RFI_18_Response.docx
DOCX document 19 KB Posted
- Attached to
- 200TH WEATHER FLIGHT O&T FACILITY
- Solicitation number
- W912LQ-17-B-3001
About this file
RFI 18
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised_Waterline_Drawing_Sheets.pdf | ||
| 200_WF_Soil_Report.pdf | ||
| W912LQ-17-B-3001-0002.pdf | ||
| FBO_MFR_for_SF30_Issuance_on_10_Aug.pdf | ||
| RFI_Responses_1-17_(no_8_or_part_of_3)_FINAL.docx | DOCX document | |
| RFI_Responses_1-17_(no_10).docx | DOCX document | |
| FBO_MFR_for_mail_in_address.pdf | ||
| FBO_MFR_for_RFI_5.pdf | ||
| Site_Visit_Minutes.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Information (RFI) receipts and answers as of 4th day of August, year 2017.
RFI #18
| Question : |
| “The specification for interstitial line type, is it (closed cell or fiberglass)? Thickness (1 or 2 inches )? , and inner duct (perforated or solid)? is not in the specifications. Please advise.” |
Regarding Specification: 233113 – Metal Ducts Plan Note #17 on Sheet M1.01
| Response : |
| Replace Note 17 on Sheet M1.01 with “Supply and Return Duct work of fan cool units 5 & 6 are not insulated.” |