090255FinalSpec_032910.pdf

PDF 809 KB Posted

Attached to
Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
W912LM-10-R-0003
Issued by
Department of the Army Minnesota Army National Guard

About this file

Prototypical Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Duluth MATOC Q A - 5-20.doc DOC document
W912LM-10-R-0003-0002 - Duluth MATOC Amendment.doc DOC document
M102A _Addendum051810.pdf PDF
090255Addendum_051810 —
04 2000 Unit Masonry.pdf PDF
Duluth MATOC Q A - 5-18.doc DOC document
W912LM-10-R-0003-0001 - Duluth MATOC Amendment.doc DOC document
Site Visit Roster - Duluth.pdf PDF
Duluth Pre-Proposal Slides.ppt PPT presentation
090255FinalDwgs_032610.pdf PDF
2010 - MATOC EXHIBITS A-D F and G Jan 09.doc DOC document
W912LM-10-R-0003 - Duluth MATOC Solicitation.doc DOC document
MATOC EXHIBIT E.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MINNESOTA

AIR NATIONAL GUARD

DULUTH INTERNATIONAL AIRPORT

DELIVERY ORDER NO. W912LM-04-D-0001-0039

PROJECT FMKM932052

REPLACE CENTRAL HEAT PLANT

SPECIFICATIONS

Type B FINAL (100%) Submittal

March 29, 2010

LHB Project No. 090255

LHB

21 West Superior Street, Ste 500

Duluth, Minnesota 55802

(218) 727-8446

FAX: (218) 727-8456

Foster, Jacobs & Johnson, Inc.

345 Canal Park Drive

Duluth, Minnesota 55802

(218) 722-3060

FAX: (218) 722-1931

090255/MnANG-Replace Central Heat FMKM032995 00 0105 - 1

SECTION 00 0105

CERTIFICATIONS PAGE

CIVIL

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR

UNDER MY DIRECT SUPERVISION AND I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MINNESOTA.

DANIEL G. SHAW, P.E. REGISTRATION #: 41423 DATE: 03/29/10

ARCHITECTURAL

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR

UNDER MY DIRECT SUPERVISION AND I AM A DULY LICENSED ARCHITECT UNDER THE

LAWS OF THE STATE OF MINNESOTA.

CYNTHIA I. POIRIER REGISTRATION #: 22021 DATE: 03/29/10

STRUCTURAL

ALAN J. VORDERBRUGGEN, P.E. REGISTRATION #: 20969 DATE: 03/29/10

MECHANICAL

JAMES R. JOHNSON, P.E. REGISTRATION #: 15920 DATE: 03/29/10

ELECTRICAL

JOHN W. TOWNSEND, P.E. REGISTRATION #: 40360 DATE: 03/29/10

TABLE OF CONTENTS

INTRODUCTORY INFORMATION

00 0105 CERTIFICATIONS PAGE

PROCUREMENT REQUIREMENTS

00 3100 AVAILABLE PROJECT INFORMATION

SUMMARY

01 1000 SUMMARY

PRICE AND PAYMENT PROCEDURES

01 2300 BID OPTIONS

ADMINISTRATIVE REQUIREMENTS

01 3000 ADMINISTRATIVE REQUIREMENTS

01 3260 ENVIRONMENTAL REQUIREMENTS

QUALITY REQUIREMENTS

01 4000 QUALITY REQUIREMENTS

PRODUCT REQUIREMENTS

01 6000 PRODUCT REQUIREMENTS

EXECUTION AND CLOSEOUT REQUIREMENTS

01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS

01 7419 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 7800 CLOSEOUT SUBMITTALS

DIVISION 02 - EXISTING CONDITIONS

02 4116 BUILDING DEMOLITION

DIVISION 03 - CONCRETE

03 1000 CONCRETE FORMING AND ACCESSORIES

03 2000 CONCRETE REINFORCING

03 3000 CAST-IN-PLACE CONCRETE

MnANG-Replace Central Heat

FMKM032995

TOC - 1

DIVISION 05 - METALS

05 3100 STEEL DECKING

05 4000 COLD-FORMED METAL FRAMING

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 1000 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 2100 THERMAL INSULATION

07 2500 WEATHER BARRIERS

07 2620 UNDER-SLAB VAPOR RETARDER

07 4213 METAL WALL PANELS

07 5300 ELASTOMERIC MEMBRANE ROOFING

07 6200 SHEET METAL FLASHING AND TRIM

07 9005 JOINT SEALERS

DIVISION 08 - OPENINGS

08 1113 HOLLOW METAL DOORS AND FRAMES

08 7100 DOOR HARDWARE

DIVISION 09 - FINISHES

09 2116 GYPSUM BOARD ASSEMBLIES

09 6500 RESILIENT BASE

09 9000 PAINTING AND COATING

DIVISION 10 - SPECIALTIES

10 4400 FIRE PROTECTION SPECIALTIES

DIVISION 22 - PLUMBING

22 0501 GENERAL PROVISIONS

22 0510 FIRESTOPPING

22 0513 COMMON MOTOR REQUIREMENTS FOR PLUMBING

EQUIPMENT

22 0519 METERS AND GAGES FOR PLUMBING PIPING

22 0553 IDENTIFICATION FOR PLUMBING PIPING AND

EQUIPMENT

22 0719 PLUMBING PIPING INSULATION

22 0800 COMMISSIONING OF PLUMBING SYSTEMS

TOC - 2 MnANG-Replace Central Heat

22 1005 PLUMBING PIPING

22 1006 PLUMBING PIPING SPECIALTIES

22 3000 PLUMBING EQUIPMENT

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 0501 GENERAL PROVISIONS

23 0510 FIRESTOPPING

23 0513 COMMON MOTOR REQUIREMENTS FOR HVAC

EQUIPMENT

23 0548 VIBRATION CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 0713 DUCT INSULATION

23 0716 HVAC EQUIPMENT INSULATION

23 0719 HVAC PIPING INSULATION

23 0800 COMMISSIONING OF HVAC

23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR

HVAC

23 0923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

23 0993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

23 2113 HYDRONIC PIPING

23 2114 HYDRONIC SPECIALTIES

23 2123 HYDRONIC PUMPS

23 2213 STEAM AND CONDENSATE HEATING PIPING

23 2214 STEAM AND CONDENSATE HEATING SPECIALTIES

23 2500 HVAC WATER TREATMENT

23 3100 HVAC DUCTS AND CASINGS

23 3423 HVAC POWER VENTILATORS

23 3700 AIR OUTLETS AND INLETS

23 5100 BREECHINGS, CHIMNEYS, AND STACKS

23 5223 CAST-IRON BOILERS

23 5233 FINNED WATER-TUBE BOILERS

23 8101 TERMINAL HEAT TRANSFER UNITS

23 8216 AIR COILS

DIVISION 26 - ELECTRICAL

26 0500 BASIC ELECTRICAL REQUIREMENTS

26 0501 MINOR ELECTRICAL DEMOLITION

26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS

AND CABLES (600V AND LESS)

26 0526 GROUNDING AND BONDING FOR ELECTRICAL

SYSTEMS

MnANG-Replace Central Heat

TOC - 3

26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL

SYSTEMS

26 0534 CONDUIT

26 0537 BOXES

26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 0916 ELECTRIC CONTROLS AND RELAYS

26 2416 PANELBOARDS

26 2717 EQUIPMENT WIRING

26 2726 WIRING DEVICES

26 2813 FUSES

26 2818 ENCLOSED SWITCHES

26 2913 ENCLOSED CONTROLLERS

26 5110 LUMINAIRES

DIVISION 27 - COMMUNICATIONS

27 1034 COMMUNICATIONS SERVICE AND PATHWAYS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 3110 FIRE DETECTION AND ALARM

SITE AND INFRASTRUCTURE SUBGROUP - DIVISIONS 31 THROUGH 35

30 1000 BASIC CIVIL REQUIREMENTS

DIVISION 31 - EARTHWORK

31 1000 SITE CLEARING

31 2200 GRADING

31 2316 EXCAVATION

31 2316.13 TRENCHING

31 2323 FILL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 1123 AGGREGATE BASE COURSES

32 1216 ASPHALT PAVING

32 1313 CONCRETE PAVING

32 9223 SODDING

DIVISION 33 - UTILITIES

33 1116 SITE WATER UTILITY DISTRIBUTION PIPING

33 4600 SUBDRAINAGE

33 5111 SITE NATURAL-GAS DISTRIBUTION

TOC - 4 MnANG-Replace Central Heat

SECTION 00 3100

AVAILABLE PROJECT INFORMATION

PART 1 GENERAL

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

EXISTING REPORTS AND SURVEYS

4.01 TESTING AND INSPECTION FORM

A. A copy of the Special Structural Testing and Inspection Program Summary Schedule, MNANG Replace Central Heat Plant is included with this document.

END OF SECTION

090255/MnANG-Replace Central Heat FMKM032995 00 3100 - 1

Q:\09Proj\090255\ADMN\F200 Design\F206 Construction Docs\F206-1 Specifications\100% Spec Submittal\090255SI122309 Special Inspection Schedule.doc

Special Structural Testing and Inspection Program Summary Schedule

Project Name MNANG – Replace Central Heat Plant Project No. 090255

Location Duluth International Airport, Duluth, MN Permit No. ________________ (1)

IBC Ref. or

Technical (2)

Description (3)

Type of

Inspector

(4)

Specific Report Frequency, Unless Noted

Otherwise (5)

Assigned

Firm (6)

Section Article

1704 7 Verify site preparation TA Per spec, prior to work

1704 7 Verify fill material and lift thickness TA Per spec

1704 7 Verify fill compaction density TA Per spec

1704 7 Verify foundation insulation placement TA Per drawings/spec

1704 4 Verify concrete reinf. placement TA Periodic

1704 4 Verify concrete mix designs SER Periodic

1704 4 Sample/test concrete TA Slump, air, temp & 4 cylinders per 50 cy

1704 4 Observe concrete placement TA Periodic

1704 4 Observe maintenance of concrete curing SER Periodic

1704 3 Steel framing compliance w/ cd’s SER Periodic

(1) Permit No. to be provided by the Building Official

(2) Referenced to the specific technical scope section in the program, or IBC reference.

(3) Use descriptions per IBC Chapter 17, as adopted by Minnesota State Building Code.

(4) SER = Structural Engineer of Record, SI-T = Special Inspector – Technical, TA = Testing Agency, SI-S = Special Inspector – Str’l.

(5) Weekly, monthly, per test/inspection, per floor, etc.

(6) Name of Firm contracted to perform services. If requested by engineer/architect of record or building official, the individual names of all prospective special inspectors and the work they intend to observe shall be identified as an attachment.

ACKNOWLEDGEMENTS (Each appropriate representative shall sign below)

Owner: Firm/Signed: Date: _______________

Contractor: Firm/Signed: Date: _______________

Architect: Firm/Signed: Date: _______________

SER: Firm/Signed: Date: _______________

SI-S: Firm/Signed: Date: _______________

S.I.T.: Firm/Signed: Date: _______________

TA: Firm/Signed: Date: _______________

Accepted for the Building Department By ______________________________________ Date __________________

SECTION 01 1000

SUMMARY

PART 1 GENERAL

1.01 PROJECT

A. Project Name: Replace Central Heat Plan.

B. Contracting Officer's Name: Colleen Dalquist.

C. The Project consists of removing several buildings from central plant steam heat and providing individual boilers. Small additions will be added at two buildings to accomodate the new boilers.

D. This Project also includes the demolition of existing building 230, the Central Heating Plant.

1.02 CONTRACT DESCRIPTION

A. Contract Type: A single prime contract based on a Stipulated Price as described in Document 00 5200 - Agreement Form.

1.03 DESCRIPTION OF ALTERATIONS WORK

A. Scope of demolition and removal work is shown on drawings and specified in Section 02 4100.

B. Scope of alterations work is shown on drawings.

C. Electrical Power and Lighting: Alter existing system and add new construction, keeping existing in operation.

1.04 WORK BY OWNER

A. Government will award a contract for removal of hazardous materials if required.

1.05 OWNER OCCUPANCY

A. Government intends to continue to occupy adjacent portions of the existing buildings during the entire construction period.

B. Government intends to occupy the Project upon Substantial Completion.

C. Cooperate with Government to minimize conflict and to facilitate Government's operations.

D. Schedule the Work to accommodate Government occupancy.

1.06 CONTRACTOR USE OF SITE AND PREMISES

A. Construction Operations: Limited to areas noted on Drawings.

B. Arrange use of site and premises to allow:

1. Government occupancy.

2. Use of site and premises by the MnANG.

C. Provide access to and from site as required by law and by Government:

1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.

2. Do not obstruct roadways, sidewalks, or other public ways without permit.

D. Existing building spaces may not be used for storage.

E. Utility Outages and Shutdown:

1. Do not disrupt or shut down life safety systems, including but not limited to fire sprinklers and fire alarm system, without 7 days notice to Government..

090255/MnANG-Replace Central Heat FMKM032995 01 1000 - 1

2. Limit shutdown of utility services to 2 hours at a time, arranged at least 24 hours in advance with Contracting Officer's Representative.

a. Schedule outages on Government flex days whenever possible.

b. Prevent accidental disruption of utility services to other facilities.

1.07 WORK SEQUENCE

A. Construct Work in stages during the construction period to allow for the continued operation of Bldg. 230, Steam Plant, until all replacement heating systems are operational.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

01 1000 - 2 FMKM032995 090255/MnANG-Replace Central Heat

SECTION 01 2300

BID OPTIONS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Description of Base Bid and Bid Options.

1.02 ACCEPTANCE OF BID OPTIONS

A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Government's option. Accepted Bid Options will be identified in the Owner-Contractor Agreement.

B. Coordinate related work and modify surrounding work to integrate the Work of each Alternate.

1.03 BASE BID WORK

A. All Work not otherwise called for in the Schedule of Bid Options, shall be included in Base Bid.

1.04 SCHEDULE OF BID OPTIONS

A. Bid Option No. 1 - PUMPS:

1. Provide 1500 gpm pumps in lieu of 1000 gpm. Refer to Specification Section 23 2123 and

Drawing Sheet M1.05.

2. Electrical service per Base Bid from Transformer T-436. Refer to Drawing Sheet E2.05.

B. Bid Option No. 2 - ABANDON STEAM PITS:

1. Abandon steam pits at Bldg. 250 and 255. Refer to Drawing Sheets C1.02 and C1.03.

C. Bid Option No. 3 - DEMOLISH BUILDING 230

1. Refer to Drawing Sheets C1.01, A1.01, and Specification 02 4116.

2. Base Bid work includes disconnection and abandonment of all building utility service.

D. Bid Option No. 4 - STANDBY POWER TO 1000 GPM PUMPS:

1. Provide Electrical Service from Sub-Station 1, in lieu of from Transformer T-436, to 1000

GPM (Base Bid) booster pumps. Refer to Drawing Sheet E1.02 and E2.05 for additional details

E. Bid Option No. 5 - STANDYBY POWER TO 1500 GPM PUMPS:

1. Provide Electrical Service from Sub-Station 1, in lieu of from Transformer T-436, to 1500

GPM (as provided in Bid Option No 1). Refer to Drawing Sheet E1.02 and E2.05 for additional details.

F. Bid Option No. 6 - DDC CONTROL SYSTEM:

1. Provide DDC control system from Invynsys (TAC), rather than Base Bid by Automated

Logic (ALC).

2. Refer to Specification Section 23 0923 - Direct-Digital Control System for HVAC.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

090255/MnANG-Replace Central Heat FMKM032995 01 2300 - 1

SECTION 01 3000

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Preconstruction meeting.

B. Progress meetings.

C. Construction progress schedule.

D. Submittals for review, information, and project closeout.

E. Submittal procedures.

1.02 RELATED REQUIREMENTS

A. Section 01 1000 - Summary:.

B. Section 01 6000 - Product Requirements

C. Section 01 7000 - Execution and Closeout Requirements: Additional coordination requirements.

D. Section 01 7800 - Closeout Submittals: Project record documents.

E. Division 1 requirements may be superseded by Federal Contracting Requirements. Reference the appropriate Federal Contract Clause for further guidance.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 PRECONSTRUCTION MEETING

A. Government will schedule a meeting after Notice of Award.

B. Attendance Required:

1. Government.

2. Contracting Officer.

3. Contractor.

4. Major Sub-contractors.

5. Architect.

C. Agenda:

1. Execution of Government-Contractor Agreement.

2. Submission of executed bonds and insurance certificates.

3. Submission of list of Subcontractors, schedule of values, and progress schedule.

4. Designation of personnel representing the parties to Contract, sub-contractors and

Contracting Officer.

5. On Base procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.

6. Notice to Proceed, Scheduling.

3.02 PROGRESS MEETINGS

A. Schedule and administer meetings throughout progress of the Work at maximum bi-monthly intervals.

B. Attendance Required: Job superintendent, major Subcontractors and suppliers as appropriate to

090255/MnANG-Replace Central Heat FMKM032995 01 3000 - 1 agenda topics for each meeting, Government, Contracting Officer, .

C. Agenda:

1. Review minutes of previous meetings.

2. Review of Work progress.

3. Field observations, problems, and decisions.

4. Waste Management plan

5. Indoor Air Quality Management plan

6. Identification of problems that impede, or will impede, planned progress.

7. Review of submittals schedule and status of submittals.

8. Review of off-site fabrication and delivery schedules.

9. Maintenance of progress schedule.

10. Corrective measures to regain projected schedules.

11. Planned progress during succeeding work period.

12. Maintenance of quality and work standards.

13. Effect of proposed changes on progress schedule and coordination.

14. Other business relating to Work.

3.03 CONSTRUCTION PROGRESS SCHEDULE

A. Within 10 days after date of the Agreement, submit preliminary schedule.

B. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.

1. Include written certification that major contractors have reviewed and accepted proposed schedule.

C. Submit updated schedule every 30 days.

3.04 SUBMITTALS FOR REVIEW

A. When the following are specified in individual sections, submit them for review:

1. Product data.

2. Shop drawings.

3. Samples for selection.

4. Samples for verification.

5. Maintenance Data

6. References

7. Warranty

B. Submit to Contracting Officer for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.

C. Samples will be reviewed only for aesthetic, color, or finish selection.

D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 7800 - CLOSEOUT

SUBMITTALS.

3.05 SUBMITTALS FOR INFORMATION

A. When the following are specified in individual sections, submit them for information:

1. Design data.

2. Certificates.

3. Test reports.

4. Inspection reports.

5. Manufacturer's instructions.

6. Manufacturer's field reports.

7. Operation data

01 3000 - 2 FMKM032995 090255/MnANG-Replace Central Heat

8. Other types indicated.

B. Submit for Contracting Officer's knowledge as contract administrator or for Government. No action will be taken.

3.06 SUBMITTALS FOR PROJECT CLOSEOUT

A. When the following are specified in individual sections, submit them at project closeout:

1. Project record documents.

2. Operation and maintenance data.

3. Warranties.

4. Bonds.

5. Other types as indicated.

B. Submit for Government's benefit during and after project completion.

3.07 NUMBER OF COPIES OF SUBMITTALS

A. Documents for Review, or Information:

1. Submit in electronic format (pdf) one (1) copy.

2. Where electronic format is not possible, submit in hard copy, the number of copies the contractor requires plus (2) total to be retained by the Contracting Officer and Architect.

B. Documents for Project Closeout: Submit per Section 01 7800.[]

C. Samples: Submit the number specified in individual specification sections; one of which will be retained by Contracting Officer.

1. Retained samples will not be returned to Contractor unless specifically so stated.

3.08 SUBMITTAL PROCEDURES

A. Transmit each submittal with MnANG Material Approval Submittal Form by Specification Section .Do not group or submit multiple submittals on a single form.

B. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.

C. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number, and specification section number, as appropriate on each copy.

D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents.

E. Deliver submittals to Contracting Officer at business address.

F. Schedule submittals to expedite the Project, and coordinate submission of related items.

G. For each submittal for review, allow 20 days excluding delivery time to and from the Contractor.

H. Identify variations from Contract Documents and Product or system limitations that may be detrimental to successful performance of the completed Work.

I. Provide space for Contractor and Contracting Officer review stamps.

J. When revised for resubmission, identify all changes made since previous submission.

K. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.

L. Submittals not requested will not be recognized or processed.

090255/MnANG-Replace Central Heat FMKM032995 01 3000 - 3

SECTION 01 3260

ENVIRONMENTAL REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

1.02 SUBMITTALS

A. Contractor Hazardous Material Identification Form - Part I

1. Complete prior to the construction start date, maintain on the job site throughout construction.

B. Contractor Hazardous Material Form Close-Out Procedure - Part II

PART 2 PRODUCTS

PART 3 EXECUTION

3.01 Hazardous Material Storage and Distribution System Requirements

A. The contractor shall establish a Hazardous Material (HM) storage and distribution system when HM is to be used. All HM required to support the contract shall be reported to the Hazardous Material Pharmacy (HMP) using the Contractor HM Identification Form. The Contractor HM Identification Form will be provided to the Contractor at or prior to the Pre-Construction meeting.

Additional HM needed by the contractor shall be identified to the Contracting Officer's Representative (COR) for approval by the HMP.

B. The contractor planning to use HM for work shall register with the base HMP prior to the start of work in order to support the installations compliance with Executive Order 12856. Federal Compliance with Right-to-Know Laws and Pollution Prevention Requirements.

C. The contractor shall maintain Contractor HM Identification Form for HM on the job site for inspection and verification.

D. The COR will verify that the HM identified to HMP is the only HM in use on the job site.

E. The Contractor shall be responsible for the following items:

F. Provide a list of each material and quantity of material for all proposed Hazardous Material (HM). HM shall be construed to mean any item that is:

1. A health hazard or physical hazard as defined in 29 CFR, 1910.1200(c).

2. Regulated in it's disposal by EPA under 40 CFR.

3. Hazardous as defined by DOT regulations under 40 CFR.

4. Hazardous as defined by the Dangerous Goods Regulations of the International Air

Transport Association.

G. Provide a material safety data sheet (MSDS) for each item on the HM list.

H. Contractor shall establish a construction specific HM storage and issue location that fully complies with Federal, State and Local environmental regulations. Materials issued shall be tracked for quantities used. Unused materials shall be inventoried and removed from the ANG installation prior to close out of the contract or expiration date of the HM. Reports of materials delivered, used and removed from the installation shall be submitted to the COR monthly and prior to the contract close-out.

I. The Contractor shall comply with all Federal, State and Local environmental standards.

J. The Contractor shall accompany the Bio-environmental Engineering Representative (BEE) and the (COR) on project close-out inspection to ensure all used/unused HM is removed from the

090255/MnANG-Replace Central Heat FMKM032995 01 3260 - 1 installation. This requirement shall not be a punch list item and must be accomplished prior to the Government accepting beneficial occupancy of the facility or construction item.

01 3260 - 2 FMKM032995 090255/MnANG-Replace Central Heat

Revised March 2004 148

ATTACHMENT 18A

Contractor Hazardous Material Identification Form

Part I Date: _______________

This part is to be completed by Contractor prior to the construction start date, and shall be maintained on the job site.

Contractor Company: (name)________________________________ Proposed work term: (date)____________to (date)______________ Contractor Point of Contact: (full name or names, phone/pager numbers, emergency 24 hour contact number, etc.)

HM to be used:

MFG./Product

M.S.D.S.

Attached

Quantity used

Disposal Procedures Used/Unused material removed from ANG installation

Note: This form is good for a one-month period and is to be submitted to the Hazardous

Material Pharmacy. All Hazardous Material used thereafter will be identified to the Contracting Officer's Representative for approval by the Hazardous Material Pharmacy.

See Part II for Contractor close-out procedures. The Hazardous Material Pharmacy phone number is (xxx) xxx-xxxx.

Approval Signatures:

COR (Contracting Officer Representative) _______________________

BEER (Bio-Environmental Engineering Representative) _______________________

EM (Environmental Manager) _______________________

SO (Safety Officer) _______________________

Revised March 2004 149

ATTACHMENT 18B

Contractor Hazardous Material Identification Form Close-Out Procedures

Part II Date: _______________

Attach this form to Part I

The Contractor shall accompany the Contracting Officer Representative and

Environmental Manager on the close-out inspection to ensure all used/unused HM was removed from the installation.

Close out Approval Signatures:

COR (Contracting Officer Representative) _____________________________

BEER (Bio-Environmental Engineering Representative) _____________________________

EM (Environmental Manager) _____________________________

Contractor _____________________________

SECTION 01 4000

QUALITY REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Quality assurance submittals.

B. Control of installation.

C. Tolerances.

D. Testing and inspection services.

E. Manufacturers' field services.

1.02 RELATED REQUIREMENTS

A. Document 00 3100 - Available Project Information: Structural Special Testing and Inspection Program Summary Schedule.

B. Section 01 3000 - Administrative Requirements: Submittal procedures.

C. Section 01 6000 - Product Requirements: Requirements for material and product quality.

1.03 REFERENCE STANDARDS

A. ASTM C 1021 - Standard Practice for Laboratories Engaged in Testing of Building Sealants;

2008.

B. ASTM C 1077 - Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation; 2008.

C. ASTM C 1093 - Standard Practice for Accreditation of Testing Agencies for Masonry; 2008.

D. ASTM E 329 - Standard Specification for Agencies Engaged Construction Inspection and/or Testing; 2008.

E. ASTM E 548 - Standard Guide for General Criteria used for Evaluating Laboratory Competence;

1994.

1.04 SUBMITTALS

A. Testing Agency Qualifications:

1. Prior to start of Work, submit agency name, address, and telephone number, and names of full time licensed Engineer and responsible officer.

2. Submit copy of report of laboratory facilities inspection made by NIST Construction

Materials Reference Laboratory during most recent inspection, with memorandum of remedies of any deficiencies reported by the inspection.

B. Design Data: Submit for Contracting Officer's knowledge as contract administrator for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents, or for Government's information.

C. Test Reports: After each test/inspection, promptly submit two copies of report to Contracting Officer, Contractor and Building Official.

1. Include:

a. Date issued.

b. Project title and number.

c. Name of inspector.

d. Date and time of sampling or inspection.

090255/MnANG-Replace Central Heat FMKM032995 01 4000 - 1

e. Identification of product and specifications section.

f. Location in the Project.

g. Type of test/inspection.

h. Date of test/inspection.

i. Results of test/inspection.

j. Conformance with Contract Documents.

k. When requested by Contracting Officer, provide interpretation of results.

D. Certificates: When specified, submit certification by the manufacturer and Contractor or installation/application subcontractor to Contracting Officer, in quantities specified for Product Data.

1. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

2. Certificates may be recent or previous test results on material or product, but must be acceptable to Contracting Officer.

E. Manufacturer's Instructions: When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, for the Government's information. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.

F. Manufacturer's Field Reports: Submit reports for Contracting Officer's benefit as contract administrator or for Government.

1. Submit report in duplicate within 30 days of observation to Contracting Officer for information.

2. Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents.

G. Erection Drawings: Submit drawings for Contracting Officer's benefit as contract administrator or for Government.

1. Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents.

2. Data indicating inappropriate or unacceptable Work may be subject to action by

Contracting Officer or Government.

1.05 REFERENCES AND STANDARDS

A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B. Conform to reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.

C. Obtain copies of standards where required by product specification sections.

D. Maintain copy at project site during submittals, planning, and progress of the specific work, until Substantial Completion.

E. Should specified reference standards conflict with Contract Documents, request clarification from Contracting Officer before proceeding.

F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Contracting Officer shall be altered from the Contract Documents by mention or inference otherwise in any reference document.

1.06 TESTING AND INSPECTION AGENCIES

A. Government will employ services of an independent testing agency (TA) to perform specified

01 4000 - 2 FMKM032995 090255/MnANG-Replace Central Heat quality control testing and inspection. Additionally, the Government will provide and pay for the following testing and inspection services identified in the Special Structural Testing and Inspection Program Summary Schedule (see Section 00 3100):

1. SI-T, Special Inspector - Technical.

2. SI-S, Special Inspector - Structural.

3. SER, Structural Engineer of Record.

B. Contractor shall employ and pay for services of an independent testing agency to perform other additional quality control testing, for testing above and beyond that listed in Section 01 4000

1.06 A, to ensure quality control such that the Contractor shall take responsibility for the end product.

C. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.

D. Contractor Employed Agency:

1. Testing agency: Comply with requirements of ASTM E 329, ASTM E 543, ASTM C 1021, ASTM C 1077, and ASTM C 1093, and shall be pre-approved by the Architect / Engineer.

2. Laboratory: Authorized to operate in State in which Project is located.

3. Laboratory Staff: Maintain a full time registered Engineer on staff to review services.

4. Testing Equipment: Calibrated at reasonable intervals either by NIST or using an NIST established Measurement Assurance Program, under a laboratory measurement quality assurance program.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Contracting Officer before proceeding.

D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Have Work performed by persons qualified to produce required and specified quality.

F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.

G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.

3.02 TOLERANCES

A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.

Do not permit tolerances to accumulate.

B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Contracting Officer before proceeding.

C. Adjust products to appropriate dimensions; position before securing products in place.

3.03 TESTING AND INSPECTION

090255/MnANG-Replace Central Heat FMKM032995 01 4000 - 3

A. See individual specification sections and Special Structural Testing and Inspection Program Summary Schedule (Section 00 3100) for quality control testing and inspection required.

B. Testing Agency Duties:

1. Provide qualified personnel at site. Cooperate with Contracting Officer and Contractor in performance of services.

2. Perform specified sampling and testing of products in accordance with specified standards.

3. Ascertain compliance of materials and mixes with requirements of Contract Documents.

4. Promptly notify Contracting Officer and Contractor of observed irregularities or non-conformance of Work or products.

5. Perform additional tests and inspections required by Contracting Officer.

6. Submit reports of all tests/inspections specified.

C. Limits on Testing/Inspection Agency Authority:

1. Agency may not release, revoke, alter, or enlarge on requirements of Contract Documents.

2. Agency may not approve or accept any portion of the Work.

3. Agency may not assume any duties of Contractor.

4. Agency has no authority to stop the Work.

D. Contractor Responsibilities:

1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs.

2. Cooperate with laboratory personnel, and provide access to the Work.

3. Provide incidental labor and facilities:

a. To provide direct access to Work to be tested/inspected.

b. To obtain and handle samples at the site or at source of Products to be tested/inspected.

c. To facilitate tests/inspections.

d. To provide storage and curing of test samples.

4. Notify Contracting Officer and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.

5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.

E. Re-testing required because of non-conformance to specified requirements shall be performed by the same agency on instructions by Contracting Officer. Payment for re-testing will be charged to the Contractor by deducting testing charges from the Contract Price.

3.04 MANUFACTURERS' FIELD SERVICES

A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, as applicable, and to initiate instructions when necessary.

B. Submit qualifications of observer to Contracting Officer 30 days in advance of required observations.

1. Observer subject to approval of Contracting Officer.

C. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.

3.05 DEFECT ASSESSMENT

A. Replace Work or portions of the Work not conforming to specified requirements.

B. If, in the opinion of Contracting Officer, it is not practical to remove and replace the Work, Contracting Officer will direct an appropriate remedy or adjust payment.

01 4000 - 4 FMKM032995 090255/MnANG-Replace Central Heat

090255/MnANG-Replace Central Heat FMKM032995 01 4000 - 5

SECTION 01 6000

PRODUCT REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. General product requirements.

B. Transportation, handling, storage and protection.

C. Product option requirements.

D. Substitution limitations and procedures.

1.02 RELATED REQUIREMENTS

A. Section 01 4000 - Quality Requirements: Product quality monitoring.

B. Section 01 7419 - Construction Waste Management and Disposal: Waste disposal requirements potentially affecting packaging and substitutions.

1.03 SUBMITTALS

A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

B. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

C. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns unless noted otherwise in the technical sections.

PART 2 PRODUCTS

2.01 NEW PRODUCTS

A. Provide new products unless specifically required or permitted by the Contract Documents.

B. Do not use products having any of the following characteristics:

1. Made using or containing CFC's or HCFC's.

2. Made of wood from newly cut old growth timber.

C. Where all other criteria are met, Contractor shall give preference to products that:

1. Are extracted, harvested, and/or manufactured closer to the location of the project.

2. Result in less construction waste.

2.02 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers: The use of brand name items is to establish a standard of quality only and shall not be construed as limiting competition or precluding the contractor from offering an equal item(s) from another source(s). Any brand name intended to be a restriction to a sole source shall be clearly identified as "No substitutions".

090255/MnANG-Replace Central Heat FMKM032995 01 6000 - 1

2.03 MAINTENANCE MATERIALS

A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.

B. Deliver and place in location as directed; obtain receipt prior to final payment.

PART 3 EXECUTION

3.01 TRANSPORTATION AND HANDLING

A. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.

B. Transport and handle products in accordance with manufacturer's instructions.

C. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.

D. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.

E. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.

F. Arrange for the return of packing materials, such as wood pallets, where economically feasible.

3.02 STORAGE AND PROTECTION

A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication.

B. Store and protect products in accordance with manufacturers' instructions.

C. Store with seals and labels intact and legible.

D. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.

E. For exterior storage of fabricated products, place on sloped supports above ground.

F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

G. Prevent contact with material that may cause corrosion, discoloration, or staining.

H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

01 6000 - 2 FMKM032995 090255/MnANG-Replace Central Heat

SECTION 01 7000

EXECUTION AND CLOSEOUT REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Examination, preparation, and general installation procedures.

B. Requirements for alterations work, including selective demolition, except removal, disposal, and/or remediation of hazardous materials and toxic substances.

C. Pre-installation meetings.

D. Cutting and patching.

E. Cleaning and protection.

F. Starting of systems and equipment.

G. Closeout procedures, except payment procedures.

1.02 RELATED REQUIREMENTS

A. Section 01 1000 - Summary: Limitations on working in existing building; continued occupancy;

work sequence; identification of salvaged and relocated materials.

B. Section 02 4116 - Building Demolition

C. Section 02 4119 - Minor Demolition for Remodeling

D. Section 01 3000 - Administrative Requirements: Submittals procedures.

E. Section 01 4000 - Quality Requirements: Testing and inspection procedures.

F. Section 01 7419 - Construction Waste Management and Disposal: Additional procedures for trash/waste removal, recycling, salvage, and reuse.

G. Section 01 7800 - Closeout Submittals: Project record documents, operation and maintenance data, warranties and bonds.

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:

1. Structural integrity of any element of Project.

2. Integrity of weather exposed or moisture resistant element.

3. Efficiency, maintenance, or safety of any operational element.

4. Visual qualities of sight exposed elements.

5. Work of Government or separate Contractor.

C. Project Record Documents: Accurately record actual locations of capped and active utilities.

1.04 PROJECT CONDITIONS

A. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.

B. FOD Control: Execute by methods to prevent Foreign Object Debris from roadways and aircraft apron.

C. Dust Control: Execute work by methods to minimize raising dust from construction operations.

090255/MnANG-Replace Central Heat FMKM032995 01 7000 - 1

Provide positive means to prevent air-borne dust from dispersing into atmosphere and over adjacent property.

D. Erosion and Sediment Control: Plan and execute work by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.

E. Noise Control: Provide methods, means, and facilities to minimize noise produced by construction operations.

F. Rodent Control: Provide methods, means, and facilities to prevent rodents from accessing or invading premises.

G. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. Comply with federal, state, and local regulations.

1.05 COORDINATION

A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.

B. Notify affected utility companies and comply with their requirements.

C. Verify that utility requirements and characteristics of new operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

D. Coordinate space requirements, supports, and installation of mechanical and electrical work that are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

E. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.

F. Coordinate completion and clean-up of work of separate sections.

G. After Government occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with Contract Documents, to minimize disruption of Government's activities.

PART 2 PRODUCTS

2.01 PATCHING MATERIALS

A. New Materials: As specified in product sections; match existing products and work for patching and extending work.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.

Start of work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.

01 7000 - 2 FMKM032995 090255/MnANG-Replace Central Heat

E. Verify that utility services are available, of the correct characteristics, and in the correct locations.

F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.

3.02 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.

3.03 PREINSTALLATION MEETINGS

A. When required in individual specification sections, convene a preinstallation meeting at the site prior to commencing work of the section.

B. Require attendance of parties directly affecting, or affected by, work of the specific section.

C. Notify Contracting Officer four days in advance of meeting date.

3.04 GENERAL INSTALLATION REQUIREMENTS

A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.

B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.

C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.

D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.

E. Make neat transitions between different surfaces, maintaining texture and appearance.

3.05 ALTERATIONS

A. Drawings showing existing construction and utilities are based on casual field observation and existing record documents only.

1. Verify that construction and utility arrangements are as shown.

2. Report discrepancies to Contracting Officer before disturbing existing installation.

3. Beginning of alterations work constitutes acceptance of existing conditions.

B. Remove existing work as indicated and as required to accomplish new work.

1. Remove items indicated on drawings.

2. Relocate items indicated on drawings.

3. Where new surface finishes are to be applied to existing work, perform removals, patch, and prepare existing surfaces as required to receive new finish; remove existing finish if necessary for successful application of new finish.

4. Where new surface finishes are not specified or indicated, patch holes and damaged surfaces to match adjacent finished surfaces as closely as possible.

C. Protect existing work to remain.

1. Prevent movement of structure; provide shoring and bracing if necessary.

2. Perform cutting to accomplish removals neatly and as specified for cutting new work.

3. Repair adjacent construction and finishes damaged during removal work.

090255/MnANG-Replace Central Heat FMKM032995 01 7000 - 3

D. Adapt existing work to fit new work: Make as neat and smooth transition as possible.

E. Patching: Where the existing surface is not indicated to be refinished, patch to match the surface finish that existed prior to cutting. Where the surface is indicated to be refinished, patch so that the substrate is ready for the new finish.

3.06 CUTTING AND PATCHING

A. Whenever possible, execute the work by methods that avoid cutting or patching.

B. See Alterations article above for additional requirements.

C. Perform whatever cutting and patching is necessary to:

1. Complete the work.

2. Fit products together to integrate with other work.

3. Provide openings for penetration of mechanical, electrical, and other services.

4. Match work that has been cut to adjacent work.

5. Repair areas adjacent to cuts to required condition.

6. Remove and replace defective and non-conforming work.

D. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition.

E. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior approval.

F. Restore work with new products in accordance with requirements of Contract Documents.

G. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.

H. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with fire rated material in accordance with Section 07 8400, to full thickness of the penetrated element.

I. Patching:

1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.

2. Match color, texture, and appearance.

3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work. If defects are due to condition of substrate, repair substrate prior to repairing finish.

3.07 PROGRESS CLEANING

A. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.

B. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

C. Collect and remove waste materials, debris, and trash/rubbish from site periodically and dispose off-site; do not burn or bury.