SECTION J
Luckey Soils Remedial Action Sample Project # 1
Phase II – Infrastructure, Operations, and Maintenance Performance Work Statement
1.0 INTRODUCTION
1.1 General
This sample project is intended to illustrate work anticipated to be performed at the Luckey Site to enable the Government to evaluate the CONTRACTOR’s proposed costs.
1.2 Contract Type
For this sample project, assume a firm fixed price task order to perform the activities described in this Performance Work Statement (PWS) and in accordance with (IAW) the contract scope of work (SOW) included as Section C.
2.0 SCOPE OF SERVICES
In general, the effort under this PWS consists of mobilization, setup, installation, and construction of all equipment, facilities, site infrastructure, environmental controls, and monitoring equipment required to implement the CONTRACTOR’s proposed Technical Approach (Proposal Volume I – Factor I). This sample project does not include preparation of work plans (Phase I) or remediation (Phase III). Further details regarding the Technical Approach proposal format and requirements are found in Section L.
Work under this PWS includes, but is not limited to, the following activities:
• Maintain and follow a Safety and Health Program.
• Civil, Topographic, and geophysical surveys.
• Workforce and equipment mobilization and if applicable, seasonal demobilization.
• Operation and maintenance (O&M) of perimeter air monitoring systems including meteorological monitoring and fixed and portable air monitoring stations to provide early detection of potential contaminant emissions during the remedial action. The air monitoring program shall include background monitoring prior to the start of remedial activities at the site.
• Installation of support facilities (i.e., site project offices, decontamination facilities, roads and utilities).
• Radiological and beryllium safety.
• Monitor worker exposures and contamination spread.
• Project management and construction quality assurance / quality control (QA/QC).
• Storm &and waste water management through effective, handling, treatment and discharge or disposal of all site waters as they apply.
3.0 COST ESTIMATE PREPARATION
The CONTRACTOR shall prepare a cost estimate for all tasks described in this sample project PWS. No work plan or write-up is required, however, the bid schedule (Enclosure 1) shall be completed and detailed backup supporting the cost estimate shall be provided.
4.0 Work Breakdown Structure
Below is a summary of tasks required under this PWS, broken down by the respective work breakdown structure as specified in Section C. The Contractor shall furnish all services, materials, supplies, labor, and travel as required to perform the required work herein. All equipment and miscellaneous items deemed necessary for the performance of this PWS including, but not limited to, computers, projectors, telephones, software, field equipment, etc. shall be provided by the CONTRACTOR.
331XX01 Mobilization and Preparatory Work
331XX0101 Mobilization of Construction Equipment and Facilities 331XX0104 Setup / Construct Temporary Facilities
331XX02 Monitoring, Sampling, Testing, and Analysis 331XX0201 Meteorological Monitoring 331XX0202 Radiation Monitoring 331XX0203 Air Monitoring and Sampling 331XX0205 Sampling Surface Water / Liquid Waste 331XX0209 Laboratory Chemical Analysis 331XX0210 Radioactive Waste Analysis 331XX0211 Geotechnical Testing 331XX0213 On-Site Laboratory Facilities 331XX0290 Beryllium Monitoring, Sampling, Testing, and Analysis
331XX03 Site Work 331XX0302 Clearing and Grubbing 331XX0304 Roads / Parking / Curbs / Walks 331XX0305 Fencing
331XX05 Surface Water Collection and Control 331XX0507 Sediment Barriers
331XX09 Liquids / Sediments / Sludges Collection and Containment 331XX0907 Lagoons / Basins / Tanks / Dikes / Pump System
331XX21 Demobilization 331XX2104 Demobilization of Construction Equipment and Facilities (Seasonal)
331XX22 General Requirements 331XX2201 Supervision and Management
331XX2204 Engineering, Surveying, and Quality Control 331XX2206 First Aid, Fire Protection, and Traffic Control 331XX2207 Health & Safety 331XX2208 Temporary Construction Facilities - Ownership 331XX2209 Temporary Construction Facilities - Operation 331XX2210 Project Utilities
5.0 Period of Performance
The period of performance for this task order shall be one (1) year from the notice to proceed.
Enclosure 1 – Bid Schedule
Luckey FUSRAP Soils Remedial Action Sample Task Order # 1
Bid Schedule
Task Description Unit Quantitiy Unit Cost Total Cost
331XX01 Mobilization and Preparatory Work 331XX0101 Mobilization of Construction Equipment and Facilities LS 1 -$ -$ 331XX0104 Setup / Construct Temporary Facilities LS 1 -$ -$
331XX02 Monitoring, Sampling, Testing, and Analysis 331XX0201 Meteorological Monitoring LS 1 -$ -$ 331XX0202 Radiation Monitoring LS 1 -$ -$ 331XX0203 Air Monitoring and Sampling LS 1 -$ -$ 331XX0205 Sampling Surface Water / Groundwater / Liquid Waste LS 1 -$ -$ 331XX0209 Laboratory Chemical Analysis LS 1 -$ -$ 331XX0210 Radioactive Waste Analysis LS 1 -$ -$ 331XX0211 Geotechnical Testing LS 1 -$ -$ 331XX0213 On-Site Laboratory Facilities LS 1 -$ -$ 331XX0290 Beryllium Monitoring, Sampling, Testing, and Analysis LS 1 -$ -$
331XX03 Site Work 331XX0302 Clearing and Grubbing LS 1 -$ -$ 331XX0304 Roads / Parking / Curbs / Walks LS 1 -$ -$ 331XX0305 Fencing LS 1 -$ -$
331XX05 Surface Water Collection and Control 331XX0507 Sediment Barriers LS 1 -$ -$
331XX09 Liquids / Sediments / Sludges Collection and Containment 331XX0907 Lagoons / Basins / Tanks / Dikes / Pump System LS 1 -$ -$
331XX21 Demobilization 331XX2104 Demobilization of Construction Equipment and Facilities LS 1 -$ -$
331XX22 General Requirements 331XX2201 Supervision and Management LS 1 -$ -$ 331XX2204 Engineering, Surveying, and Quality Control LS 1 -$ -$ 331XX2206 First Aid, Fire Protection, and Traffic Control LS 1 -$ -$ 331XX2207 Health & Safety LS 1 -$ -$ 331XX2208 Temporary Construction Facilities - Ownership LS 1 -$ -$ 331XX2209 Temporary Construction Facilities - Operation LS 1 -$ -$ 331XX2210 Project Utilities LS 1 -$ -$
Sample Task Order #1 Total (Firm Fixed Price) -$