RFI_Responses_1-17_(no_10).docx
DOCX document 2 MB Posted
- Attached to
- 200TH WEATHER FLIGHT O&T FACILITY
- Solicitation number
- W912LQ-17-B-3001
About this file
Attached are the responses to submitted RFI's. Answers will be posted as they become available.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised_Waterline_Drawing_Sheets.pdf | ||
| 200_WF_Soil_Report.pdf | ||
| W912LQ-17-B-3001-0002.pdf | ||
| FBO_MFR_for_SF30_Issuance_on_10_Aug.pdf | ||
| RFI_Responses_1-17_(no_8_or_part_of_3)_FINAL.docx | DOCX document | |
| RFI_18_Response.docx | DOCX document | |
| FBO_MFR_for_mail_in_address.pdf | ||
| FBO_MFR_for_RFI_5.pdf | ||
| Site_Visit_Minutes.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Information (RFI) receipts and answers as of 2nd day of August, year 2017.
RFI #1
| Question : |
| “The survey provided by Draper Aden does not match the existing conditions on the plans. Which of these do I use to compare with?” |
| Response : |
| See Sheet C3.0 for existing and new elevations. |
RFI #2
| Question : |
| “SPRINKLER - Please confirm if the building is to receive a fire protection sprinkler system. Sheet LS1.01 calls for Automatic Sprinkler System: 2013 NFPA 13 and UFC 3-600-01 – but the drawings do not show a new fire service main to the building.” |
| Response : |
| See LS 1.01 for instruction; automatic sprinkler system is not required for this building. |
RFI #3
| Question : |
| 1) “On Sheet 10, it calls for approximately 465' of 6" C-900 waterline which is being connected to an existing 8" private main to the east of the site. Plans show approximately 84' to property line (S07*58'21"W) and stops. More information is needed for connection. Existing main is not shown, so we have no idea as to location, type of pipe (Ductile or C-900), or depth. |
2) Does the 6" Fire Hydrant require a 6" gate valve? The plans do not show installation of a gate valve on the line.
3) Do they want a 2" valve in the line where it reduces from 6" to 2" so if they have any problems, they can isolate the 2" line?
| Response : |
| 1) Response Pending |
2) Yes, include installation of 6” gate valve just prior to branch for hydrant.
3) Yes, Install combination of mechanical water meter and shut off on 2” waterline approx. 5 feet from building.
RFI #4
| Question : |
| “Is it required for the Mass Notification portion to have separate Speaker strobes as the symbol legend shows on drawing E0.01? The UFC requires that there be one set of speakers shared by the fire alarm and the mass notification systems. The Mass Notification symbol should be for an Amber Strobe only not a speaker strobe.” |
| Response : |
| Bid as designed. Correction required on sheet LS1.01, building does require Mass Notification System. |
RFI #6
| Question : |
| “Can a copy of the geotechnical report be provided? This is a crucial piece of information to allow for the amount of cut and fill to be determined for the site.” |
| Response : |
| Document is attached. |
RFI #7
| Question : |
| “Is it required for the Mass Notification portion to have separate Speaker strobes as the symbol legend shows on drawing E0.01? The UFC requires that there be one set of speakers shared by the fire alarm and the mass notification systems. The Mass Notification symbol should be for an Amber Strobe only not a speaker strobe.” |
| Response : |
| Bid as designed. Correction required on sheet LS1.01, building does require Mass Notification System. |
RFI #8
| Question : |
| Drawing S1.01 general note #3 states that the special inspector will be required under section 1704, 2012 UBC, for the inspections for the C- I-P concrete, earthwork and the PEMB system. Section 1704 of the UBC requires the owner/owner’s design professional “shall employ one or more approved agencies to perform inspections of work listed in section 1705”. No schedule of special inspections is included in the specifications. Specification section 31 2000 clearly states owner will provide special inspector for the required tests, there is no confirmation Owner is supplying the special inspector for the concrete and PEMB. Please confirm owner will be providing the special inspections for these divisions also. |
| Response : |
| Bid as designed. |
RFI #9
| Question : |
| Specification section 01 22 00 para 1.07 is stating, to provide unit pricing for 2 items (import, placement & compaction of fill soil and removal, export and disposal of unsuitable soils (cut)). For bidding purposes can you provide a quantity for each item requested? Also there is no unit pricing items shown on the bid form can you please clarify/provide? |
| Response : |
| Delete section 01 2200 paragraph 1.07 |
RFI #11
| Question : |
| Specification section 01 50 00 para graph 1.09 states “provide project identification sign of design, construction and location approved by Owner”. Please provide design, construction type and artwork required. |
| Response : |
| Bid as specified |
RFI #14
| Question : |
| Is the use of MC cable permitted on this project? |
| Response : |
| Per specification 26 0533 Part 3, Paragraph 3.01 ; use conduit as directed. |
RFI #15
| Question : |
| Drawing C4.0 states “Extend communication lines to proposed building (by others)”, and drawing E0.02 shows the communication conduit as part of the electrical work. Please confirm who will be responsible for running the conduit from the existing building to the new proposed building. Will the same contractor be responsible for the cabling to include connection inside the new building? If this work is by others, please confirm general contractor will only be responsible to 5’ outside the building. |
| Response : |
| Replace note on C4.0 to state “Extend communication duct to proposed building.” Refer to Sheet E0.02 |
This work is to be included in bid.
RFI #16
| Question : |
| In rooms 111 and 112 is there a minimum required clearance from the finished floor to the bottom of the mainframe rafters? |
| Response : |
| Per sheet A5.01 “Roof Bearing” height is 14’- 0” |
Attachments:
RFI #17 Concrete Sealing
1. For sealed concrete areas, provide a lithium-silicate densifier that includes a siliconate stain repellant, similar to V-Seal Industrial-Seal 117A (approximate cost $39.95/gallon), and apply soon after concrete is set in accordance with manufacturer’s instructions.
RFI #12 Grounding
1. Don’t see your referenced sections or paragraphs.
2. See Section 26 0526 for project grounding requirements.
3. Delete references in Section 32 3113 to Section 26 4113 Lightning Protection for Structures.
RFI #13 Metal Building Exterior Skin
1. See Paragraph 2.04 A and B for options on base metal for wall and roof panels.
2. Provide min. 1 mil thickness 70% PVDF finish on BOTH wall and roof panels.
3. Roof Panels must be warrantable with a 20 year weathertightness warranty, although the bid price should not include the 20 year warranty (and it’s cost).
Paragraph 1.07 requires a 5 year manufacturer warranty for all exterior building skin components for both weathertightness and for finish as indicated image1.emf
200 WF Soil Report.pdf
1592 Penniman Road, Suite E Williamsburg, Virginia 23185 Phone: (757)-564-6452 Fax: (757)-564-6453 info@getsolutionsinc.com
October 23, 2015
TO: Guernsey Tingle Architects
4350 New Town Avenue Suite 101 Williamsburg, Virginia 23188
Attn: Mr. Michael Creasy
RE: Report of Subsurface Investigation and Geotechnical Engineering Services 200th Weather Flight O & T Facility Mullins Armory – Beulah Road Sandston, Virginia G E T Project No: WM15-167G
Dear Mr. Creasy:
In compliance with your instructions, we have completed our Subsurface Investigation and Geotechnical Engineering Services for the above referenced project. The results of this study, together with our recommendations, are presented in this report.
Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation.
We appreciate the opportunity to work with you on this project. We trust that the information contained herein meets your immediate need, and should you have any questions or if we could be of further assistance, please do not hesitate to contact us.
Respectfully Submitted, G E T Solutions, Inc.
James R. Wheeler Project Geologist
Bruce R. Spiro, P.E.
Principal Engineer VA Lic. # 015791
Copies: (1) Client g
Tested By: A. Kotyk Checked By: J. Wheeler
MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE)
D ry d en si ty , p cf
Water content, %
10 11.5 13 14.5 16 17.5 19
14.5%, 105.3 pcf
ZAV for Sp.G. = 2.70
Test specification: ASTM D 698-07 Method A Standard
1-2 ft. CL A-4 17 Estimated
2.6 26 8 0 86
Brown, Lean CLAY (CL) with few Sand & trace organics
WM15-167G Guernsey Tingle Architects
CBR #1
Sample Obtained: 10/8/2015 Sample Tested: 10/9/2015
Elev/ Classification Nat.
Sp.G. LL PI
Depth USCS AASHTO Moist. #4 No.200
TEST RESULTS MATERIAL DESCRIPTION
Project No. Client: Remarks:
Project:
Location: See Attached Boring Location Plan Sample Number: CBR #1 GET Solutions, Inc.
Williamsburg, VA Figure
Maximum dry density = 105.3 pcf
Optimum moisture = 14.5 %
BEARING RATIO TEST REPORT
ASTM D 1883-07
Project No: WM15-167G
Project: 200th Weather Flight O & T Facility
Location: See Attached Boring Location Plan
Sample Number: CBR #1 Depth: 1-2 ft.
Date: 10/8/2015
Brown, Lean CLAY (CL) with few Sand & trace organics
Test Description/Remarks:
Resiliency Factor = 2.0
Figure 1a
105.3 14.5 26 8CL
Material Description
USCS
Max.
Dens.
(pcf)
Optimum Moisture
LL PI
Molded Density
Percent of Max. Dens.
Soaked
CBR (%)
0.10 in. 0.20 in.
Linearity Correction
(in.)
Surcharge (lbs.)
Swell
1 105.3 100 14.0 104.7 99.5 20.8 8.1 8.0 0.015 10 0.6
Pe ne tr at io n
R es is ta nc e
(p
Penetration Depth (in.)
0 0.1 0.2 0.3 0.4 0.5
200 WF Soil Report.pdf
1592 Penniman Road, Suite E Williamsburg, Virginia 23185 Phone: (757)-564-6452 Fax: (757)-564-6453 info@getsolutionsinc.com
October 23, 2015
TO: Guernsey Tingle Architects
4350 New Town Avenue Suite 101 Williamsburg, Virginia 23188
Attn: Mr. Michael Creasy
RE: Report of Subsurface Investigation and Geotechnical Engineering Services
Mullins Armory – Beulah Road Sandston, Virginia G E T Project No: WM15-167G
Dear Mr. Creasy:
In compliance with your instructions, we have completed our Subsurface Investigation and Geotechnical Engineering Services for the above referenced project. The results of this study, together with our recommendations, are presented in this report.
Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation.
We appreciate the opportunity to work with you on this project. We trust that the information contained herein meets your immediate need, and should you have any questions or if we could be of further assistance, please do not hesitate to contact us.
Respectfully Submitted, G E T Solutions, Inc.
James R. Wheeler Project Geologist
Bruce R. Spiro, P.E.
Principal Engineer VA Lic. # 015791
Copies: (1) Client
Tested By: A. Kotyk Checked By: J. Wheeler
MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE)
D ry d en ty , p cf
Water content, %
10 11.5 13 14.5 16 17.5 19
14.5%, 105.3 pcf
ZAV for Sp.G. = 2.70
Test specification: ASTM D 698-07 Method A Standard
1-2 ft. CL A-4 17 Estimated
2.6 26 8 0 86
Brown, Lean CLAY (CL) with few Sand & trace organics
WM15-167G Guernsey Tingle Architects
Elev/ Classification Nat.
Sp.G. LL PI
Depth USCS AASHTO Moist. #4 No.200
TEST RESULTS MATERIAL DESCRIPTION
Project No. Client: Remarks:
Project:
Location: See Attached Boring Location Plan Sample Number: CBR #1
Williamsburg, VA Figure
Maximum dry density = 105.3 pcf
Optimum moisture = 14.5 %
ASTM D 1883-07
Project No: WM15-167G
Project: 200th Weather Flight O & T Facility
Location: See Attached Boring Location Plan
Sample Number: CBR #1 Depth: 1-2 ft.
Date: 10/8/2015
Brown, Lean CLAY (CL) with few Sand & trace organics
Test Description/Remarks:
Resiliency Factor = 2.0
Figure 1a
105.3 14.5 26 8CL
Material Description
USCS
Dens.
Optimum
LL PI
Molded
Soaked
CBR (%)
0.10 in. 0.20 in.
Linearity Correction
(in.)
Surcharge (lbs.)
Swell
1 105.3 100 14.0 104.7 99.5 20.8 8.1 8.0 0.015 10 0.6
Pe ne tr at io n
R es is ta nc e
(p
Penetration Depth (in.)
0 0.1 0.2 0.3 0.4 0.5