RFI_18_Response.docx

DOCX document 19 KB Posted

Attached to
200TH WEATHER FLIGHT O&T FACILITY
Solicitation number
W912LQ-17-B-3001
Issued by

About this file

RFI 18

View the file

Other files

File Type Posted
Revised_Waterline_Drawing_Sheets.pdf PDF
200_WF_Soil_Report.pdf PDF
W912LQ-17-B-3001-0002.pdf PDF
FBO_MFR_for_SF30_Issuance_on_10_Aug.pdf PDF
RFI_Responses_1-17_(no_8_or_part_of_3)_FINAL.docx DOCX document
RFI_Responses_1-17_(no_10).docx DOCX document
FBO_MFR_for_mail_in_address.pdf PDF
FBO_MFR_for_RFI_5.pdf PDF
Site_Visit_Minutes.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request For Information (RFI) receipts and answers as of 4th day of August, year 2017.

RFI #18

Question :
“The specification for interstitial line type, is it (closed cell or fiberglass)? Thickness (1 or 2 inches )? , and inner duct (perforated or solid)? is not in the specifications. Please advise.”

Regarding Specification: 233113 – Metal Ducts Plan Note #17 on Sheet M1.01

Response :
Replace Note 17 on Sheet M1.01 with “Supply and Return Duct work of fan cool units 5 & 6 are not insulated.”