Questions_and_Answers.pdf
PDF 188 KB Posted
- Attached to
- TUMR182112 Multi Facilities Repairs Muniz Federal contract opportunity
- Solicitation number
- W912LR-18-B-5008
About this file
Pre Bid questions and answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3.pdf | ||
| 12_A.pdf | ||
| 80.pdf | ||
| 9.pdf | ||
| 85.pdf | ||
| Pre_Sol_Conference_Sign_in_Sheet.pdf | ||
| 3._SOW_-_TUMR182112.pdf | ||
| TUMR182112_Asbestos_in_Base_Bid.pdf | ||
| W912LR-18-B-5008.pdf | ||
| 2._PWS_-_TUMR182112.rtf | RTF text file | |
| W912lR-18-B-5008_Pre-Bid_Conference_Slides.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bldg 2
Interior/Exterior Walls:
Do we need to remove and seal all the Windows of the building and for the outside which material will be use? SOW say remove and seal window unit HVAC. Seal with same material as the wall
The second floor of the building will be paint inside and outside? Consider painting entire structure inside and out side
If the first floor of the building will be paint from inside and the outside, is there a presence of lead? (See page 7 TUMR182112_asbestos…) if yes, do we need to remove the asbestos or stay? If asbestos is suspected you need to test for it.
BLDG 3
The statement “Remove and replace damage gypsum wall board in deputy Fire Chif office”. We did not saw any gypsum board at the moment of the site visit. Site visit requirement to verify if there was or not.
East Lower Interior/ Walls:
Indicate to remove the walls and doors from the dorms. This dorms will be reconstructed or we need to leave an open space? Room will be reconstructed as they were
Ceilings
For the ceiling area from the woman/men bathrooms the green gypsum ceiling board will be use as on the locker rooms? yes
BLDG 9 (Pag. 8 SOW)
Interior/Flooring
The statement: “Replace any VAT with vinyl floor tile” refer to? VAT - Vinyl Asbestos Tile
Bldg 80
The equipment and cabinets from rooms 116,117 and 118 will be remove by the owner? On the site visit somebody mentioned that the job for polish concrete floor can change. Equipment and cabinets will remain in place.
Running Track and Tennis Fence Repair
As was mentioned on the site visit the top layer running track will be eliminated, please confirm.
Running track is not to be considered in the contract, eliminated.
BLDG 93
It is very important that the drawings can be interpreted to the detail.
A new prefabricated building need to be designed of the same size. No to be re-exactly replicated.
Design to current construction codes and SOW requirements