This document contains a federal contract solicitation and related technical specifications for construction services. The US Army National Guard Minnesota is seeking a firm fixed-price contract to renovate and add onto an existing base supply facility at Duluth Air National Guard Base, Minnesota. Work includes repairs to the existing metal roof and brick facade, replacement of doors and mechanical systems, and interior renovations to accommodate the new layout. The project budget is between $5-10 million and must be completed within 540 days. The NAICS code is 236220. This is a 100% small business set-aside. The pre-proposal conference is October 7th and questions are due by October 26th. Proposals are due October 29th and will be evaluated based on past performance and price. The specifications provide requirements for the brick, roofing, communications, dock equipment, flooring, security, and construction methods.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovate ADAL B222 102554 Duluth Air National Guard Base, Minnesota
SECTION 09 29 00
GYPSUM BOARD
08/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A108.11 (1992; Reaffirmed 2005) Specifications for Interior Installation of Cementitious Backer Units
ASTM INTERNATIONAL (ASTM)
ASTM C475/C475M (2017) Standard Specification for Joint Compound and Joint Tape for Finishing Gypsum Board
ASTM C840 (2019b) Standard Specification for Application and Finishing of Gypsum Board
ASTM C954 (2018) Standard Specification for Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs from 0.033 in. (0.84 mm) to
0.112 in. (2.84 mm) in Thickness
ASTM C1002 (2018) Standard Specification for Steel Self-Piercing Tapping Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel Studs
ASTM C1047 (2019) Standard Specification for Accessories for Gypsum Wallboard and Gypsum Veneer Base
ASTM C1177/C1177M (2017) Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing
ASTM C1396/C1396M (2017) Standard Specification for Gypsum Board
ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
SECTION 09 29 00 Page 1
ASTM D624 (2000; R 2020) Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers
ASTM D1149 (2007; R 2012) Standard Test Method for Rubber Deterioration - Surface Ozone Cracking in a Chamber
ASTM D3273 (2016) Standard Test Method for Resistance to Growth of Mold on the Surface of Interior Coatings in an Environmental Chamber
ASTM E336 (2020) Standard Test Method for Measurement of Airborne Sound Attenuation between Rooms in Buildings
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
GYPSUM ASSOCIATION (GA)
GA 214 (2010) Recommended Levels of Gypsum Board Finish
GA 216 (2010) Application and Finishing of Gypsum Panel Products
GA 253 (2012) Application of Gypsum Sheathing
GA 600 (2009) Fire Resistance Design Manual
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
SECTION 09 29 00 Page 2
UL Fire Resistance (2014) Fire Resistance Directory
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Cementitious Backer Units
Glass Mat Water-Resistant Gypsum Tile Backing Board
Water-Resistant Gypsum Backing Board
Glass Mat Covered or Reinforced Gypsum Sheathing
Glass Mat Covered or Reinforced Gypsum Sheathing Sealant
Abuse Resistant Gypsum Board
Accessories
Submit for each type of gypsum board and for cementitious backer units.
Gypsum Board
VOC Content of Joint Compound; S
SD-06 Test Reports
ASTM E90 Factory Test Report; G
ASTM E336 Field Test Report; G
SD-07 Certificates
Asbestos Free Materials; G
Certify that gypsum board types, gypsum backing board types, cementitious backer units, and joint treating materials do not contain asbestos.
Indoor Air Quality for Gypsum Board; S
Indoor Air Quality for Non-aerosol Adhesives; S
Indoor Air Quality for Aerosol Adhesives; S
SD-08 Manufacturer's Instructions
Safety Data Sheets
SD-10 Operation and Maintenance Data
SECTION 09 29 00 Page 3
Manufacturer Maintenance Instructions
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
Submit required indoor air quality certifications in one submittal package.
1.3.1.1 Ceiling and Wall Systems
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.3.1.2 Adhesives and Sealants
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
Deliver materials in the original packages, containers, or bundles with each bearing the brand name, applicable standard designation, and name of manufacturer, or supplier.
1.4.2 Storage
Keep materials dry by storing inside a sheltered building. Where necessary to store gypsum board and cementitious backer units outside, store off the ground, properly supported on a level platform, and protected from direct exposure to rain, snow, sunlight, and other extreme weather conditions. Provide adequate ventilation to prevent condensation. Store per manufacturer's recommendations for allowable temperature and humidity range. Do not store gypsum wallboard with materials which have high emissions of volatile organic compounds (VOCs) or other contaminants. Do not store panels near materials that may offgas or emit harmful fumes, such as kerosene heaters, fresh paint, or adhesives. Do not use materials that have visible moisture or biological growth.
1.4.3 Handling
Neatly stack gypsum board and cementitious backer units flat to prevent sagging or damage to the edges, ends, and surfaces.
SECTION 09 29 00 Page 4
1.5 QUALIFICATIONS
Furnish type of gypsum board work specialized by the installer with a minimum of 3 years of documented successful experience.
1.6 SCHEDULING
Commence application only after the area scheduled for gypsum board work is completely weathertight. The heating, ventilating, and air-conditioning systems must be complete and in operation prior to application of the gypsum board. If the mechanical system cannot be activated before gypsum board is begun, the gypsum board work may proceed in accordance with an approved plan to maintain the environmental conditions specified below. Apply gypsum board prior to the installation of finish flooring and acoustic ceiling.
1.7 ENVIRONMENTAL REQUIREMENTS
Do not expose the gypsum board to excessive sunlight prior to gypsum board application. Maintain a continuous uniform temperature of not less than 50 degrees F and not more than 80 degrees F for at least one week prior to the application of gypsum board work, while the gypsum board application is being done, and for at least one week after the gypsum board is set.
Shield air supply and distribution devices to prevent any uneven flow of air across the plastered surfaces. Provide ventilation to exhaust moist air to the outside during gypsum board application, set, and until gypsum board jointing is dry. In glazed areas, keep windows open top and bottom or side to side 3 to 4 inches. Reduce openings in cold weather to prevent freezing of joint compound when applied. For enclosed areas lacking natural ventilation, provide temporary mechanical means for ventilation.
In unglazed areas subjected to hot, dry winds or temperature differentials from day to night of 20 degrees F or more, screen openings with cheesecloth or similar materials. Avoid rapid drying. During periods of low indoor humidity, provide minimum air circulation following gypsum boarding and until gypsum board jointing complete and is dry.
1.8 FIRE RESISTIVE CONSTRUCTION
Comply with specified fire-rated assemblies for design numbers indicated per UL Fire Resistance or FM APP GUIDE.
PART 2 PRODUCTS
2.1 MATERIALS
Conform to specifications, standards and requirements specified. Provide gypsum board types, gypsum backing board types, cementitious backing units, and joint treating materials manufactured from asbestos free materials only. Submit Safety Data Sheets and manufacturer maintenance instructions for gypsum materials including adhesives.
2.1.1 Gypsum Board
ASTM C1396/C1396M . Provide data identifying percentage of recycled content for gypsum board. Paper facings must contain a minimum of 100 percent recycled paper content. Gypsum cores must contain a minimum of 95 percent post-industrial recycled gypsum content. Provide data identifying percentage of recycled content for paper facing and gypsum cores. Provide gypsum wall board and panels meeting the emissions requirements of
SECTION 09 29 00 Page 5
CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type). Provide certification or validation of indoor air quality for gypsum board.
2.1.1.1 Regular
48 inch wide, 5/8 inch thick, tapered edges.
2.1.1.2 Type X (Special Fire-Resistant)
48 inch wide, 5/8 inch thick, tapered edges.
2.1.1.3 Mold Resistant / Anti-Microbial Gypsum
ASTM D3273. 48 inch wide, 5/8 inch thick, tapered edges.
2.1.2 Glass Mat Covered or Reinforced Gypsum Sheathing
Exceeds physical properties of ASTM C1396/C1396M and ASTM C1177/C1177M .
Provide 5/8 inch, gypsum sheathing. Provide gypsum board of with a noncombustible water-resistant core, with glass mat surfaces embedded to the gypsum core or reinforcing embedded throughout the gypsum core.
Warrant gypsum sheathing board for at least twelve months against delamination due to direct weather exposure. Provide continuous, asphalt impregnated, building felt to cover exterior face of sheathing. Seal all joints, seams, and penetrations with compatible sealant.
2.1.2.1 Glass Mat Covered or Reinforced Gypsum Sheathing Sealant
Provide sealant compatible with glass mat covered or reinforced gypsum sheathing, rubber washers for masonry veneer anchors, and other associated cavity wall components such as anchors and through wall flashing. Provide sealants for glass mat covered or reinforced gypsum sheathing board edge seams and veneer anchor penetrations recommended by the glass mat covered or reinforced gypsum sheathing manufacturer and have the following performance requirements:
a. ASTM D412: Tensile Strength, 80 psi
b. ASTM D412: Ultimate Tensile Strength (maximum elongation), 170 psi
c. ASTM D624: Tear Strength, dieB, 27 ppi
d. ASTM D1149: Joint Movement Capability after 14 Days cure, plus or minus 50 percent.
2.1.3 Cementitious Backer Units
In accordance with the Tile Council of America (TCA) Handbook.
2.1.4 Joint Treatment Materials
ASTM C475/C475M. Product must be low emitting VOC types with VOC limits not exceeding 50 g/L. Provide data identifying VOC content of joint compound. Use all purpose joint and texturing compound containing inert fillers and natural binders, including lime compound. Pre-mixed compounds must be free of antifreeze, vinyl adhesives, preservatives, biocides and other slow releasing compounds.
2.1.4.1 Embedding Compound
Specifically formulated and manufactured for use in embedding tape at
SECTION 09 29 00 Page 6 gypsum board joints and compatible with tape, substrate and fasteners.
2.1.4.2 Finishing or Topping Compound
Specifically formulated and manufactured for use as a finishing compound.
2.1.4.3 All-Purpose Compound
Specifically formulated and manufactured to serve as both a taping and a finishing compound and compatible with tape, substrate and fasteners.
2.1.4.4 Setting or Hardening Type Compound
Specifically formulated and manufactured for use with fiber glass mesh tape.
2.1.4.5 Joint Tape
Use cross-laminated, tapered edge, reinforced paper, or fiber glass mesh tape recommended by the manufacturer.
2.1.5 Fasteners
2.1.5.1 Screws
ASTM C1002, Type "G", Type "S" or Type "W" steel drill screws for fastening gypsum board to gypsum board, wood framing members and steel framing members less than 0.033 inch thick. ASTM C954 steel drill screws for fastening gypsum board to steel framing members 0.033 to 0.112 inch thick. Provide cementitious backer unit screws with a polymer coating.
2.1.6 Adhesives
Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for non-aerosol adhesives applied on the interior of the building (inside of the weatherproofing system). Provide certification or validation of indoor air quality for aerosol adhesives used on the interior of the building (inside of the weatherproofing system).
2.1.6.1 Adhesive for Fastening Gypsum Board to Metal Framing
Not permitted.
2.1.7 Accessories
ASTM C1047. Fabricate from corrosion protected steel designed for intended use. Accessories manufactured with paper flanges are not acceptable. Flanges must be free of dirt, grease, and other materials that may adversely affect bond of joint treatment. Provide prefinished or job decorated materials.
SECTION 09 29 00 Page 7
2.1.8 Asphalt Impregnated Building Felt
Provide a 15 lb asphalt moisture barrier over glass mat covered or reinforced gypsum sheathing. Conforming to ASTM D226/D226M Type 1 (No.
15) for asphalt impregnated building felt.
2.1.9 Water
Provide clean, fresh, and potable water.
PART 3 EXECUTION
3.1 EXAMINATION
3.1.1 Framing and Furring
Verify that framing and furring are securely attached and of sizes and spacing to provide a suitable substrate to receive gypsum board and cementitious backer units. Verify that all blocking, headers and supports are in place to support plumbing fixtures and to receive soap dishes, grab bars, towel racks, and similar items. Do not proceed with work until framing and furring are acceptable for application of gypsum board and cementitious backer units.
3.1.2 Masonry and Concrete Walls
Verify that surfaces of masonry and concrete walls to receive gypsum board applied with adhesive are dry, free of dust, oil, form release agents, protrusions and voids, and any other foreign matter. Do not proceed with work until surfaces are acceptable for application of gypsum board with adhesive.
3.1.3 Building Construction Materials
Do not install building construction materials that show visual evidence of biological growth.
3.2 APPLICATION OF GYPSUM BOARD
Apply gypsum board to framing and furring members in accordance with ASTM C840 or GA 216 and the requirements specified. Apply gypsum board with separate panels in moderate contact; do not force in place. Stagger end joints of adjoining panels. Neatly fit abutting end and edge joints.
Use gypsum board of maximum practical length; select panel sizes to minimize waste. Cut out gypsum board to make neat, close, and tight joints around openings. In vertical application of gypsum board, provide panels in lengths required to reach full height of vertical surfaces in one continuous piece. Lay out panels to minimize waste; reuse cutoffs whenever feasible. Surfaces of gypsum board and substrate members may not be bonded together with an adhesive , except where prohibited by fire rating(s) . Treat edges of cutouts for plumbing pipes, screwheads, and joints with water-resistant compound as recommended by the gypsum board manufacturer. Provide type of gypsum board for use in each system specified herein as indicated.
3.2.1 Application of Gypsum Board to Steel Framing and Furring
Apply in accordance with ASTM C840, System VIII or GA 216 .
SECTION 09 29 00 Page 8
3.2.2 Glass Mat Covered or Fiber Reinforced Gypsum Sheathing
Apply glass mat covered or fiber reinforced gypsum sheathing in accordance to gypsum association publications GA 253 . Follow gypsum sheathing manufacturer's requirements of design details for joints and fasteners and be properly installed to protect the substrate from moisture intrusion.
Do not leave exposed surfaces of the glass mat covered or fiber reinforced gypsum sheathing beyond the manufacturer's recommendation without a weather barrier cladding. Provide continuous asphalt impregnated building felt over sheathing surface in shingle fashion with edges and ends lapped a minimum of 6 inch. Properly flash the openings. Seal all joints, seams, and penetrations with a compatible silicone sealant.
3.2.3 Control Joints
Install expansion and contraction joints in ceilings and walls in accordance with ASTM C840, System XIII or GA 216 . Fill control joints between studs in fire-rated construction with firesafing insulation to match the fire-rating of construction.
3.3 APPLICATION OF CEMENTITIOUS BACKER UNITS
3.3.1 Application
In wet areas (shower enclosures), apply cementitious backer units in accordance with ANSI A108.11 . Place a 15 lb asphalt impregnated, continuous felt paper membrane behind cementitious backer units, between backer units and studs or base layer of gypsum board. Place membrane with a minimum 6 inch overlap of sheets laid shingle style.
3.3.2 Joint Treatment
ANSI A108.11 .
3.4 FINISHING OF GYPSUM BOARD
Tape and finish gypsum board in accordance with ASTM C840, GA 214 and GA 216 . Finish plenum areas above ceilings to Level 1 in accordance with GA 214 . Finish water resistant gypsum backing board, ASTM C1396/C1396M , to receive ceramic tile to Level 2 in accordance with GA 214 . Finish walls and ceilings to receive a heavy-grade wall covering or heave textured finish before painting to Level 3 in accordance with GA 214 .
Finish walls and ceilings without critical lighting to receive flat paints, light textures, or wall coverings to Level 4 in accordance with GA 214 . Unless otherwise specified, finish all gypsum board walls, partitions and ceilings to Level 5 in accordance with GA 214 . Provide joint, fastener depression, and corner treatment. Tool joints as smoothly as possible to minimize sanding and dust. Do not use self-adhering fiber glass mesh tape with conventional drying type joint compounds; use setting or hardening type compounds only. Provide treatment for water-resistant gypsum board as recommended by the gypsum board manufacturer. Protect workers, building occupants, and HVAC systems from gypsum dust.
3.4.1 Uniform Surface
Wherever gypsum board is to receive eggshell, semigloss or gloss paint finish, or where severe, up or down lighting conditions occur, finish gypsum wall surface in accordance to GA 214 Level 5. In accordance with
SECTION 09 29 00 Page 9
GA 214 Level 5, apply a thin skim coat of joint compound to the entire gypsum board surface, after the two-coat joint and fastener treatment is complete and dry.
3.5 SEALING
Seal openings around pipes, fixtures, and other items projecting through gypsum board and cementitious backer units as specified in Section 07 92 00 JOINT SEALANTS. Apply material with exposed surface flush with gypsum board or cementitious backer units.
3.5.1 Sealing for Glass Mat or Reinforced Gypsum Board Sheathing
Apply silicone sealant in a 3/8 inch bead to all joints and trowel flat.
Apply enough of the same sealant to all fasteners penetrating through the glass mat gypsum board surface to completely cover the penetration when troweled flat. Do not place construction and materials behind sheathing until a visual inspection of sealed joints during daylight hours has been completed by Contracting Officer.
3.6 FIRE-RESISTANT ASSEMBLIES
Wherever fire-rated construction is indicated, provide materials and application methods, including types and spacing of fasteners, wall and ceiling framing in accordance with the specifications contained in UL Fire Resistance for the Design Number(s) indicated, or GA 600 for the File Number(s) indicated. Joints of fire-rated gypsum board enclosures must be closed and sealed in accordance with UL test requirements or GA requirements. Seal penetrations through rated partitions and ceilings tight in accordance with tested systems.
3.7 SOUND RATED ASSEMBLIES
When sound rated assemblies are required, provide materials and application methods, including panels, insulation, types and spacing of fasteners, wall and ceiling framing in accordance with the contract document and the description of the assembly in the ASTM E90 Factory Test Report. Seal partitions continuously with acoustical foam or sealant (both sides) and finished to match wall wherever it abuts another element such as the floor, ceiling, wall, column, mullion, or another system or assembly.
3.8 PATCHING
Patch surface defects in gypsum board to a smooth, uniform appearance, ready to receive finishes.
3.9 SOUND RATED ASSEMBLY FIELD TESTING
Provide third party testing of sound rated assemblies tested in accordance with ASTM E336. Provide the ASTM E336 Field Test Report verifying that the installed assemblies perform no less than five ASTC rating points below the ASTM E90 Factory Test Report. Examine, modify adjust, and retest any installation not meeting the STC Rating until compliance is obtained.
-- End of Section --
SECTION 09 29 00 Page 10
File details come from the government source that posted it. Updated .