HAATS Q A.pdf
PDF 151 KB Posted
- Attached to
- HIGH ALTITUDE AVIATION TRAINING SITE (HAATS) Federal contract opportunity
- Solicitation number
- W912LC10R0009
About this file
Updated questions and answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT0006.pdf | ||
| HAATS Site Map - Sep 10.pdf | ||
| HAATS Q A.pdf | ||
| Access Instructions.pdf | ||
| QUESTIONS AND ANSWERS.doc | DOC document | |
| HAATS_Business Meeting 26 May 2010.pdf | ||
| HAATS Business Meeting_Sign In sheet 26May2010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAATS Q&A
Q1. Is it acceptable for the prime contractors proposing on this project to obtain the HAATS documents in the manner described in Questions and Answers 1 and 2 and then distribute the documents to subcontractors and suppliers for pricing proposals as long as we maintain a document control log and track the distribution of these documents. The documents can then be collected from unsuccessful proposers and destroyed at the end of the solicitation period.
A1. Yes this is acceptable
Q2. Can the prime contractors proposing on this project post these documents to an ftp site or ISquare
Foot (ISF) for distribution to the subcontractor community?
A2. This will be acceptable under the following conditions; you MUST have controlled means of access to the documents at all times.
Q3. Please confirm that Primavera P3 and/or P6 schedule formats are acceptable.
A3. Primavera P5 or P6 schedule formats are acceptable, P3 is not.
Q4. When submitting electronic schedule documents, are we required to submit the schedule in .pdf format or do we need to provide the native .prx files for electronic evaluation?
A4. Electronic schedules are to be submitted in .pdf format along with the native .prx files.
Q5. Can the 3D model that has been produced be distributed to the proposing teams in its native file format?
A5. Electronic schedules are to be submitted in .pdf format, along with the native .prx files.
Q6. Personnel: If the proposed key personnel are identified as having worked on at least three (3) of the projects provided in the Exhibit A Performance Relevancy Questionnaire’s; should we still provide an
Exhibit B form for each of these individuals or is it required only for key personnel having not worked on three (3) or more of the projects provided Exhibit A Performance Relevancy Questionnaire’s?
A6. The Exhibit B needs to be completed for personnel that has no previous experience demonstrated in Exhibit A. The overriding factor is to provide the government with the essential information on all personnel proposed for the project.
Q7. Subcontractors: Are Exhibit B forms required to be filled out and submitted for subcontractors in each scope of work for this project or is the intent of this form to be provided only if major subcontractors did not work on three (3) or more of the projects provided Exhibit A Performance
Relevancy Questionnaire’s?
A7. The Exhibit B needs to be completed for subcontractors that have no past performance demonstrated in Exhibit A. The overriding factor is to provide the government with the essential information on all subcontractors proposed for the project.
Q8. Subcontractors: Although our team will have a shortlist of two (2) or three (3) qualified best value subcontractors for each scope, all subcontractors may not be selected at the time of proposal submission on 20 October 2010 in an effort to ensure a competitive procurement through the government’s stipulated “Final Revised Proposal” and final negotiations. Is it acceptable to provide
Exhibit B forms for more than one potential subcontractor for each scope of work?
A8. The Exhibit B needs to be submitted for only the subcontractors that are intended to actually perform the work. This is necessary to allow the government to accurately evaluate the proposed team.
Q9. There are three wage scales referenced (building, heavy, highway). Please clarify which portions of the work fall under the specific wage scales to all bidders will be pricing each work item on equal rates.
A9. The three wage scales have been included because of the different types of work involved to complete this project. In reviewing the plans and specifications this will help you determine what part of the work falls under each category. We have also listed the website for you in section 0100 of the solicitation.
Q10. Would the gov't please make CAD files for the civil drawings available to the bidding contractors? This greatly streamlines the process for taking off the quantities for the site work.
A10. Plans and drawings can be accessed through www.fbo.gov only.
Q11. Since Andover Controls, Westover Corporation and APC Net Shelter are sole sourced for their items, can the gov't please provide a point of contact for those firms?
A11. The Westover/Andover contact is Josh Webelow at 303-429-3600.
The APC contact is 800-800-4272, press 3 for sales, then press 2 for contracting sales support.
Q12. In follow up to the "HAATS Q & A" posted 9/23/10, questions 3 and 4 were with regard to format and software applications for CPM scheduling. Software capability and functionality are critical.
It is unclear to us as to whether the answers apply to the RFP response, or to the project after award, or both.
A12. Questions asked may apply to both the RFP and Contract Award
Q13. Under 1.5.7, page 23, it states "("Read Only" files are acceptable)" and "Schedule can be in
Microsoft Project". Under Construction Schedule, it states "Any program may be used however, after award the schedule must be submitted to the Government in Microsoft Project unless agreed to otherwise by Contracting Officer.
A13. If you propose to submit a schedule in something other than Microsoft Project this must agreed to by the Contracting Officer prior to submission.
http://www.fbo.gov/
Q14. Is the Contracting Officer approving Primavera P5 or P6 as acceptable format, post award?
A14. See on www.fbo.gov posted Q3 & A3.
Q15. Is it sufficient to submit "read only" PDF electronic copies for the sake of the RFP response, understanding that after award the native.prx files are also required?
A15. PDF electronic files of the RFP response are acceptable.
http://www.fbo.gov/
File details come from the government source that posted it. Updated .