Addendum 09.doc

DOC document 68 KB Posted

Attached to
B222 Renovation and Addition Federal contract opportunity
Solicitation number
W912LM20R1003
Issued by
Department of the Army Minnesota Army National Guard

About this file

This document contains a notice of request for proposal addendum and related federal contract opportunity for the renovation and addition of Building B222 at Duluth Air Force Base in Minnesota. Key details include that the project scope involves constructing an addition and renovating the existing facility to accommodate base supply functions, with work to include replacement of mechanical, electrical and plumbing systems, selective demolition and reconfiguration of interior partitions, replacement of exterior doors, and repair of brick facade and metal roofing. The contract is a firm-fixed price award with a magnitude between $5-10 million and a construction completion time of 540 days. The solicitation closing date is extended to November 3, 2020. The NAICS code is 236220 and it is a small business set-aside. The pre-proposal conference was on October 7 and the last day for questions is October 26. Evaluation factors are best value past performance and price with no discussions anticipated.

View the file

Other files for this federal contract opportunity

Other files attached to B222 Renovation and Addition, newest first.
File Type Posted
B 08 W912LM20R1003 Amendment 01 B222 Renovation and Addition.pdf PDF
Addendum 08.doc DOC document
Q and A Addendum 07 27Oct2020 102554_ - Sheet - AD010 - GROUND FLOOR DEMOLITION PLAN.pdf PDF
Q and A Addendum 07 27Oct2020 08 11 13.pdf PDF
Q and A Addendum 07 27Oct2020 08 81 00.pdf PDF
Q and A Addendum 07 27Oct2020 08 71 00.pdf PDF
Q and A Addendum 07 27Oct2020 08 51 13.pdf PDF
Addendum 07.doc DOC document
Q and A Addendum 07_Structural.pdf PDF
Q and A Addendum 07 27Oct2020 102554_ - Sheet - A-353 - SECTION DETAILS.pdf PDF
222-1984-84005-Addition to Engine Shop.pdf PDF
222-1976-Original Construction.pdf PDF
B222_2007_ExistingWindowInformation.pdf PDF
B222_2007_Renovation.pdf PDF
Addendum 05 and 06.doc DOC document
Q and A Addendum 05 09 29 00 26OCT20.pdf PDF
Q and A Addendum 05 08 33 13 26OCT20.pdf PDF
Q and A Addendum 03 Architecture.pdf PDF
Addendum 03 and 04.doc DOC document
Addendum 01 and 02.doc DOC document
Q and A Addendum 01_02 (07 05 23).pdf PDF
Q and A Addendum 01_02 (08 71 00).pdf PDF
Q and A Addendum 01_02 (102554_Elec_PanelboardSchedules_Add01).pdf PDF
Q and A Addendum 01_02 (07 27 10.00 10).pdf PDF
Q and A Addendum 01_02 (08 81 00).pdf PDF
Q and A Addendum 01_02 (14 21 23).pdf PDF
Preproposal Conference.pdf PDF
MATOC Preproposal Conference.pdf PDF
B222 Site visit.pdf PDF
B 04 DB Wage Det 28 Sep.pdf PDF
B 08 W912LM20R1003 B222 Renovation and Addition.pdf PDF
Exhibit D_Letter of Commitment Ld.docx DOCX document
148FW Form 66.pdf PDF
EXHIBIT B Ld.doc DOC document
EXHIBIT_C_-_Reference_Questionnaire_Package NEW Ld.docx DOCX document
EXHIBIT A Ld.doc DOC document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE OF REQUEST FOR PROPOSAL

ADDENDUM 09

DATE: 30 Oct 2020

PROJECT TITLE & NUMBER:

REPRENOVATION & ADDITION FOR B222

PN: FMKM112035

1. This amendment is being issued to answer Contractor submitted questions and to extend the bid closing date for the above referenced project Q1. Warehouse 130 is a high ceiling area with the bar joists over 26’ at the high point. Drawing ET112 calls for running two 4” communications conduits across the middle of the room at 11’-9 ¾” AFF. The Gas Infrared Heat is shown installed at 14’-0” AFF. At what height do the 4” communication conduits and electrical feeders that run across the middle of the space need to be installed at?

A1.Revised conduit(s) mounting height(s) to 24’ AFF to run conduits in joist space below roof deck similar to mechanical piping mounting heights and above lighting.

Q2. There is no specification or model number for the cord reels shown on drawing EP111 in the Wood Shop 139.

A2.Provide Hubbell cord reel with strain relief, model #HBL45123 or approved equal.

Q3.There is no specification or model number for the “FB2” Poke Thru.

A3.“FB1” floor box shall be Wiremold model #EFBS6-OG or approved equal per E1/E-503. “FB2” floor box shall be poke through style, Wiremold #6AT2BK or approved equal with (2) duplex receptacles and (1) “4A” data outlet.

Q4.There is no information on the owner provided furniture. Does the furniture being fed from power poles (Open Office 133,134) have a powered base with pre-installed receptacles or is the EC responsible for providing the receptacles and wiring in the base?

A4.EC is not responsible for providing furniture receptacles and wiring the base.

Q5.Keyed note 10 on drawing ET111 says “See detail F1 on sheet E-504”. Detail F1 does not correspond to what the keyed note on ET111 is pointing to.

A5.Revise note to point to detail H6 on E-504 with added detail below for typical conduit to cable tray transition, included in this addendum.

Q6.Where do the communication outlets in room NIPR 202 get routed to? Wall cabinet in SIPR 201 or cable tray system below?

A6.NIPR comm outlets to be routed to Comm Room 118 per schedule on ET201.

2. With this amendment the closing date is extended and now reads:

3 Nov 2020 at 1:00pm CST.

3. This amendment must be acknowledged when submitting your proposal.

File details come from the government source that posted it. Updated .