MATOC EXHIBIT E.doc

DOC document 36 KB Posted

Attached to
Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
W912LM-10-R-0003
Issued by
Department of the Army Minnesota Army National Guard

About this file

Exhibit E and E-1

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Duluth MATOC Q A - 5-20.doc DOC document
090255Addendum_051810 —
W912LM-10-R-0003-0002 - Duluth MATOC Amendment.doc DOC document
M102A _Addendum051810.pdf PDF
Duluth MATOC Q A - 5-18.doc DOC document
04 2000 Unit Masonry.pdf PDF
W912LM-10-R-0003-0001 - Duluth MATOC Amendment.doc DOC document
Site Visit Roster - Duluth.pdf PDF
Duluth Pre-Proposal Slides.ppt PPT presentation
090255FinalDwgs_032610.pdf PDF
2010 - MATOC EXHIBITS A-D F and G Jan 09.doc DOC document
090255FinalSpec_032910.pdf PDF
W912LM-10-R-0003 - Duluth MATOC Solicitation.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ MATOC

RFP W912LM-10-R-0003

EXHIBIT E PROTOTYPICAL PROJECT

NOTICE OF PROPOSED PROJECT, PROPOSAL FORM

Date: April 26, 2010

PROJECT TITLE AND NO:

Energy: Decentralize Heat Plant, Bldg 230

FMKM932052

PROJECT DESCRIPTION:

The project consists of removing several buildings from central plant steam and providing individual boilers. Small additions will be added at two buildings to accommodate the new boilers. The project also includes the demolition of existing Bldg 230, the Central Heating Plant.

MAGNITUDE OF PROJECT:

$500,000 – 1,000,000 PERFORMANCE PERIOD: 120 Days, after receipt of Notice to Proceed SITE VISIT: A site visit will be conducted in conjunction with the MATOC pre-proposal meeting. See Section 00100 of the solicitation for details.

PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $100,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.

LIQUIDATED DAMAGES: ( ) YES or ( X ) NO- reference Contract Clause 52.211-12.

CONSTRUCTION: (X ) YES or ( ) NO- reference Contract Clause 52.246-21, Warranty of Construction, is applicable to this task order.

WAGE DETERMINATION: Currently, General Decision Number MN20080075, Modification No. 0, dated March 12, 2010 is applicable to this task order. However, the current prevailing Wage Determination will be incorporated at time of award.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.

Item

Number

Description

Lump Sum Amount

Replace Central Heat Plant

IAW Specifications

Option 0001 1500 gpm Pumps

Option 0002 Abandon Steam Pits

Option 0003 Demolish Bldg 230

Option 0004 Emergency Power to

1000 gpm Pumps

Option 0005 Emergency Power to

1500 gpm Pumps

Option 0006 DDC, TAC in Lieu of ALC

SIGNATURE:

COMPANY NAME

Name and title of person authorized to sign Offer Date

EXHIBIT E – 1 - CALCULATION OF SELF-PERFORMED WORK

SUBMITTED IN RESPONSE TO W912LM-10-R-0003

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:__________________________________

B.1 Total Offer Price: $_________________

B.2 If applying for consideration as a General Contractor (multi-discipline projects) Subtract specialties, ie: Mechanical, Electrical, Roofing, Horizontal (unless being self-performed) $_____________ B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)_________________________________________

B.4 Remainder is “Total amount of work to be performed under the Contract” = $__________________

B.5 “Work to be self-performed”: = $ _________________________________ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.6 % Self-performed Work = Line B.5 / B.4 X 100% = ________________________%