Final_Amendment_2.doc

DOC document 45 KB Posted

Attached to
Luckey FUSRAP Remediation
Solicitation number
W912P4-14-R-0002
Issued by

View the file

Other files

File Type Posted
Amendment_4.doc DOC document
Questions_and_Answers_Round_6_Responses.docx DOCX document
Section_5.1.2.3_from_Final_Scope_of_Work_-_RFP_rev02.pdf PDF
CELRB_CBDPP_BHA_BWP_outlines.pdf PDF
UFGS_02_61_13_rev03.pdf PDF
UFGS_02_81_00_rev03.pdf PDF
Questions_and_Answers_Set_5_Responses.docx DOCX document
Service_Contract_Wage_Determination.pdf PDF
Final_Scope_of_Work_-_RFP_rev02.pdf PDF
CELRB_Beryllium_Variance_Updated_2014-09-12.pdf PDF
Davis_Bacon_Wage_Determination.pdf PDF
Final_Amendment_3.docx DOCX document
Task_Order_001_PWS_(Phase_I)_rev01.pdf PDF
UFGS_01_32_01.00_10_rev01.pdf PDF
UFGS_02_81_00_rev02.pdf PDF
site_vist_attendance_list.pdf PDF
SOW_Att_3_-_Volume_Estimate_Summary_rev01.pdf PDF
UFGS_02_61_13_rev02.pdf PDF
Questions_Set_4_Responses_23_dec.docx DOCX document
RFP_Questions_Set_3_Responses_ernest_23_dec.docx DOCX document
RFP_Questions_Set_2_Responses.docx DOCX document
Sample_PWS__2_(Phase_III)_rev01.docx DOCX document
Final_Scope_of_Work_-_RFP_rev01.docx DOCX document
UFGS_02_61_13_rev01.pdf PDF
Amendment_1.doc DOC document
Final_Questions_and_Answers_Round_1_Responses.docx DOCX document
UFGS_01_57_23_rev01.pdf PDF
UFGS_02_81_00_rev01.pdf PDF
Scope_of_Work_-_Revised_20_Aug_2014.pdf PDF
Sample_Project__2_PWS_(Phase_III).pdf PDF
Task_Order_001_(Phase_I)_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
Task_Order_001_PWS_(Phase_I).pdf PDF
W912P4-14-R-0002_Final_Luckey_Solicitation.pdf PDF
Sample_Project__2_(Phase_III)_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
Wage_Determination.pdf PDF
PPQ_0_Form.doc DOC document
Sample_Project__1_PWS_(Phase_II).pdf PDF
Sample_Project__1_(Phase_II)_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
Section_M_-_Evaluation_Factors_for_Award_09May14.pdf PDF
Section_L_-_Instruction _Conditions_and_notices_9MAY14.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text:

REVISED SECTION L

SECTION L – INSTRUCTION, CONDITIONS AND NOTICES TO OFFERORS

Paragraph 3.1.2 of Section L is hereby revised to read as follows

3.1.2 Volume I, Factor I, Sub-factor 2 –Safety Approach

Safety is a key operating principle for the Government and this sub-factor evaluates how the Offeror’s proposal meets the submission requirements and demonstrates the Technical Expertise to meet the requirements of the Work Plan Task Order and the two (2) Sample Task Order PWS (Section J). The Offeror’s proposal will contain conceptual schematics and flow charts as applicable. The proposal shall address the Offeror’s approach to health and safety for the Luckey Soils Remediation including but not limited to:

· Work planning and preparation

· Beryllium safety and health physics

· Hazards identification

· Integrated safety analysis (or similar), including hazard mitigation, minimization and controls

· Communications and reporting

Corporate Safety and Health Program The Offeror must submit the following:

1. A narrative description of the Offeror’s safety management program including the organizational structure and responsibilities of the safety program.

2. The Table of Contents for the corporate Safety and Health Program, including a list of standard operating procedures.

3. One of the Offeror’s existing Accident Prevention Plans (APP) prepared within the last five years from the date of this Request for Proposal for a hazardous waste project. The APP provided shall be complete, including the corresponding Site Safety and Health Plan (SSHP) and any other appendices (i.e. Chronic Beryllium Disease Prevention Program (CBDPP)) or attachments. The APP shall be provided as an appendix to Volume I.

Accident Summary The following information shall be submitted for the offeror and its subcontractors identified in the Offeror’s proposal.

1. A copy of the corporate OSHA 300 logs and corresponding 300-A forms for the last three calendar years from the date of this Request for Proposal. These shall be an appendix to Volume I.

2. A summary of accidents that occurred within the last three calendar years from the date of this Request for Proposal that resulted in property damage over $2,500 or permanent disability or death.

A tabulated summary of: the Experience Modification Rate; the Recordable Incident Rate (RIR – sometimes also known as the “incident rate” or the Total Case Incident Rate); and the Days Away from work, Restricted activities or job Transfer (DART) rate, for the last three calendar years from the date of this Request for Proposal. The RIR and DART rates shall be calculated according to the procedures defined by OSHA and the Bureau of Labor Statistics. The rates shall be calculated using the information provided in the 300 and 300-A logs and the tabulated summary shall include enough explanation to allow the reader to easily reproduce and validate the calculations. The summary shall include documentation of the EMR rates assigned by each firm’s insurance provider.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .