Questions_and_Answers.pdf

PDF 188 KB Posted

Attached to
TUMR182112 Multi Facilities Repairs Muniz Federal contract opportunity
Solicitation number
W912LR-18-B-5008
Issued by
Department of the Army Puerto Rico Army National Guard

About this file

Pre Bid questions and answers

View the file

Other files for this federal contract opportunity

Other files attached to TUMR182112 Multi Facilities Repairs Muniz, newest first.
File Type Posted
3.pdf PDF
12_A.pdf PDF
80.pdf PDF
9.pdf PDF
85.pdf PDF
Pre_Sol_Conference_Sign_in_Sheet.pdf PDF
3._SOW_-_TUMR182112.pdf PDF
TUMR182112_Asbestos_in_Base_Bid.pdf PDF
W912LR-18-B-5008.pdf PDF
2._PWS_-_TUMR182112.rtf RTF text file
W912lR-18-B-5008_Pre-Bid_Conference_Slides.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bldg 2

Interior/Exterior Walls:

Do we need to remove and seal all the Windows of the building and for the outside which material will be use? SOW say remove and seal window unit HVAC. Seal with same material as the wall

The second floor of the building will be paint inside and outside? Consider painting entire structure inside and out side

If the first floor of the building will be paint from inside and the outside, is there a presence of lead? (See page 7 TUMR182112_asbestos…) if yes, do we need to remove the asbestos or stay? If asbestos is suspected you need to test for it.

BLDG 3

The statement “Remove and replace damage gypsum wall board in deputy Fire Chif office”. We did not saw any gypsum board at the moment of the site visit. Site visit requirement to verify if there was or not.

East Lower Interior/ Walls:

Indicate to remove the walls and doors from the dorms. This dorms will be reconstructed or we need to leave an open space? Room will be reconstructed as they were

Ceilings

For the ceiling area from the woman/men bathrooms the green gypsum ceiling board will be use as on the locker rooms? yes

BLDG 9 (Pag. 8 SOW)

Interior/Flooring

The statement: “Replace any VAT with vinyl floor tile” refer to? VAT - Vinyl Asbestos Tile

Bldg 80

The equipment and cabinets from rooms 116,117 and 118 will be remove by the owner? On the site visit somebody mentioned that the job for polish concrete floor can change. Equipment and cabinets will remain in place.

Running Track and Tennis Fence Repair

As was mentioned on the site visit the top layer running track will be eliminated, please confirm.

Running track is not to be considered in the contract, eliminated.

BLDG 93

It is very important that the drawings can be interpreted to the detail.

A new prefabricated building need to be designed of the same size. No to be re-exactly replicated.

Design to current construction codes and SOW requirements