but are not limited to, sampling, well/boring installation, material/waste handling and loadout, and health and safety during these activities.

Quality Assurance inspections will be conducted periodically using QA checklists. Quality Assurance inspections are likely to be conducted at critical stages and during some routine field activities. Frequency of inspections may fluctuate depending upon the contractor’s performance and the nature of the field activity.

Following all field quality assurance reviews, the QA inspector shall submit their documentation to the

USACE COR and Project Manager so that the QA documentation can be incorporated into the project files.

QA documentation from field audits as well as the comments on documents will be used to evaluate overall Contractor performance on an interim basis and at the end of the project.

Table 1- Performance Objectives, Acceptance Criteria and Monitoring Methods

Performance Objectives Performance Standard Monitoring Method Milestone 1: Develop Remedial Action Work Plans, Establish Health and Safety Program, Project Management, Earned Value Cost Tracking System, and Task Order Closeout.

Approval through Contracting Officer representative (COR)

100% inspection of milestones /deliverables associated with objective

• Resource loaded schedule

• Earned Value Cost Tracking System

• P roject Status reports provided as proposed

• Review and approval of all planning documents and field practices.

• Completeness of documents

Milestone 2: Infrastructure Setup, Mobilization, General Conditions, Environmental Monitoring, Maintain Health and Safety Program, Project Management, Earned Value Cost Tracking System, and Task Order Closeout.

Approval through the

COR

100% inspection of milestones /deliverables associated with objective

• Adherence to the approved plans or use of proper change control methodology

• Review of safety record

• Review of quality control documentation

• Comparison to schedule

• Project Status reports provided as proposed

Performance Objectives Performance Standard Monitoring Method

Milestone 3: Remediation IAW the SOW; General Conditions; Transportation and Disposal of FUSRAP Waste; Environmental Monitoring, Sampling, and Analysis; Implement Site Closure Protocols; Monitor Well Decommission and Replacement; Maintain Health and Safety Program;

Reporting and Document Preparation; Maintenance of GIS and Project Files; Project Management; Earned Value Cost Tracking System; and Task Order Closeout.

Approval through the

COR

100% inspection of milestones /deliverables associated with objective

• Adherence to the approved plans or use of proper change control methodology

• Review of safety record

• Review of quality control documentation

• Comparison to schedule

• Review of Waste Profiles/Manifests

• Project Status and Completion reports provided as proposed

• Completeness of documents

6.0 Quality Assurance Surveillance Forms

Attached are the quality assurance surveillance forms that will be used by USACE to detail any required corrective actions. Additional quality assurance feedback will come in the form of comments on documents, USACE performance evaluations, field checklists, and letters to the Contractor

QUALITY ASSURANCE MONITORING FORM

Date: / /

Work Task (Milestone/Activity):

Survey Period: / / Method of Surveillance: COR Review through / /

Evaluation of Contractor’s Performance:

Evaluation

Corrective Action Required: Yes No

Narrative Discussion of Contractor’s Performance During Survey Period:

Discussion

CORRECTIVE ACTION FORM FOR QASP

1) Work Task (Milestone/Activity):

2) Survey Period: / / through / /

3) Description of the Failure/Deficiency that Precipitated the Corrective Action:

Description

4) Description of the Criterion that the Failure/Deficiency was Evaluated Against:

5) Personnel Involved in the Identification of the Failure/Deficiency, Determination of the Appropriate Corrective Action, Approval of the Corrective Action, and Implementation of the Corrective Action:

6) Description of the Corrective Action that was Required:

7) Date/Time of Implementation of the Corrective Action: / /

8) Follow-Up Information to Prevent Recurrence of Failure/ Deficiency (i.e., Need For Revision of Procedures or Specifications):

9) Personnel Responsible for Follow-Up Work:

10) Planned Date for Follow-Up Surveillance: / /

11) Other Notes:

Other

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-5 Inspection Of Services Cost-Reimbursement APR 1984 52.246-12 Inspection of Construction AUG 1996 52.246-15 Certificate of Conformance APR 1984

CLAUSES INCORPORATED BY FULL TEXT

52.202-1 DEFINITIONS (NOV 2013)

When a solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulation (FAR), the word or term has the same meaning as the definition in FAR 2.101 in effect at the time the solicitation was issued, unless--

(a) The solicitation, or amended solicitation, provides a different definition;

(b) The contracting parties agree to a different definition;

(c) The part, subpart, or section of the FAR where the provision or clause is prescribed provides a different meaning;

or

(d) The word or term is defined in FAR Part 31, for use in the cost principles and procedures.

(End of clause)

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 02-APR-2015 TO

01-APR-2020

N/A N/A

0002 POP 02-APR-2015 TO

01-APR-2020

0003 POP 02-APR-2020 TO

01-APR-2025

0004 POP 02-APR-2020 TO

01-APR-2025

52.242-15 Stop-Work Order AUG 1989 52.242-15 Alt I Stop-Work Order (Aug 1989) - Alternate I APR 1984

Section G - Contract Administration Data

52.228-11 Pledges Of Assets JAN 2012 52.228-14 Irrevocable Letter of Credit DEC 1999 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.228-16 Performance and Payment Bonds--Other Than Construction NOV 2006 52.228-16 Alt I Performance and Payment Bonds--Other Than Construction

(Nov 2006) - Alternate I

JUL 2000

52.232-16 Progress Payments APR 2012 52.232-16 Alt I Progress Payments (Apr 2012) - Alternate I MAR 2000 52.232-17 Interest OCT 2010 52.232-18 Availability Of Funds APR 1984 52.232-20 Limitation Of Cost APR 1984 52.232-25 Prompt Payment JUL 2013 52.232-25 Alt I Prompt Payment (July 2013) Alternate I FEB 2002 52.232-27 Prompt Payment for Construction Contracts JUL 2013 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

252.204-0006 Line Item Specific: Proration SEP 2009 252.232-7004 DOD Progress Payment Rates OCT 2001

Section H - Special Contract Requirements

252.234-7001 Notice of Earned Value Management System APR 2008 252.234-7002 Earned Value Management System MAY 2011

Section I - Contract Clauses

52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees APR 1984 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures OCT 2010 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

JAN 1997

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-13 Contractor Code of Business Ethics and Conduct APR 2010 52.203-16 Preventing Personal Conflicts of Interest DEC 2011 52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.204-1 Approval of Contract DEC 1989 52.204-2 Security Requirements AUG 1996 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management JUL 2013 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract

Awards

JUL 2013

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

AUG 2013

52.210-1 Market Research APR 2011 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--

Modifications

AUG 2011

52.215-12 Subcontractor Certified Cost or Pricing Data OCT 2010 52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications OCT 2010 52.215-14 Integrity of Unit Prices OCT 2010 52.215-14 Alt I Integrity of Unit Prices (Oct 2010) - Alternate I OCT 1997 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits

(PRB) Other than Pensions

JUL 2005

52.215-19 Notification of Ownership Changes OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data-- Modifications

OCT 2010

52.215-23 Limitations on Pass-Through Charges OCT 2009 52.216-8 Fixed Fee JUN 2011 52.216-9 Fixed Fee--Construction JUN 2011 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns JUL 2013 52.219-14 Limitations On Subcontracting NOV 2011

52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-2 Payment For Overtime Premiums JUL 1990 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards Act - Overtime

Compensation

JUL 2005

52.222-6 Davis Bacon Act JUL 2005 52.222-7 Withholding of Funds FEB 1988 52.222-8 Payrolls and Basic Records JUN 2010 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) JUL 2005 52.222-12 Contract Termination-Debarment FEB 1988 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility FEB 1988 52.222-16 Approval of Wage Rates FEB 1988 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-27 Affirmative Action Compliance Requirements for

Construction

FEB 1999

52.222-30 Davis-Bacon Act--Price Adjustment (None or Separately Specified Method)

DEC 2001

52.222-35 Equal Opportunity for Veterans SEP 2010 52.222-36 Affirmative Action For Workers With Disabilities OCT 2010 52.222-37 Employment Reports on Veterans SEP 2010 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-41 Service Contract Act Of 1965 NOV 2007 52.222-49 Service Contract Act -- Place Of Performance Unknown MAY 1989 52.222-50 Combating Trafficking in Persons FEB 2009 52.222-54 Employment Eligibility Verification AUG 2013 52.222-99 (Dev) Establishing a Minimum Wage for Contractors (Deviation

2014-O0017)

JUN 2014

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-5 Alt I Pollution Prevention and Right-to-Know Information (May

2011) Alternate I

MAY 2011

52.223-5 Alt II Pollution Prevention and Right-to-Know Information (May 2011) Alt II

MAY 2011

52.223-6 Drug-Free Workplace MAY 2001 52.223-10 Waste Reduction Program MAY 2011 52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995 52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.223-16 IEEE 1680 Standard for the Environmental Assessment of

Personal Computer Products

DEC 2007

52.223-16 Alt I IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) Alternate I

DEC 2007

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.223-19 Compliance with Environmental Management Systems MAY 2011 52.224-1 Privacy Act Notification APR 1984 52.224-2 Privacy Act APR 1984 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.226-1 Utilization Of Indian Organizations And Indian-Owned

Economic Enterprises

JUN 2000

52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.227-9 Refund Of Royalties APR 1984 52.227-11 Patent Rights--Ownership By The Contractor DEC 2007 52.227-14 Rights in Data--General DEC 2007 52.227-16 Additional Data Requirements JUN 1987 52.227-17 Rights In Data-Special Works DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-7 Insurance--Liability To Third Persons MAR 1996 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995 52.228-14 Irrevocable Letter of Credit DEC 1999 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.228-16 Performance and Payment Bonds--Other Than Construction NOV 2006 52.229-3 Federal, State And Local Taxes FEB 2013 52.230-2 Cost Accounting Standards MAY 2012 52.230-4 Disclosure and Consistency of Cost Accounting Practices for

Contracts Awarded to Foreign Concerns

MAY 2012

52.230-5 Cost Accounting Standards--Educational Institutions MAY 2012 52.232-9 Limitation On Withholding Of Payments APR 1984 52.232-16 Alt I Progress Payments (Apr 2012) - Alternate I MAR 2000 52.232-17 Interest OCT 2010 52.232-18 Availability Of Funds APR 1984 52.232-19 Availability Of Funds For The Next Fiscal Year APR 1984 52.232-23 Assignment Of Claims JAN 1986 52.232-25 Prompt Payment JUL 2013 52.232-25 Alt I Prompt Payment (July 2013) Alternate I FEB 2002 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-37 Multiple Payment Arrangements MAY 1999 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes JUL 2002 52.233-1 Alt I Disputes (Jul 2002) - Alternate I DEC 1991 52.233-3 Protest After Award AUG 1996 52.233-3 Alt I Protest After Award (Aug 1996) - Alternate I JUN 1985 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-13 Accident Prevention NOV 1991 52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I NOV 1991 52.236-18 Work Oversight in Cost-Reimbursement Construction

Contracts

APR 1984

52.236-19 Organization and Direction of the Work APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.237-3 Continuity Of Services JAN 1991 52.239-1 Privacy or Security Safeguards AUG 1996 52.242-1 Notice of Intent to Disallow Costs APR 1984 52.242-2 Production Progress Reports APR 1991 52.242-3 Penalties for Unallowable Costs MAY 2001 52.242-4 Certification of Final Indirect Costs JAN 1997 52.242-13 Bankruptcy JUL 1995 52.243-2 Alt I Changes--Cost-Reimbursement (Aug 1987) - Alternate I APR 1984 52.244-5 Competition In Subcontracting DEC 1996 52.244-6 Subcontracts for Commercial Items DEC 2013 52.245-1 Government Property APR 2012 52.245-9 Use And Charges APR 2012 52.246-25 Limitation Of Liability--Services FEB 1997 52.247-1 Commercial Bill Of Lading Notations FEB 2006 52.247-63 Preference For U.S. Flag Air Carriers JUN 2003 52.247-64 Alt I Preference for Privately Owned U.S.-Flag Commercial

Vessels (Feb 2006) - Alternate I

APR 2003

52.247-67 Submission Of Transportation Documents For Audit FEB 2006 52.247-68 Report of Shipment (REPSHIP) FEB 2006 52.248-3 Value Engineering-Construction OCT 2010 52.249-6 Termination (Cost Reimbursement) MAY 2004 52.249-6 Alt I Termination (Cost-Reimbursement) (May 2004) - Alternate I SEP 1996 52.249-14 Excusable Delays APR 1984 52.251-2 Interagency Fleet Management System (IFMS) Vehicles And

Related Services

JAN 1991

52.252-2 Clauses Incorporated By Reference FEB 1998 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.203-7004 Display of Fraud Hotline Poster(s) DEC 2012 252.204-7000 Disclosure Of Information AUG 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A MAY 2013 252.204-7005 Oral Attestation of Security Responsibilities NOV 2001 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Terrorist Country

DEC 2006

252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.215-7000 Pricing Adjustments DEC 2012 252.215-7002 Cost Estimating System Requirements DEC 2012 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage And Disposal Of Toxic And

Hazardous Materials

APR 2012

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7004 Report of Intended Performance Outside the United States and

Canada--Submission after Award

OCT 2010

252.225-7006 Quarterly Reporting of Actual Contract Performance Outside the United States

OCT 2010

252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

SEP 2004

252.227-7013 Rights in Technical Data--Noncommercial Items JUN 2013 252.227-7015 Technical Data--Commercial Items JUN 2013 252.227-7016 Rights in Bid or Proposal Information JAN 2011 252.227-7017 Identification and Assertion of Use, Release, or Disclosure

Restrictions

JAN 2011

252.227-7020 Rights In Special Works JUN 1995 252.227-7022 Government Rights (Unlimited) MAR 1979 252.227-7024 Notice and Approval of Restricted Designs APR 1984 252.227-7025 Limitations on the Use or Disclosure of Government-

Furnished Information Marked with Restrictive Legends

MAY 2013

252.227-7026 Deferred Delivery Of Technical Data Or Computer Software APR 1988 252.227-7027 Deferred Ordering Of Technical Data Or Computer Software APR 1988 252.227-7028 Technical Data or Computer Software Previously Delivered to the Government

JUN 1995

252.227-7030 Technical Data--Withholding Of Payment MAR 2000 252.227-7033 Rights in Shop Drawings APR 1966 252.227-7037 Validation of Restrictive Markings on Technical Data JUN 2013 252.227-7039 Patents--Reporting Of Subject Inventions APR 1990 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.242-7004 Material Management And Accounting System MAY 2011 252.242-7006 Accounting System Administration FEB 2012 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.245-7000 Government-Furnished Mapping, Charting, and Geodesy

Property

APR 2012

252.245-7001 Tagging, Labeling, and Marking of Government-Furnished Property

APR 2012

252.245-7002 Reporting Loss of Government Property APR 2012 252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal MAY 2013 252.246-7001 Warranty Of Data DEC 1991 252.247-7023 Transportation of Supplies by Sea JUN 2013 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000 252.251-7000 Ordering From Government Supply Sources AUG 2012 252.251-7001 Use Of Interagency Fleet Management System (IFMS)

Vehicles And Related Services

DEC 1991

52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of US Army Corps of Engineers Contracting Officer and shall not be binding until so approved.

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY

MATTERS (JULY 2013)

(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management database via https://www.acquisition.gov.

(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments--

(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by--

(i) Government personnel and authorized users performing business on behalf of the Government; or

(ii) The Contractor, when viewing data on itself; and

(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for--

(i) Past performance reviews required by subpart 42.15;

(ii) Information that was entered prior to April 15, 2011; or

(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.

(c) The Contractor will receive notification when the Government posts new information to the Contractor's record.

(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.

(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.

(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.

https://www.acquisition.gov/

(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.

52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of (To be determined on a task order basis) per calendar day of delay [Contracting Officer insert amount].

(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (To be determined on a task order basis) [Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.216-7 ALLOWABLE COST AND PAYMENT (JUN 2013)

(a) Invoicing.

(1) The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) subpart 31.2 in effect on the date of this contract and the terms of this contract. The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract.

(2) Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act. Interim payments made prior to the final payment under the contract are contract financing payments, except interim payments if this contract contains Alternate I to the clause at 52.232-25.

(3) The designated payment office will make interim payments for contract financing on the 30th day after the designated billing office receives a proper payment request.

In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.

(b) Reimbursing costs. (1) For the purpose of reimbursing allowable costs (except as provided in subparagraph (b)(2) of the clause, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term "costs" includes only--

(i) Those recorded costs that, at the time of the request for reimbursement, the Contractor has paid by cash, check, or other form of actual payment for items or services purchased directly for the contract;

(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for--

(A) Supplies and services purchased directly for the contract and associated financing payments to subcontractors, provided payments determined due will be made--

(1) In accordance with the terms and conditions of a subcontract or invoice; and

(2) Ordinarily within 30 days of the submission of the Contractor's payment request to the Government;

(B) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;

(C) Direct labor;

(D) Direct travel;

(E) Other direct in-house costs; and

(F) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts; and

(iii) The amount of financing payments that have been paid by cash, check, or other forms of payment to subcontractors.

(2) Accrued costs of Contractor contributions under employee pension plans shall be excluded until actually paid unless--

(i) The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and

(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor's indirect costs for payment purposes).

(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) of this clause, allowable indirect costs under this contract shall be obtained by applying indirect cost rates established in accordance with paragraph (d) of this clause.

(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government shall be disregarded for purposes of cost-reimbursement under this clause.

(c) Small business concerns. A small business concern may receive more frequent payments than every 2 weeks.

(d) Final indirect cost rates. (1) Final annual indirect cost rates and the appropriate bases shall be established in accordance with Subpart 42.7 of the Federal Acquisition Regulation (FAR) in effect for the period covered by the indirect cost rate proposal.

(2)(i) The Contractor shall submit an adequate final indirect cost rate proposal to the Contracting Officer (or cognizant Federal agency official) and auditor within the 6-month period following the expiration of each of its fiscal years. Reasonable extensions, for exceptional circumstances only, may be requested in writing by the Contractor and granted in writing by the Contracting Officer. The Contractor shall support its proposal with adequate supporting data.

(ii) The proposed rates shall be based on the Contractor's actual cost experience for that period. The appropriate Government representative and the Contractor shall establish the final indirect cost rates as promptly as practical after receipt of the Contractor's proposal.

(iii) An adequate indirect cost rate proposal shall include the following data unless otherwise specified by the cognizant Federal agency official:

(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.

(B) General and Administrative expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).

(C) Overhead expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.

(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) and expense reallocation to final indirect cost pools.

(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.

(F) Facilities capital cost of money factors computation.

(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost element.

(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of Government participation percentages in each of the allocation base amounts.

(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.

(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contact information).

(K) Summary of each time-and-materials and labor-hour contract information, including labor ategories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.

(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.

(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.

(N) Certificate of final indirect costs (see 52.242-4, Certification of Final Indirect Costs).

(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).

(iv) The following supplemental information is not required to determine if a proposal is adequate, but may be required during the audit process:

(A) Comparative analysis of indirect expense pools detailed by account to prior fiscal year and budgetary data.

(B) General organizational information and limitation on allowability of compensation for certain contractor personnel. See 31.205-6(p). Additional salary reference information is available at http://www.whitehouse.gov/omb/procurement_index_exec_comp/.

(C) Identification of prime contracts under which the contractor performs as a subcontractor.

(D) Description of accounting system (excludes contractors required to submit a CAS Disclosure Statement or contractors where the description of the accounting system has not changed from the previous year's submission).

(E) Procedures for identifying and excluding unallowable costs from the costs claimed and billed (excludes contractors where the procedures have not changed from the previous year's submission).

(F) Certified financial statements and other financial data (e.g., trial balance, compilation, review, etc.).

(G) Management letter from outside CPAs concerning any internal control weaknesses.

(H) Actions that have been and/or will be implemented to correct the weaknesses described in the management letter from subparagraph G) of this section.

(I) List of all internal audit reports issued since the last disclosure of internal audit reports to the Government.

(J) Annual internal audit plan of scheduled audits to be performed in the fiscal year when the final indirect cost rate submission is made.

(K) Federal and State income tax returns.

(L) Securities and Exchange Commission 10-K annual report.

(M) Minutes from board of directors meetings.

http://www.whitehouse.gov/omb/procurement_index_exec_comp/

(N) Listing of delay claims and termination claims submitted which contain costs relating to the subject fiscal year.

(O) Contract briefings, which generally include a synopsis of all pertinent contract provisions, such as: Contract type, contract amount, product or service(s) to be provided, contract performance period, rate ceilings, advance approval requirements, pre-contract cost allowability limitations, and billing limitations.

(v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct and indirect costs claimed and billed, as required in paragraph (d)(2)(iii)(I) of this section, within 60 days after settlement of final indirect cost rates.

(3) The Contractor and the appropriate Government representative shall execute a written understanding setting forth the final indirect cost rates. The understanding shall specify (i) the agreed-upon final annual indirect cost rates, (ii) the bases to which the rates apply, (iii) the periods for which the rates apply, (iv) any specific indirect cost items treated as direct costs in the settlement, and (v) the affected contract and/or subcontract, identifying any with advance agreements or special terms and the applicable rates. The understanding shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. The understanding is incorporated into this contract upon execution.

(4) Failure by the parties to agree on a final annual indirect cost rate shall be a dispute within the meaning of the Disputes clause.

(5) Within 120 days (or longer period if approved in writing by the Contracting Officer) after settlement of the final annual indirect cost rates for all years of a physically complete contract, the Contractor shall submit a completion invoice or voucher to reflect the settled amounts and rates. The completion invoice or voucher shall include settled subcontract amounts and rates. The prime contractor is responsible for settling subcontractor amounts and rates included in the completion invoice or voucher and providing status of subcontractor audits to the contracting officer upon request.

(6)(i) If the Contractor fails to submit a completion invoice or voucher within the time specified in paragraph (d)(5) of this clause, the Contracting Officer may--

(A) Determine the amounts due to the Contractor under the contract; and

(B) Record this determination in a unilateral modification to the contract.

(ii) This determination constitutes the final decision of the Contracting Officer in accordance with the Disputes clause.

(e) Billing rates. Until final annual indirect cost rates are established for any period, the Government shall reimburse the Contractor at billing rates established by the Contracting Officer or by an authorized representative (the cognizant auditor), subject to adjustment when the final rates are established. These billing rates--

(1) Shall be the anticipated final rates; and

(2) May be prospectively or retroactively revised by mutual agreement, at either party's request, to prevent substantial overpayment or underpayment.

(f) Quick-closeout procedures. Quick-closeout procedures are applicable when the conditions in FAR 42.708(a) are satisfied.

(g) Audit.

This is the start of the file's text. The full file is on GovTribe.