This document is a Questions and Answers (Q&A) file addressing clarifications to a federal solicitation for facility housekeeping and maintenance services at Camp Roberts in California. The acquisition is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with FAR clause 52.219-27 incorporated. The contract requires SDVOSB certification at time of offer, and RFO FAR clause 52.219-14 (Limitations on Subcontracting) applies to define self-performance requirements. The phase-in period begins immediately upon contract award and is included in CLIN 0001, with the period of performance starting September 1, 2026. Turnaround requirements for services are measured in business days, with operating hours of 0800 to 1600, Monday through Friday.
The Performance Work Statement (PWS) specifies daily housekeeping duties including room cleaning, restroom restocking, and facility maintenance across multiple buildings (BLDG 6004, 6108, 6109, 6428). Government-owned linen remains the contractor's financial responsibility if lost or damaged per FAR clause 252.237-7015. The Government furnishes consumables such as toilet paper, trash bags, and hand soap; the contractor cannot utilize Government equipment. A mandatory site visit to Camp Roberts was scheduled for August 18, 2026 at 10:00am PST (30 minutes duration) with the Contracting Officer Manuel Jimenez; all personnel require valid Government identification, driver's licenses, proof of insurance, and vehicle registration for access. The solicitation was closed as extended to accommodate the site visit, and cover pages, tables of contents, and acronym lists do not count against the 20-page limit for Volume I or 10-page limit for Volume II. RFO FAR clause 52.222-41 (Service Contract Labor Standards) applies with Wage Determination 2015-5643, Revision 26 for San Luis Obispo County, and no predecessor collective bargaining agreement exists.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question 1(a): Block 10 of the SF 1449 designates this acquisition as a 100% set-aside for Service-Disabled Veteran-Owned Small Business. The Contract Clauses section incorporates FAR 52.219-6, Notice of Total Small Business Set-Aside, and does not incorporate an SDVOSB set- -aside category applies and, if SD
10, p. 1; Contract Clauses, p. 32
Answer 1(a): This acquisition is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. RFO FAR Clause 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran- SDVOSB Program, forth in RFO FAR clause 52.219-27.
Question 1(b): If this acquisition is a Service-Disabled Veteran-Owned Small Business set-proposes award, and identify the self-performance requirement applicable to each arrangement.
Answer 1(b): The requirement will be awarded in accordance with the terms and conditions as set form in this solicitation, as amended. RFO FAR Clause 52.219-14, Limitations on Subcontracting has been added to the solicitation.
Question 2:
and 31b, p. 1\
Answer 2:
A Contracting O Representative will be appointed after contract award.
Question 3: PWS 1.4.15 requires personnel on board during a 30-day phase-in period, and no phase- -in occurs prior to the 1 September 2026 period of performance start date, and whether it is separately compensated. CLIN 0001, p. 3; PWS 1.4.15
Answer 3: The phase in period will begin immediately upon contract award and is included in CLIN 0001.
Question 4: FAR 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards -
Determination revisions during option periods? CLINs 1001-4001, pp. 3-6; Contract Clauses, pp. 32-33
Answer 4: Please see RFO FAR clause 52.222-41, Service Contract labor standards included in the solicitation.
Question 5: Please identify the Limitations on Subcontracting clause applicable to this acquisition and the percentage of the amount paid for services the prime must self-perform. Neither FAR 52.219-14 nor FAR 52.219-27 appears in the clause list. Please also may be counted as a similarly situated entity. Contract Clauses, p. 32; 13 CFR 125.6
Answer 5: Please see the answer 1b.
Question 6:
number, revision, and county. Wage Determination 2015-5643, Revision 26, for San Luis
Obispo Counties. FAR 52.222-41, p. 33; WD 2015-5643 Rev. 26
Answer 6: Wage determination attached to the solicitation is correct.
Question 7:
41, p. 33
Answer 7: There is collective bargaining agreement.
Question 8: FAR 52.223-23, Sustainable Products, is incorporated by reference. Paragraph statement of work or elsewhere in the contract. Please identify the sustainable product categories and purchasing programs applicable to this requirement. FAR 52.223-23, p. 34
Answer 8: RFO FAR clause 52.223-23 was erroneously added to the solicitation and has been removed.
Question 9:
- -hour turnaround requirements are measured in calendar days or business days. PWS 1.4.1, 5.1, 5.3.1.
Answer 9: Turnaround requirements are measured in business days..
Question 10: -
Answer 10: There will be one site visit to Camp Roberts Facilities.
Tuesday am PST, site visit should take 30 mins. Any questions
2026, 4:00pm PST. In order to schedule a visit please email , with the following:
Full Names
Name of Company
, page 1 vehicles, to gain access to Camp Roberts.
Question 11:
contractor personnel requiring installation access. PWS 1.4.5, 1.4.5.2
Answer 11: and of base access is the same day as long as contractor personnel present the necessary paperwork.
Question 12: -171 assessment must be a medium- or high-under the DoD Assessm
Provision 252.204-2019, and that neither 252.204-7019 nor 252.204-7020 appears in the DFARS clause list. PWS 1.4.5.6; DFARS Clauses, pp. 33-34
Answer 12: Disregard. Section PWS 1.4.5.6- PWS has been reserved.
Question13:
DFARS 252.204-7012
Answer 13: Disregard. section PWS 1.4.5.6- PWS has been reserved.
Question 14:
Answer 14:
requirement. Please see PWS 4.1.
Question 15: -and identify the valuation basis to be applied. PWS 3.0, 5.4
Answer 15: government-owned. Please see RFO FAR clause 252.237-7015 Loss or Damage
Question 16:
Answer 16: of all the classes end dates, if there is a change in schedule it shall be provided accordingly. The contractor to come in within one day of classes ending. 15 rooms should be done in less than 30 mins for all the cleaning.
Question17:
whether the contractor is responsible for furnishing restroom consumables, including toilet tissue, hand soap, and paper towels. PWS 5.3.1.2
Answer 17: The furnish consumables such as toilet paper, trash bags, and hand soap.
Question 18:
only. Please provide square footage for the laundry room, front foyer entry, and upper and
Answer 18:
staircases, 60sq ft each total 120 sq ft. hallway upstairs is 494 sq ft and runs across the length of the building
Question 19: Is the incumbent contractor, contract number, and current annual contract
Answer 19: This requirement is not currently being performed by a contractor.
Question 20:
count against the 20-page limit for Volume I and the 10-page limit for Volume II. Addendum to FAR 52.212-1, pp. 49-50
Answer 20:
against page limits.