Luckey Soils Remedial Action Scope of Work LUCKEYSOILRASOW
Section 01 57 23 Page 1
SECTION 01 57 23
TEMPORARY STORM WATER POLLUTION CONTROL
04/08
PART 1 GENERAL
1.1 SUMMARY
The work consists of implementing the storm water pollution prevention measures to prevent sediment from entering streams or water bodies as specified in this Section in conformance with the requirements of Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION, and the requirements of the National Pollutant Discharge Elimination System (NPDES).
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D4439 (2011) Geosynthetics
ASTM D4491 (1999a; R 2009) Water Permeability of Geotextiles by
Permittivity
ASTM D4533 (2011) Trapezoid Tearing Strength of Geotextiles
ASTM D4632 (2008) Grab Breaking Load and Elongation of Geotextiles
ASTM D4751 (2012) Determining Apparent Opening Size of a Geotextile
ASTM D4873 (2002; R 2009) Identification, Storage, and Handling of Geosynthetic Rolls and Samples
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 832-R-92-005 (1992) Storm Water Management for Construction Activities
Developing Pollution Preventions and Plans and Best Management Practices
1.3 EROSION AND SEDIMENT CONTROLS
The controls and measures required of the Contractor are described below.
Section 01 57 23 Page 2
1.3.1 Stabilization Practices
The stabilization practices to be implemented include temporary seeding, mulching, geotextiles, sod stabilization, vegetative buffer strips, erosion control mats, protection of trees, preservation of mature vegetation, etc. On the daily CQC Report, record the dates when the major grading activities occur, (e.g., clearing and grubbing, excavation, embankment, and grading); when construction activities temporarily or permanently cease on a portion of the site; and when stabilization practices are initiated. Except as provided in paragraphs UNSUITABLE CONDITIONS and NO ACTIVITY FOR LESS THAN 21 DAYS, initiate stabilization practices as soon as practicable, but no more than 14 days, in any portion of the site where construction activities have temporarily or permanently ceased.
1.3.1.1 Unsuitable Conditions
Where the initiation of stabilization measures by the fourteenth day after construction activity temporarily or permanently ceases or is precluded by unsuitable conditions caused by the weather, initiate stabilization practices as soon as practicable after conditions become suitable.
1.3.1.2 No Activity for Less Than 21 Days
When the total time period in which construction activity is temporarily ceased on a portion of the site is 21 days minimum, stabilization practices do not have to be initiated on that portion of the site until 14 days have elapsed after construction activity temporarily ceased.
1.3.1.3 Burnoff
Burnoff of the ground cover is not permitted.
1.3.1.4 Protection of Erodible Soils
Immediately finish the earthwork brought to a final grade, as indicated or specified, and protect the side slopes and back slopes upon completion of rough grading. Plan and conduct earthwork to minimize the duration of exposure of unprotected soils.
1.3.2 Erosion, Sediment and Stormwater Control
a. Submit "Erosion and Sediment Controls" (E&S) (form provided at the pre-construction conference) and Storm Water Inspection Reports to the Contracting Officer once every 7 calendar days and within 24 hours of a storm event that produces 0.5 inch or more of rain.
b. Submit a Storm Water Pollution Prevention Plan (SWPPP) for the project to the Contracting Officer prior to the commencement of work. The SWPPP shall meet the requirements of the State of Ohio general permit for storm water discharges from construction sites. Maintain an approved copy of the SWPPP at the construction on-site office, and continually update as regulations require, to reflect current site conditions. Include within the SWPPP:
(1) Identify potential sources of pollution which may be reasonably expected to affect the quality of storm water discharge from the site.
Section 01 57 23 Page 3
(2) Describe and ensure implementation of practices which will be used to reduce the pollutants in storm water discharge from the site.
(3) Ensure compliance with terms of the State of Ohio general permit for storm water discharge.
(4) Select applicable best management practices from EPA 832-R-92-005.
1.3.3 Structural Practices
Implement structural practices to divert flows from exposed soils, temporarily store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site. Implement structural practices in a timely manner, during the construction process, to minimize erosion and sediment runoff.
1.3.3.1 Silt Fences
Provide silt fences as a temporary structural practice to minimize erosion and sediment runoff.
Properly install silt fences to effectively retain sediment immediately after completing each phase of work where erosion would occur in the form of sheet and rill erosion (e.g. clearing and grubbing, excavation, embankment, and grading). Install silt fences in the locations indicated on the drawings.
Obtain approval from the Contracting Officer prior to final removal of silt fence barriers.
1.3.3.2 Diversion Dikes
Build diversion dikes with a maximum channel slope of 2 percent and adequately compacted to prevent failure. The minimum height measured from the top of the dike to the bottom of the channel shall be 18 inches. The minimum base width shall be 6 feet and the minimum top width shall be 2 feet. Ensure that the diversion dikes are not damaged by construction operations or traffic. Locate diversion dikes where shown on the drawings.
1.3.4 Sediment Basins
Trap sediment in temporary sediment basins. Select a basin size to accommodate the runoff of a local 25-year storm. Pump dry and remove the accumulated sediment, after each storm. Use a paved weir or vertical overflow pipe for overflow. Remove collected sediment from the site. Institute effluent quality monitoring programs. Install, inspect, and maintain best management practices (BMPs) as required by the general permit. Prepare BMP Inspection Reports as required by the general permit. If required by the permit, include those inspection reports.
1.3.5 Vegetation and Mulch
a. Provide temporary protection on sides and back slopes as soon as rough grading is completed or sufficient soil is exposed to require erosion protection. Protect slopes by accelerated growth of permanent vegetation, temporary vegetation, mulching, or netting. Stabilize slopes by hydroseeding, anchoring mulch in place, covering with anchored netting, sodding, or such combination of these and other methods necessary for effective erosion control.
Section 01 57 23 Page 4
b. Seeding: Provide new seeding where ground is disturbed. Include topsoil or nutriment during the seeding operation necessary to establish a suitable stand of grass.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for [Contractor Quality Control approval.] [information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Storm Water Pollution Prevention Plan [G]
SD-06 Test Reports
Storm Water Inspection Reports for General Permit Erosion and Sediment Controls
SD-07 Certificates
Mill Certificate or Affidavit
1.5 DELIVERY, STORAGE, AND HANDLING
Identify, store and handle filter fabric in accordance with ASTM D4873.
PART 2 PRODUCTS
2.1 COMPONENTS FOR SILT FENCES
2.1.1 Filter Fabric
Provide geotextile that complies with the requirements of ASTM D4439, and consists of polymeric filaments which are formed into a stable network such that filaments retain their relative positions.
The filament shall consist of a long-chain synthetic polymer composed of at least 85 percent by weight of ester, propylene, or amide, and contains stabilizers and/or inhibitors added to the base plastic to make the filaments resistant to deterioration due to ultraviolet and heat exposure. Provide synthetic filter fabric that contains ultraviolet ray inhibitors and stabilizers to assure a minimum of six months of expected usable construction life at a temperature range of 0 to 120 degrees F. The filter fabric shall meet the following requirements:
Section 01 57 23 Page 5
FILTER FABRIC FOR SILT SCREEN FENCE
PHYSICAL PROPERTY TEST PROCEDURE STRENGTH REQUIREMENT
Grab Tensile Elongation (percent) ASTM D4632 100 lbs. min. 30 percent max.
Trapezoid Tear ASTM D4533 55 lbs. min.
Permittivity ASTM D4491 0.2 sec-1
AOS (U.S. Std Sieve) ASTM D4751 20-100
2.1.2 Silt Fence Stakes and Posts
Use either wooden stakes or steel posts for fence construction. Wooden stakes utilized for silt fence construction, shall have a minimum cross section of 2 by 2 inches when oak is used and 4 by 4 inches when pine is used, and have a minimum length of 5 feet. Steel posts (standard "U" or "T" section) utilized for silt fence construction, shall have a minimum weight of 1.33 pounds/linear foot and a minimum length of 5 feet.
2.1.3 Mill Certificate or Affidavit
Provide a mill certificate or affidavit attesting that the fabric and factory seams meet chemical, physical, and manufacturing requirements specified above. Specify in the mill certificate or affidavit the actual Minimum Average Roll Values and identify the fabric supplied by roll identification numbers. Submit a mill certificate or affidavit signed by a legally authorized official from the company manufacturing the filter fabric.
PART 3 EXECUTION
3.1 INSTALLATION OF SILT FENCES
Extend silt fences a minimum of 16 inches above the ground surface without exceeding 34 inches above the ground surface. Provide filter fabric from a continuous roll cut to the length of the barrier to avoid the use of joints. When joints are unavoidable, splice together filter fabric at a support post, with a minimum 6 inch overlap, and securely sealed. Excavate trench approximately 4 inches wide and 4 inches deep on the upslope side of the location of the silt fence. The 4 by 4 inch trench shall be backfilled and the soil compacted over the filter fabric. Remove silt fences upon approval by the Contracting Officer.
3.3 FIELD QUALITY CONTROL
Maintain the temporary and permanent vegetation, erosion and sediment control measures, and other protective measures in good and effective operating condition by performing routine
Section 01 57 23 Page 6 inspections to determine condition and effectiveness, by restoration of destroyed vegetative cover, and by repair of erosion and sediment control measures and other protective measures. Use the following procedures to maintain the protective measures.
3.3.1 Silt Fence Maintenance
Inspect the silt fences in accordance with paragraph, titled "Inspections," of this section. Any required repairs shall be made promptly. Pay close attention to the repair of damaged silt fence resulting from end runs and undercutting. Should the fabric on a silt fence decompose or become ineffective, and the barrier is still necessary, replace the fabric promptly. Remove sediment deposits when deposits reach one-third of the height of the barrier. Remove a silt fence when it is no longer required. The immediate area occupied by the fence and any sediment deposits shall be shaped to an acceptable grade. The areas disturbed by this shaping shall [receive erosion control] [be seeded in accordance with Section 32 05 33 LANDSCAPE ESTABLISHMENT, except that the coverage requirements in paragraph, titled "Establishment" of this section do not apply].
3.3.2 Diversion Dike Maintenance
Inspect diversion dikes in accordance with paragraph, titled "Inspections," of this section. Pay close attention to the repair of damaged diversion dikes and accomplish necessary repairs promptly. When diversion dikes are no longer required, shape to an acceptable grade. Seed the areas disturbed.
3.4 INSPECTIONS
3.4.1 General
Inspect disturbed areas of the construction site, areas that have not been finally stabilized used for storage of materials exposed to precipitation, stabilization practices, structural practices, other controls, and area where vehicles exit the site at least once every seven (7) calendar days and within 24 hours of the end of any storm that produces 0.5 inches or more rainfall at the site. Conduct inspections at least once every month where sites have been finally stabilized.
3.4.2 Inspections Details
Inspect disturbed areas [and areas used for material storage that are exposed to precipitation] for evidence of, or the potential for, pollutants entering the drainage system. Observe erosion and sediment control measures identified in the Storm Water Pollution Prevention Plan to ensure that they are operating correctly. Inspect discharge locations or points to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters. Inspect locations where vehicles exit the site for evidence of offsite sediment tracking.
3.4.3 Inspection Reports
For each inspection conducted, prepare a report summarizing the scope of the inspection, name(s) and qualifications of personnel making the inspection, the date(s) of the inspection, major observations relating to the implementation of the Storm Water Pollution Prevention Plan, maintenance performed, and actions taken. Furnish the report to the Contracting Officer within 24
Section 01 57 23 Page 7 hours of the inspection as a part of the Contractor's daily CQC REPORT. A copy of the inspection report shall be maintained on the job site.
[3.4.4 Monthly Inspection Report and Certification Form
Complete, sign, and submit the original form, on the first working day of each month, to the COR.
-- End of Section --
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 EROSION AND SEDIMENT CONTROLS |
| 1.3.1 Stabilization Practices |
| 1.3.1.1 Unsuitable Conditions |
| 1.3.1.2 No Activity for Less Than 21 Days |
| 1.3.1.3 Burnoff |
| 1.3.1.4 Protection of Erodible Soils |
| 1.3.2 Erosion, Sediment and Stormwater Control |
| 1.3.3 Structural Practices |
| 1.3.3.1 Silt Fences |
| 1.3.3.2 Diversion Dikes |
| 1.3.4 Sediment Basins |
| 1.3.5 Vegetation and Mulch |
| 1.4 SUBMITTALS |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| PART 2 PRODUCTS |
| 2.1 COMPONENTS FOR SILT FENCES |
| 2.1.1 Filter Fabric |
| 2.1.2 Silt Fence Stakes and Posts |
| 2.1.3 Mill Certificate or Affidavit |
| PART 3 EXECUTION |
| 3.1 INSTALLATION OF SILT FENCES |
| 3.3 FIELD QUALITY CONTROL |
| 3.3.1 Silt Fence Maintenance |
| 3.3.2 Diversion Dike Maintenance |
| 3.4 INSPECTIONS |
| 3.4.1 General |
| 3.4.2 Inspections Details |
| 3.4.3 Inspection Reports |
| [3.4.4 Monthly Inspection Report and Certification Form |