Solicitation # W912LR18B0003‐0001

MODERNIZATION OF BILLETING BLDGs 121 & 123 FATA PRARNG

Questions Received from sellers as of 8‐25‐18:

1. What is the amperage for the safety switch? The Amperage of the AC safety switches shall be 208V, NEMA 4X. Fuses sizes following manufacturer’s recommendation.

2. What is the NEMA standard for the safety switch (Nema 1, Nema 3R, Nema 4X Stainless Steel)? Please refer to question #1.

3. The one line diagram did not show if we need to provide a breaker for the P1,P2,P3,P4

Panels or if this breaker are existing. If we need to provide the breaker please tell us the model and brand. Panels and breaker (150 A for each panel) at MDP shall be provided.

Refer to E4.

4. Page A2.Sheet 8‐ Note 7 – According to site visit, please confirm contractor is not responsible for any scope of work on roof. Page A2.Sheet 8‐ Note 7. Do not consider roofing work on sheet A‐6. However if for some reason, contractor perforates roof as part of the modernization, remediate following recommendations of roof sealing.

5. A6 Sheet 12. Roof work required as per General Roof Notes. According to the site visit to Fort Allen per discussion. There is no scope of work for Contractor please confirm.

Please refer to question #4.

6. Page A3. Sheet 9. Inside of exterior wall in restroom at window elevation shown does not show having cement board or tile. A8 sheet 14‐ indicates cement board. Please clarify if only tile is to be used on this wall. Cement board shown on outside wall of restrooms in dormitory area, please clarify if cement board is to be used. Page A3. Sheet

9. All bathroom walls shall be Cementitious Boards.

7. A7 sheet 13. Door schedule general schedule does not indicate the use of weather stripping for the Entrance Doors (marked A). Please clarify if weather stripping is to be used. Page A7. Sheet 13. Consider weather Stripping on all exterior door.

8. A7 Sheet 13. Window notes – window schedule requires Low‐e glass for windows.

According to window manufacturer low ‐e is back ordered 6 months or more. If this is correct, can Low‐e film be applied to the window glass in lieu of the low‐e glass? Page A7 Sheet 13 Contractor shall consider Low‐ e glass.

9. A8 Sheet 14. Indicates urinals in the schedule but none indicated on plans, please clarify.

A8 Sheet 14. Page A8. Sheet 14. Omit urinals specified on bathroom fixture schedule.

10. M2 Sheet 19. Specifics Daikin Brand and Model Number, this model has been discontinued and no longer available. Page M2. Sheet 19. No brand name required, propose solution based on requirements.